ICE-O-MATIC ICE SERIES CUBERS

Similar documents
SERVICE MANUAL ICEU 125 ICEU 175. Electronic cubers with storage. Version: 2010/2

Installation and User's Manual for Cuber Model CU0515

Table of Contents SPECIFICATIONS Page 2. FOR THE INSTALLER Page 3. FOR THE PLUMBER Page 4. INSTALLATION Page 5. INITIAL START UP Page 6

SERVICE PARTS MANUAL. The ICE Series Undercounter Cubers MODEL-ICEU300, ICEU305

Scotsman Technical Training. CU50 Cube Ice Machine

Hoshizaki America, Inc.

SERVICE PARTS MANUAL ICE SERIES CUBERS MODEL-ICE0250, ICE0400, ICE0500, ICE0606

MXG 328 MXG 428 MXG 438 MXG 638 MXG 938

SERVICE PARTS MANUAL ICE SERIES CUBERS MODEL-ICE0250, ICE0400, ICE0500, ICE0606 Includes 50Hz. Units

SERVICE AND INSTALLATION MANUAL ICE UNDERCOUNTER SERIES CUBERS MODEL-ICEU070A

Peachtree City is home office for America located about 30 miles south of the Atlanta airport this is were all KM cubers as well as Flakers are built.

Technical Training Prodigy Undercounter Cubers. Models CU1526, CU2026 and CU3030

Condensing Unit Installation and Operating Instructions

NO. F ISSUED: JUN. 15, 2009 REVISED: HOSHIZAKI MODULAR CRESCENT CUBER KMD-201AA KMD-201AWA MODEL SERVICE MANUAL

CMS1402 SERVICE PARTS

KM-900MAH KM-900MWH KM-900MRH KM-900MRH3

Page 1. Page 1 SERVICE MANUAL MC 1210 R 404 A VERSION. Electronic modular cubers

ICEU 36 SPARE PARTS LIST REV. 07/2016

Hoshizaki America, Inc.

Automatic Ice maker. Service manual MIM250

SERVICE PARTS MANUAL ICE SERIES CUBERS MODEL-ICE0806, ICE1006 Includes 50Hz. and 3 Phase Units

Parts List. Modular Crescent Cuber. Models KM-515MAJ, MWJ, MRJ. hoshizakiamerica.com

IMPORTANT. HOSHIZAKI provides this manual primarily to assist qualified service technicians in the service and maintenance of the icemaker.

Hoshizaki America, Inc.

NO. F ISSUED: JUN. 18, 2008 REVISED: JUN. 17, 2011 HOSHIZAKI SELF-CONTAINED CRESCENT CUBER KM-100A KM-125A MODEL SERVICE MANUAL

Hoshizaki America, Inc.

MODULAR CRESCENT CUBER

Page 1. Page 1 SERVICE MANUAL MC 1210 R 404 A VERSION. Electronic modular cubers

Parts List. Modular Crescent Cuber. Models KM-901MAJ KM-901MWJ KM-901MRJ/3. hoshizakiamerica.com

Parts List. Modular Crescent Cuber. Models KM-340MAJ, MWJ. hoshizakiamerica.com

KM-61BAH KM-101BAH KM-151BAH

KML-600MAH KML-600MWH KML-600MRH

KM-630MAH KM-630MWH KM-630MRH

ICE MAKER Model 50. _. :a:; :& : $ys;*g :m.-,. ::,~~~;,~-,s,~..-:o-,~,-n, c_ Ipi.,r--.**i;p *... +~..?/ f,.

Hoshizaki America, Inc.

