RCM Refrigerant Module

Similar documents
R Series Cooling Modules

R Series Cooling Modules

R Series Cooling Manual

Parts List * October 2013

LV Installation Manual

LV Installation Manual

JH Series Installation

Service Step by Step Trouble-Shooting Check-List

MYSTICOOL Max Valve System with Xstream and A.R.M.E.D. Technology Service & Installation Instructions Page 1

INSTALLATION INSTRUCTIONS

G Series. G Series Air Coils Installation ti Manual ENCASED/UNCASED AIR COILS. Geothermal/Water Source Heat Pumps R-410A Refrigerant 2-5 Ton

XSTREAM Valve System With A.R.M.E.D. Technology Service & Installation Instructions Page 1

Installation, Operation, and Maintenance Information

Mortex INSTALLATION INSTRUCTIONS AIR CONDITIONING & HEAT PUMP INDOOR COILS

Owner s Manual Refrigerated Compressed Air Dryers Models F-200, 250, 300 & F350

Condensing Unit Installation and Operating Instructions

Condensing Unit Installation and Operating Instructions

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS

Cased Aluminum Coils "Dedicated Upflow / Downflow" Convertible to horizontal with separately purchased kit

INSTALLATION INSTRUCTIONS

Installation Manual for. Series HWM and Non-ETI HYDRONIC WATER MODULE with SC and SD COMPRESSOR UNITS and R-410 REFRIGERANT

PL Series Premier Indoor Plenum Coils

Installation Manual for CCS Cased Coils with SC, SD, SW Compressor Units and R-410A Refrigerant

Owner s Manual Refrigerated Compressed Air Dryers Model F-100

Installation Manual for ETI AVS Series and NON-ETI Air Handlers with SC or SD Compressor Units and R-410A Refrigerant

EarthLinked SW Series Compressor Unit R-410A Quik-Start Instructions

DLCLRA. INSTALLATION INSTRUCTIONS Outdoor Unit Single Zone Ductless System Sizes 36 to 58 TABLE OF CONTENTS

INSTALLATION INSTRUCTIONS

EarthLinked CC Series Compressor Unit R-410A Quik-Start Instructions

Installation Instructions

Featuring: Small Duct High Velocity Heating, Cooling and Indoor Air Quality Systems

INSTALLATION INSTRUCTIONS TXV Horizontal Slab Coils WLSH

CS/CD/CP AIR COOLED CONDENSING UNITS (P/N E207120C R2)

Evaporator Coil. Installation Instructions GENERAL

Installation Instructions

Installation Instructions

WineZone Ceiling Mount Ductless Split 15

Installation Instructions

Installation Instructions

GAM SERIES INSTALLATION & OPERATING INSTRUCTIONS MULTI-POSITION AIR HANDLER (ELECTRIC HEAT)

2/4TXCC037BC3HCA 2/4TXCB042BC3HCA 4TXCC044BC3HCA 2/4TXCC043BC3HCA 2/4TXCB048BC3HCA

Instructors: Contact information. Don Reynolds Doug McGee Factory Tech Support

Owner s Manual Refrigerated Compressed Air Dryer Model F-50

Mini Duct Heating and Air Conditioning Indoor Air Quality Systems. July Featuring: Also Including: Lo-Velocity Systems JH Fancoils

Installation Manual BCS2000/3000

Sporlan Valve Division Parker Hannifan/CIC Group

R.A.S.E.R.S System. Installation Guide

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

Owner s Manual Refrigerated Compressed Air Dryers Models F-3528, F-3529, F-3530, F-3531 & F-3532

Evaporator Coil. Installation Instructions GENERAL

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS MODELS: HF-07 FEATURES B-0703

COOLING / HEATING COILS

CROWN. Boiler Co. Santa-Fe Series. Hydronic Air Handlers INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Installation Instructions

EarthLinked SC Series Compressor Unit R-407C Quik-Start Instructions

INSTALLATION MANUAL G*FD SERIES FULL-CASED A COILS UPFLOW/COUNTERFLOW/HORIZONTAL COOLING/HEAT PUMP

Operation & Maintenance Manual

INSTALLATION AND OPERATING MANUAL

KR Series Air Defrost Unit Coolers Operating and Installation Manual

Daikin Direct Expansion (DX) Cooling Coils

Installation Manual BCS 1000/1500

INSTALLATION GUIDE. 4AC 14* ASA1 SERIES R-410a CONDENSING UNITS R-410A ATTENTION, INSTALLER! ATTENTION, USER!

