INDEX INTRODUCTION. The development encompasses multifaceted living and will include the following:

Similar documents
CORNUBIA RETAIL PARK- PLANNING REPORT REVERT 3

ENVIRONMENTAL IMPACT ASSESSMENT

BASIC ASSESSMENT PROCESS THE PROPOSED CANELANDS EXTENSION, KWAZULU-NATAL KZN DAEA REF NO: DM/0031/2012 BACKGROUND INFORMATION DOCUMENT AUGUST 2012

TRANSPORTATION: Roads and Highways Services

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Welcome. Walk Around. Talk to Us. Write Down Your Comments

4 RESIDENTIAL ZONE. 4.1 Background

I615. Westgate Precinct

PROPOSED GARDEN CITY NEW TOWN DEVELOPMENT, KRAAIFONTEIN DRAFT ENVIRONMENTAL IMPACT REPORT Summary Document

Keystone Business Park Precinct Structure Plan North East Industrial Precinct. Part 2 Design Principles

BACKGROUND INFORMATION DOCUMENT

LIDBURY, SUMMERS & WHITEMAN

binary response film centre for the gasworks precinct produced by Phia Groenewald

PUBLIC NOTICE UNDER CLAUSE 5 OF SCHEDULE 1 OF THE RESOURCE MANAGEMENT ACT 1991 PLAN CHANGE 12 TO THE OPERATIVE CITY OF NAPIER DISTRICT PLAN

WATERFORD Plan of Preservation, Conservation and Development Supplement Part 1 - Policy Element

BUILDER LOTS FOR SALE

plan context INTRODUCTION 10 EXISTING SITE CONDITIONS 16 RELATED PLANS & INITIATIVES 10 CONSULTATION 30

PURPOSE OF MEETING MEETING GUIDELINES PROJECT BACKGROUND ESKOM CLOCOLAN-FICKSBURG 88 KV POWERLINE, FREE STATE

Cc~tporate Sers~ic:es

DATE OF BIRTH : 23 October 1971 YEARS EXPERIENCE : 21

Appendix 1 Structure plan guidelines

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

THEMES, VISION, + PRINCIPLES

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Leduc Industrial Outline Plan SE W4

MEETING HELD AT THE EDTEA OFFICES (ethekwini) ON 03 July 2018 AT 10h00. Ms. Naadira Nadasen (NN) Mrs Chen read (CR) and Mrs Tejal Singh (TS)

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

ENVIRONMENTAL IMPACT ASSESSMENT

EXPANDED ENVIRONMENTAL ASSESSMENT FORM PART III Bear Mountain Triangle Rezoning

Transportation. Strategies for Action

GREENBANK DEVELOPMENT MASTERPLAN

Issues, Challenges & Opportunities

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

14.5 HOPEFIELD: (REFER PLAN 39 AND PLAN 40)

2.0 AREA PLANS. Lakeside Business District. Lakeside Business District Land Use Categories:

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

6.2 Current condition of the Walker Spruit and Apies River

North Somerset Council Local Development Framework

EXISTING COMPREHENSIVE PLAN

Vivid Architects were appointed by Rabie Property Group as the lead Urban Designers

PUBLIC OPEN HOUSE SEPTEMBER 8 TH, 2010 CITY OF LETHBRIDGE DEVELOPMENT SERVICES

The Fairfield Partnership Vision for North-East Elsenham

Northern Territory Compact Urban Growth Policy

Bypass #16 - Bend Parkway (new alignment for US 97) (MP )

BRIDGE OF DON MASTERPLAN & PLANNING SUMMARY

Draft Western District Plan

Submission to the Kildare County Council Development Plan North Kildare Chamber. Executive Summary

RIVER MAINTENANCE MANAGEMENT PLAN APPLICATION

Derry Green Corporate Business Park

DEVELOPMENT FRAMEWORK POST 2030 LAND USE PLAN INTRODUCTION

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

Cardiff International Sports Village Waterfront Development Volume IV : Non-Technical Summary of the Environmental Statement

SOCIO-ECONOMIC MOVEMENT ENVIRONMENT INFRASTRUCTURE TOWN PLANNING

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

Challenge 2017 St. Peters Place and Innovation

I539. Smales 2 Precinct

MAYFIELD WEST SECONDARY PLAN PHASE 2

DRAFT IMPACT ASSESSMENT REPORT

Final Master Plan and Development Control Regulations

12 th Street Connector Alignment Study VISIONING PUBLIC WORKSHOP - JUNE 25, :00PM TO 8:00PM

Business Plan for development of the Water Palace waterfall.

