DESIGN OF A RECYCLE BIN TIN CAN CRUSHER MUHAMMAD HANIS BIN MUHAMMAD ZULKIFLI

Similar documents
IMPROVEMENT OF BUS ROOF SECTION

AIR CONDITIONING STUDY FOR AUTOMOTIVE APPLICATION ALAUDDIN HAFIZ BIN YUSOF UNIVERSITI MALAYSIA PAHANG

MUIHAMAD RUSYDI BIN AL!

ANALYSIS OF HEAT GAIN AGAINST COOLING CAPACITY AT OCCUPIED BUILDING KOH KELVIN

VISUAL REPRESENTATION OF NATURE IN THE LIBRARY SOMAYEH ROUSTAEI SADRY UNIVERSITI TEKNOLOGI MALAYSIA

APPLICATION OF BIM IN EARLY STAGE DESIGN COST ESTIMATION

IDENTIFICATION OF AUDIO AND ROOM PARAMETERS FOR OPTIMUM SPEECH INTELLIGIBILITY IN ROOM NG TSING CHUN UNIVERSITI TEKNOLOGI MALAYSIA

A Suitable Development Trend in Linear City Based On Smart Growth A Case Study in Lanzhou Urban Area ZHOU WEI

ASSESSMENT OF PARKING DEMAND IMPACT ON ADJOINING ROADWAY NETWORK WAN NUR ALIFFA WAN RAMLI

A COMPARISON BETWEEN TRADITIONAL PAVEMENT REHABILITATION METHOD AS COMPARED TO RECYCLING METHOD SITI MAZZUANA BINTI SHAMSUDDIN

HEDGES USED IN BACKGROUND OF THE STUDY SECTIONS OF ENGLISH DEPARTMENT THESES: A CASE STUDY AT DIAN NUSWANTORO UNIVERSITY THESIS

EFFECT OF FINE AGGREGATE ANGULARITY ON RUTTING RESISTANCE OF ASPHALT CONCRETE AC10

POROSITY ARCHITECTURE IN ECOLOGICAL DESIGN TAN KWON CHONG

UNIVERSITI TEKNOLOGI MARA IMPLICATION OF NIGHT-TIME LEISURE ACTIVITIES TOWARDS PLACE IDENTITY OF URBAN PUBLIC PARK IN SHAH ALAM AND PUTRAJAYA

GREEN HIGHWAY ECOLOGY AND ECOSYSTEM PRESERVATION AND RESTORATION MUDATHIR OMER ADAM ARBAB

NAZANEEN AHMED NASROULLA

Gagnon, R. M. (2008). Design of special hazard and fire alarm systems (2nd ed.). Albany, NY: Delmar Learning.

DYNAMIC ANALYSES OF COMPOSITE FOOTBRIDGES EXCITED BY PEDESTRIAN INDUCED LOADS FARAZ SADEGHI UNIVERSITI TEKNOLOGI MALAYSIA

GEOGRAPHICAL ANALYSIS OF LIBYAN AIRPORTS AND THEIR POTENTIAL AS A HUB OF AIR TRANSPORTATION FOUAD D S ABDULWAFI UNIVERSITI TEKNOLOGI MALAYSIA

UNIVERSITI TEKNOLOGI MARA

DESIGN AND CONSTRUCTION OF A MICROCONTROLLER BASED UNDER AND OVER VOLTAGE PROTECTION DEVICE WITH ALARM NAT BEREGHA EREMIEMI (2006/24462EE)

TABLE OF CONTENTS CHAPTER TITLE PAGE DECLARATION DEDICATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK

FLOOD MAPPING FOR SUNGAI BUNUS MOHD IRSYAM NOORFAWANA BIN MASRI

UNIVERSITI TEKNIKAL MALAYSIA MELAKA

ASSESSMENT OF URBAN GREEN SPACE BASED ON LANDSCAPE ECOLOGICAL PRINCIPLES SITI SYAMIMI BINTI OMAR

FIR 3305, Fire Protection Structure and Systems Course Syllabus. Course Description. Course Textbook. Course Learning Objectives.