INSTALLATION AND OPERATING MANUAL

EarthLinked SCW Series Compressor Unit R-410A Quik-Start Instructions

AVS Air Handlers Installation Manual for Classic SC, SD, and SDH

VariCool VAV Engineering Guide

EVAPORATOR COILS Installation Manual CCG, VCG, MCG M Series Coils

RPI Industries, Inc.

RPI Industries, Inc.

Calhoon MEBA Engineering School. Study Guide for Proficiency Testing Refrigeration

KR Electrical Defrost Unit Coolers (PN E108318_E)

INSTALLATION MANUAL UN-CASED A COILS UPFLOW FOR COOLING/HEAT PUMPS FLEX COILS FOR FIELD INSTALLED TXV MODELS: UC LIST OF SECTIONS LIST OF FIGURES

ThermoSaver TM Hot Gas Defrost System

Cased Aluminum "Convertible" Coils 4TXCB003CC3HC** 4TXCB004CC3HC** 4TXCC005CC3HC** 4TXCC006CC3HC**

INSTALLATION INSTRUCTIONS

AIR CONDITIONING. Carrier Corporation 2002 Cat. No

Series 6, Vertical Floor-Mount Units

DLCSRA. INSTALLATION INSTRUCTIONS Outdoor Unit Ductless Split System Sizes 09 to 36 TABLE OF CONTENTS

Installation Instructions

INSTALLATION INSTRUCTIONS TXV Coils for Manufactured Housing EMA

INSTALLATION MANUAL LIST OF SECTIONS LIST OF FIGURES LIST OF TABLES SECTION I: SAFETY

INSTALLATION MANUAL G*FD SERIES FULL-CASED A COILS UPFLOW/COUNTERFLOW/HORIZONTAL COOLING/HEAT PUMP MODELS: TABLE OF CONTENTS LIST OF FIGURES

Installation and Testing of Inverted Bucket Steam Traps Manual

EarthLinked HC Series Compressor Unit R-410A Quik-Start Instructions

"SWVP - SWHP" COMMERCIAL WATER SOURCE HEAT PUMPS & AIR CONDITIONERS

T-Series Air Conditioner T53 Model

TECHNICAL GUIDE GENERAL SPECIFICATIONS COMMERCIAL SPLIT-SYSTEM COOLING UNITS FOUR PIPE SYSTEM OUTDOOR UNIT: INDOOR UNIT:

12 In Row. Installation Manual. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

RHGN-H: COMMERCIAL AIR HANDLER WITH VARIABLE FREQUENCY DRIVE (VFD) NOMINAL 10 TONS R-410A REFRIGERANT 2-STAGE AIR-FLOW

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

FALCON Rooftop Units ACPSE 50/60Hz Cooling Capacity : 36 to 1388 MBH (11 to 407 kw) Heating Capacity : 40 to 1298 MBH (12 to 380 kw)

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH

INSTALLER'S GUIDE. ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES

INSTALLATION INSTRUCTIONS

INSTALLATION MANUAL R-22/R-407C OUTDOOR SPLIT-SYSTEM AIR CONDITIONING MODELS: GCGA SERIES 1.5 TO 6.3 TONS 1 & 3 PHASE LIST OF SECTIONS LIST OF FIGURES

Installation, Start-Up and Service Instructions

Installation Instructions

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS

DESIGN STANDARDS SECTION 15600

Transcription:

Small Duct High Velocity Heating, Cooling and Home Comfort Systems RCM Refrigerant Module Installation Manual Manufactured By Module-RCM-Refrigerant-Module-Installation-0666

