Annexure - D. Station Interface Matrix Power Supply, S&T, AFC,Lift & Escallators,Rolling stock and Track work. Station Civil and E & M Contractor

Similar documents
Port of Portland Conveying Equipment Guidelines

PART 4 ELECTRICAL STANDARDS

Document Information Cover Sheet

1.0 CONDITIONS FOR CHILLED WATER SUPPLY (PRIMARY SIDE BY DHCS SUPPLIER)

Project Briefing Document. Section 3 Electrical Services design guide and specifications

National Reach. Local Service.

Part: I TECHNICAL SPECIFICATION

TITLE: SPECIFICATION NO. PE-MSE-VD-ACC VOLUME:

RD:30 Specification No. TI/SPC/PSI/AUTOTR/0090 For 50U5/150 MVA, 220/132 kv Auto Transformer

incorporating Guidance to Shafts for Smoke Control A useful guide to practical smoke shaft principals and specifications

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

Japanese Case Study: How to maintain the fire safety in subway station and tunnel

ARCHITECTURAL SPECIFICATIONS

SCHOOL DISTRICT PALM BEACH COUNTY BUILDING DEPARTMENT PLAN REVIEW CHECK LIST -- ELECTRICAL

Electrical Design Guidelines Table of Contents

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

The last date of submission of responses has been extended up to 14: 00 hrs on 20/07/2018.

DESIGN OF FOOTBRIDGES

CHAPTER 8 ELECTRICAL

CHAPTER 8 ELECTRICAL

FINNED WATER-TUBE POOL HEATERS

ESTIMATE SET-UP PACKAGE BID SCHEDULE ENTRY AND MAINTENANCE

DISASTER MANAGEMENT PLAN 3.0 IDENTIFICATION OF MAJOR HAZARD POTENTIAL

DSCR Communications Room Standards

Indian National Trust for Art and Cultural Heritage (INTACH, 71, KK Birla Lane, Lodhi Estate, New Delhi , Ph. No.

FINNED WATER-TUBE POOL HEATERS

WATER-TUBE POOL HEATERS

Guide for Inspection of Elevators, Escalators, and Moving Walks

NOTTINGHAM CITY HOMES

Policy and Specification for the Interface with Independent Distribution Network Operators Installations

SPECIFICATION: AlarmLine TM INTELLIGENT LINEAR HEAT DETECTION

Electronic Safety and Security

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

WATER-TUBE POOL HEATERS

CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

Official Journal of the European Union C 97/11

Maintenance of Fire Systems

SECTION WET-PIPE SPRINKLER SYSTEMS

ELEVATOR UPGRADE AND MODERNIZATION

DIVISION FINNED WATER-TUBE WATER HEATERS

ELECTRICAL SYSTEMS ASSESSMENT Hanover High School

Table-1: Clarifications and modification in tender specifications based on Pre-bid meeting discussion

FOGTEC Rail Systems. Rolling Stock Applications. Fire Protection Solutions from one source. Experts in Fire Protection

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

CLOSURE OF INTERFACES FOR RAILWAY LINE HERZELYA KEFAR SABA IN CLOSURE_INTERFACES_HZL-01

TENDER DOCUMENT FOR SUPPLY OF EPOXY MIXING & POURING PLANT

ASME A17.1/CSA B44 Handbook

PLAN REVIEW SUBMITTAL GUIDE

4.13 Security and System Safety

BHARAT HEAVY ELECTRICAL LIMITED, JHANSI

CONSULTANT PROCEDURES & DESIGN GUIDELINES ACCESS CONTROL SYSTEM

KIRKWOOD PUBLIC LIBRARY REQUEST FOR PROPOSAL SECURITY SYSTEMS AND MONITORING SERVICE. Proposal Due Date : Wednesday, January 10, PM

COMPANY PROFILE Electrical & Instrumentation Contractor

polar zone components and systems for extreme temperatures

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

Carbon Heating Film. Failure to follow these instructions may result in fire, electrical shock, property damage, personal injury, or death.