SUSTAINABILITY ASSESSMENT OF COMPACT-CITY DEVELOPMENT USING GEODESIGN APPROACH AHMED ABDULHAFEDH OWAID UNIVERSITI TEKNOLOGI MALAYSIA

CENTRE OF STUDIES FOR BUILDING SURVEYING FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING UNIVERSITI TEKNOLOGI MARA

TABLE OF CONTENTS. iii iv vi. vii. xii xiii xvii xix

CENTRE OF STUDIES FOR BUILDING SURVEYING FACULTY OF ARCHITECTURE, PLANNING AND SURVEYING UNIVERSITI TEKNOLOGI MARA

Samsiah binti Mohamad

Rockmaster Super Black Diamond Black Diamond Cobra SINGLE ROLL CRUSHERS

NAZANEEN AHMED NASROULLA

Crushers, Mills and Stock Treatment

DESIGN AND ANALYSIS OF ELECTRICAL IRON USING BOOTHROYD DEWHURST DFMA METHODOLOGY MOHD HAZUAN BIN MOHD ZAWAWI

Design and Fabrication of Aluminium Tin Can Crusher

SMART GARDEN SYSTEM NURSHAHNEEM BINTI MOHD SAID

THE DESIGN AND FABRICATION OF AN OIL VACUUM CLEANER FOR INDUSTRIAL USE

DESIGN FACTORS THAT INFLUENCE THE EFFECTIVE USE OF MEYDAN IN IRAN REIHANEH SADAT HAJMIRSADEGHI UNIVERSITI TEKNOLOGI MALAYSIA

UNIVERSITI TEKNOLOGI MARA

NUTRIENT LEACHING IN PEAT AND LATERITIC SOIL TREATED WITH INORGANIC AND ORGANIC FERTILISER

HUMIDITY CONTROL SYSTEM FOR ROLLING AND FERMENTING ROOM OF A TEA FACTORY

THE RELEVANCE OF TRANSIT-ORIENTED DEVELOPMENT FOR TRANSIT STATION COMMUNITY IN MALAYSIA ZAINUDDIN BIN AB RAHMAN

SYLLABUS. Departmental Syllabus. Fire Protection Equipment Alarm Systems. Departmental Syllabus. Departmental Syllabus. Departmental Syllabus

Development of eco-friendly washing machine

SAN DIEGO COMMUNITY COLLEGE DISTRICT MIRAMAR COLLEGE ASSOCIATE DEGREE COURSE OUTLINE

Electrical Safety Program

UNIVERSITI TEKNOLOGI MARA THE CONDITION OF OUTDOOR SCULPTURES IN ASEAN SCULPTURE GARDEN KUALA LUMPUR: A CONSERVATION STUDY NORA SOFIA MOHAMED YURAN

Cabinet Type Washing and Drying Machine

UNIVERSITI TEKNOLOGI MARA A CASE STUDY ON PERSIAN GEOMETRIC ISLIMIS FOR FURNITURE DESIGN

SISTEM PBNGUJIAN TAPAK CADAI\IGAN BINAAN HALIZAH BINTI AHMAD

Crystalline Silica Control Methods

HEAT TRANSFER CHARACTERISTICS OF A HEAT EXCHANGER JAMIATUL ADAWIAH BT AB. SIDEK UNIVERSITI TEKNIKAL MALAYSIA MELAKA

The Mousetrap Car Engineering Design Competition requires participation in these areas:

ANALYSIS AND MEASUREMENT FIBER OPTIC FAULT BY USING OPTICAL TIME DOMAIN REFLECTROMETER (OTDR) AKWANIZAM BIN AZMI

A STRUCTURED CRITICAL SUCCESS FACTORS MODEL FOR THE IMPLEMENTATION OF GREEN RETROFIT PROJECTS REHMAASHINI JAGARAJAN UNIVERSITI TEKNOLOGI MALAYSIA

Fire Protection Systems FST 209. COURSE SYLLABUS Fire Protection Systems FST 209 [Semester] CRN 3 Credits

JHT, JXT JAW CRUSHERS

Developing a Healthcare Facility Fire Door Inspection Program

THE MOUSETRAP CAR GUIDELINES FOR SECME ENGINEERING DESIGN COMPETITION 1

Required Materials For complete material(s) information, refer to

DESIGN AND CONSTRUCTION OF OVER-VOLTAGE AND UNDER VOLTAGE PROTECTIVE DEVICE WIT.H REMOTE CONTROL

JC Series Jaw Crusher

PROPOSE AND DESIGN A CANVAS SHOES CLEANER MACHINE NUR SYAFIQAH BINTI ISMUINI

Emergency Evacuation Plans and Exercises. Risk Management Services

BUBBLE-Maker. Necessary tools and materials:

The Influence of Graphics on Contemporary Commercial Interiors in Sri Lanka. library UNIVERSITY OF MORATUWA, SRI LANKA MORATUWA

oem OEM 1" Between the Glass Metal Blind Series P2100 Included:

FLOW AND PERFORMANCE INVESTIGATIONS OF CENTRIFUGAL BLOWERS WITH AEROFOIL BLADED IMPELLERS

RESPIRABLE CRYSTALLINE SILICA PARAGRAPHS (C) THROUGH (J)

IN VITRO REGENERATION OF PINEAPPLE (Ananas comosus) L. MERR 'MD2' USING DIFFERENT CONCENTRATION OF INDOLE ACETIC ACID (IAA) AND KINETIN (KN) HORMONE

H.R. LABOUNTY SAFETY AWARD PROGRAM TEHACHAPI-CUMMINGS COUNTY WATER DISTRICT APPLICATION IMPROVED HEAT EXCHANGER INLET SCREEN MARCH 2016

DESIGN AND CONSTRUCTION OF A WAILING ALARM SIREN SYSTEM ZUBAIR LARABA RAKIYA 200S/22108EE DEPARTMENT OF ELECTRICAL/COMPUTER ENGINEERING

User s Manual WS-68N30SS WS-68N36SS WS-68N42SS

HPT Cone Crusher. Reach new height with KEFID. The production increases 40% Improved the humanized operation. Reasonable graduation and better shape

UNIVERSITI TEKNOLOGI MARA EFFECTIVENESS OF VESICULAR ARBUSCULAR MYCORRHIZA ON ROOT DEVELOPMENT OF SAGO PALM PLANTLETS

PHYSICAL ATTRIBUTES ON PLACE ATTACHMENT IN MALAYSIAN URBAN PARKS HADI EBADI UNIVERSITI TEKNOLOGI MALAYSIA

CONTEXT OF THIS AFRIKAANS PROTESTANT CHURCH

RADIATION CONTROL GUIDE

UNIVERSITI PUTRA MALAYSIA SUSTAINABILITY OF STREET FURNITURE DESIGN IN URBAN MALAYSIA

Graduate Degree program B.Sc. Interior Design

RECOMMENDED COURSE SEQUENCE

OSHA Table 1

FIRE ALARM WITH SECURITY SYSTEM MOHAMED FAIZ BIN MOHAMED MUSA

Table of Contents for the REGULATION (EU) 2017/745 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 5 April 2017

Landscape construction processes through a quality management system

Master Gardener Volunteer Expectations Guidelines

Mukwonago Community Library Emergency Procedures

Specified Exposure Control Methods When Working With Materials Containing Crystalline Silica

Required total credit : 43 All graduate students must register one of RES 501, RES 502 or RES 503, RES 504 or RES 505, RES 506 or RES 509, RES 510.

PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL

Standpipe Systems for Fire Protection

Deluge/Preaction Systems Annotated Instructor s Guide

Machine Guarding BLR B L B R usi ne B s u s si & n e L s e s g a & l L R e e g s a o l u r R c e e s s o(u 1rc 7 e 1 s 0) 1

Deluge/Preaction Systems Annotated Instructor s Guide

Landscape Architecture (LARC)

Implementation of Auto Car Washing System Using Two Robotic Arms

AQUAPONIC SYSTEM FOR SELF-SUSTAIN LIVING YAN YEN QUN

Principles of Fire Risk Assessment in Buildings

BLAST-IT-ALL BUMPER BLASTER

Transcription:

DESIGN OF A RECYCLE BIN TIN CAN CRUSHER MUHAMMAD HANIS BIN MUHAMMAD ZULKIFLI A report submitted in partial fulfillment of the requirements for the award of the degree of Diploma of Mechanical Engineering Faculty of Mechanical Engineering Universiti Malaysia Pahang OKTOBER 2008

ii SUPERVISOR S DECLARATION We hereby declare that we have checked this project and in our opinion this project is satisfactory in terms of scope and quality for the award of the degree of Diploma of Mechanical Engineering Signature : Name of Supervisor: Mr. Muhammad Ammar Bin Nik Mu tasim Position : Date :

iii AUTHOR S DECLARATION I hereby declare that the work in this thesis is my own except for quotations and summaries which have been duly acknowledged. The thesis has not been accepted for any degree and is not concurrently submitted for award of other degree. Signature : Name : Muhammad Hanis Bin Muhammad Zulkifli ID Number: Date :

