Time Extension: Tender submission deadline is extended up to 12:00 Hrs. of

Similar documents
Bharat Heavy Electricals Limited (High Pressure Boiler Plant) Tiruchirapalli , TAMIL NADU, INDIA MATERIALS MANAGEMENT / CAPITAL EQUIPMENT

Part: I TECHNICAL SPECIFICATION

This is a preview - click here to buy the full publication. High-voltage switchgear and controlgear

NPS/003/030 Technical Specification for Transformer and Switchgear Cable Boxes and their associated Bushing Assemblies

Date of Start and downloading the tender 12 sep 2018

SPECIFICATION FOR GAPLESS METAL OXIDE DISTRIBUTION TYPE SURGE ARRESTERS WITH POLYMERIC HOUSING

STANDARD TECHNICAL SPECIFICATION FOR PRESSURE SWITCH, DIFFERENTIAL PRESSURE SWITCH VOLUME - IIB. SPECIFICATION No: PES

RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer

CIRCUIT BREAKER FAIL PROTECTION

Low-voltage switchgear and controlgear - rated voltage does not exceed 1000V AC or 1500V DC

Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No.

Supply & Installation of Fire Protection System at STPI- Nashik. Tender No. STPI/P/PUR/07/14-15 Date Signature of Bidder

DC POWER DISTRIBUTION BOARD

NPS/003/025 Technical Specification for Fault Throwers

Annexure - 1. Detectors: Fire Alarm Control Panel :

38-SDMS-03 SPECIFICATIONS FOR LV DIGITAL PANEL METERS

SPECIFICATION NPS - 210/6 FOR SF6 INSULATED SWITCHGEAR FOR SYSTEM RATED VOLTAGE UP TO 24 kv

CORRIGENDUM NO: 2 TO REQUEST FOR QUOTATION CRFQ NO E-Tender Ref. No: 9093

CONNECTION, ENERGISING, COMMISSIONING AND PERMANENT DISCONNECTION OF HIGH VOLTAGE APPARATUS

Lloyd s Register Type Approval System Test Specification Number 3

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME:

Due to large sum and BG processing time it is requested to offer 15 Working days instead of 7 working days.

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

Shipboard incinerators with capacities up to 4000 kw

INTER - UNIVERSITY ACCELERATOR CENTRE (An Autonomous Centre of UGC) Aruna Asaf Ali Marg, New Delhi

STANDARD TECHNICAL SPECIFICATION FOR LEVEL SWITCH (FLOAT/DISPALCER TYPE) VOLUME - IIB. SPECIFICATION No: PES

RULEBOOK ON ELECTROMAGNETIC COMPATIBILITY

TENDER DOCUMENT FOR SUPPLY OF EPOXY MIXING & POURING PLANT

Eligibility Criteria for Participation [Qualification Requirement (QR)]

38-SDMS-01 SPECIFICATIONS FOR FAULT INDICATORS FOR UNDERGROUND DISTRIBUTION NETWORKS

Request for quotation (RFQ) for goods/services

GMA Panels with double busbar

SECTION AUTOMATIC TRANSFER SWITCHES

NB/ 0695/MFFS/P 17A Feb 18 REQUEST FOR INFORMATION (RFI) FOR SUPPLY AND INSTALLATION OF MAGAZINE FIRE FIGHTING SYSTEM

RADAR REFLECTOR STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

INVITATION TO QUOTE. Page 1 of 7. Fire & Emergency Safety Plan Control Number: 2018-CFS-003 Issue Date: March 7, Purpose

