The use of willows in the rivers of the Bay of Plenty region, New Zealand

Similar documents
USING PLANTS TO STABILIZE STREAM BANKS

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

The Toe Wood Structure

Kootenai River Habitat Restoration Program June 18, 2018 Kootenai Valley Resource Initiative Update

PART 9: PLANTED STORMWATER DEVICES

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

STREAM ALTERATION PRACTICES

Green Street Challenges and Design Considerations. Watershed Revegetation Program Bureau of Environmental Services

Biotechnical streambank stabilization

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

Vegetation Management

West Little Pimmit Storm Sewer & John Marshall Green Street Projects. July 7, 2015 Nottingham Elementary School

Bioengineered designs

SECTION 5: REACH RECOMMENDATIONS/MAPS

The Napa River Flood Protection Project

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Bio-Engineering Techniques to Revegetate Streambanks

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

Stormwater and Your Rain Garden

5.0 Storm Water Landscape Guidance Introduction

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

SITE PREPARATION GRADING

REFERENCE DRAWINGS FOR 332 W. MAIN STREET ROCK HILL, SOUTH CAROLINA

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

South Waterfront Park

Arroyo Grande Creek Flood Control Channel Vegetation Management: A Photo Series

Property Owner s Guide to Creek and Shoreline Maintenance

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

Landfill Closure, Intermediate Cover & Post-Closure Care. Municipal League Meeting

COVER PAGE. Observations on Morgan County wetland restoration. 28 December 2006

APPENDIX F: EXTERNAL APPROVALS

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Erosion Prevention Practices (EPPs) Activity: Nets and Mats (N and M)

BRUSH BOXES BIOENGINEERING TREATMENTS AND ROCK. Brush Boxes along the Rhine River in Germany. Brush Box on the Coeur d Alene River

Riparian zones A guide to the protection of Canterbury s rivers, streams and wetlands

Town of Essex Small Site Erosion Control Guide

Monica Smith, PE President Robinson Engineering Company

Post Construction BMPs

Kittson Parkway / Watershed Park Parking Lot

Revetting and Supporting River Banks 4.7 Bank revetment using low steel sheet piling and coir rolls

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

Water for (almost) Free by Charlee Ware, Kingman Area Master Gardener

Guidelines for Streambank Protection

Little River stream maintenance

Christine Toner, Consultation Leader

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

Marin Stream Ordinance

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

Adaptive Management of Erosion and Sediment Control Best Management Practices (BMPs) Presenter: Denis Rushton, P. Eng. Date: May 18, 2016

Urban Water Management and Soils (ESRM 311 & SEFS 507)

Illinois Urban Manual

Water Sensitive Urban Design Site Development Guidelines and Practice Notes. Appendix

Urban Water Management (ESRM 311 & SEFS 507) Cougar Mtn Regional Wildland Park & Lakemont Blvd, Bellevue WA

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

4.6. Low Impact and Retentive Grading

BIORETENTION FACILITY

Certain areas of your yard or property may not represent a good location for your rain garden. Don t plant your rain garden:

Single most pervasive problem: Polluted runoff from watershed development

Working with nature to manage your stream

EARTH SCIENCE CONCEPTS -Geologic time scale

Appendix 16 Guideline for native revegetation plantings

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

SECTION 6. Routine Maintenance Activity Details

6.9 Check Dams Description/Purpose Catchment Area Construction

Chapter Six: Tree Removal and Erosion Control

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design?

Preventing Storm Water Pollution: What We Can Do

Invasive non-native aquatic weeds: an often underestimated problem

FURNEAUX CREEK 5 CHANNEL

HOW TO CONTROL STREAMBANK EROSION

Working Group Meeting

The Development of Riparian Stream Buffers in Greensboro, NC

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Walkover Assessment. River Wear Frosterley Angling Club. July 2014

Residential Rain Gardens. Dr. Cathy Neal Extension Specialist Landscape Horticulture

Balancing Conservation and Development on the Jordan River

Urban Rain Gardens: Capturing our local water. Martha Berthelsen The Watershed Project

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

Rain Gardens. A Welcome Addition to Your Landscape

Use of Best Management Practices

River Restoration Practices:

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

ACTIVITY: Tree Preservation & Maintenance TP 01

Homeowners Guide to Stormwater BMP Maintenance

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

Tips for Maintaining and Enhancing Stormwater Management Areas

Raingardens and Bioretention Tree Pits MAINTENANCE PLAN. EXAMPLE June 2008

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

Veranda Park Planting Plan Draft 10/08/10

John F. Kennedy STEM High School Green Infrastructure Information Sheet

Riparian Buffer and Upland Restoration With Woody Species. Dan Salas Delaware Riverkeeper Network

EROSION & SEDIMENT CONTROL

Specimen trees are those that are either of a larger grade than normally planted or have been specified as such by the Engineer.