To my beloved family iv

v ACKNOWLEDGEMENTS I would like to return my gratitude and courtesy to all hose that have assisted and encourage me in completing this project and report. A special thanks to my supervisor Mr. Muhammad Ammar Bin Nik Mu tasim for his support, critic and encouragement through out the project. Also, thank to lecture and technicians at the faculty of Mechanical for their valuable comments and knowledge on using machining at laboratory. I would like to acknowledge y appreciation to my university for providing the lab to be used and also the library for supplying the relevant literatures. My fellow classmates should be recognized for their support and help during testing my project. I would like to thank them for their encouragement, views and tips which were useful. Finally, I am grateful to my parents and family members for giving me the support and encouragement to complete this project.

vi ABSTRACT The study of manufacturing was very important in order to carried out this project to ensure that student understand on what are needs to do. This project is about designing and fabricating the Recycle Bin Tin Can Crusher to helps people easy to crush the tin and bring anywhere. This project involves the process of designing the crusher using considering forces and ergonomic factor for people to use. After the design has complete, it was transformed to its real product where the design is used for guideline. These projects also require ensuring the safety for indeed of publishing. Methods and process involve in this project for instance joining using bending, welding, drilling, and cutting process. This project is mainly about generating a new concept of tin can crusher that would make easier to bring anywhere and easier to crush the tin. After all process had been done, this crusher may help us to understand the fabrication and designing process that involve in this project.

vii ASBTRAK Pembelajaran mengenai pembuatan adalah penting untuk menjalankan projek ini bagi memastikan pelajar memahami tentang perkara yang perlu dilakukan. Projek ini adalah mengenai merekabentuk dan membuat Alat Pengemek Tin Kitar Semula bagi memberi kemudahan kepada pengguna untuk membawa kemana-mana sahaja dan mudah mengemekkan tin. Projek ini melibatkan proses mereka pengemek tersebut berdasarkan daya dan ergonomik bagi memudahkan pengguna untuk menngunakannya. Selepas proses ini siap, pengemek tersebut dihasilkan berdasarkan reka bentuk yang telah dibuat. Projek ini juga melibatkan cirri-ciri keselamatan bagi pengguna untuk tujuan pemasaran. Kaedah dan proses yang terlibat dalam projek ini bagi penyambungan segera menggunakan proses melipat, menebuk, kimpalan dan memotong. Projek ini sebenarnya melibatkan proses menjana konsep baru dalam menghasilkan pengemek tin kitar semula dan memudahkan untuk mengemekkan tin serta mudah dibawa kemana-mana. Selepas semua projek ini siap, pengemek ina akan membantu kita tentang pemahaman proses merekabentuk dan penghasilan yang terlibat dalam projek ini.

viii TABLE OF CONTENTS SUPERVISOR S DECLARATION STUDENT S DECLARATION DEDICATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES LIST OF APENDIX Page ii ііі iv v vi vii viii-x xi xii - xiv xv CHAPTER 1 INTRODUCTION 1 Introduction 1 1.1 Project synopsis 1 1.2 1.3 1.4 1.5 1.6 Objective Scope of Work Problem Statement Project Planning Gantt Chart 2 2 2 3-4 4

ix CHAPTER 2 LITERATURE REVIEW 2.1 Terminology 6 2.2 Types of Tin Can Crusher 7 2.3 Crusher 8 2.4 Types of Crusher 8 2.4.1 Jaw Crusher 9 2.4.2 Gyratory Crusher 10 2.4.3 Impact Crusher 11 CHAPTER 3 METHODOLOGY 3 3.1 3.3 3.4 3.5 3.6 3.7 3.8 3.9 Methodology Flow Chart Drawing Sketching and Drawing Selection 3.4.1 Concept 1 3.4.2 Concept 2 3.4.3 Concept 3 3.4.4 Concept 4 Concept Generation and evaluation Computer Aided Design Drawing Design Specification Fabrication Process 3.8.1 Process Involve Summary 12 13-15 16 16 16 17 17 18 19 20 21 22 22-25 26 CHAPTER 4 RESULTS AND DISCUSSION

