Alessandro Volta Elementary School

Similar documents
Genevieve Melody Elementary School

Richard Henry Lee Elementary School

Charles W Earle Elementary School

John Palmer Elementary School

Agustin Lara Elementary Academy

Washington Irving Elementary School

DeWitt Clinton Elementary School

Josefa Ortiz De Dominguez Elementary School

Joseph Brennemann Elementary School

Sidney Sawyer Elementary School

Edward Jenner Elementary Academy of the Arts

Francis M McKay Elementary School

Oscar DePriest Elementary School

Calmeca Academy of Fine Arts and Dual Language

George B Swift Elementary Specialty School

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

Mechanical Inspection Plumbing

DOCUMENT TABLE OF CONTENTS

Briar Crest Elementary

NYC Department of Education

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

PLATTEVILLE MIDDLE SCHOOL

PLAN REVIEW SUBMITTAL GUIDE

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

NYC Department of Education

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

RECAPP Facility Evaluation Report

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Florence High School / Middle School Page 1 of 3 Florence, WI

NYC Department of Education

NYC Department of Education

2014 Bond Project Guide

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

NYC Department of Education

NYC Department of Education

NYC Department of Education

Estimated Repair, Replacement, and Upgrade Costs

NYC Department of Education

NYC Department of Education

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

New High School Concept

NYC Department of Education

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

Cook - Wissahickon Elementary School

NYC Department of Education

Ashland School District Facility & Capacity Assessment Report 2005

NYC Department of Education

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

NYC Department of Education

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

Inspection Report 123 My Street Midland, GA

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

Master Facility Planning Update School Board Meeting May 26, 2016

NYC Department of Education

NYC Department of Education

Massachusetts School Building Authority

S AGE E NGINEERING A SSOCIATES, LLP

NYC Department of Education

Mechanical System Description

NYC Department of Education

1354 CHECKLIST for Project Closeout

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

NYC Department of Education

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions : The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Metal Canopy CHIMNEY Brick Chimney - Concrete/ Mortar Liner Metal Flue GRE 6 54 GRE 6 66 4 54 SF $1,300 $1,300 66 LF $33,033 14 LF $901 $33,934 Assessment Date: 2/25/2013 Page 1 of 17

CORNICE Cornice - Terra Cotta DOORS Exterior Steel Door Overhead Rolling / Garage Door Transom Lite ENTRANCE GRE 6 789 GRE 6 21 2 789 LF $24,201 $24,201 2 $6,937 $1,027 12 EA $3,398 $11,361 Concrete Exterior Stairs Concrete Ramp Entrance Controls - Audio Entrance Controls - Audio and Video Ramp Handrails Stair Handrails Stone Stairs 65 GRE 6 64 GRE 6 3 GRE 7 137 8 49 40 BLU 5 301 165 LF $17,696 64 LF $8,923 $429 3 EA $4,290 137 LF 107 LF $3,281 301 LF $129,129 $163,749 FOUNDATION Concrete Foundation GRE 7 1,754 1,754 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted BLU 5 1 2 7 3 EA $4,719 17 EA $3,647 Assessment Date: 2/25/2013 Page 2 of 17

$8,366 LINTELS Lintels - Steel Lintels - Stone,082 15 GRE 7 291 1,097 LF $40,848 291 LF $40,848 PARAPET Coping - Terra Cotta Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height ROOF SYSTEM,467 GRE 6 417 GRE 6 76 GRE 6 974 1,467 LF 417 LF $64,938 76 LF $19,725 974 LF $202,237 $286,901 Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof Roof Structure: Heavy Timber Roof Structure: Steel with Clay Tile Arch GRE 6 66 GRE 6 486 9,833 YEL 4 28,138 GRE 7 19,833 GRE 7 28,138 66 LF $1,227 486 LF 19,833 SF $149,747 28,138 SF $663,916 19,833 SF 28,138 SF $814,890 SUPERSTRUCTURE Slab on Grade Steel GRE 7 17,176 GRE 7 67,204 17,176 SF 67,204 SF Assessment Date: 2/25/2013 Page 3 of 17

