Submittal ata Model M ow Intensity daptive Modulating Infrared Heaters Project Engineer ontractor Model # ate: Submitted by: pproved by: General Specification Fuel Type (heck one) Natural Gas PG Heat Exchanger (heck one) Heat Treated luminized Steel Inlet Gas Pressure Electrical: (Select thermostat) Minimum Natural Gas @. W.. 0V, 0 Hz, PG @. W.. long, Prong Power ead Maximum ow Voltage Thermostat Natural Gas & PG @ Modulating Manifold Gas Pressure M 0. W..(N) 0.00 W..(P) Flue/ir onnections iameter onnection Maximum Vent ength = 0 feet M.0 W..(N) 0.0 W.. (P) Maximum Fresh ir length = 0 feet M 0.0 W.. (N) 0.0 W.. (P) M 00.0 W.. (N) 0.0 W.. (P) Vent + Fresh ir = 0 Feet Max ccessories (heck all that apply) Modulating Thermostat, v Modulating net Thermostat Multiplex ontroller Potentiometer ontrol Remote Indoor Sensor Ubend pkg. Elbow pkg. Side reflector and brackets ower shield and brackets Flue onnecting Tee (xx) Gas flex connector Shut off valve Gas onnection ½ NPT (female) MOE RTE TUH FTORY PPROVE HETER ENGTH (heck length - feet) M 0 0,000 -,000 0 0 M,000-9,000 0 0 M 0 0,000-90,000 0 0 M 00 00,000,000 0 0 PROJET MOIFITI (length - feet) Quantity on Project Series M October,0
Introduction Superior Radiant offers its 0 years of infrared expertise in a cost effective unitary heater design as culmination of that commitment. Series M models are field assembled, low intensity infrared heaters that are easy to install and maintain, and which were engineered with significant input from our customers. They are designed to provide economical operation and trouble-free service for years to come. The following is for engineer submittal purpose only and should not be used to replace the full Installation and Operation Manual Installation odes Installations must comply with local building codes, or in their absence, the latest edition of the national regulations and procedures as listed below. General Installation and Gas odes Heaters must be installed only for use with the type of gas appearing on the rating plate, and the installation must conform to the National Fuel Gas ode, NSI Z./NFP in the US and N/G 9. and 9. Installation odes in anada. Gas Supply ines Gas supply pipe sizing must be in accordance with the National Fuel Gas ode, NSI Z./NFP in the US and N/G 9. and 9. Installation odes in anada. Electrical ll heaters must be electrically grounded in accordance with the National Electric ode, NSI/NFP 0 in the US, and the anadian Electric ode, S. in anada, and must comply with all local requirements. Venting Refer to the National Fuel Gas ode, NSI Z./NFP in the US and N/G 9. and 9. Installation odes in anada for proper location, sizing and installation of vents as well as information on clearance requirements when penetrating combustible walls for venting purposes. Series M Page October,0
General Specifications General Specifications Gas Supply Inlet Pressure Natural Gas: Minimum Maximum." W...0" W.. Propane Gas: Minimum Maximum." W...0" W.. Manifold Pressure Natural Gas: Propane Gas: M - 0." W.. 0.00" W.. M -.0" W.. 0.0" W.. M - 0.0" W.. 0.0" W.. M - 00.0" W.. 0.0" W.. Inlet onnection Natural Gas or Propane: /" female NPT Electric Supply 0 V, 0 HZ,. mp: cord with grounded prong plug Flue and Outside ir onnection O.. male connection for flue adapter and outside air (optional) provided at the heater Series M Page October,0
imensional harts 0' " " " "." 0." ".00" " 0' - Figure : Overall imensional Information EOW " WHEN INSTING, ORIENT N MP OK OTS TO TOP, T 0 O'OK OR O'OK POSITI OUPING FFE SETI '-" OR ' OR '-" REFETOR " " 0' - TUE U-TUE Figure : omponent imensional Information 0' Series M Page October,0
