At this time of year, our days are anything but short. It s go time for Facilities.

Similar documents
NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence

New High School Concept

Briar Crest Elementary

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

Imagine RBC 2010 The Plan

Design Presentation. Chief Operations Officer Willie Burroughs

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Angela M. Bollinger. architecture & interior design project management facilities management PORTFOLIO

Overview and Update of the Rutgers-New Brunswick Physical Master Plan. January 2015

Academics Efficient use of space will be used to enhance investments in new pedagogies such as active learning classrooms.

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

UPDATE ON ESTATES AND FACILITIES PROJECTS APRIL Projects Completed within last 24 months. 1. Richmond and Workshop Cladding ( 6.

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Academic Building Naming Prospectus. Environment Hall HOME OF THE NICHOLAS SCHOOL OF THE ENVIRONMENT AT DUKE UNIVERSITY

University of Pennsylvania, Neural and Behavioral Sciences Building

H107 Video Conference Room

Mirrored Wall, Spin Cycle, Dumbbells, Floor Mats, Jump Ropes, Exercise Bar and Large Exercise Ropes. Blackboards, A/V Cart, Presentation Remote

Oxford Hills School District Capital Renewal Plan Updated March 2017

Creating 3D Interior Maps for Campus Planning

2014 Bond Project Guide

Adopted DEFP FY16 - Amendment. Broward County Public Schools. Amended to Incorporate Board Approved Changes

REPORT CARD TO THE COMMUNITY MAY 15, 2018

Chabot College: Plan Kickoff and Visioning Session with Student Senate

Master Facility Planning Update School Board Meeting May 26, 2016

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Towson West Village Commons

PROJECT SUMMARY. University of California, Irvine Humanities Building. Project No FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Hawthorn Building. Penn State Altoona Campus Altoona, PA. Walter Nichols. Lighting/Electrical Option Faculty Advisor: Dr.

Forest Hills Facilities Plan

TALLEY STREET ELEMENTARY SCHOOL CITY SCHOOLS OF DECATUR COMMUNITY PRESENTATION DECEMBER 6, 2017

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

Tech Report. September 9,

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Maintenance Road Show

7/14/2016 CITY HALL ADA ENHANCEMENT/REMODEL ACTION PLAN 1978 Construction

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

Lighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1

University of West Florida s New School of Science and Engineering Building Adheres to PKAL Principles

3.2.4 OFFICE FACILITIES

Tech Report 1, Part 1: Lighting Proposal Memo TO: Shawn Good

GENERAL ASSIGNMENT CLASSROOM DESIGN STANDARDS

TRINITY LUTHERAN SCHOOL RENOVATIONS

Ohlone College Measure G Project Scope Revisions

ATLANTA-FULTON PUBLIC LIBRARY SYSTEM CENTRAL LIBRARY RENOVATION

LMS A NORTH BEACH BRANCH LIBRARY SCHEMATIC DESIGN IMAGES SAN FRANCISCO PUBLIC LIBRARY

Renovation Project Presentation Public Meetings

Facilities Management Services

Planning Guide for the Refurbishment, Renovation, or Construction of Instructional Space Environments

Master Project List Report

Jamie Devenger Senior Thesis Princeton University Sherrerd Hall 1 Lighting Proposal Memo September 11, 2009

6.1 University Projects

Bethlehem University 2008 Projects Summary

Doing Business with Bartlett Cocke General Contractors

LIVE OAK LIBRARY ANNEX PROJECT COUNTY OF SANTA CRUZ. December 4, 2018 COMMUNITY MEETING #3

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Goal 1: To Encourage the Orderly, Harmonious and Judicious Use of University Resources in the Development of University Land.

GiCor group of companies

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Design, education and collaboration intersect to create innovative learning environment

Center for Health Research and Rural Advocacy

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

Purchasing Services - Standard Operating Procedure [S.O.P.] Purchasing Methods

Kenmore Town of Tonawanda Union Free School District : Capital Improvement Project Phase 2

Laney College 2012 Facilities Master Plan

9333 Ehler Avenue SE Delano, MN

Albany Senior Center Remodel

2014 Exhibition of School Planning and Architecture. White Hill Middle School Campus Master Plan & Design. Ross Valley School District Fairfax, CA

CAMPUS MASTER PLAN DRAFT PLAN UPDATE JANUARY

12 th Pacific Science Inter Congress HEALTH AND SAFETY INFORMATION BOOKLET FOR PARTICIPANTS