SPECIFICATIONS FOR TENDER # SUPPLY OF A FIRE ALARM SYSTEMS SERVICE AGREEMENT FOR WESTERN HEALTH

SECTION AUTOMATIC TRANSFER SWITCHES

APPROVED PANEL OF SWITCHBOARD MANUFACTURERS FOR THE SUPPLY OF LOW VOLTAGE SWITCHBOARDS

Scope of Work and Other Terms & Conditions

INTERNATIONAL STANDARD

CO-ORDINATION OF NOTIFIED BODIES PPE Regulation 2016/425 RECOMMENDATION FOR USE

SWITCHGEAR, BUSBAR SYSTEMS and ITS BUILT-IN COMPONENTS: SOMETHING IS MISSING IN IEC and IEEE STANDARDS

NATIONAL BANKING GROUP WEST-1

INTERNATIONAL STANDARD

1S25. Arc Fault Monitor 4 Zones, 8 Sensors. Features. Introduction. ARC Fault Protection

The last date of submission of responses has been extended up to 14: 00 hrs on 20/07/2018.

EXPRESSION OF INTEREST CONSULTANCY SERVICES FOR GIVING FACELIFT TO BHEL GATES & LAND SCAPING OF SOUTH AVENUE AT BHEL-R.C.

TENDER NO: MR 92/2017 SUPPLY OF HIGH VOLTAGE PROXIMITY DETECTORS

Overhead Line Insulators

Queries raised by the representatives. 4 Sl. No.( iv) 31 Refer Sl. No. 2 It should be Windows 10 professional as it is the latest one

INVITATION TO BID SUPPLY OF VARIOUS PORTABLE FIRE EXTINGUISHERS

MARINE GYRO COMPASS STANDARD FOR CERTIFICATION. DET NORSKE VERITAS Veritasveien 1, N-1322 Høvik, Norway Tel.: Fax:

Table-1: Clarifications and modification in tender specifications based on Pre-bid meeting discussion

CE Marking and Technical Standardisation

Substations and high voltage installations exceeding 1 kv a.c.

INTERNATIONAL STANDARD

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

INTERNATIONAL STANDARD

EUROPUMP ATEX Guideline Part II

SCOPE OF SUPPLY SUPPLY OF H2S ANALYZER

PRE-QUALIFICATION OF FIRE SAFETY AUDITORS

DEPARTMENT OF TRADE AND INDUSTRY DEPARTEMENT VAN HANDEL EN NYWERHEID. NATIONAL REGULATOR FOR COMPULSORY SPECIFICATIONS ACT (Act 5 of 2008)

TECHNICAL SPECIFICATION FOR SMC AMR METER BOXES MADE FROM THERMOSETTING PLASTIC

INTERNATIONAL STANDARD

Guide to Membership Assessments

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD

FALCON SERIES 12 METAL CLAD

FALCON SERIES 12 METAL CLAD

Majis Industrial Services SAOC TENDER NO. MISCP/09/2014

NEMA Standards Publication ICS (R 2007) Adjustable Speed Electrical Power Drive Systems

SECTION P01 LIGHTING AND APPLIANCE PANELBOARDS - A-SERIES

NOTICE INVITING TENDER

Approval of Ex (Electrical) Equipment for use/installation in Hazardous Areas.

.4 Do complete installation in accordance with latest Electrical Bulletins of the local inspection authority.

7XG3120 ReyArc20 Arc Fault Monitor Relay Energy Management

Pressure Equipment Directive PED 2014/68/EU Commission's Working Group "Pressure"

STAR HOUSE BANK OF INDIA NATIONAL BANKING GROUP NORTH-I H-2 CONNAUGHT CIRCUS Middle/Outer Circle, Phone No

CLARIFICATIONS DOCUMENT

INTERNATIONAL STANDARD

IECEx TEST REPORT IEC Explosive atmospheres Part 0: Equipment General requirements

TENDER FOR EMPANELMENT OF VENDORS

Fiji Electricity Authority Transmission Unit 2 Marlow Street, Suva

This is a preview - click here to buy the full publication INTERNATIONAL ELECTROTECHNICAL COMMISSION

SCHEDULE 2 - EXHIBIT 1 DATED [ ] NATIONAL GRID ELECTRICITY TRANSMISSION PLC (1) and THE CONNECTION AND USE OF SYSTEM CODE