Refrigerant Modules (RCM) Fig. 02 - Mounting brackets RCM Installation (2/8) The cooling coil comes as a module and must be installed in the vertical position on the return air side of the fan coil. For return air cut out sizes, refer to Table Return air cutouts. Refrigerant modules come with two L mounting brackets, thermal expansion valve, site glass, two access ports, and an external freeze stat. Fig. 0 shows an installed coil assembly and how each piece is connected. Fig. 0 - Coil Assembly 2 Evaporator Coil 0 9 2 6 8 5 4 4 Thermal expansion valve (TX) When brazing the TX valve to the copper liquid line, a brazing rod that can bound dissimilar metals should be used. Always wet rag or use heat dissipating paste on the TX body to reduce the chance of overheating the valve. Thermal expansion sensing bulb The remote sensing bulb for the thermal expansion valve should be located on a clean, horizontal section of the suction line. It should be mounted on the top half of the pipe in the 2 o clock or 0 o clock position (Fig. 0 and Fig. 0 reference 4). ) Liquid line 2) Site glass ) High side access port 4) Adjustment stem cap 5) Superheat adjustment stem 6) Thermal expansion valve (TX) ) Refrigerant distributor 8) Distributor tubes 9) External equalizer line 0) Suction line ) Anti-ice control 2) Low side access port ) TX capillary tube 4) TX sensing bulb Fig. 0 - TX sensing bulb R series modules can be used on R-40A condensers; if R-40A refrigerant components are used. All Energy Saving Products R series modules are shipped with R-40A refrigerant components. R-22 is a specialty order and must be stated at time of purchase. Mounting Brackets Mounting the cooling coil to the fan coil can be done with the L brackets supplied (Fig. 02), ensure that no screws puncture the drain pan or coil. Appendix B has the dimensions of the fan coil units and cooling modules. Site Glass and Access Ports When refrigerant lines are connected to the fan coil, a site glass needs to be installed (Fig. 0 reference 2), as well as both high and low side access ports (Fig. 0 reference & 2). The site glass should be installed close enough to the coil to be seen while charging the system. The site glass and access ports are required for system startup and for future trouble shooting or service. - RCM Coil Installation (2/8) -2-

External Equalizer Line The external equalizer line should be installed on the suction line, immediately after the remote sensing bulb (Fig. 0 reference 9). When the pressure drop through the evaporator is of any consequence: F in the air conditioning range 2 F in the commercial temperature range F in the low temperature range It will hold the thermo expansion valve in a relatively restricted position and reduce the system capacity, unless a thermo expansion valve with an external equalizer is used. Freeze Stat Install the anti-ice control (Freeze-Stat) above the center line of the suction line and connect the wires to the Freeze Stat terminals on the fan coil circuit board (Fig. 0 and Fig. 0 reference ). Ensure that the TX bulb and the anti-ice control are fastened securely and are well insulated. Do not use a self-tightening clamp on the anti-ice control, as the control may be damaged by excessive tightening. RCM Installation (/8) Some building codes call for a secondary drain pan under the entire unit (Fig. 05). Any installation that has the potential of property damage due to condensate must have a secondary drain pan installed. If the unit is installed in a high heat and/or high humidity location, extra insulation around the unit casing may be required. This will prevent excessive condensate from forming on the outer surface of the casing. Fig. 05 - Secondary drain pan Refrigerant Bypass All RCM coils come with check valve ready TX valves. Third party TX valves may require a bypass check valve. P-Trap Fig. 04 - Bypass check valve Secondary drain pan P - Trap The condensate drain must have a Vented P-trap installed (Fig. 05), and run at a slope of ¼ per foot in the direction of the drain. All RCM/WCM modules come with a ¾ primary outlet and a ¾ secondary outlet. When installing the P-trap it must be installed on the primary outlet. A vent must be installed between the coil and the P-trap, keeping the vent as close to the coil as possible. Secondary Drain Pan Piping the RCM Only refrigerant grade pipe and fittings are to be used with Hi- Velocity Systems. Plumbing fittings may contain wax or other contaminants which are detrimental to the proper operation of the system. Insulate the suction line with /8 insulation such as Armaflex. In high heat areas, /2 insulation may be needed. If the lines are run in an area where temperatures could exceed 20 F or runs longer than 50, then the liquid line may need to be insulated as well. Support thepipe every 5 feet, or whatever local code states. Run the pipes in the most direct route possible, taking into account structural integrity and building details. If the evaporator is located above the condenser, slope any horizontal runs toward the condenser. If the condenser is located above the evaporator, a P-trap must be installed at the bottom of the vertical riser. For long vertical risers, additional P-traps must be installed for every twenty feet. For lines running over 50, a suction line accumulator must be installed. Lines running over 00 are not recommended. - RCM Coil Installation (/8) --