onfigurations Model Rate (TU/Hr) Heat Exchanger ength (ft.) Minimum Maximum affle ength (ft.) affle Kit P/N M - 0,000-0,000 0' 0' T0 M - 9,000 -,000 0' 0' ' T0 M - 0 90,000-0,000 0' 0' ' T0 M - 00,000-00,000 0' 0' + (see fig. below) T09 Table : onfiguration Information Note: - affles are always placed in the last section of radiant tube, unless stated / shown otherwise. - affles are either aluminized or stainless steel sections ', ' and ' long. - When ' is required the ' aluminized steel baffle is lengthened forward (toward the burner) with a ' stainless steel section. FFE OTI FOR,000 TU/Hr, 0 ft. UNITS Y Stainless steel affle P/N T00 Twist lock two ' baffles luminized affle P/N T00 luminized affle P/N T00 0' 0' ' ' ' Fold tab over ' Fold tab over 0' Figure : affle ocation M - Models only Series M Page October,0
onfigurations Special configurations continued: FFE OTI FOR 00,000 TU/Hr, 0 ft. UNITS Y luminized affle P/N T0 luminized affle P/N T0 0' 0' '-" Fold tab over '-" Fold tab over 0' FFE OTI FOR 00,000 TU/Hr, 0 ft. UNITS Y luminized affle P/N T0 luminized affle P/N T0 0' 0' '-" Fold tab over '-" Fold tab over 0' Figure : affle ocation M - 00 Models only. Series M Page October, 0
learance to ombustibles general clearance of (0. m) in every direction is recommended for servicing around each urner, if possible. In addition to this it is very important to observe the minimum clearance to combustibles at all times to avoid any possibility of property damage or personal injury. Series M Page October, 0
learance to ombustibles Table : Minimum learance to ombustibles Model No.: M Reflector onfigurations im 0 0 00 Horizontal Reflector Tilt " " " " " " " " " 0" " " " " " 0" " " 0" " " One Side Extension " " " Two Side Extension " " " " " 0" " " " " " 9" " " " 0" " " 9" U-Tube, Horizontal " " " " " U-Tube, Opposite " " 0" " " 9" " " " " 0" " " Unvented bove " " " " End " " " " Vented End " " " " " " 9" Series M Page October, 0
Installation Installation Sequence Generally, there is no unique sequence for installation of the burner or heat exchanger. review of the job site will usually indicate a logical installation order. However, time and expense can be saved if installation is begun at the most critical dimension, watching for interference from overhead doors, cranes, auto lifts etc. Figure provides a general overview of the components utilized in the installation, as well as their general relationship. End ap oose Screws Reflector Overlap pprox. " Tight Screws Fasten Endcap with Screws Vent dapter end Tab over End of Tube oose Screws Tight Screws **Install affle(s) as required in the last section of tube or as specified in this manual Heat Exchanger Tube Tube oupling ombustion Tube lose all chain links "S" hooks, "J" bolts and turnbuckles or any open connection. " Install "J" olt at first hanger Tube Flange urner ssembly Tube & Reflector Hangers Gasket Figure : General Overview of Installation Series M Page 9 October, 0
Venting / ombustion ir ucting General Requirements Refer to the National Fuel Gas ode, NSI Z. (NFP ) in the US and N/G 9. and 9. Installation odes in anada, as well as all local requirements for general venting guidance. Series M Infrared Heaters may be installed vented or unvented. Series M Infrared Heaters may be vented horizontally or vertically using conventional venting materials. Optional outside air supply may be directed to the heater horizontally or vertically. Un-Vented Operation Requirements for combustion air supply and dilution air vary by jurisdiction, building type and specific installation details. See local codes for guidance. In general, fresh air ventilation must be provided to the building space at ( cfm per 000 TU/Hr in anada)( cfm per 000 TU/ HR US). Series M Page 0 October, 0