Prodigy Eclipse Cuber Technical Training

SELF-CONTAINED CRESCENT CUBER

Condensing Unit Installation and Operating Instructions

NU Range (Self Contained Ice machines)

Technical Review. Remote Condenser Cuber. Enhanced Refrigeration and Water Systems. CM 3 Technology. of a. with. using. models included are:

SEA FROST SHORE ASSIST SA-1 R-12 THIS MANUAL IS SUPPLEMENTAL TO THE SEA FROST R-12 ENGINE DRIVE MANUAL INSTALLATION INSTRUCTIONS

Reliability is a beautiful thing TM MODULAR CRESCENT CUBER KM-500MAH KM-500MWH KM-500MRH SERVICE MANUAL

Prodigy Plus - D Series Cuber Technical Review

EC S 040 A. Installation Instructions 1-1. General Information. Model Numbers. Model Numbers Identification. This manual covers the following models:

Norcold Repair Guide for Ice Maker

ICE0320, ICE0520, ICE0726, ICE0926

CM 3 Control System Update. Prodigy Cuber. Technical Review

Hoshizaki America, Inc.

3. OPERATING INSTRUCTIONS & INSTALLATION

Parts List. Stackable Crescent Cuber. Models KM-1601SAJ/3 KM-1601SWJ/3 KM-1601SRJ/3. hoshizakiamerica.com

INSTALLATION MANUAL. Series 322 Ice Cube Machine SPECIFICATIONS UNPACKING. Series 322 Ice Cube Machine Installation Instructions

Hoshizaki America, Inc.

Eclipse Technical Training CME686 CME810 CP686 CP886 CP1086

Hoshizaki America, Inc.

For more Parts Information:

Hoshizaki America, Inc.

Hoshizaki America, Inc.

Hoshizaki America, Inc.

SCCG30 & SCCP30 Service Manual Introduction:

SELF-CONTAINED FLAKER

Hoshizaki America, Inc.

Automatic Ice Maker. Service Manual VT ICEMAKER 15

CME256, 506, 656, 806: AutoIQ Cubers

SCCG30 & SCCP30 Service Parts

ICEU 36 ICEU 46 ICEU 56 ICEU 66 ICEU 86 ICEU 106 ICEU 126 ICEU 146 ICEU 186 ICEU 206

NO. 15FD-742 ISSUED: AUG. 10, 2007 REVISED: SEP. 30, 2013 HOSHIZAKI SELF-CONTAINED CRESCENT CUBER KM-30A KM-35A KM-50A KM-75A MODEL SERVICE MANUAL

SECTION 8 AIR SOURCE HEAT PUMPS UNIT 43 AIR SOURCE HEAT PUMPS

Parts List. Modular Crescent Cuber. Models KMD-460MAH, MWH KMD-530MAH, MWH, MRH. hoshizakiamerica.com

Table of Contents. Specifications... page 2. Installation... page 3. Customizing... page 4. Reversing door swing... page 5

(PD[ $LU 'U\HU 5 ( ) 5, * ( 5 $ 7 ( ' 7 < 3 ( & ( 6 6 ( ' $, 5 ' 5 < ( 5 6 ('5&) ದ ('5&) Instructions Manual

Hoshizaki America, Inc.

Hoshizaki America, Inc.

C0322 and C0522 Service Parts

Hoshizaki America, Inc.

Parts List. Modular Crescent Cuber. Models KM-1100MAJ, MWJ, MRJ. hoshizakiamerica.com

Hoshizaki America, Inc.

Hoshizaki America, Inc.

Instruction Manual. Stackable Crescent Cuber Models KMH-2100SWJ3, SRJ/3. hoshizakiamerica.com

BASIC HEAT PUMP THEORY By: Lloyd A. Mullen By: Lloyd G. Williams Service Department, York Division, Borg-Warner Corporation

HOSHIZAKI MODULAR CRESCENT CUBER MODELS KM-280MAH KM-280MWH INSTRUCTION MANUAL

Liebert CSU3000 Chiller

Parts List. Stackable Crescent Cuber. Models KM-1900SAJ/3 KM-1900SWJ/3 KM-1900SRJ/3. hoshizakiamerica.com

an ISO 9001:2008 Registered Company GOLL ST. - SAN ANTONIO, TX ph fax MINI SPACE SAVER HEAT /COOL

CU1526, CU2026, CU3030 Service Parts

SAVE THESE INSTRUCTIONS HOUSEHOLD USE ONLY

SERVICE PARTS MANUAL MODEL-ICE1405, ICE1406 and ICE1407 Version 3 Includes 50Hz.and 3 phase Units

CME1202 & CME1402 INTRODUCTION. Table of Contents. This manual was printed on recycled paper.