x 4.1 Final Product 27 4.1.1 Result After Finishing 28 4.2 Product Specification 29 4.3 Types of Defected 30 4.3.1 Not Parallel 30 4.3.2 Gap 31 4.3.3 Bead 31 4.4 Problem in Progress 32 4.4.1 Design Problem 32 4.4.2 Fabrication Problem 33 4.5 Analysis 33-34 4.6 Testing 35-36 CHAPTER 5 CONCLUSION AND RECOMMENDATIONS 5.1 Introduction 37 5.2 Conclusions 37 5.3 Recommendation 38 5.4 Future Work 38 REFERENCES 39 APPENDICES 40 A 3D Drawing Tin Can Crusher 40 B C D 3D Drawing Recycle Bin Tin Can Crusher 2D Drawing Recycle Bin Tin Can Crusher Figure and List of Machine 41 42 43-45

xi LIST OF TABLE Table No. Page 1.1 Gantt chart 4 3.1 Matrix chart 19 3.2 Design specification 21 4.1 Product specification 29 4.2 Testing result 36

xii LIST OF FIGURES Figure No. Page 2.1 Several tin can crusher 7 2.2 Jaw crusher 9 2.3 Gyratory crusher 10 2.4 Impact crusher 11 3.1 Flow chart diagram 13 3.2 Concept 1 16 3.3 Concept 2 17 3.4 Concept 3 17 3.5 Concept 4 18 3.6 Overall view of the design 20 3.7 Material 22 3.8 3.9 Measurement and marking the material Cutting the material 23 23

xiii 3.10 Drilling process 24 3.11 Process bending sheet metal 24 3.12 Welding process 25 3.13 Grind using hand grinding 25 4.1 Recycle bin tin can crusher 28 4.2 Side view 28 4.3 Upper view 29 4.4 Table not parallel 30 4.5 Gap between top table and leg 31 4.6 Bead at surface recycle bin tin can crusher 31 4.7 Cosmos analysis for part 1 34 4.8 Cosmos analysis for part 2 34 4.9 Before crush the tin 35 4.10 After crush the tin 35

xiv C1 Bending Machine 43 C2 Apparatus MIG Welding Machine 43 C3 Floor Disc Cutter 44 C4 Portable Hand Drill 44 C5 Grinding Machine 45 C6 Measuring Tape 45

xv LIST OF APENDIXS Appendix no. Page A 3D Drawing Tin Can Crusher 40 B 3D Drawing Recycle Bin Tin Can Crusher 41 C 2D Drawing Recycle Bin Tin Can Crusher 42 D Figure and List of Machine 43-45

1 CHAPTER 1 INTRODUCTION The sole purpose of this project is to understand the fundamental knowledge of design and mechanism by using fulcrum system and a simple mechanism property. A mechanical tin can crusher is basically one of the most aid able machines. It helps to reduce the pollute environment of this world. Thus helps create a better place to live in. apart from that, this tin can crusher can actually be the future mode of recycles apart from the recycle bins. It can be placed every where, in the park, houses, even in cars. Using a similar type of a design from the diagram below, but with the added a bin bellow the tin can crusher concept of recycling can be apply. Therefore, as a student of mechanical engineering of University Malaysia Pahang, this project interest and expose me the field of mechanism and design engineering. To design the mechanical part of a tin can crusher and to fabricate the mechanical part of the system is the step to learn mechanical engineering. 1.1 Project Synopsis In this project, development of a recycle bin tin can crusher so the tin can might crush as flat and look as symmetrically as possible and inserted the bin. The designs are an environment friendly and use simple mechanism properties such as fulcrum system. The design is done so that the knowledge of designing, mechanism and forces.

2 1.2 Objective і) To develop of a recycle bin tin can crusher. іі) To fabricate recycle bin tin can crusher low cost and time consuming. 1.3 Scope of Work і) Literature review on the knowledge of mechanism design іі) To design the mechanical part of a tin can crusher using CAD software Solid Work. ііі) Develop the model tin can crusher using bending process, welding process, drilling process and cutting process. іv) Fabricate the model tin can crusher using welding skill and machining. 1.4 Problem Statement When people footstep the tin after finishes their drink, the tin always not look symmetrically flat and it look messy. This condition sometime makes tin produce the sharp adage will harm or injured the people. Furthermore, people always throw the can anywhere. These conditions makes pollution for this environment, become bad surrounding and separate the ditches. So this design is use to crush the can as flat as possible and try to reduce time, cost consuming and the sharp edge also have bin bellow the crusher.