Pipe Sizing Tables 0 and 02 contain line sizing information for the liquid and suction lines. Table 0 Liquid Line sizes Tons Distance 2 2 4 5 25 26 50 5 6 5 5 6 00 5 6 5 6 Table 02 Suction Line sizes Tons Distance 2 2 4 5 25 5 5 RCM/RM Installation (4/8) Once the system has been determined clean and ready for charging, refrigerant can be added to the system. The service valves on the condenser must be open at this point. Never leave the system unattended when charging. With the system running, slowly add refrigerant to the system until the site glass is clear of all bubbles. If the site glass is clear of bubbles and the super heat is off, the TX valve will need to be adjusted (See Super Heat for temperature settings). When adjusting the TX valve, never turn it more than a quarter turn at a time. Always allow 5 minutes for the system to settle down before making another TX adjustment. When adjusting the TX valve, a clockwise turn will close the valve, allowing less refrigerant through. With less refrigerant flowing through the coil, less cooling will be done, which will bring up the suction line temperature. Super Heat Super heat on Hi-Velocity systems with the RCM series should normally be around 8ºF -2ºF. The suction line should be set at approximately 42ºF. 26 50 5 5 5 6 00 The sizes given in the above tables are only for general reference, if the condenser manufacture requires a different size than specified in Table 0 and Table 02, their sizing shall be used whenever a discrepancy occurs. Outdoor Unit Installation Locate the outdoor unit in a suitable location, as close as possible to the fan coil. Maintain the clearances recommended by the manufacturers of the outdoor unit, to ensure proper airflow. The outdoor unit must be installed level, in a properly supported location. A liquid line filter/drier is recommended to be installed. Wiring Outdoor Unit Make all connections to the outdoor unit with rain tight conduit and fittings. Most building codes require a rain tight disconnect switch at the outdoor unit as well (always check local codes). Run the proper size copper wires to the unit, and connect as per the manufacturer s recommendations. Ensure that the unit is setup for a TX system. If not, a hard start kit may be required. Evacuating After the piping is installed and all components have been brazed together, a vacuum pump must be used to evacuate the system from both the low and high side to 500 microns. Add pressure to the system to bring the pressure above zero psig. After allowing the refrigerant to absorb moisture, repeat the above procedure. Evacuate the system to 500 microns on the second evacuation, and ensure that the system holds at the vacuum pressure. If not, check for leaks and evacuate again. If the vacuum holds, add refrigerant to raise the pressure to 2 psig. At this point open service valves on pre-charged condensing units, or add refrigerant to the system. The use of an electronic leak detector is recommended, as it is more sensitive to small leaks under the low pressures. Charging Refrigerant Pre-Piped Module (RPM-E) An alternative to the RCM, our RPM-E Series comes pre-piped with the coil assembly; the coil assembly is shown in Fig. 0. With the RPM, the Liquid and Suction line are the only brazing that need to be done at the fan coil. For charging and brazing, remove the front access panel of the RPM (Fig. 06). With the access panel removed the coil assembly will be accessible. Wet rag the liquid and suction line (or use a heat dissipating paste) to ensure no overheating occurs to the pre-piped coil assembly. Install the RPM with the same procedures used per RCM, omitting the coil assembly as it has already been pre-piped. Fig. 06 - Remove front access panel Carry Over Screen All RCM refrigerant cooling modules come supplied with a nylon mesh Carry-Over Screen and six stand-off plugs. The Hi-Velocity units have a very high humidity removal rate, it is possible for the airflow across the coil to grab moisture off the fins and carry it into the unit. With the carry-over screen in place it reduces the chance of moisture being carried into the unit. Ensure that the nylon mesh is placed on the exiting air side of the cooling module (Fig. 0). - RCM Coil Installation (4/8) -4-

Installation Instructions The Carry Over Screen is placed on fan coil side of the cooling module (Fig. 0). Fig. 0 - Screen on the fan coil side On the fan coil side of the cooling module, attach three plastic stand-offs down each side of the cooling coil (Fig. 08). RCM/RM Installation (5/8) Return Air When sizing the return air ducts, keep in mind that if they are too small they can create noise, but if they are too large, the fan coil cannot build up proper pressure. Table 0 has recommended return air sizes for round and rectangular ducts. A variance of plus/minus 20% is allowable for sizing return ducts that connect to the Hi-Velocity Systems unit. It is recommended to install a grill that is 0-20% larger than specifications require, this will ensure that there is no air velocity noise at the grill. Where allowed by local codes, a single return air grill may be used. When using flexible duct for return air, use one duct size larger due to the higher friction loss. Return Cutout Fig. 0 shows the different locations the return air can be installed on Hi-Velocity Systems. Table 0 contains the dimensions needed for the return. All fan coils are shipped with a Return Air Cutout template; the template will guarantee maximum airflow across the coil. Fig. 08 - Attach stand-off plugs Table 0 Return air cutouts Model A B C D 50/5/52 H/BU 0/ H/BU 00/0 H/BU 0 5 22 4 5 5 Fig. 0 - Return air cutout sizing Legend RA - Return air Place the nylon wire mesh over the stand-offs, ensuring the screen touches the drain pan. Then snap the screen over the plastic stand-offs (Fig. 09). Fig. 09 - Attach screen to coil Note: DO NOT cut past the center plate or electrical box (Dim A & B). 00 and 40 Units CANNOT use return air C (RA-C). This drawing is NOT to scale. - RCM Coil Installation (5/8) -5-