Polar Air Dryer. Instructions Manual PDRCF PDRCF R E F R I G E R A T E D T Y P E C O M P R E S S E D A I R D R Y E R S

SERVICE PARTS MANUAL MODEL-ICE1806 and ICE1807 Version 3 MODEL-ICE2106 and ICE2107 Version 3

Parts List. Low-Profile Modular Crescent Cuber. Models KML-325MAJ KML-325MWJ. hoshizakiamerica.com

SERVICE PARTS MANUAL MODELS-ICE1806 and ICE1807 Version 4-5 MODELS-ICE2106 and ICE2107 Version 4-5 Includes 3 Phase Units

Hoshizaki America, Inc.

Installation Manual BCS2000/3000

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s)

Service Manual. F132, 202 & 302 Modular Ice Cubers (Including Bin Information) (Issued August 2011) ISO ISO 9001

KM-1600MRF KM-1600MRF3

Installation Manual BCS 1000/1500

CABINET PARTS. For Models: KBLC36FMS00 (Stainless Steel) 9 05 Litho In U.S.A. (kdj) Part No " BOTTOM MOUNT BUILT IN REFRIGERATOR

CABINET PARTS For Model: KBLC36FMS02 (Stainless Steel)

MCM1462 INTRODUCTION. Table of Contents

Transcription:

ICE SERIES CUBERS TECHNICAL SERVICE TRAINING Welcome to another technical service presentation. This one will cover the ICE-O-MATIC Series Ice Cube Machines models ICEU 45, 65 and 85.

TOPICS On the next slides are shown the following steps by steps procedures: UNPACKING INSTALLATION START UP and OPERATIONAL CHECKS OPERATING PRINCIPLES and COMPONENTS MAINTENANCE SERVICE ANALYSIS

TOPICS On the next slides are shown the following steps by steps procedures: UNPACKING INSTALLATION START UP and OPERATIONAL CHECKS OPERATING PRINCIPLES and COMPONENTS MAINTENANCE SERVICE ANALYSIS

TOPICS On the next slides are shown the following steps by steps procedures: UNPACKING INSTALLATION START UP and OPERATIONAL CHECKS OPERATING PRINCIPLES and COMPONENTS MAINTENANCE SERVICE ANALYSIS

TOPICS On the next slides are shown the following steps by steps procedures: UNPACKING INSTALLATION START UP and OPERATIONAL CHECKS OPERATING PRINCIPLES and COMPONENTS MAINTENANCE SERVICE ANALYSIS

TOPICS On the next slides are shown the following steps by steps procedures: UNPACKING INSTALLATION START UP and OPERATIONAL CHECKS OPERATING PRINCIPLES and COMPONENTS MAINTENANCE SERVICE ANALYSIS

TOPICS On the next slides are shown the following steps by steps procedures: UNPACKING INSTALLATION START UP and OPERATIONAL CHECKS OPERATING PRINCIPLES and COMPONENTS MAINTENANCE SERVICE ANALYSIS

UNPACKING

UNPACKING The machines are supplied in a carton box secured by two plastic strips to a wooden base. Check first the outside conditions of carton box and wooden base then cut the two plastic strips, remove the tape and then the carton box.

Visually inspect the exterior of the machine then open the bin door and remove from the inside the: water supply inlet tube water outlet tube leg kit (on ICEU 85 only). UNPACKING

UNPACKING Remove the adhesive tape securing the spray platen assembly to the front of the water sump.