Material Description Quantity UOM

INTERNATIONAL STANDARD NORME INTERNATIONALE

Survey of electrical equipment installed in hazardous areas on tankers

A three-pole dead-tank SF 6 circuit-breaker incorporating one interrupter per pole in single-pole enclosures with a common operating mechanism

Bold items are particular to the City of Euless

On Electromagnetic Compatibility

INTERNATIONAL STANDARD

TENDER NO. PGVCL/PROC/SMC BOX FOR CT OPERATED METER & Junction Box/867

Technical Specification For Design and supply of Water Mist cum CAFS (Compressed Air Foam System) Backpack Fire Fighting System

Contact Phone Number: (609) Fax: (609)

SECTION AUTOMATIC TRANSFER SWITCHES

Technical Assessment Guideline Applicable for the Kiwa KQ Certification Scheme:

SUGGESTED SPECIFICATION For Series 300 Manual Transfer Switches (3MTS)

Transcription:

ASSAM ELECTRICITY GRID CORPORATION LIMITED OFFICE OF THE MANAGING DIRECTOR Regd. Office: (FIRST FLOOR), BIJULEE BHAWAN, PALTANBAZAR; GUWAHATI - 781001 CIN: U40101AS2003SGC007238 PHONE: 0361-2739520 FAX NO.0361-2739513 Web: www.aegcl.co.in Email: managing.director@aegcl.co.in No AEGCL/MD/Tech-721/SRSJ/200MVA/2017-18/23 Dtd :13.12.2017 Corrigendum IFB No. AEGCL/MD/Tech-721/SRSJ/200MVA/2017-18/5(IFB) Bid Identification No.: AEGCL/MD/Tech-721/SRSJ/220MVA/2017-18/2(BID) Amendment: The following clauses of the bid identified against the above referred IFB and Bid identification no. is hereby amended to be read as follows:. 5.12.0 WARRANTY 5.12.2. The term Period of Warranty shall mean the period of Thirty Six (36) months from the date of issue of Completion Certificate in pursuance to SCC Clause 5.6.0. Pre-Bid Query Clarification: Pursuant to the pre-bid meeting held on 12.12.17, the following clarifications against pre-bid queries raised by intended bidders are to be noted: Appendix- (A): Pre-bid Clarification enclosed. Annexure- (I): Manufacturer Authorization- Format Time Extension: Tender submission deadline is extended up to 12:00 Hrs. of 21.12.2017. All other terms and conditions shall remain same S/d Chief General Manager (T&T) Assam Electricity Grid Corporation Ltd Page 1 of 1

Pre-bid Query Clarification Annexure- (A) : Sl No. Vol Sec Clause no. Clause Name Tender Description Clarification as sought for Remarks By AEGCL (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) 1 V-2 sec 1 1.2.4 Scope 245kV, 3150A, 40kA for 1 Second, SF6 HGIS Transformer Feeder Bay Module including Numerical LCC suitable for MAIN-I & MAIN-II Bus & Transformer, comprising of SF6 gas insulated circuit breaker, current transformer, bus-bar disconnectors with common grounding switch, disconnector with safety grounding switch(es), high speed fault making grounding switch, local control cubicle, SF6 gas monitoring system for complete bay We feel Numerical Control Cabinet is not required, and hence we will be supplying normal LCC along with the equipment. We will not be providing FAES in our Hybrid switchgear. SF 6 gas monitoring system for complete bay is done by dial type density monitors. Pls confirm the acceptance of the same. 2 V-2 sec 1 1.2.4 Scope 245kV, 3150A, 40kA for 1 Second, SF6 HGIS Transformer Feeder Bay Module suitable for MAIN-I & MAIN-II Bus & Transformer... Based on the site visit done by ABB representatives on 14.11.2017, we understand that the 245 kv s/s is with Single MAIN & TRANSFER Bus bar configuration. Hence the 245 kv Hybrid module to be supplied shall be suitable for connection to Single MAIN Bus bar only(& not transfer bus). Kindly confirm the acceptance of the same. The original design the bus configuration is Main-I & Main-II. Thouh presently it is being used as Main & Tr.; in the near future AEGCL intends to convert it into Main-I & Main-II 3 V-2 sec 1 1.2.4 Scope 245kV, 3150A, 40kA for 1 Second, SF6 HGIS Transformer Feeder Bay Module suitable for MAIN-I & MAIN-II Bus & Transformer... The 245kV Hybrid module shall have the following single line diagram. Pls convey your acceptance of the same. (*****) SLD should be for Main-I & Main-II as stated in slno.2 above. 4 V-2 sec 1 1.2.4 Scope 1 4 5 k V, 2 0 0 0 A, S F 6 H G I S T r a n s f o r m e r B a y M o d u l e i n c l u d i n g N u m e r i c a l L C C ( f r o m 2 2 0 k V ), suitable for MAIN-I & MAIN-II Bus & Transformer, comprising of SF6 gas insulated circuit breaker, current transformer, bus-bar disconnectors with common grounding switch, disconnector with safety grounding switch(es), high speed fault making grounding switch, local control cubicle, SF6 gas monitoring system for complete bay We feel Numerical Control Cabinet is not required, and hence we will be supplying normal LCC along with the equipment. We will not be providing FAES in our Hybrid switchgear. SF 6 gas monitoring system for complete bay is done by dial type density monitors. Pls confirm the acceptance of the same.