RCM/RM Installation (6/8) Cooling Start-Up. Pipe system with Site Glass and Access Ports at the evaporator. 2. Leak check and evacuate system.. Check system operation with power to the outdoor unit off or use the service disconnect. 4. Connect gauges and open outdoor unit service valves. 5. Turn on power to the outdoor unit and start system. Start N Bubbles In Site Glass Remove Charge Until Bubbles Are Visible Y Add Charge Until Site Glass Is Clear Check Suction Line Temperature Temperature Over: (And/Or Hunting) RCM Series 44 F +/- F Temperature at: RCM Series 42 F +/- F Temperature below: RCM Series 42 F +/- F Open TX Valve ¼ turn and WAIT FIVE minutes Close TX Valve ¼ turn and WAIT FIVE minutes Confirm Site Glass Is Still Clear System Start-Up Complete Y Line Temperature is Stable Within a +/- 2 F swing N Perform System Trouble Shooting Check Return to Start Rectify Problem - RCM Coil Installation (6/8) -6-

TX Specifications RCM/RM Installation (/8) Hi-Velocity Specifications 50 (2) 52 0/ 00/0 TX Cooling MBH () 8-24 8-24 0-6 42-60 MBH TX Thousand British Thermal Units per Hour Thermal Expansion. Smaller condensers may be matched to the fan coil when needed (match TXV to condenser size). 2. Minimum number of full outlets per ton of cooling needed. R Series Sizing Item Length Width Height Refrigerant Modules B C A D E RCM-50 4 0 8 RCM-0 9 0 8 RCM-00 25 0 8 - RCM Coil Installation (/8) --

WARRANTY Three year limited warranty. The VFD Motor, WEG Controller (HE-Z/HE-B/LV-Z Units), PSB Circuit Board (HE-Z/LV-Z Units) HEB Circuit Board (HE-B Units) and the VFD Motor, EPC Controller, EPC Circuit Board and PWM Control (HE Units) are free from defects in workmanship for three years from date of purchase. Two year limited warranty. The Electric Strip Heater is free from defects in workmanship for two years from date of purchase. One year limited warranty. The Heating Coil (Heat Exchanger), Air Conditioning Coil, Chilled Water Coil, Blower and PSC motor and electrical components (HV/LV/JH Units) are free from defects in workmanship for one year from date of purchase. This warranty applies strictly to the first purchaser and only to the fan coil unit. It does not include connections, attachments and other products or materials furnished by the installer. This warranty excludes any damages caused by changes, relocation to, or installation in a new site. This warranty does not cover any defects caused by failure to follow the installation and operating instructions furnished with the fan coil. This warranty does not cover defects caused by failing to adhere to local building codes and following good industry standards. Failure to correctly install the fan coil, or material related to the unit, may result in improper system performance and/or damages and will void this warranty. Using the fan coil as a source of temporary heating/cooling during construction, will void this warranty. Terms and Conditions Any repair performed under warranty must be approved by Energy Saving Products Ltd. for this warranty to be valid. The manufacturer is not liable for any other damages, personal injury, or any other losses of any nature. The liability of the manufacturer is limited to and shall not exceed the cost of pre-approved replacement parts and shall not include transportation to and from the factory, and field labour. Inoperative parts must be returned with serial number, purchase date, and a detailed description of the entire problem with an ESP RMA Form. This warranty replaces all other warranties expressed or implied. Disclaimer Energy Saving Products Ltd. reserves the right to discontinue, make changes to, and add improvements upon its products at any time without public notice or obligation. The descriptions and specifications contained in this manual were in effect at printing. Some illustrations may not be applicable to your unit.