INSTALLATION

INSTALLATION Check the data plate of the machine located on the rear panel for correct voltage as well as for the proper wiring/fuse size. Remember that all machines require a solid earth wire.

INSTALLATION Check for the correct water and ambient conditions that should be: Min. ambient temperature 10ºC (50F) Max. ambient temperature 40ºC (100F) Min. water temperature 5ºC (40F) Max. water temperature 35ºC (90F) Min. water pressure 1 bar (14 PSI) Max. water pressure 5 bar (70 PSI)

INSTALLATION Adequate space must be left for proper water and electrical connections on the rear side of the machine. A minimum clearance of 15 cm on both sides for best routing air. Min. space 15 cm

INSTALLATION - AIR CIRCULATION COLD AIR Fan Motor Condenser HOT AIR Compressor Control box

INSTALLATION Installation under counter with no space of both sides are allowed but daily ice capacity can drop down to a maximum of 20%.

INSTALLATION Level the unit on both directions front to rear and right to left side using the adjustable legs.

INSTALLATION - ELECTRICAL Install, on the cable supply with the machine, an adaguate electrical plug according to the local standards and regulations. Maximum voltage variation should be ±10%. Machine must be individually fuse protected.

INSTALLATION - WATER IN Connect the water inlet 3/4 male threat of the water inlet solenoid valve to the water supply line by means of the rubber hose provided with machine. Install on water supply line closed to the machine a water valve (tap).

INSTALLATION - WATER DRAIN Connect the 20 mm O.D. fitting of the water drain with the flexible hose supply with the machine securing by its proper clamp.

TYPICAL INSTALLATION HAND DISCONNECT SWITCH WATER VALVE WATER FILTER POWER WATER INLET WATER DRAIN

START UP AND OPERATIONAL CHECKS

START UP AND OPERATIONAL CHECKS Open the water tap/valve. Switch ON the power on the electrical supply line.

START UP AND OPERATIONAL CHECKS Move the Cleaning Switch on the Cleaning - II position.

START UP AND OPERATIONAL CHECKS By doing so, both the water and hot gas solenoid valve are energized together with the water pump and fan motor. SAFETY THERMOSTAT BIN THERMOSTAT EVAPORATOR THERMOSTAT 6 3 4 2 CLEANING SWITCH COMPRESSOR WATER INLET VALVE HOT GAS VALVE WATER PUMP FAN MOTOR

START UP AND OPERATIONAL CHECKS The components energized during this period are: Water Inlet Solenoid Valve

START UP AND OPERATIONAL CHECKS The components energized during this period are: Water Inlet Solenoid Valve Hot Gas Solenoid Valve

START UP AND OPERATIONAL CHECKS The components energized during this period are: Water Inlet Solenoid Valve Hot Gas Solenoid Valve Water pump

START UP AND OPERATIONAL CHECKS The components energized during this period are: Water Inlet Solenoid Valve Hot Gas Solenoid Valve Water pump Fan Motor ICE-O-MATIC

START UP AND OPERATIONAL CHECKS The Ice Machine will start up charging water till the water sump is filled up till the overflow stand pipe.

START UP AND OPERATIONAL CHECKS The water goes through the Water Inlet Valve then..flows into the small orifice of the Flow Control located on the outlet port of the same.

START UP AND OPERATIONAL CHECKS Following the copper inlet tube the incoming water arrive on the upper side of the evaporator.... where it flows onto the plastic evaporator platen dribbling down through the holes located on the corners.

START UP AND OPERATIONAL CHECKS Dribbled water is collected down, through the evaporator housing..

ACCENSIONE E VERIFICHE FUNZIONALI.into the water sump where is located the overflow hole ( ON THE ICEU 45-65 MODELS) that assures the proper water level and quantity for the next freezing cycle, or... ICEU 45-65

START UP AND OPERATIONAL CHECKS...into the water sump where is located the overflow stand pipe for the model ICEU 85. ICE-O-MATIC ICEU 85

START UP AND OPERATIONAL CHECKS As soon as the water sump is full and water is going through the drain, move the Cleaning Switch on the Operating - I position.