Rain Garden Installation Guide

Grass Buffer T-1. Description. Site Selection. Designing for Maintenance

Transcription:

The use of willows in the rivers of the Bay of Plenty region, New Zealand Presenters Tony Dunlop Principal Works Engineer Bay of Plenty Regional Council and Gary Williams, Waterscape Consultant Engineer

Introduction Vegetation along the river margins: A buffer of vegetation along a river bank provides: A soft edge that absorbs flood waters. Deflection of strong currents from the river edge. Root strengthening of the banks. 2

Introduction (cont d) A vegetated zone to absorb erosion. Easy re-establishment to reclaim losses. It provides a flexible boundary and a management zone between the active channel and human assets. 3

WILLOWS & POPLARS Willows and poplars are used extensively along New Zealand river banks as they: Establish easily; Are fast growing; Can be managed as an edge vegetation buffer. On-going management is, though, essential, because of its characteristics

Key attributes of willows River edge plant tolerant of wide range of conditions. Grows rapidly even in poor soils and gravels. Fine fibrous root mat that stabilises land. Grows from small cuttings to buried trunks. Sprouts and grows quickly while producing a large number of fine roots. Wide range of species and varieties available. 5

Activities that utilise willows Flood damage repairs quick method for repairs with immediate growth. Live groynes as anchored/trenched trees. Reclaiming active channel with live transplanted willows and pole planting. River bank strengthening by layering/topping. 6

Activities that utilise willows (cont d) Maintaining diffuse boundary and slow berm velocities. Maintaining protective buffer zones and riparian planting. 7

Beneficial effects of willows along river margins Reduced lateral erosion. Improved meander alignment and reduced channel distortions. Vegetation cover at the river edge. Reduced sediment input from bank erosion. Natural filter of debris and suspended load. 8

Examples Waioeka River Waimana River Whakatāne River Rangitaiki River 9

10 Waioeka River typical reach

Lanauze site post 2010 flood Front line vegetative protection and stop bank severely damaged 11

12 Lanauze site prior to repairs

13 Preparation works at site Included stop bank reposition; bank battered to 4:1; rock stubb groynes; willow trench groynes; willow planting

14 Lanauze site completed (October/November 2013)

15 Waioeka River Lanauze at February 2014 Note: Willow groynes, stubb rock groynes, plantings

16 Lanauze February 2014 Note: Willow growth of groynes and layered willows

17 Pole planting erosion repair site

Typical bank erosion prior to pole planting (August 2013) 18

Pole planting site at present (December 2013) 19

20 Waimana River typical reach

21 Falkners site post 2012 flood

22 Falkners site prior to repairs

23 Repair works Includes: rock groynes, willows, rail irons and wire rope

Waimana River, Falkners site at present 24

25 Whakatāne River post 2012 flood

River bank erosion and meander mis-alignment prior to repair works 26

27 Repair works completed Works include: trenched willow groynes and willow planting

Whakatāne River Watene (February 2014) 28

Rangitaiki River, Penitito post flood damage repairs (2010) Note: entrenched river channel 29

30 Rangitaiki River Penitito site During works (November 2013) benching/lowering river bank for rock toe strengthening/willow planting

31 Completed works rock toe strengthening benching and willows - December (2013) Note: Willows have been mulched on opposite bank

Rangitaiki River Penitito rock toe lining and willow planting (February 2014) 32

33 Penitito site (February 2014) Note: Willow pole growth and mulching on opposite bank

Examples Willow maintenance 34

35 Willow layering over flood damage

36 Willow topping and layering

Mulching willows to reduce height/weight allowing rejuvenation of trees 37

Large willows causing toppling concerns - being topped/mulched 38

Willows programmed for mulching / layering upstream following slide 39

40 Willows mulched/layered 12 months

41 Rangitaiki River Typical reach willows layered/mulched plus sites planned for same works

Comparison foreground topping/ mulching 2012 - background not topped 42

Beneficial effects of willows along river margins Summary Reduced lateral erosion of river banks. Improved meander alignment and reduced channel distortions. Vegetation margin along the river and vegetation cover at the river edge. Natural tree lined river edges 43

Beneficial effects of willows along river margins (cont d) Reduced sediment input from bank erosion. Natural filter of debris and suspended load. 44

Where to from here? Ongoing willow breeding programme? Improve disease resistance Consistency of application / outcome driven Wider (public and other agency) perceptions of willows vs natives Dynamic tool in our toolbox 45