5 V-2 sec 1 1.2.4 Scope 1 4 5 k V, 2 0 0 0 A, S F 6 H G I S T r a n s f o r m e r B a y M o d u l e, suitable for MAIN-I & MAIN-II Bus & Transformer.. Based on the site visit done by ABB representatives on 14.11.2017, we understand that the 145 kv s/s is with Single MAIN & TRANSFER Bus bar configuration. Hence the 145 kv Hybrid module to be supplied shall be suitable for connection to Single MAIN Bus bar only(& not transfer bus). Kindly confirm the acceptance of the same. 6 V-2 sec 1 1.2.4 Scope 7 V-2 sec 1 1.16.3 Inspection & Inspection Certificate 1 4 5 k V, 2 0 0 0 A, S F 6 H G I S T r a n s f o r m e r B a y M o d u l e, suitable for MAIN-I & MAIN-II Bus & Transformer.. If desired by AEGCL, the Contractor shall also carry out type tests as per applicable Standards for which AEGCL shall bear the expenses except in cases where such tests have to be carried out in pursuance to Clause 1.17.3. The 145kV Hybrid module shall have the following single line diagram. Pls convey your acceptance of the same. The offered Hybrid switchgear module has already been type tested as per IEC 62271-205 which is the applicable standard for Hybrid Switchgear. Hence we have not considered any performance or repetition of type/special tests to be in our scope of work. Valid Type Test Report shall have to be furnished 8 V-2 sec 1 1.16.5 Tests Type Tests shall mean those tests, which are to be carried out to prove the process of manufacture and general conformity of the material to this Specification. These tests shall be carried out on samples prior to Commencement of commercial production against the order. The Bidder shall indicate his schedule for carrying out these tests. The offered Hybrid switchgear module has already been type tested as per IEC 62271-205 which is the applicable standard for Hybrid Switchgear. Hence we have not considered any performance or repetition of type/special tests to be in our scope of work. Factory type test/acceptance test shall have to be carried out in front of AEGCL's representative 9 V-2 sec 1 1.17.0 Type Test Reports Such type test certificates shall be acceptable only if:- (a) Tests are conducted in an independent and well known testing laboratory, or (b) Tests are conducted in manufacturer s own laboratory. In this case (i) the laboratory must have ISO 9000 (or its equivalent) series certification; and (ii) tests have been witnessed by technically qualified representatives of earlier clients or purchaser. The offered Hybrid switchgear module has already been type tested as per IEC 62271-205. The tests have been witnessed by As stated in Sl No. 7