START UP AND OPERATIONAL CHECKS The machine start up now in the freezing cycle with the following components in operation. SAFETY THERMOSTAT BIN THERMOSTAT EVAPORATOR THERMOSTAT 6 3 4 2 CLEANING SWITCH HOT WATER FAN GAS PUMP MOTOR COMPRESSOR WATER VALVE INLET VALVE

START UP AND OPERATIONAL CHECKS Compressor

START UP AND OPERATIONAL CHECKS Compressor Water Pump ( ICEU 45-65 ) Water Pump ( ICEU 85 )

START UP AND OPERATIONAL CHECKS Compressor Water Pump Fan Motor (on air cooled version only)

START UP AND OPERATIONAL CHECKS Water is circulating by the water pump into the inverted tin plated copper molds of the evaporator.

START UP AND OPERATIONAL CHECKS.while the refrigerant is flowing into the serpentine welded on the upper side of the tin plated copper molds.

START UP AND OPERATIONAL CHECKS Few minutes after the start up of the freezing cycle, the temperature of the evaporator serpentine is very cold with a larger extension of frost around the same.

START UP AND OPERATIONAL CHECKS The machine remains in the freezing cycle for an average time of 20-22 minutes (supposing an ambient/room temperature of 21ºC) till the evaporator thermostat reach its Cut In temperature of -25ºC. <-25ºC

START UP AND OPERATIONAL CHECKS At this time the evaporator thermostat change its position closing the contacts 3-2 and opening the contacts 3-4. SAFETY THERMOSTAT BIN THERMOSTAT EVAPORATOR THERMOSTAT 6 3 4 2 CLEANING SWITCH COMPRESSOR WATER INLET VALVE HOT GAS VALVE WATER PUMP FAN MOTOR

START UP AND OPERATIONAL CHECKS Once completed the freezing cycle the machine enters into the defrost or harvest cycle with the following electrical components in operation: Compressor

START UP AND OPERATIONAL CHECKS Compressor Water Inlet Solenoid valve

START UP AND OPERATIONAL CHECKS Compressor Water Inlet Solenoid valve Hot Gas Valve

START UP AND OPERATIONAL CHECKS During the defrost or harvest cycle the combined action of refrigerant, in Hot Gas state, and incoming Water are going to partially melt the ice cubes in contact with the tin plated copper molts with the dropping down of the same through the curtain.

START UP AND OPERATIONAL CHECKS In the meantime the temperature of the serpentine as well as of the cube size control (evaporator thermostat) rises up to its warm Cut In temperature changing the position from 3-2 to 3-4 and closing again the power to the water pump and fan motor. SAFETY THERMOSTAT BIN THERMOSTAT EVAPORATOR THERMOSTAT 6 3 4 2 CLEANING SWITCH COMPRESSOR WATER INLET VALVE HOT GAS VALVE WATER PUMP FAN MOTOR

START UP AND OPERATIONAL CHECKS Holding an hand full of ice cubes in contact with the storage bin thermostat it is possible to test its operation. <+1ºC Cooling down the bin thermostat to +1ºC.

START UP AND OPERATIONAL CHECKS..the machine should stop to operate within 30-40 seconds. SAFETY THERMOSTAT BIN THERMOSTAT EVAPORATOR THERMOSTAT 6 3 2 4 CLEANING SWITCH COMPRESSOR WATER INLET VALVE HOT GAS VALVE WATER PUMP FAN MOTOR

OPERATING PRINCIPLES AND COMPONENTS

OPERATING PRINCIPLES - FREEZE Evaporator Compressor Hot gas valve Air cooled condenser

OPERATING PRINCIPLES - HARVEST Evaporator Compressor Hot gas valve Air cooled condenser

