North Star. Pre-Construction Meeting Presentation

Similar documents
Citizen Information Meeting

3. Additional driveways may be permitted where determined by the Planning Commission to adequately accommodate traffic or ensure public safety.

Revocable Street Privilege

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

Welcome to the. Open House

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Standard Operating Procedure

Scope of Work 40 New Standard Street Tree Pits: Identifying utility conflicts through the PA One Call System in advance of the

Boise Municipal Code. Chapter 9-04 EXCAVATIONS

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

PROPOSED DRAINAGE PATTERNS

Winnipeg Fire Department Fire Prevention Branch

Commissioners Road West Realignment Environmental Assessment

Reconnecting New Haven: Downtown Crossing

2016 REVISIONS COMMENT FORM RULES AND REGULATIONS FOR CONSTRUCTION IN THE PUBLIC WAY COMMENT PERIOD: JUNE 1 TO JUNE 30, 2015

VALLEY COUNTY MINIMUM STANDARDS FOR PRIVATE ROAD DESIGN AND CONSTRUCTION

Rezoning Transportation Analysis Petition Number: General Location Identifier:

Installing Exterior Lighting Systems

Specification and Construction Plans For: South Bethany Landscaping Improvement Plan Contract Number T

APPROXIMATE LIMIT OF CITY LANDFILL LIMIT OF CONTRACTOR WORK ZONE. INSTALL CONSTRUCTION SNOW FENCE.

PROJECT SHOWING MINUTES

3.1 Survey Monument Preservation Guidelines for New and Reconstruction Projects. B. After construction and prior to recording Notice of Completion:

DESIGN CRITERIA PACKAGE

Monroe Street Reconstruction. Public Preconstruction Meeting February 21, 2018

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

4/8/2015 Item #10D Page 1

Type BUILDING PERMITS Permits Fee Collected Valuation Units

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

Project Overview & Summary of Existing Conditions

SR 15 SECTION 088 CSVT SOUTHERN SECTION PUBLIC MEETING JUNE 16, 2015

Please Read and Save These Instructions.

Business Fire Inspection. City of Guadalupe

Type BUILDING PERMITS Permits Fee Collected Valuation Units

St. Laurent Transit Improvements Innes / Industrial to Smyth. Public Information Session December 2, 2015

RECEIVE AN UPDATE ON THE ALMOND GROVE PHASE II PROJECT

Middlebury RS 0174(8)

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

CITY OF PASADENA FIRE DEPARTMENT

A. INTRODUCTION AND SUMMARY OF FINDINGS B. EXISTING CONDITIONS. Table 10-1 Adjacent Storm Drains

City of Vista Fire Department

Prince William Street Project (Grant Avenue to Wellington Road)

ROANOKE STREET IMPROVEMENTS CHRISTIANSBURG, VIRGINIA VDOT PROJECT # U R24 UPC #:

Transbay Folsom Streetscape Project 2 nd Street to Spear Street Community Update July 16, 2015

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

2018 City of Hillsboro Fee Schedule

AIRVAC sewer systems are reliable, dependable, and will save you money.

Welcome! Agenda. South Downtown

Dallas CBD Second Light Rail Alignment (D2)

Dallas CBD Second Light Rail Alignment (D2)

REVIEW SET ONLY - NOT FOR BIDDING

Union Station Master Plan Task 2 Briefing

W Harmony Rd. Group Home

SF180 Installation Instructions

183

Mayor and City Council Update May 4, Community Relations. Library News. Fire Department

Coffee Creek Park Development Low Impact Development (LID)

Project will Replace: Utilities Curb Pavement Lighting. City of Madison

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

Transportation Systems and Utility Infrastructure

Chapter 2: Strategies for Local Governments Chapter 3: Site Assessment and Design for Low Impact Development. Break Out Group 10:30 am to 12 pm

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

Section 9 Landscaping and Street Trees

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

Bushaway Railroad Bridge, 1915 Horse & buggy entering Bushaway, Sept. 10, 2008 Presentation to Task Force for Reconstruction of Hwy 101

RP, GP, XP Pro Series Installation Instructions

CREEKSIDE VILLAGE HOMEOWNERS ASSOCIATION LANDSCAPE RULES CONTENTS

Public Works Project Delivery Report

I.T.S. PLAN ALONG I-95 INSTALL FIBER OPTIC LINE PROJECT SHOWING Tuesday, June 18, 2013, 1:30pm Ashland Residency Conference Room

Sun City Lincoln Hills ARC Application Checklist

DESIGN & CONSTRUCTION GUIDELINES

Bushaway Trees just south of I 394 Frontage Road. Bushaway Task Force Progress Report Workshop for the Wayzata City Council June 5, 2012

Fire System Impairment Policy

P A R K L E T 2016 PILOT PROJECT

CARVER COUNTY DIVISION OF PUBLIC WORKS LANDSCAPE POLICY. Adopted by the Carver County Board of Commissioners March 3, 2015

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

2018 Woodhill Road Improvements Public Informational Meeting. September 28, :00 pm

MAIN STREET RECONSTRUCTION PROJECT PRE-CONSTRUCTION PUBLIC INFORMATION SESSION AGENDA

The following two (2) checklists verify what information is being provided and required.