Type Test Reports older than five (5) years on the 10 V-2 sec 1 1.17.0 Type Test Reports date of Technical bid opening shall not be accepted. The offered Hybrid switchgear module has been type tested as per IEC 62271-205 which is the applicable standard for Hybrid switchgear. Hybrid switchgear being a high end technical product doesn t call for the frequent design modifications. Repetition of the type tests every five years is not feasible. Request to accept the type test validity for 10 years prior to bid due date. We have not considered repetition or performance of any type tests or special tests to be in our scope. Furnish Type Test report. However, you are to certify clearly and in no uncertain terms that no design changes have been made in the offered product since the "type test" date for which the type test report is being submitted. 11 V-2 sec 1 Annexure-I Schdeule of Qty of (Supply) Not Applicable Pls clarify whether the schedule is applicable or not. Price Schedules are included sperartely in the e-tender. 12 V-2 sec 1 11 Annexure-I Testing & Maintenance Equipment for GIS 21.1 SF 6 gas filling and evacuating plant - 1 set; Partial discharge monitoring system - 1 set; SF 6 gas leak detector - 1 no. ; Dew Point meter - 1 no. All these spares are not in scope of PGHV- PASS. Prices against the items are to be quoted. 13 V-2 sec 1 Annexure-III SCHEDULE OF QUANTITY (MANDATORY SPARES) Please furnish the details of spare to be quoted. Mandatory Spares shall be as per the Price Schedules included in the e- tender 14 V-2 Sec 4 4.1.0 Scope In general, the scope covers the design, engineering, manufacture, assembly, inspection and testing before dispatch, supply, transportation, delivery at given destination, unloading and storage, erection, testing and commissioning and putting into successful operation of integrated multifunctional HYBRID modules having combination of HV switchgears along with clamp connectors and accessories, tools, tackles, support structure, anchoring bolts, SF6 gas for first filling etc. Transportation, delivery at given destination, unloading & storage, erection, testing and commissioning & putting into operation the Hybrid module is excluded from PGHV-PASS scope of work. Clamps, connectors, accessories, tools, tackles, anchor bolts is excluded from PGHV-PASS scope of supply. All the civil work activities are excluded from PGHV-PASS scope of work. As per bid dopcument, Erection, testing and commissioiing shall be under the scope of the bidder 15 V-2 Sec 4 4.2.5 General Foundation details with calculations shall be submitted with the offer Foundation calculations shall be excluded from PGHV-PASS scope. Foundation drawing shall have to be furnished. 16 V-2 Sec 4 4.2.15 General Also the live part to ground clearance shall be maintained as per relevant standards for safe operating conditions. The live part to ground clearance of the offered Hybrid switchgear shall be as per the tender purpose General Arrangement of Hybrid switchgear modules which is a part our offer.

17 V-2 Sec 4 4.2.23 General Also portholes shall be provided at an easily accessible place to allow visual inspection of the position whether the component is closed or open. View ports are provided to allow visual inspection of Isolator and Earthswitch position. 18 V-2 Sec 4 4.2.24 General Main contact position of all three poles must be indicated by directly activated auxiliary position switches with at least 8 NO + 8 NC contacts wired to terminal block in the local control panel for purchaser s use. In Hybrid switchgear module, the electrical interlocks between breaker & isolators are in-built unlike conventional schemes. Hence, only 5NO+5NC contacts shall be provided for CB as per our standard design which shall be sufficient for purchaser s use. Requirement of additional contacts shall be decided during detail engineering at the time of execution and shall be provided via contact multiplier relays if required. 19 V-2 Sec 4 4.2.26 General The actual position of each disconnector and each earthing switch shall be indicated by mechanically coupled auxiliary switches with at least 8 NO+ 8 NC contacts. In Hybrid switchgear module, the electrical interlocks between breaker & isolators are in-built unlike conventional schemes. Hence, only 3NO+3NC contacts shall be provided for combined disconnector/earthing switch as per our standard design which shall be sufficient for purchaser s use. Requirement of additional contacts shall be decided during detail engineering at the time of execution and shall be provided via contact multiplier relays if required. Pls confirm the acceptance for the same. 20 V-2 Sec 4 4.2.30 General 21 V-2 Sec 4 4.3.0 Standards IEC 62271-203 22 V-2 Sec 4 4.5.3 Interlocking systems The gas handling kit shall be supplied along with the module. The CB can be operated also in case of the gas pressure drop down to the atmospheric value. In this case, the power frequency withstand voltage (1 min) must be guaranteed. Gas Handling kit is excluded from PGHV- PASS scope of supply. The offered Hybrid switchgear complies to IEC 62271-205 which the applicable standard for Hybrid switchgear The requirement of Hybrid switchgear to operate below minimum functional pressure or at atmospheric pressure of SF 6 gas is not a service condition. as per IEC 62271-100 and hence cannot be confirmed. Prices against the items are to be quoted. Both IEC- 62271 and IEC-62271-105 shall be admissable