Time Extension: Tender submission deadline is extended up to 12:00 Hrs. of

SECTION ELECTRIC TRACTION ELEVATORS PART 1 GENERAL 1.01 SUMMARY. A. Section Includes: Electric Traction Elevators.

MEP Syllabus CAREER DEVELOPMENT CENTRE SHRISTI MEP. Trichy-26

HORIZON PARK BUSINESS CENTER, Phase 2

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC

Commercial Rules and Regulations

BUILDING ASSESSMENT REPORT ELECTRICAL SERVICES FOR 75 FOX STREET BUILDING

Chilled Water Precision Air Conditioner for Critical Application

DTW Master Specification Section EMCS: Start Up, Verification and Commissioning

Following are the systems proposed as per NBC & Local Fire Authority:

FIRE RISK ASSESSMENT NOT KNOWN 15/10/ SOMERTON COURT BROADMOSS DRIVE SIMON ROFFEY

DIVISION 14 - CONVEYING SYSTEMS. 1. Passenger Elevators 2. Vertical Platform and Inclined Wheelchair Lifts.

CHENNAI METRO RAIL LIMITED ADDENDUM-1. for

Commercial Remodel/ Add On Rules and Regulations

Guided Learning Hours (GLH) 8 Invigilated Assessment Hours (IA) 2 Total Qualification Time (TQT) 10

SCOPE OF SUPPLY SUPPLY OF H2S ANALYZER

B. After installation, the Owner shall be able to perform hardware configuration changes as desired without the services of the Integrator.

Corbin Building. Technical Assignment 2. Matthew Trethaway Lighting/ Electrical AE 481W 10/26/2011 Advisor: Ted Dannerth

DONALD H. BERG, ARCHITECT

"ESDDR" Series Electric Humidifier

DESIGN, PERFORMANCE, MATERIAL AND WORKMANSHIP SPECIFICATIONS

CITY OF PASADENA FIRE DEPARTMENT

Appendix SPAIN Madrid M30-Río-TUNNEL

Electrical Equipment & Systems

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

BEVERAGE CONDUIT SYSTEMS

Building Consent Application Compliance Schedule Information

FIRE SERVICE FEATURES

Loss Prevention Standards

Petralba tunnel: A case of success

Guide to Membership Assessments

Our objective is to deliver quality electrical materials and services to construction and housing projects that are of the highest quality.

Tender Document. MR 193/ Design, Supply & Commission New Control Panel for Ruston 16RK270 Generator

CHAPTER Committee Substitute for Committee Substitute for Committee Substitute for House Bill No. 973

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

DIVISION FINNED WATER-TUBE BOILERS

DIVISION COMMERCIAL, GRID-TYPE, FINNED-TUBE, GAS DOMESTIC WATER HEATERS

The extent of liability of the signatory/signatories is limited to the work described above as the subject of this certificate.

DIVISION FINNED WATER-TUBE WATER HEATERS

Spark Extinguishing Systems

Introducing the innovative ipids Indoor Outdoor Detection System MANUFACTURING SECURITY SOLUTIONS

Randle Siddeley associates landscape architecture environment urban design

DESIGN, PERFORMANCE, MATERIAL AND WORKMANSHIP SPECIFICATIONS

Transcription:

Item No A Item Description Power Supply contractor Connection between Secondary of Auxillary Transfomer and the LowVoltage Switch Board Station Interface Matrix Power Supply, S&T, AFC,Lift & Escallators,Rolling stock and Track work Power Supply contractor shall ensure that facility are available on the Transformer secondary to receive the cable Station Civil and E & M Contractor Supply, erection and conection by cable will be done by E & M Annexure - D Remarks 2 Power demand Power supply contractor shall request for the total power load in the station from Station E & M contractor and accordingly design the transformer capacity. Station E & M contractor shall give the details of total power load of the station by collecting the load requirement from all other system -wide contractors and submit to Power Supply Contractor Space Requirement Shall design the technical room layout including,builders works requirement in accordance with space provision specified. Power supply contractor shall furnish room layout with equipment foot prints and equipment static and dynamic load and shall be co-operated with Station contractor Shall incorporate, Power Supply Contractor requirements in station design and shall be cooperated with Power supply contractor. 4 Ventilation and illumination requirement Power supply contractor shall specify the operating temperature (ventilation), illumination parameters affiliated to ASS technical room Station E& M contractor shall design illumination (lux level) according to ASS room specification requirements 5 Earthing Design the earthing for HV and LV power supply systems Station E& M contractor Shall co-ordinate with the, including building structure and request for appropriate earth Power Supply E & M Contractor and design the station bus routing in the technical room. earthing pits and earthing bus in the technical rooms 6 Cable Routing Power supply contractor shall request cable containments/trunking /brackets for HV cable routing. Station E& M contractor shall install cable trays/tunking required for all cable routings Shall provide inputs to combined services drawings (CSD) for detailed cable (for duct bank/cable trays/cable troughs/cable shafts and etc... ) layout/routing/laying [HV and LV cables crossing to be avoided] within the Station and cable crossing at stations. Power supply contractor shall specify the cable routing and section needed at the interface between Viaduct and station. Shall install the rated capacity Transformer Shall jointly check the technical rooms made ready by Civil and E&M contractor and to be confirmed. Shall prepare the combined services drawings(csd) in time required for the cable layout/routing/laying within the Station and cable crossing at stations. Shall design the section accordingly Shall construct the suitable solid foundation/platform sufficiently at out of reach of flood, and co-ordinate accordingly for civil and structure works. Technical rooms should be ready with lighting, small power, fire Detection and Fire Fighting systems,cabletrays/supports/trenches/troughs Etc. and Shall be co-operated withpower supply

Shall jointly check the arrangements made ready for cable routing/laying [HV and LV cables crossing to be avoided] within All the necessary arrangements should be made ready for the cable routing/laying and shall be co-operated the Station and cable crossing at stations to be confirmed. with Power supply Contractor. Shall jointly check the earthing works and earth bus in the technical rooms required for High Voltage and Low Voltage All the earthing works should be made ready and hand power supply systems including the building structure and to over to Power supply Contractor. be confirmed. Power supply Contractor will incorporate in his systems of tripping and protection and shall be confirmed. E & M Contractor will hand over all the protection and tripping systems of all other contractors in the station to, Power supply Contractor and shall be Co-operate. B Signalling and Telecom Space Requirement Shall furnish the space and mechanical load requirements of Shall provide preliminary design station layout the showing the rooms and vertical cable risers. Signal Equipment Room (SER), Communication Equipment Room b) Shall Update the Station drawings to accommodate (CER), Station Control Room (SCR), Telecom closets and lighting, the flooring, false flooring, cable duct and vertical cable risers in requirements of E & M Contractor the c) Shall collect the data & integrate with other users above mentioned rooms. and provide it to all contractors. Shall furnish the sizes of S & T equipments to be installed in SER, TER and SCR. All corridors and doors shall be sized to enable equipment to be delivered to SER, TER and SCR for installation and replacements. Space for Signalling Equipment Room is 60 Sqm, Telecom Equipment Room 55 Sqm and for UPS 50 Sqm. UPTO raised floor E&M contractor will provide cable tray. Cable tray size will be 600x00 mm. S&T Equipments Size will be 800x700mm. According to that contractor will provide. 2 Air Conditioning Requirements Shall Provide the details of equipment heat generation load, number of persons and operating temperature requirement in the Signalling equipment room,telecom equipment room,station control room and UPS room to design VAC system. Shall collect the detail and provide as required by the signalling and telecom contractor. 2 Precision AC 5 Tonne hot standby are required for SER and TER. Central AC required for UPS Room. Cable Routing Shall furnish the routing of the cables for S&T equipment in whole Station Shall establish the synthesis layout for cable routing according to all the sub systems layout Cable Duct and Cable Tray will be provideded by E&M Contracot in coordinaton with System Contactor. a. Shall furnish the detailed drawing of main cable routing arrangements in respect of S & T cables in the station (including requirements of minimum meter separation between S & T cables and HV cables). Shall furnish the details of Signal & a. Shall design the cable routing and cable Telecommunication cables like dimensions, weight, containments in the station. minimum b. For heavy equipments like CCTV monitors, display bending radius and supporting & mounting details. boards,analog clocks etc., to be mounted on walls / b. Shall provide detailed drawing with the locations of all suspended from the roof, to integrate the fixing equipments and cables to be installed on the track. arrangements with the structural design. c. Shall provide detailed drawing of locations, loads, type of fixing/mounting arrangements for signalling and Telecommunication equipments to be installed on the platform, concourse and entrance levels like PA system, PID s, CCTV