Bramble Cottage Bicker. Boston, Lincolnshire, PE20 3DP 450,000

Mechanical Inspection Plumbing

THE COMMITTEE ON BUILDINGS AND GROUNDS SHALL CONSIDER AND MAKE RECOMMENDATIONS ON ALL MATTERS RELATING TO THE BUILDINGS AND GROUNDS OF THE COLLEGE,

PROCTOR TERRACE ELEMENTARY SCHOOL

E-SPLOST V. Facts and Information. August 2018

r.i.s.e demonstration center

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Building Technology III New York City College of Technology. Course Day 21 Revit Day 12 (Project Day 10)

Update on University Avenue Study. September 21, 2015

2014 Michael G. Meyers Design Competition

View from North West Corner

NEIGHBORS SOUTHWEST NEIGHBORHOOD MEETING December 17, 2014 BEAVERTON SCHOOL DISTRICT SOUTH COOPER MOUNTAIN HIGH SCHOOL

DRAFT $252,790,000. Career & Technical Education Department. Departmental Needs. Estimated Cost of Departmental Needs. Departmental Meeting

Allston Brighton Boston College Task Force Meeting. Brighton Marine Health Center March 27, 2013

UNIVERSITY OF TORONTO FACULTY OF LAW

Urban Institute for Contemporary Arts

3404 Greenbank Road - Jockvale on the River

Learning Connecting Relaxing TIB/UB Relaunching the public spaces

Diamond Schmitt Architects MEDIA RELEASE September 17, 2013

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

INTERIORS. serving all your interiors needs

Beaufort County Community College. Maintenance and House Keeping Plan

RA1.01. Project Description:

Recreation Unlimited Foundation

TECHNICAL ASSIGNMENT #3: SCHEMATIC LIGHTING DESIGN

PORTFOLIO SARAH NG

Spoonfed, A Full Service Restaurant

Transcription:

Intersession Projects At this time of year, our days are anything but short. It s go time for Facilities. After December, every day is just a little longer than the day before, which gives us a little more daylight to tackle our intersession project list. Here s what s on the calendar this year. Questions? Email Lauren Alzate or visit our website to learn more. ) NEUROMOTOR RECOVERY LAB (NRL) 0 Ashford Street A, sq ft space at the Track & Tennis Center for Sargent s Department of Physical Therapy & Athletic Training is being renovated to accommodate biomechanical measurement of study participants. The lab will feature an treadmill with recessed force plates to measure ground contact force during walking. A large oval track will surround the treadmill; cameras mounted around the room will allow concurrent tracking of an individual s movement. Real-time data and biofeedback will be available on a large projector screen. The NRL lab will also house a control station overlooking all activity, a separate treatment room with biofeedback capabilities, and two offices for research personnel. East Concord Street (L) ) EVENTS & CONFERENCES RELOCATION Commonwealth Avenue Renovation of the Castle into BU s new Alumni Center requires relocation of Events & Conference Services office to unassigned shell space in the north end of Agganis Arena. The new location next to Arena management will facilitate collaboration between departments. The area is also the hub of summer housing operations, including summer camps that use West Campus and Student Village. The new space will offer an open environment allowing for improved communication among staff. The project includes new furnishings which allow existing furnishings to remain in the Castle for Alumni Relations.

Intersession Projects ) FITNESS & RECREATION CENTER (FITREC) Commonwealth Avenue Updates include removal of five fold-up divider curtains around the perimeter of the gym, and removal of curtains that separate the three courts. The curtains dividing the courts will be replaced with new roll-up dividers. Roll-ups are easier to operate, cause less damage to floor finishes, and match those in the four-court gym on the third floor. New window shades will be installed to minimize glare from seven large south-facing windows. ) RENOVATION PREP WORK Commonwealth Avenue Facilities will initiate demolition and abatement of interior finishes at Comm Ave over the winter break. The preparation work is the first step in relocating IS&T offices from the center of campus to free up space for teaching and research. ) STUDENT SERVICES Commonwealth Avenue Phase two renovations to lower level offices of Student Accounting Services will include the creation of four new cubicles for student services staff. ) COLLEGE OF FINE ARTS (CFA) Commonwealth Avenue Suite and room will be configured into several offices to accommodate new staff in the online education program. Changes to a rd floor bathroom will bring it into compliance with the Americans with Disabilities Act (ADA). A partial wall between rooms A and 0 will be removed to provide access to the wood shop. The th floor project includes abatement of the tile floor, sink removal, installation of new blinds and electrical outlets. East Concord Street (L) ) THEATRE ARTS PROJECT Commonwealth Avenue Work will continue over intersession on BU s new stateof-the-art theatre arts production and performance space. When complete, the School of Theatre s design and technical production programs will relocate to the multifunctional facility, which is closer to other fine arts programs. Designed by Elkus Manfredi Architects and under construction by BOND construction, the,000 gsf