WALLS Brick Stone - Cast Terra Cotta GRE 6 41,377 6,447 GRE 6 760 GRE 6 3,990 47,824 SF $273,361 760 SF $10,868 3,990 SF $114,114 $398,343 WINDOWS Skylite - Glass Double-Pane Window - Guards perforated Window - Guards wire guard Windows - Sash Aluminum Double-pane Windows - Sash Lexan EXTERIOR ELECTRICAL EMERGENCY SYSTEM 84 GRE 6 4,732 GRE 6 276,360 10,090 YEL 4 72 184 SF $1,737 4,732 SF 276 SF 11,450 SF $133,539 72 SF $12,436 $147,711 $1,931,604 Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Exit Signs - Auditorium Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - Intrusion detection BLU 5 1 ORA 2 2,294 ORA 3 13,378 2,030 ORA 2 3,899 YEL 4 1,638 1,260 ORA 2 6 ORA 2 26 ORA 3 2 1 YEL 4 84,380 GRE 6 84,380 $4,433 2,294 SF $15,910 15,408 SF $41,131 3,899 SF $6,969 2,898 SF $5,856 6 EA $5,577 26 EA $24,167 3 EA $2,092 $1,430 84,380 SF $299,245 84,380 SF $78,431 Assessment Date: 2/25/2013 Page 4 of 17

$485,242 MAIN SERVICE Main Electrical service - Live Front - 2000 A 120/208/3PH Main Electrical service 1000 A and below 120/208/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp ELECTRICAL FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System SPRINKLER SYSTEM BLU 5 9 15 BLU 5 1 3 GRE 6 3 7,176 YEL 4 67,204 17,176 $12,155 $6,435 $18,590 24 EA $59,631 4 EA $16,445 3 EA $6,435 $82,511 $586,343 17,176 SF $6,140 84,380 SF $258,249 $264,389 Sprinkler Heads Wet Sprinkler System FIRE PROTECTION GRE 7 17,176 GRE 7 17,176 17,176 SF 17,176 SF $264,389 Assessment Date: 2/25/2013 Page 5 of 17

MECHANICAL AIR CONDITIONING Condensing - Ground Mounted less than 5 tons Condensing - Roof Mounted less than 5 tons Window A/C AIR HANDLING SYSTEMS GRE 6 39 $715 $858 39 EA $8,366 $9,939 Air Intake - Built Up Air Handling Air intake for all Air Handling s except built up AHU Make Up Air - Indoor Mounted - Hot Water less than 6000 cfm Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm Reheat Boxes With Steam Coils Return Duct Work - Masonry and Ducts - Existing or Missing Exterior Shaft Single Zone Built Up Air Handling - Steam 8,001 to 15,000 cfm Single Zone Built Up Air Handling - Steam less than 4,000 cfm Single Zone Built Up Air Handling Auxiliaries - Steam less than 4,000 cfm Single Zone Built Up Air Handling Auxiliaries- Steam 8,001 to 15,000 cfm YEL 4 2 YEL 4 2 BLU 5 2 BLU 5 12 GRE 7 400 YEL 4 1 YEL 4 1 2 EA $52,338 $1,430 $2,002 2 EA $185,900 2 EA $25,740 12 EA $66,924 400 LF $32,890 $15,730 $1,430 $3,575 $387,959 BOILER SYSTEMS Boiler Assembly - Non-Condensing Flexible Tube Hot Water Boiler 2,001MBH-3,000 MBH Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 76-100 HP Boiler Auxiliary - Condensing Hot Water Boiler 2,001MBH-3,000 MBH Boiler Auxiliary - Steam Boiler 76-100 HP Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water BLU 5 2 YEL 4 2 GRE 6 2 YEL 4 2 GRE 6 2 2 EA $102,960 2 EA $237,380 2 EA $11,154 2 EA $40,040 2 EA $4,290 $300 Assessment Date: 2/25/2013 Page 6 of 17

Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Glycol Feed System HEATING DEVICES Cabinet Heaters With Hot Water Coils Radiators - Steam Heater - Hot Water Wall Heater - Electric MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Hot Water 5 to 10 HP TEMPERATURE CONTROL GRE 6 5 YEL 4 1 ORA 2 1 GRE 6 6 YEL 4 35 GRE 6 2 BLU 5 18 YEL 4 2 YEL 4 300 GRE 6 400 BLU 5 300 GRE 6 2 5 EA $1,430 $31,460 $3,861 $432,875 6 EA $3,003 35 EA $49,049 2 EA $2,860 18 EA $9,266 $64,178 2 EA $57,200 300 LF $29,387 400 LF $3,546 300 LF $14,843 2 EA $4,004 $108,980 Hybrid Pneumatic/Direct Digital Control (DDC) System ORA 3 67,204 67,204 SF $672,712 Thermostats - Pneumatic YEL 4 36 36 EA $23,681 Zone Dampers YEL 4 36 36 EA $30,373 $726,766 UNIT VENTILATION Ventilators - Hot Water and Self Contained Electric Cooling 5 15 EA $23,595 $23,595 Assessment Date: 2/25/2013 Page 7 of 17