23 V-2 Sec 4 4.7.0 Type Tests The type test reports shall not be older than five years and shall be valid up to expiry of validity of offer. The offered Hybrid switchgear module has been type tested as per IEC 62271-205 which is the applicable standard for Hybrid switchgear. Hybrid switchgear being a high end technical product doesn t call for the frequent design modifications. Repetition of the type tests every five years is not feasible. Request to accept the type test validity for 10 years prior to bid due date. We have not considered repetition or performance of any type tests or special tests to be in our scope. 24 V-2 Sec 4 4.7.0 Type Tests Following type test reports from NABL laboratory, as specified in IEC standards (amended up to date) shall be submitted Test reports from NABL/International laboratory shall be submitted. Pls confirm. 25 V-2 Sec 4 4.7.0 Type Tests The types tests shall be furnished as applicable as per IEC 62271-205 for Mixed technology switchgear (Clause 6.1 - Table 101). Following type tests shall not be applicable as per IEC 62271-205 for Mixed technology switchgear: - Additional tests on auxillary and control circuits - Tests to prove performance under thermal cycling and gas tightness tests. - Corrosion test on earthing connections - Tests to assess the effects of arcing due to an internal fault. - Tests on solid dielectric components(operating rods, spacers etc) Electromagnetic compatibility test is not applicable.

26 V-2 Sec 4 4.8.0 Routine/Acceptan ce Testing Following tests are not part of routine/acceptance tests for hybrid Switchgear as per IEC 62271-205: 1) PD Test 2) Pressure test of enclosures, 3) Pressure test on partitions. Since enclosures & Partitions are bought out items for us, the routine tests reports carried out at respective Vendor s facility can be submitted. 27 V-2 Sec 4 4.10.0 7) On site, Power frequency Voltage withstand test with PD test We perform Power frequency voltage withstand test as part of our standard routine test plan at factory under controlled and dust free environment. Such factory pre-assembled tested modules are dispatched to site without requirement of any gas handling site assembly. Hence it is not envisaged to repeat these tests. Standard proceudre to carry out HV test as a pre-comissioing test. HV testting shall be applicable, in case of loss of gas pressure or exposure to any light part 28 V-2 Sec 4 4.10.0 1) Dielectric Test on the main circuit 2) Dielectric Test on the auxiliary circuit We perform Dielectric test on main and auxiliary circuit as part of our standard routine test plan at factory under controlled and dust free environment. Such factory pre-assembled tested modules are dispatched to site without requirement of any gas handling site assembly. Hence it is not envisaged to repeat these tests. 29 V-2 Sec 4 4.10.0 6) Gas quality Verfications The gas for first filling in the Hybrid module is fresh SF 6 gas. We do not envisage the requirement of gas quality verifications at site. The certificate of purity from SF 6 gas supplier shall be submitted for scrutiny if required during the factory inspection. Gas quality must be checked by Gas Analyser.