OPERATING PRINCIPLES - FREEZE

OPERATING PRINCIPLES - HARVEST

OPERATING PRINCIPLES - TRIP OFF Whenever the condensing temperature rises up to 70ºC, the safety thermostat installed with its pig tail bulb on the liquid line. >70ºC

OPERATING PRINCIPLES - TRIP OFF.Switch Off immediately the operation of the machine. SAFETY THERMOSTAT BIN THERMOSTAT EVAPORATOR THERMOSTAT 6 3 2 4 CLEANING SWITCH COMPRESSOR WATER INLET VALVE HOT GAS VALVE WATER PUMP FAN MOTOR

COMPONENTS - REFRIGERANT SYSTEM The components of the refrigerant system of the Models ICEU 45, 65 and 85 are composed by: COMPRESSOR

COMPONENTS - REFRIGERANT SYSTEM LOCATION OF REFRIGERANT COMPONENTS COMPRESSOR CONDENSER

COMPONENTS - REFRIGERANT SYSTEM LOCATION OF REFRIGERANT COMPONENTS COMPRESSOR CONDENSER EVAPORATOR

COMPONENTS - REFRIGERANT SYSTEM LOCATION OF REFRIGERANT COMPONENTS COMPRESSOR CONDENSER EVAPORATOR SUCTION LINE AND CAPILLARY TUBE

COMPONENTS - REFRIGERANT SYSTEM COMPRESSOR CONDENSER EVAPORATOR SUCTION LINE AND CAPILLARY TUBE DRIER ICE-O-MATIC LOCATION OF REFRIGERANT COMPONENTS

COMPONENTS - REFRIGERANT SYSTEM COMPRESSOR CONDENSER EVAPORATOR SUCTION LINE AND CAPILLARY TUBE DRIER ICE-O-MATIC LOCATION OF REFRIGERANT COMPONENTS HOT GAS VALVE

COMPONENTS - WATER SYSTEM The components of the water system of the Models ICEU 45, 65 and ICEU 85 are composed by: WATER INLET VALVE

COMPONENTI - CIRCUITO IDRAULICO WATER INLET VALVE WATER SUMP ( ICEU 45-65 )

COMPONENTS - WATER SYSTEM WATER INLET VALVE WATER SUMP ( ICEU 85 only )

COMPONENTI - CIRCUITO IDRAULICO WATER INLET VALVE WATER SUMP WATER PUMP ( ICEU 45-65 )

COMPONENTS - WATER SYSTEM WATER INLET VALVE WATER SUMP AND COVER WATER PUMP ( ICEU 85 only )

COMPONENTS - WATER SYSTEM WATER INLET VALVE WATER SUMP AND COVER WATER PUMP SPRAY PLATEN

COMPONENTI - CIRCUITO IDRAULICO WATER INLET VALVE WATER SUMP AND COVER WATER PUMP SPRAY PLATEN OVERFLOW ICEU 45-65

COMPONENTI - CIRCUITO IDRAULICO WATER INLET VALVE WATER SUMP AND COVER WATER PUMP SPRAY PLATEN PLASTIC PLUG ( ICEU 45-65 ONLY ).

COMPONENTS - WATER SYSTEM WATER INLET VALVE WATER SUMP AND COVER WATER PUMP SPRAY PLATEN OVERFLOW ( ICEU 85 ONLY )

COMPONENTS - ELECTRICAL CONTROLS The components of the Electronic System of the Models ICEU 45,65 and ICEU 85 are composed by: EVAPORATOR THERMOSTAT

COMPONENTS - ELECTRICAL CONTROLS EVAPORATOR THERMOSTAT BIN THERMOSTAT

COMPONENTS - ELECTRICAL CONTROLS EVAPORATOR THERMOSTAT BIN THERMOSTAT SAFETY THERMOSTAT

COMPONENTS - ELECTRICAL CONTROLS EVAPORATOR THERMOSTAT BIN THERMOSTAT SAFETY THERMOSTAT CLEANING SWITCH

END FIRST HALF