3 1.4 Project Planning To start of this project, a meeting with supervisor in the first week is done to manage the schedule of weekly meetings. The purpose is to inform the supervisor on the progress of the project and guided by the supervisor to solve difficulty. Briefing based on the introduction and next task of the project is given by supervisor. Make research of literature review with the means of the internet, books, available published articles and materials that is related to the title. Designing phase start of by sketching few model models using manual sketch on A4 papers. Do it comparison for choose the best concept. Software applications are downloaded from internet to design the model based on the sketches. Software Solid Work helps to draw the better dimension. The preparation of mid-presentation of the project is next. Before presenting, the supervisor will see through the slide presentations and comment on corrections to be made. Then, presentation on the knowledge attained and instilled in the design phase is presented to a panel of three judges. Following up, is the fabrication of make some method for this project. Choose the material, make some list for the material and dimension. Do it planning of fabrication process for this project. After that, start the fabrication process. It would take seven weeks to get this design and fabrication process alteration done. Make some analysis and testing for the project. Do it correction for error this project. Finish the fabrication process with painting process.

4 After that, the final report writing and final presentation will be the last task to be accomplished. The supervisor will review the final presentation and revise mistakes to be amended. The final presentation then again will be presented to three panels. A draft report would then be submitted to the supervisor to be point out the flaws. Corrections are done and the real final report is handed over as a completion of the final year project. 1.5 Gantt Chart Table 1: Gantt chart

5 CHAPTER 2 LITERATURE REVIEW The title development of recycle bin tin can crusher requires an amount of good understanding on the knowledge of the science. Therefore, executing a research is necessary to obtain all the information available and related to the topic. The information or literature reviews obtained are essentially valuable to assist in the construction and specification of this final year project. With this grounds established, the project can proceed with guidance and assertiveness in achieving the target mark.

6 2.1 Terminology Can recycling is a very important part of any family and community recycling program. Aluminum recycling is one of the easiest things you can do to help the environment. Recycling of can began long ago and started to become common place back in the early 1970s. Can is 100% renewable. This means that the can you take to your local recycling center today becomes a new aluminum can. There are no waste products in the process of making aluminum a 100% renewable resource and one of the best things you can recycle. You might be surprised to know that within 60 days an aluminum can is able to go from your recycling center and become a brand new can to be used by consumers. Recycle bin tin can crusher use to crush tin can. Tin can crusher will help community to crush the tins. Crusher also can less the using of force and avoids causing injury. This Crusher will clipped the plate above and below of the tin. Then, the tin will be pressed by the plate till the sufficient force was imposed and lastly the tin crush.

7 2.2 Types of Tin Can Crusher Figure 2.1: Several tin can crusher

8 2.3 Crusher A crusher is a machine designed to reduce large solid material objects into a smaller volume, or smaller pieces. Crushers may be used to reduce the size, or change the form, of waste materials so they can be more easily disposed of or recycled, or to reduce the size of a solid mix of raw materials (as in rock ore), so that pieces of different composition can be differentiated. Crushing is the process of transferring a force amplified by mechanical advantage through a material made of molecules that bond together more strongly, and resist deformation more, than those in the material being crushed do. Crushing devices hold material between two parallel or tangent solid surfaces, and apply sufficient force to bring the surfaces together to generate enough energy within the material being crushed so that its molecules separate from (fracturing), or change alignment in relation to (deformation), each other. The earliest crushers were hand-held stones, where the weight of the stone provided a boost to muscle power, used against a stone anvil. Querns and mortars are types of these crushing devices. 2.4 Types of Crusher The most common types of crusher these days are basically used for help people. The design of these types enable them to crush follow the types of crusher and then crush as look as possible or destroy. These crusher types are jaw crusher, gyratory crusher and impact crusher.