Auckland City Council

AOTEA SUPERMARKET ZONE. Zone Introduction

BORRISOKANE SETTLEMENT PLAN

Comprehensive Plan Advisory Panel Meeting #3

at Lakowe Lakes An exclusive sanctuary of only 18 villas... True Serenity.

Brampton. Secondary Plan. Review. Bram West. A New Direction in Planning & Public Consultation

Section 1. Executive Summary

NATIONAL ROAD 3: KEEVERSFONTEIN TO WARDEN (DE BEERS PASS SECTION) CHAPTER 1: INTRODUCTION

McCowan Precinct Plan Study Background & Deliverables

PHASE 1 ARCHAEOLOGICAL IMPACT ASSESSMENT PROPOSED DEVELOPMENT ERF 3 ROBERTSON WESTERN CAPE PROVINCE

CONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE

04Design. Methodology. Future of Jacksons Hill Identifying Potential Uses Building Typology and Adaptability Community Engagement

CURRICULUM VITAE MAGNUS VAN ROOYEN

PRESENTATION ON JOHANNESBURG S BIODIVERSITY PROGRAMME

Pine Island Road Corridor Master Plan

THE PROPOSED DEVELOPMENT OF A RETIREMENT VILLAGE AND RESIDENTIAL ESTATE, TOKAI

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

SINGITA SWENI LODGE EXPANSION: SUMMARY REPORT - BAR

3.5 Principle 5/Response

Wiltshire Council s Core Strategy

CHAPTER 8 ISSUES, CONCERNS, CONSTRAINTS AND OPPORTUNITIES

BASIC ASSESSMENT PROCESS

Contents of Part 6. Part 6 Zones

CHAPTER 5: GUIDING PRINCIPLES

Employment and Commercial Review Analysis of Policy Directions

REMARKABLES PARK ZONE

Longbridge Town Centre Phase 2 Planning Application

PROJECTS OF DUBRUTO URBAN PLANNING 22 February 2016 Centurion Lake Redevelopment - Symbio City

Road transport activities and infrastructure can have adverse effects on the environment and community.

4.00 STAKEHOLDERS. urbanprojects

Bloor St. W. Rezoning - Preliminary Report

SCHEDULE 10 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ10. Truganina Precinct Structure Plan. 1.0 The Plan

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

CORNELIUS ART DISTRICT & FESTIVAL STREETSCAPE. October 3, 2016

M A K E K A D E S I G N L A B. CONCEPT l CONTENT l CRAFT

The transportation system in a community is an

TSHWANE STRENGTHENING PROJECT PHASE 1, GAUTENG PROVINCE: Draft Scoping Report: Apollo - Verwoerdburg July 2009

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment

THE NEIGHBORHOOD TODAY

Transcription:

INDEX INTRODUCTION 2 THE VISION 3 RESIDENTIAL 4 SPECIALIST STUDIES 6 TRAFFIC IMPACT SUMMARY 6 NEW & UPGRADING ROADS 7 FAQ 8 CONTACT DETAILS 10 2 INTRODUCTION The Linksfield, Integrated Mixed Use Development, comprising of a central Mixed Use Hub, Commercial Development, Retail Precinct, Residential Estate, and Inclusionary Housing, will form the hub and starting seed for a new economic node which, through its innovative urban design framework, will cater to all aspects of life and all creeds. The development encompasses multifaceted living and will include the following: Apartments and residential suburbs Primary and Secondary Schools Private University Offices Entertainment Restaurants Retail precinct Business parks Hotels Conference facilities Showrooms Gymnasium Light industrial / commercial areas It is envisioned that this development should be a turning point and mark the creation of a new era of lifestyle for South Africans of a truly multi class, multi-racial working and living environment. Interconnectivity of the site with the surrounding associated land uses is important for the socio economic sustainability of the site. Therefore the development will connect with the surrounding built environment in order to uplift the area as a whole. The main focus of the development is on promoting our uniquely South African outdoor extroverted lifestyle and the integration of South Africans from all walks of life into the integrated development precinct. The prime focus will be on building and reinforcing the family unit which is so vital, considering the frantic pace at which most people live today. Equicent s main goal is to create a fully integrated, mixed use development that can serve both as an example and a showcase for Gauteng and South Africa as a whole.