VENTILATION Exhaust Fan - Indoor Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof Mounted above 8,000 cfm MECHANICAL PLUMBING HOT WATER Hot Water Heater - Gas 150,000-300,000 BTU/HR Hot Water Heater - Gas less than 150,000 BTU/HR Storage Tank less than 500 gallons PIPING YEL 4 3 GRE 6 2 BLU 5 1 1 YEL 4 1 YEL 4 2 3 EA $16,731 $429 2 EA $458 $2,145 $19,763 $1,774,055 2 EA $27,027 $14,872 2 EA $29,744 $71,643 Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping BLU 5 67,204 YEL 4 67,204 YEL 4 67,204 YEL 4 67,204 YEL 4 67,204 YEL 4 67,204 17,176 YEL 4 67,204 17,176 YEL 4 67,204 17,176 BLU 5 67,204 17,176 BLU 5 67,204 BLU 5 67,204 17,176 67,204 SF $11,532 67,204 SF $43,246 67,204 SF $14,415 67,204 SF $30,753 67,204 SF $36,519 84,380 SF $164,420 84,380 SF $136,059 84,380 SF $79,583 84,380 SF $41,324 67,204 SF $31,714 84,380 SF $24,025 $613,589 Assessment Date: 2/25/2013 Page 8 of 17

PUMPS Domestic Booster Pump simplex ORA 2 1 $17,160 $17,160 PLUMBING $702,392 INTERIOR ADMINISTRATIVE SUITES Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Flooring - Wood Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall Walls - Structural Glazed Tile GRE 6 416 509,099 GRE 6 90 443 94 GRE 6 965 GRE 6 332 GRE 6 4 11 GRE 6 4 2 9 GRE 7 200 GRE 6 948 5,465 GRE 6 75 925 SF $892 1,099 SF $3,112 533 SF $129 194 SF $494 965 SF $1,380 332 SF $2,507 15 SF $19 15 SF $28 200 SF 6,413 SF $17,368 75 SF $536 $26,464 AUDITORIUM - DEDICATED Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System 00 GRE 6 288 GRE 7 1 GRE 7 5 GRE 7 1 100 EA $3,681 288 EA $10,601 5 EA $14,282 Assessment Date: 2/25/2013 Page 9 of 17

DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Transom Window GRE 6 35 GRE 6 9 87 GRE 6 336 72 35 EA $9,910 96 EA $53,513 408 SF $6,246 $69,670 DRINKING FOUNTAINS Double Fountain Single Fountain GRE 6 2 GRE 7 12 2 EA $1,316 12 EA $1,316 GYMNASIUM / AUDITORIUM Ceiling - Plaster/Drywall Flooring - Wood Lighting - Metal Halide/Sodium Vapor Scoreboards Walls - Plaster/Drywall GRE 6 2,407 GRE 6 2,407 GRE 7 8 GRE 7 1 GRE 6 4,406 2,407 SF $20,583 2,407 SF $18,174 8 EA 4,406 SF $37,803 $76,561 LIBRARY Casework Flooring Carpet Lighting - Lay-In GRE 6 46,485 GRE 7 24 46 LF $1,411 1,485 SF $2,124 24 SF $3,535 LUNCHROOM Ceiling - Plaster/Drywall,492 1,492 SF $4,224 Assessment Date: 2/25/2013 Page 10 of 17

Flooring - Tile/Sheet Lighting - Pendant/Surface Serving Line Wall - Plaster/Drywall MDF/IDF,492 GRE 6 28 GRE 7 10 GRE 6 2,294 1,492 SF $2,134 28 SF $20 10 LF 2,294 SF $5,413 $11,791 Finishes Ventilation and Cooling GRE 7 80 80 SF $1,401 $1,401 MECHANICAL/SERVICE ROOMS Air Tunnels Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room BLU 5 3,855,596 360 GRE 6 4 GRE 6 2,049 343,109 80 3,855 SF $87,320 1,956 SF $7,532 4 SF $19 2,392 SF $9,669 1,189 SF $5,233 $109,773 STAFF RESTROOM Accessories Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface,343 1,988 GRE 6 355 2,708 268 GRE 6 4 8,260,878 93 GRE 7 10 17 15 YEL 4 12 GRE 6 20 11 3,331 SF $10,371 3,331 SF $9,678 12 EA $1,201 1,260 SF $5,946 1,878 SF $4,780 193 SF $276 10 EA 33 EA $10,039 12 SF $43 31 SF $14 Assessment Date: 2/25/2013 Page 11 of 17

Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Wall - Structural Glazed Tile Wall - Tile Ceramic/ Porcelain Water Closet THEATER GRE 6 2 4 36 13 GRE 7 2,440 GRE 6 2,024 GRE 6 5,628 GRE 6 260 GRE 6 26 29 2 EA $57 50 EA $2,511 14 EA $372 2,440 SF 2,024 SF $4,776 5,628 SF $40,240 260 SF $662 55 EA $9,667 $100,632 Ceiling - Lay-In Flooring - Carpet Lighting - Chandelier, Incandescent Lighting - Pendant/ Surface Stage Wall - Plaster/Drywall GRE 7 2,294 GRE 6 2,294 GRE 6 6 GRE 6 26 GRE 6 531 BLU 5 4,952 2,294 SF 2,294 SF $3,280 6 EA $1,931 26 SF $43 531 SF $2,255 4,952 SF $70,814 $78,322 VOCATIONAL SHOP Work Sink INTERIOR GRE 7 3 3 EA $493,745 ROOM CASEWORK Casework GRE 6 283 240 523 LF $10,117 $10,117 Assessment Date: 2/25/2013 Page 12 of 17

CEILING Lay-In/Drop Plaster/Drywall GRE 6 870 12,000 GRE 6 21,164 12,870 SF $1,866 21,164 SF $59,924 $61,790 CHALK BOARD Chalk Board YEL 4 364 364 LF $44,244 $44,244 CLASSROOM Laptop Charging Station GRE 7 2 2 EA CORRIDORS Concrete Block Drop/Lay-In Lay-In Pendant/Surface Plaster/Drywall Stair Handrails Structural Glazed Tile Student Lockers Terrazzo Tile/Sheet Flooring GRE 7 4,642 GRE 6 2,030 YEL 4 2,030 GRE 6 5,162 8,216 6,560 GRE 6 596 5,378 GRE 6 437 GRE 6 3,826 986 GRE 6 3,146 6,779 4,642 SF 2,030 SF $4,354 2,030 EA $12,337 13,378 EA $3,691 16,560 SF $39,073 596 LF 15,378 SF $109,953 437 EA $62,491 4,812 SF $21,666 9,925 SF $27,509 $281,075 Assessment Date: 2/25/2013 Page 13 of 17

CORRIDORS CEILING Plaster/Drywall FLOOR Tile/Sheet Wood LIBRARY_CEILING Drop/Lay-In LIBRARY_WALL 3,378 6,081 7,953,485 13,378 SF $37,878 $37,878 16,081 SF $22,996 17,953 SF $135,552 $158,548 1,485 SF $3,185 $3,185 Plaster/Drywall GRE 6 2,066 2,066 $4,875 LIGHTING $4,875 Lay-In Pendant/Surface YEL 4 141 GRE 6 298 104 14 $52,424 402 EA $21,307 $73,731 MARKER BOARD Marker Board GRE 6 602 557 1,159 LF $17,217 $17,217 Assessment Date: 2/25/2013 Page 14 of 17

STAIRS Asphalt Terrazzo Tile WALL 6 GRE 6 274 GRE 6 61 16 SF $114 274 SF $3,103 61 SF $461 $3,678 Concrete Block Plaster/Drywall ROOM GRE 7 6,000 GRE 6 46,921 6,000 SF 46,921 SF $110,710 $110,710 $807,049 SITE CIVIL/DRAINAGE Site Drain Site Manhole GRE 6 2 GRE 7 10 2 EA $223 10 EA $223 FENCING Chain Link Guard Rail Ornamental Iron LANDSCAPE Asphalt Play Area/Hardscape GRE 6 260 2,016 GRE 6 280 BLU 5 973 GRE 6 52,680 2,276 LF $56,800 280 LF $7,928 973 LF $60,609 $125,337 52,680 SF $45,199 Assessment Date: 2/25/2013 Page 15 of 17

Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas MODULAR GRE 6 30,596 GRE 6 3,090 GRE 6 31,710 30,596 SF $12,251 3,090 SF $5,833 3 $8,866 1,710 SF $72,149 2-Classroom Modular Building YEL 4 1 $536,250 $536,250 PARKING LOT Asphalt Concrete Curbs Vehicular Screening PLAYGROUND GRE 6 25,273 GRE 6 689 GRE 6 378 25,273 SF $21,684 689 LF $4,158 378 LF $25,842 Playground Equipment - Combo 3-12 Playground Surfacing - Poured Surface GRE 7 1,589 1,589 SF SIDEWALKS Internal Walks Perimeter Sidewalks SIGNAGE GRE 6 243 GRE 6 9,989 243 LF $2,293 9,989 SF $18,855 $21,149 Flag Pole GRE 7 1 Assessment Date: 2/25/2013 Page 16 of 17

Marquee - Free Standing Back Lighted SITE Campus Need ² ³ $780,950 $7,340,527 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 2/25/2013 Page 17 of 17