Passenger emergency communication Shall furnish the locations and space requirements of passenger emergency communication and help point equipments to be installed. Shall validate the locations of passenger emergency communication system and help point system. To be finalised with CSD drawings 4 Access control system 5 Earthing Shall furnish the locations and details of access control system and Intrusion detection system. Shall furnish the requirements of earthing arrangement including earth impedance value for different S & T systems to be installed Shall validate the locations of access control system and intrusion detection system proposed by S&T. Shall provide the earthing arrangement for different systems and extend it up to SER, CER and SCR accordingly and terminate in the room Earthing terminal. To be finalised with CSD drawings Earthing arrangemnt will be provided by E&M Contractor for Clean Earth and Main Earth as per requirement of System Contractor. 5 BMS/SCADA system a.shall validate the interface design. Design the connectivity requirements from the interface devicse up to the SCR / OCC. b) Shall design the HMI of M&E SCADA at the SCR and OCC to meet the control and monitoring requirements of equipments installed by E & M contractor a) Shall design the interface device for each monitored / controlled equipment, Local control panel (where applicable) for the station M & E equipment, LV power distribution, UPS, lighting systems and building management systems installed under the E & M contractor scope b) Shall advise the locations and connectivity requirements of interface devices associated with M & E equipment to be monitored / controlled by SCADA. 6 EMI/EMC Shall furnish the EMI / EMC levels of S & T equipments to be installed in stations. Shall incorporate in station design and prepare a common EMI / EMC plan as per the EN-000-6-2, EN-000-6-,E502-2000 standards 7 Power requirement 8 Fire alarm system a) Shall furnish the detailed Electrical power load requirement of various S & T equipments (Normal & Emergency feeder ) Shall furnish the interface requirement with Fire alarm system., Shall design the Feeder requirement with suitable protection devices at the output accordingly. Shall design and incorporate the requirement of S&T,PA and security systems in the Fire alarm system 80 KVA for the Interlocking station, & 60 KVA for non -interlocking To be finalised with CSD drawings 2 Shall verify that the requirements of lighting, false flooring (for prescribed load levels) and vertical cable risers in SER, CER, Telecom Closets and SCR are as per the requirement. Shall install all signaling and communication cables and provide the connections to individual devices. a) Shall arrange the mounting and fixing accessories to station contractor. b) Shall install the equipments at stations like staff protection keys, Emergency stop plungers, PIDs, PA system, clocks, CCTV cameras and Television system equipments etc., Shall provide the lighting, false flooring (for prescribed load levels) and vertical cable risers in SER, CER, Telecom Closets and SCR. Ensure provision of cable ducts, main cable crossing arrangements, including openings required for entry / exit arrangements for main S & T cables in the station. Shall install the mounting and fixing arrangements for heavy equipments like CCTV monitors, display boards, analogue clocks etc., during the construction as per the S & T requirements.