Intersession Projects Intersession Projects building will feature a black box theatre, seating up to 0 depending on stage configuration. Production and support facilities include high-bay spaces for constructing and painting scenery and props, as well as costume shops. The design includes faculty offices and studios for classes in lighting, sound, costume, and scenery design. The project includes a two-level subsurface garage with spaces and a reconfigured surface lot with spaces for a total of parking spaces. A new loading dock will serve the production and performance spaces and the historic Peter Fuller Building at 0 Comm Ave. Plans include a landscaped front plaza and landscaped zones along Essex and Dummer Streets. Over intersession, work will continue on installation of concrete foundation walls and erection of the steel frame. The building will be tarped and heated so work can continue throughout the winter months. ) GEORGE SHERMAN UNION (GSU) Commonwealth Avenue Two food court stations will receive facelifts over the winter break. Cranberry Farms and Copper Kettle will be upgraded with new signage and finishes. East Concord Street (L) Renovations on the rd floor include demo of finishes in five conference rooms, adjacent hallways, and common spaces; installation of new AV infrastructure; new paint, carpeting, ceilings, and lighting throughout. Furniture purchased last summer will be replaced after the renovations. Carpet in the Community Service Center (CSC) on the th floor will be replaced. The CSC s sustainable design includes

Intersession Projects existing carpet tiles from Commonwealth Avenue which will be repurposed for the space instead of being disposed of during that building s renovation. ) FRAUNHOFER CENTER St. Mary s Street An overall refresh is planned for the first floor of the Fraunhofer Center for Manufacturing Innovation. The project scope includes painting and carpeting in offices, seminar rooms, and common rooms including the corridor and stairs. Stairways to the lower level will also receive fresh paint. ) CAS COLLABORATION SPACE Commonwealth Avenue Work will begin on a new student collaboration space in the College of Arts & Sciences (CAS) building. The full gut renovation of suite will lay the groundwork for CAS Collaboration Space, a longtime student request. When complete, students will be able to meet, study, and relax in collaboration spaces, break out rooms, and an open area with new furnishings. ) EARTH & ENVIRONMENT LAB Commonwealth Avenue Existing lab space in rooms and will be renovated to accommodate new Earth & Environment faculty members. The project will include removal of wall tile, a sink upgrade, electrical circuit installation, installation of suction and snorkel fans, installation of air vents, and additional storage. ) EARTH & ENVIRONMENT LABS Commonwealth Avenue Over the winter break, work will continue on new labs for the Department of Earth & Environment, located in the basement of the Stone Science Building. The project includes new sinks and wet sample prep spaces, a coral sample weighing area with anti-vibration table, a separate coral milling area within room B, and a student computational area. Plans also include additional electrical outlets for freezers, lab stools, sample storage area, and an anteroom for computers. East Concord Street (L) ) SOCIOLOGY LOUNGE & KITCHEN Cummington Mall A total refurbishment is slated for the Department of Sociology faculty lounge and kitchen; specs include lighting,

Intersession Projects flooring, patch/paint, built-in cabinet removal, and new furnishings. ) BIOMEDICAL ENGINEERING RESEARCH LAB Cummington Mall Prep work for a new faculty member in the Department of Biomedical Engineering will take place over intersession. Refurbishments to the lab space include installation of shelving and relocation of electrical outlets and data ports. Plans include painting and new lab stools and benches. ) BIOLOGY LAB Cummington Mall Renovations to lab space (rooms and ) will be made to accommodate new researchers in Biology. The project includes new plumbing, HVAC, and electrical. Renovations will also be made to a shared student write-up area. ) ZIMMERMAN FAMILY SOCIAL MEDIA NEWSROOM 0 Commonwealth Avenue After a total gut of room, construction will begin on the new Zimmerman Family Social Media Newsroom. Partially funded by a Zimmerman family donation, the high-tech classroom and lab will allow COM students to analyze developing social media trends. The renovated space will be designed to resemble an advertising agency, in this case an agency run by students. It will facilitate innovative instruction focusing on social media s impact on consumer motivation and decisionmaking. The room will seat up to students at four workstations with interactive LCD screens that will connect to students laptops. Five large LCD screens on the front wall will interact with the workstations; soft seating in the area will facilitate media review and impromptu meetings. The work includes new finishes, lighting, furniture, and AV equipment. East Concord Street (L) ) BIOMECHANICS LAB Commonwealth Avenue Renovations are slated for the Movement & Applied Imaging Lab at SAR, a trans-disciplinary collaboration that focuses on preventing and managing musculoskeletal disorders. The project includes construction of space for measuring walking, running, jumping, stair climbing, and other movement. State-of-the-art equipment will include a motion capture system (multiple high-speed infrared and video