Wiles Road from University Drive to Riverside Drive

2040 Long Range Transportation Plan

Title 11 Streets and Sidewalks

SECTION 605 PLANTING

Jenifer Street Reconstruction Neighborhood Engagement Meeting November 4, 2015

Valley Line LRT. Project Update & Citizen Working Groups Overview Public At Large Recruitment Meeting Citizen Working Group A Downtown

Grand River Ravines Georgetown Township

STI Street Maintenance & Overlay Project

Downtown Brampton Capital Project

FEE SCHEDULE Construction Services and Permitting

Irrigation Requirements

Today s Agenda. Introduction to Camiros. Introduction to Zoning. Overview of Project Process Current understandings What we ve heard so far

Subject: Fire Protection Impairment Program Reference: NFPA (see bottom of page 5) Effective Date: August 2014 Distribution All YC Employees

DEPARTMENT OF PUBLIC WORKS & UTILITIES

SaskPower Gas Inspections Schedule of Fees

Type BUILDING PERMITS Permits Fee Collected Valuation Units

Transcription:

North Star Pre-Construction Meeting Presentation Presented by: Gas Engineering New Business March 16, 2017 1

Providing Natural Gas To North Star 2

North Star Project Overview Total Feet of Pipe Installed: approx. 12,255 of 2 approx. 750 of 4 approx. 465 of 6 approx. 8,135 of 8 Customers in project area: 210 directly impacted Customers signed up for gas service line: 87 customers or 41% of neighborhood We are in need of additional applicants based on project bids received Size of PY pipe to be installed: 2, 4, 6 & 8 3

Preliminary Design North Star 4

North Star Construction Timeline Construction Schedule: Begin construction Late March Complete main installation Late July Complete final restoration 10/31/2017 All work is weather dependent Scope of work may change daily due to unforeseen conditions The intent is to complete final restoration once all main and services are complete. Temporary restoration will be done at the end of each task or week. 5

Natural Gas Expansion Project Project scope involves: Marking of utility lines 8-1-1 Awarding bid contractor will test hole over main Set up of the directional drill Excavation of the receiving pits, etc. Boring of the main Gas main will be tied-in (energized) Installation of service lines to applicable locations (bore) Restoration will occur once all main and services are complete 6

Installation of Natural Gas Preliminary order of Gas Main installation by street for North Star 1. Polaris Dr 2. Meteor Ct 3. Mercury Rd 4. Jupiter Rd 5. Neptune Dr 6. North Star Rd 7. Beech Hill Dr 8. Mercury Rd 9. Mars Rd 10. Meteor Ln 11. Orbit Cir 12. Saturn Dr 13. Jupiter Rd 14. Venus Dr 15. Planet Rd 16. Galaxy Dr 17. Comet Lane 7

Service Installations Services will be installed to each applicant when the customer is ready to start receiving natural gas Each applicant will have an on-site meeting with the field technician and during those on-site meetings it will be determined if the customer is ready to receive a natural gas service line during this project. Applicants are refunded their $200 security deposit when natural gas is flowing to the residence for a gas-fired appliance. Customer Converts & Gas meter is installed Security deposit refunded 8

Gas Conversion Projects: Staging of Material Locations in neighborhood that have been identified as low traveled areas are used for the staging of materials. Material is coned off for safety and kept to minimum level of encroachment into roadway. 9

Gas Expansion Projects: Test Holes Test holes may be performed prior to main installation by either hand digging or possibly vacuum excavation 10

Gas Conversion Projects: Test Holes Left: Test hole areas left safe with proper coverage until temporary restoration Right: Completed temporary restoration with backfill 11

Gas Conversion Project: Main Installation Install new main throughout neighborhood in the state right-ofway at the curb line utilizing a directional bore technique. Equipment may need to encroach on private property for perpendicular main alignments 12

Gas Conversion Project: Main Installation Right: temporary restoration on a driveway that was open cut due to unforeseen underground conditions Left: temporary restoration on large section of receiving pit for main 13

Gas Conversion Project: Main Installation Final Restoration On Driveway 14

Gas Conversion Project: Main Installation - Temporary Restoration Left: temporary restoration of test hole in roadway Right: temporary restoration of disturbed area in right-of-way 15

Service line, Riser, & Meter bar When customer is ready to convert to a gas-fired appliance, they must: Hire a licensed contractor to install fuel lines Have NCCO inspect & tag fuel line Private contractor ties fuel line into meter bar Call Delmarva Power to schedule meter install 16

Meter Installation Example of Inspection Tag 17

North Star Gas Project Contact Sheet Business Development Coordinator Mike June Email: michael.june@delmarva.com Phone: (302) 429-3290 Field Technician Brent Lobley Email: Brent.Lobley@delmarva.com Phone: (302) 650-3067 Project Engineer Rob Rex Email: robert.rex@delmarva.com Phone: (302) 429-3222 18

Questions? Thanks for attending! 19