9 2.4.1 Jaw Crusher A jaw or toggle crusher consists of a set of vertical jaws, one jaw being fixed and the other being moved back and forth relative to it by a cam or pitman mechanism. The jaws are farther apart at the top than at the bottom, forming a tapered chute so that the material is crushed progressively smaller and smaller as it travels downward until it is small enough to escape from the bottom opening. The movement of the jaw can be quite small, since complete crushing is not performed in one stroke. The inertia required to crush the material is provided by a weighted flywheel that moves a shaft creating an eccentric motion that causes the closing of the gap. Single and double toggle jaw crushers are constructed of heavy duty fabricated plate frames with reinforcing ribs throughout. The crusher s components are of high strength design to accept high horsepower draw. Manganese steel is used for both fixed and movable jaw faces. Heavy flywheels allow crushing peaks on tough materials. Double Toggle jaw crushers may feature hydraulic toggle adjusting mechanisms. Figure 2.2: Jaw crusher

10 2.4.2 Gyratory Crusher A gyratory crusher is similar in basic concept to a jaw crusher, consisting of a concave surface and a conical head; both surfaces are typically lined with manganese steel surfaces. The inner cone has a slight circular movement, but does not rotate; the movement is generated by an eccentric arrangement. As with the jaw crusher, material travels downward between the two surfaces being progressively crushed until it is small enough to fall out through the gap between the two surfaces. As an example, a Fuller-Traylor gyratory crusher features throughputs to 12,000 TPH with installed powers to 1,300 HP. Figure 2.3: Gyratory crusher

11 2.4.3 Impact Crushers Impact crushers involve the use of impact rather than pressure to crush material. The material is contained within a cage, with openings on the bottom, end, or side of the desired size to allow pulverized material to escape. This type of crusher is usually used with soft and non-abrasive material such as coal, seeds, limestone, gypsum or soft metallic ores. Figure 2.4: Impact crusher

12 CHAPTER 3 METHODOLOGY In designing and fabricating this tin can crusher, a flow of methods had to be used the design and crusher the tin. First of all, a process planning had to be charted out. This acts as a guideline to be followed so that, the final model meets the requirement and time could be managed. This would determine the efficiency of the project to be done. Regulating and analyzing these steps are very important as each of it has its own criteria to be followed.

13 3.1 Flow Chart Figure 3.1: Flow chart diagram

14 The flow chart starts with the introduction. Here, the introduction is first plan to start the project. The supervisor request for understanding of the project and make some research about the project title. Student makes project synopsis, objective, and scope of work, problem statement and planning. Once the introduction is done, the supervisor request for the understanding of the project. Thus, literature review on the title is done thoroughly covering all the aspect of the project. The medium for this research are via internet and books. Essential information related to the project is gathered for referencing. In conceptualization, few designs are done using the sketching which is then saved to be reviewed. Sketch four concepts suitable for the project with a 3-dimensional and understanding. The sketching is first step for designer used of the time. The designs and concepts are than reviewed and recalculated to fit the best dimensions and performance of recycle bin tin can crusher. After four design sketched, design consideration have been made and one design have been chosen. The selected design sketched is then transfer to solid modeling and drawing using solid work application. Software is used because it gives a better dimension of recycle bin tin can crusher compared to manual draw and is much easier to use. However, the drawing using software is just a guideline to be followed to improve the recycle bin tin can crusher. After draw is done, the project proceeds to next step that is fabrication process. The finished drawing and sketching is used as a reference by following the measurement and the type of material needed. The fabrication process that involved is cutting, welding, drilling, bending and other. After every process was finish, the parts are check to make sure that the output of the process obeys the product requirement.

15 If all the parts had been processed, the parts are joined together to produce fullscale recycle bin tin can crusher. Here come the analysis processes. The recycle bin tin can crusher will be test to see if it fulfills the requirement such as easy to crusher the tin, easy to bring anywhere, strength and recycling. During the testing, if problem occur such as cant crusher the tin, the recycle bin tin can crusher will step back to previous process to fix back the problem. The recycle bin tin can crusher is expected to have an error that may cause the part to be redesigned again. The recycle tin can crusher is finished by doing some finishing process such as grinding and spraying. After all parts had been joined together and analysis, the last phase of process that is result and discussion. In result and discussion, the draft report and the entire related article are gathered and hand over to the supervisor for error checking. For the conclusion, the finish product will be compare with the report to make sure that there is no mistake on both project and report. After the product and report had been approve by the supervisor, the report is rearrange and print out to submit at supervisor, the project coordinator and faculty of Mechanical Engineering. In this stage, the final presentation was also being prepared and waited to be present.