30 V-2 Sec 4 4.10.0 10. Demonstration and operational compatibility with SCADA SCADA system is connected to the C&R panel in the control room. Hence the operational compatibility with SCADA is to be checked with C&R panel. 31 V-2 Sec 4 4.10.0 Test on CTs The modules are transported from factory to site with CTs fitted on it. Hence we don't envisage the requirement of CT testing at site. Pls confirm. Shall have to be carried out 32 V-2 Sec 4 4.10.0 Insulation Resistance measurement tests Insulation resistance measurement test is not applicable for offered Hybrid switchgear as per IEC 62271-205. 33 V-2 Sec 4 4.10.0 Additional information Following tests will be performed on the offered Hybrid modules. 1) Physical examination for complete unit 2) Check the contact alignment for Disconnector. 3) SF6 gas filling & Leakage test. 4) Module local operation 5) Interlocks 6) Circuit Breaker operation timing test 7) Contact resistance measurement for Breaker Kindly confirm 34 - - - - Additional information : Control Circuit, Motor circuit and auxiliary supply voltage values. Please furnish the control circuit Voltage, motor voltage & auxiliary supply voltage. 35 - - - - Additional Information : Qualification Requirment In line with the advisory issued by Central Electricity Authority, Delhi pertaining to procurement of equipement for domestically funded project, we would request "Make in India" to be incorporated in the tender conditions. We request to pls incorporate the clause that the 132 kv Hybrid switchgear module to be supplied shall be manufactured in India. Please confirm. Cannot be considered at this point as the same is not yet cincoporated in the " GCC- Supply & Erection " of AEGCL.

(*****) SLD as mentioned in Sl-3 Column (vii)

Annexure (I) Manufacturer's Authorization [The Bidder, in pursuant to ECQ Clause 2.1.2 (if applicable) shall require the Manufacturer to fill in this Form in accordance with the instructions indicated. This letter of authorization should be signed by a person with the proper authority to sign documents that are binding on the Manufacturer. Please refer to notes at bottom] To: [Insert: full name of Purchaser] (Manufacturer s Letterhead) Date: [insert date (as day, month and year) of Bid Submission] Bid No.: [insert number of bidding process] WE [insert: name of Manufacturer] who are established and reputable manufacturers of [insert: name and/or description of the Goods] having production facilities at [insert: address of factory] do hereby authorize [insert: name & address of Bidder] (hereinafter, the Bidder ) to submit a bid the purpose of which is to provide the following goods, manufactured by us, and to subsequently negotiate and sign the Contract: 1. --------------------------------------- 2. --------------------------------------- --------------------------------------- We hereby extend our full guarantee and warranty in accordance with Clause 5.12.0 of the Special Conditions of Contract, for the above specified Goods supporting the Supply of specified Goods and fulfilling the Related Services by the Bidder against this Bidding Documents, and duly authorize said Bidder to act on our behalf in fulfilling these guarantee and warranty obligations. We also hereby declare that, we will furnish the Performance Guarantee in accordance with SCC Clause 5.9.1. Further, we also hereby declare that we and, [insert: name of the Bidder] have entered into a formal relationship in which, during the duration of the Contract (including related services of supervision of erection, testing & commissioning of the equipments and warranty / defects liability) we, the Manufacturer or Producer, will make our technical and engineering staff fully available to the technical and engineering staff of the successful Bidder to assist that Bidder, on a reasonable and best effort basis, in the performance of all its obligations to the Purchaser under the Contract. For and on behalf of the Manufacturer Signed: Date: In the capacity of [insert: title of position or other appropriate designation](and this should be signed by a person having the power of attorney to legally bind the manufacturer). Date:... Place:... (Signature)........ (Printed Name).... (Designation)...... (Common Seal).......... Notes: 1. The letter of Undertaking should be on the letterhead of the Manufacturer and should be signed by a person competent and having Power of Attorney to sign on behalf of the Manufacturer(to be attached with this MA) to legally bind the Manufacturer. It shall be included by the bidder in its bid. 2. Above undertaking shall be registered or notarized so as to be legally enforceable.