THE VISION Retail Mixed Used Light Industrial / Commercial Areas Institutional Business Residential 3

RESIDENTIAL 4 The development will contain a range of quality residential apartments ranging from studio apartments to tree bedroom family units

5

SPECIALIST STUDIES 6 The EIA Regulations, 2010 and the associated Government Notices Nos R544, R545 and R546 promulgated in terms of NEMA specify the process to be followed to obtain Environmental Authorisation. Since the proposed development includes activities listed in all the notices (No. R544, No. R545 and No. R546), an application for a full EIA process was lodged at the Gauteng Department of Agriculture and Rural Development (GDARD). In order to comply with the requirements of the Act and Regulations, as well as the directive by GDARD, comprehensive investigations are being carried out. The outcomes of these studies will be included in the Environmental Impact Assessment Report (EIR) will inform the decision to be taken on this application. The specific studies include the following: Geohydrology- Aurecon Agricultural Potential- Terrasoil Bulk Electrical Supply - LTE Consulting Services Report- WSP Stormwater Management Plan- WSP Flora- Galago Ecological Avifauna- Galago Ecological Herpetofauna - Galago Ecological Wetland Addendum- Galago Ecological Geotechnical - J Louis van Rooyen Heritage Study - Leonie Marais-Botes Baseline Forensic soil investigation into potential Pathological risks- Terrasoil Additional input from Anthrax Specialist - Varies Speciialists Noise Impact Assessment - Enviro Acoustic Research Town Planning Report- Urban Dynamic Gauteng Traffic Impact Assessment - WSP Visual impact assessment - Zone Land Solutions Wetland Delineation - Terrasoil TRAFFIC IMPACT SUMMARY In order to accommodate the additional traffic demand at acceptable congestion levels to the regional community, new infrastructure and road upgrades are required. The road upgrades proposed in the traffic impact assessment include: A new link parallel to the N3. A new interchange between Modderfontein Road and Linksfield Road. A new access road on Moderfontein Road to provide direct access to the development. New north-south and west-east links, passing through the development to improve regional traffic accessibility and mobility. Additional lanes on Club Street, Linksfield Road and Modderfontein Road. Additional ramps on Linksfield Road Improvements on the surrounding intersections. An integrated public transport facility A new BRT complementary route passing through the site. A new Gautrain feeder route to Marlboro station. This will entail the upgrade of sections of Shakespeare Rd. Access management improvements.

NEW AND UPGRADING ROADS 7

FAQ 8 Q. What will happen to the Graves and Grave Yard on Site? Nothing, none of the Grave Yards on site will be disturbed by the Development. These four grave yards, two adjacent to Club Street, one adjacent to the Jukskei River and the other in the current Sizwe Hospital grounds will be retained in their current positions. Theses grave yards will be retained as Public Open Space to ensure the Heritage of the sites are retained. The extent of these sites have been verified by a team of specialists and surveyed by a registered land surveyor to ensure they are correctly demarcated on the Development Layout Plan. Q. There have been allegations of Mass and Unmarked Graves on Site. Has any evidence of this been forthcoming? No, Despite extensive specialist studies undertaken on the site, as well as an extensive Public Participation Process with various advertisements placed in prominent newspapers, no evidence of mass graves or any additional grave sites other than the four identified on the Layout Plan attached have been identified. Q. How does the Development take Grave Sites into consideration? The grave sites are a large portion of the history of the site and will be retained as Public Open Spaces to ensure that the Heritage of the Site is retained as well as various Buildings of historical significance such as Dr. Mellis House, which will be retained as a public Museum to retain a sense of Place and a portion of the history of Linkfield. Q. How is the Project being Financed and does it include Government Funds? The Development was Tendered Out in 2011 and was awarded to Equicent Infrastructure Development the following year. The project is, in its entirety, being funded by Equicent, however qualified purchasers of inclusionary Units within the development will receive the standard inclusionary housing subsidy as per the National Housing Legislation. Q. Was the Heritage on the Site taken into consideration? Yes, extensive heritage studies been done and these were taken into account regarding the future development on the site. Detailed research has been done in order to ascertain which buildings are of historical significance and architectural merit and should be retained, as well as what these Buildings should be used for. For example; the Dr. Mellis House is being restored as a Museum, as well as Wards 1 and 2 of the original Sizwe Hospital, which will be restored and converted into an Information Centre within the Development. Q. Was the Fauna & Flora on the Site taken into consideration? Yes, sensitive Fauna and Flora, as identified by the relevant specialists, will be protected during the development of the site. Extensive studies have been done to identify the sensitive areas on the Site as well as what rehabilitation will need to take place along the River s Edge. This is included in the EIA and a copy of the Sensitivity Plan is attached herewith. Q. How will the Development impact on Engineering Services and Infrastructure? Detailed studies have been done by the various Engineering Firms to ascertain what upgrades will be required, the following have been identified; Sewer: The current Bruma Outfall Sewer has capacity and it has been confirmed that no upgrades on the sewer will be required. Water: The existing 450mm water pipe on the site will need to be upgraded.