16 3.3 Drawing The drawings are diving into two categories, which are: Sketching: all the ideals for tin can crusher fabrication are sketched on the paper to ensure that ideas selection can be made after the selected design choose. Solid Works Application: The design or concept sketched is transfer to solid modeling and drawing using Solid Work Application. 3.4 Sketching and Drawing Selection From the existing ideas, only four sketching that had been chosen to be considered as the final ideas, which are: 3.4.1 Concept 1 This concept is using hand to crush the tin. The put inside the crusher, center of the crusher. The upper side will be pressed and crush the tin until it dent. The bottom side is the base for the crusher. Figure 3.2: Concept 1

17 3.4.2 Concept 2 This concept is same for concept 1, but using the feet to crush the tin. The feet put the upper for the crusher to put the crusher. Figure 3.3: Concept 2 3.3.2 Concept 3 The third concept just presses the crush using the hand. The tin put inside the crush in lie down position. Figure 3.4: Concept 3

18 3.3.3 Concept 4 This concept have pulley to crush the tin. The tin put at the bottom plate and the upper side down to crush the tin. The upper side down used the pulley. Figure 3.5: Concept 4

19 3.5 Concept Generation and evaluation Four concepts for tin can crusher were developed. These are evaluated against the datum of standard tin can crusher: Table 3.1: Matrix chart From the concept of selection table, the advantages and disadvantages of the design can be outlined. Criteria or characteristic for the product to be fabrication are important thing to be consider, before fabrication process. Ten criteria are been chosen to be considered. According to the table, study of the concept selection shows that Concept 4 scores the highest value. As we can see on the figure in Concept 4, the tin can crusher more easy to crush the tin.

20 3.6 Computer Aided Design Drawing After a design has been selected, the next step in designing process is dimensioning. The design is separated into part by part and the dimensioning process is firstly sketched on the paper. The dimensioning is base on relevant dimensions and also referring the existence cycle tin can crusher so that the design is fit into other part. After dimensioning, the drawing of the design is drawn using Solid Works application; at this stage solid modeling method is used. Part by part solid modeling create according to the dimension done before, after all part create, the 3d model is assemble with each other base on the design. Figure 3.6: Overall view of the design

21 3.7 Design Specification The concept 4 is the best design that can be evaluated. The table 3.3 is the detail product design specification of the concept 4: Table 3.2: Design specification PARTS MATERIAL TYPE SIZE(mm) QUANTITY 1 Mild Steel Sheet Metal 200 140 1 1 2 Mild Steel Sheet Metal 140 110 2 2 3 Mild Steel Sheet Metal 120 15 2 2 4 Mild Steel Sheet Metal 260 15 2 2 5 Mild Steel Sheet Metal 250 40 4 2 6 Mild Steel Square Hollow 200 30 30 1 7 Mild Steel Steel Rod 110 Ø15 1 8 Mild Steel Bolt & Nut Ø8 8 9 Mild Steel & Wheel - 4 Rubber 10 Wood Plate Wood 320 200 5 1 11 Wood Plate Wood 380 200 5 1 12 Wood rectangular Wood 530 50 30 2 13 Wood rectangular Wood 360 50 30 2

22 3.8 Fabrication Process After designing phase, fabrication processes take place. These processes are about using material selection and make the product base on the design and by followed the design dimension. Many methods can be used to fabricate a product, like welding, cutting, bending, grinding, drilling and many more methods. Fabrication process is a process to make only one product rather the manufacturing process was used at the whole system production. This way include part by fabrication until assembly to others component. 3.8.1 Process Involve In order to make the design come reality, fabrication process needs to be done first. The fabrication process starts from dimensioning the raw material until I finish as a desire product. The processes that involve are: 1) Getting material Figure 3.7 introduces the material have in UMP mechanical laboratory. This rack have more types of steel like L- shape sheet, rectangular hollow steel, rectangular steel, and etc. Figure 3.7: Material

23 2) Measuring and marking After get the material, the next step is measurement and making material like Figure 3.8. The equipment used in this process is measuring tape and maker pen. The scale is from solid work software and this scale is the true. Figure 3.8: Measurement and marking the material 3) Cutting material Figure 3.9 introduce the process cutting the material using shearing machine after measurement and marking process. Figure 3.9: Cutting the material

24 3) Drilling Mark the position to drill using scraper before start drill. After that, start the drilling like Figure 3.10. Figure 3.10: Drilling process 4) Bending process After drilling process the sheet metal will undergoes process bending using bending machine to get true shape for the project. Figure 3.11: Process bending sheet metal