Intersession Projects Intersession Projects cameras around the perimeter), floor recessed force platforms, instrumented staircase, and wireless muscle activity and Inertial Measurement Unit (IMU) sensors. The space will feature an interactive smart screen offering real-time data, and a computerized multimode dynamometer to measure muscle strength and performance. A data capture control station will overlook the lab; treatment areas and workstations for analyzing biomechanics and MRI data will also be installed. ) CENTER FOR INTEGRATED LIFE SCIENCES & ENGINEERING (CILSE) With a completion date in sight, work will continue on BU s state-of-the-art integrated life sciences and engineering research facility. The $0 million, LEED-registered Center will be the hub of collaborative, interdisciplinary research among engineers, life scientists, and physicians from the Medical and Charles River Campuses. It will house neuroscience research, systems/synthetic biology research, a cognitive neuroimaging center, and a satellite vivarium. Community and colloquium spaces, the imaging center, and building administration will occupy the ground floor. Floors two and three of the 0,000 sq ft building will house mechanical, electrical, and vivarium support; floors four through nine will be dedicated to faculty research. Commonwealth Avenue East Concord Street (L) Work over intersession break includes interior finishes, installation of lab casework and equipment; start up/ testing of mechanical equipment; and installation of the functional magnetic resonance imaging (fmri) machine. Site work and landscaping on the east and west plazas will be ongoing.

Intersession Projects ) QUESTROM SCHOOL OF BUSINESS Commonwealth Avenue Refurbishments and updates are slated for a Questrom computer lab classroom. Room will receive new furniture, carpet, paint, and finishes. Work in the lobby of the Rafik B. Hariri Building will include installation of a window into the mailroom s copy center and reworking the entryway to create a st floor office. ) CHEMISTRY LAB 0 Commonwealth Avenue Renovations will continue on the nd floor of 0 Comm Ave over intersession to accommodate a new chemistry faculty member. Work will focus on the conversion of a 0-year-old wet lab into a modern laser lab. Offices for grad students will also be created from space currently used for storage. ) MARCIANO COMMONS 0 Bay State Road Marciano Commons, a two-level dining facility with seats, is located in the Yawkey Center for Student Services. Over intersession, the acoustic wall lining the facility s main staircase will be replaced. ) NEUROSCIENCE LAB Beacon Street Renovations to an existing lab space in room 0 for a recent hire in Perception & Human Cognitive Neuroscience includes construction of two free-standing EEG chambers that are radio frequency electromagnetic compliant. Also included: installation of a lab sink, sound-shielded behavioral testing rooms, idea paint and/or white boards, and student collaboration and computational spaces within the lab. East Concord Street (L) ) MYLES STANDISH HALL Beacon Street Phase (May August ) renovations to Myles Standish Hall will continue. The project includes renovation of,000 sq ft. with the goal enlivening the Beacon Street streetscape with an active undergraduate community space. The interior of the building will be reconfigured to better meet the needs of modern student living. Constructed in, the suite-style hotel has provided housing to BU undergrads since. Preserving and modernizing the original hotel and adjacent annex building is designed

Intersession Projects Intersession Projects to improve the undergraduate residential experience The LEED-registered project design maximizes private bedrooms, and will showcase the modern amenities and common spaces required to attract today s students to oncampus living. Work over the break will include utility connections into the building from Beacon Street, installation of new stone on the exterior walls on levels &, mechanical system roughin on the lower floors, and finishes on the upper floors. ) SLONE RELOCATION East Concord Street To accommodate the relocation of the Slone Epidemiology Center (currently housed at Commonwealth Avenue), abatement and demolition of the th floors of the L and R buildings will be done. This first phase of the renovation includes demolition and removal of concrete walls, HVAC, plumbing, and electrical to prepare the space for construction. The second phase will include build-out of offices, work stations, conference rooms, and classrooms and renovation of bathrooms will to meet ADA accessibility code. East Concord Street (L) This project is Leadership in Energy and Environmental Design (LEED)-registered under the green building certification program. The LEED green building certification program is the nationally accepted benchmark for the design, construction, and operation of green buildings. This project uses sustainable practices and products.