9 Roads: Significant road upgrades are required to accommodate the traffic for this Development. The primary purpose of these road upgrades is to solve existing traffic issues in the area, as well as ensure that the development and surrounding suburbs have increased access to the Freeway and main arterial routes. Public Transport: In addition to the road upgrades, allowances have been made for future BRT Routes both from Ekurhuleni and The City of Johannesburg. Electricity: The electrical infrastructure requires significant upgrades. The existing overhead power lines that run through the Development will be upgraded and a new 100KV MVA Substation will be built on the site. This Substation will only use 20% of its capacity to supply the development, the remaining capacity being utilized to further strengthen the existing power grid that is currently experiencing strain within the area. Gas: To further reduce electrical consumption within the development an existing Egoli Gas line is being extended into the site and will supply both residential and commercial users. Q. Can the existing Support of Facilities, such a Police Stations and Schools sustain the Development? As part of the Development Proposal additional facilities as are currently planned to be built. This includes Schools, both Private and Public a Fire Station and Police Station in order to ensure that the current facilities are bolstered and more capacity is provided rather than over straining existing facilities. Q. There is a Perception that this Development is Aimed to Provide Low Cost Housing; How will the Development Impact on the Property Values of Surrounding Homeowners? Positively, The Linksfield Integrated Mixed Used Development will be the First Fully Integrated Development in South Africa providing access to facilities as well as accommodation to both Upmarket as well as Inclusionary Housing. It is anticipated that the surrounding property values will increase significantly over the duration of the Development, both due to the increase in accessibility because of the Road Upgrades, as well as additional Amenities that will be provided. Currently one of the major risks that drive open property values down is the possibility of Land invasion occurring. With the development of this Site this possibility is effectively, eliminated. Q. How will this development impact on the developments to the East of the Highway such a Marais Steyn Park? It won t, There is an existing underpass beneath the Freeway which will be used specifically to link to an additional new Bypass Road acting as an off-ramp from the Freeway. There is no planned link into the Marais Steyn Park suburb, it will remain a completely separate area. Q. How Will the Proposed Development Impact SAHETI School and the Elphin Lodge Retirement Village? Although there will be additional traffic within the area, the Road Upgrades that have been provided will provide significantly increase capacity and it is believed that the access to both the Saheti School as well as the Retirement Village located on the opposite sides of the Development will be improved, rather than affected, by the Development.

CONTACT DETAILS 10 Client and Land Owner Department of Human Settlements INFRASTRUCTURAL DEVELOPMENTS Developer Equicent Developments Town Planner Urban Dynamics Gauteng Inc. Jon Busser Tel: 011 482-4131 Environmental Consultant Bokamoso Environmental Consultants Lizelle Gregory Tel: 012 346 3810 Engineer (Infrastructure) WSP, Civil and Structural Engineers Douglas Ackerman Tel: 012 762 1207 For more information visit: www.linksfield.dev