Vented Operation Venting / ombustion ir ucting In all cases, be sure vent pipes and outside air supply ducts are sealed with approved sealant, such as high temperature RTV silicone. ouble wall venting ( vent) may not require sealant. Horizontal Venting GSG VENT MTERI. MIN. MX. 0' WITH EOWS MX. 0' WITH EOWS VENT TERMIN P/N T0 N-OMUSTIE W MIN. VENT TERMIN P/N T0 W THIME P/N S00 OMUSTIE W NOTES: - W THIME N VENT TERMIN MUST E USE WITH SINGE W VENTING THROUGH OMUSTIE W. Figure : Horizontal Venting Series M Page October, 0
Venting / ombustion ir ucting SINGE HETER MUTIPE HETERS FOR VERTI VENTING REFER TO NSI Z. FOR FN SSISTE PPINES. FOR VERTI VENTING REFER TO NSI Z. FOR FN SSISTE PPINES. TYPE -VENT TYPE -VENT ROOF ROOF INRESE TO ETERMINE VENT SIZE FOR VERTI VENTING REFER TO NSI Z. FOR FN SSISTE PPINES. Figure : ommon Vertical Venting ommon Horizontal Venting OMM VENTING FOR HETERS WITH OMINE TOT INPUT OF 0,000 TUH OR GRETER OMM VENTING FOR HETERS WITH OMINE TOT INPUT OF UP TO 0,000 TUH TOT VENT ENGTH FOR SINGE W VENTING (INUING EOWS) = 0' EH EOW = ' MX. NUMER OF EOW = ' MX " GSG VENT MTERI. " VENT TERMIN P/N T0 TOT VENT ENGTH FOR SINGE W VENTING (INUING EOWS) = 0' EH EOW = ' MX. NUMER OF EOW = ' MX GSG VENT MTERI. FOR OMUSTIE WS W THIME P/N S00 " W THIME P/N S0 " MIN. " MIN. VENT TERMIN P/N T0 W W NOTES: (FOR HORIZT VENTING) - USE SINGE W VENT WITH HETERS OF OMINE INPUT OF UP TO 0,000 TUH N " FOR OMINE TOT INPUT OF 0,000 TUH OR GRETER. - W THIMES N VENT TERMINS MUST TO E USE WITH SINGE W HORIZT VENTING THROUGH OMUSTIE WS. W THIME MY E REPE Y FSHING WHERE THE VENT IS PENETRTING N-OMUSTIE W. Figure : ommon Horizontal Venting Series M Page October, 0
SW SW I V J ISO M S S S SRTN N F + - + - Electrical Wiring General Requirements Heaters are normally controlled by modulating thermostats. In all cases, heaters must be grounded in accordance with the National Electric ode, NSI/NFP 0 in the US, and the anadian Electric ode, S. in anada, and must comply with all local requirements. Heaters may also be controlled with a manual line switch or timer switch potentiometer with or without timer in place of a thermostat. Refer to Figure for guidance on electrical wiring of heaters. If any of the original wire as supplied with the heater must be replaced, it must be replaced with wiring having a rating of at least 0 temperature service and 00 volts capability. Red rown GS VVE Yellow Yellow Red V RUN MP Purple Yellow rown rown Yellow Green IGNITER URNER SENSOR Pink Internal Wiring External Wiring WG, Twisted Pairs, Shielded HEYWE THERMOSTT ( MOUNTE EXTERNY ) Modulating ircuit oard IGNITI MOUE X- IN 0 FS V lue See the factory setting below Red lack 0 9 White 9 0 OWER Speed ontroller SW IP Switch T90 SW M M 0 M 00 SW SW rown INE FITER 0 V 0 Hz N Ground Green Red N.. ir rown Switch N.O. ir Switch N White Red SW IP Switch Settings using external 0-0V nalog input M 0 Figure : Wiring iagram with Honeywell modulating thermostat Series M Page October,0
SW SW SW I V J SW ISO M S S S SRTN N F + - + - SW Electrical Wiring Wiring iagram ontinued: See factory settings below R YE N YE N VT R GS VVE YE N.. ir switch N.O. ir switch GN IGNITI MOUE X- IN 0 R K Modulating ircuit oard 0 9 V FS V IGNITER OWER PK R URNER SENSOR Speed ontroller Internal Wiring External Wiring WG, Twisted Pairs, Shielded M 0 M M 0 M 00 Run amp INE FITER 0 V 0 Hz N Ground N R GN Not used (Tape end) WT / switch 0 K Ohm R Potentiometer UTI Make sure that the live wire from the ignition module is terminated to the terminal '' as shown and NOT to terminal 'N' SW IP Switch SW IP Switch Settings using 0K Ohm Potentiometer for Modulation M 0 Figure : Wiring iagram with a potentiometer Series M Page October, 0