4 5 Shall install the M & E SCADA system at the OCC & SCR and provide LAN connectivity up to interface device for all controlled /monitored systems installed bye&m contractor. Shall install the power cables from the Emergency main distribution Board in Electrical room UPS Room and to SER / TER and extend it to the SCR, Telecom Closets etc., Shall provide, wire and connect the interface devices upto the station LAn port provided by S& T Contractor for various equipments, local control panels (where applicable) for M & E equipment, LV power distribution system, UPS system, lighting system and building management system etc., forming part of E & M Contractor. Shall Provide the Feeder and suitable protection devices at the output of emergency main distribution board. 6 Shall verify the interfacing of fire system with PA system. Shall install the fire alarm and control system and provide the necessary interfaces with PA system. C 2 PSD(Platform screen door) a)shall validate and find the locations of Platform Screen Doors (PSD) and design space, hanger walls / (a)shall furnish the specification of Platform Screen Doors (PSD) beams & necessary supports, structural and platform like dimensions, weight and supporting & mounting details slab by considering the dimensions, weight and throughout stations. mounting details of PSD. (b)shall furnish the maximum load of PSD on platform edge (b)shall collect details from PDS E & M Contractor and design the platform to accommodate PSD load requirement. Shall furnish the requirements of passenger emergency escape doors track access doors. Shall validate and find the locations of passenger emergency escape doors and track access doors. Shall furnish the installation location and method of Platform Screen Doors Local Control Panel on platform level. Shall validate and find the locations of Platform screen doors local control panel. 4 Shall furnish the requirement of earthing system including earth impedance value and earth bars for the PSD equipment. Shall fulfil the requirements of earting and earth bars. 5 Shall furnish the details of UPS power supply requirement for PSD Operation Shall install the Platform Screen Doors, Emergency Escape Doors, Track access doors and Platform screen doors local control Shall design the Feeder requirement with suitable protection devices at the output accordingly. Shall provide necessary supports to install the platform screen doors and local control panels. 2 Shall verify the requirements of earths and earth bars. Shall install earths and earth bars for Platform screen doors and its equipments to be installed in Stations. D AFC Space requirement Shall install control panel, power and control cable according to Provision of Rooms and Areas for Equipment Lay-out To finalise the room schedule and lay-out for AFC at stations Shall install cable containment/ducts to install control panel, power and control cable according to plan Shall incorporate the space and room requirements in the station Design

2 Earthing Provide details of earthing requirements Incorporate the earthing scheme for AFC system as per requirement Power requirement 4 Cable routing Provide the Electrical Power requirement in the station for AFC equipments Provide the cabling scheme for AFC system and cable routing requirement for Power and Data. Shall design the power supply with suitable protection devices for AFC equipments in station To space proof the cable routing requirement of AFC for Power and Data in the station design Provide cable Containment. 5 Fire Alarm (a) Shall design the AFC system to interface with fire alarm system. Shall also specify the details like type of signal, communication protocol etc, (b) Shall Design the software according to functional requirements in emergency condition.to check and confirm that AFC specific requirements for installation are made available. 2.To install the electric cabinet and do the cable termination..to install the switches and do the data cable termination. 4.To do the internal wiring at the AFC rooms. 5.To fix the AFC equipements at AFC rooms and complete the installation. To confirm that the earthing provided is as per the requirement and provide earthing for the equipments (a) Shall design the Fire Alarm system to interface with AFC system. Shall verify and accept mutually the details like type of signal, communication protocol etc, (b) Shall specify the functional requirements of AFC system operation in emergency condition Construct and provide civil and strutural facilities required for AFC installation. To provide earthing as per AFC requirement E Lift & Escalator Power requirement Shall provide the requirements of total Electrical Power, Earthing, Cable Routing & location of the power point (Isolator) for Lifts and Escalators in the station. Shall collect the load details and give input to power supply contractor to select the capacity of Transformer. Shall design the earthing(from earth pit to respective equipment room), Cable routing and isolators locations as per requirement. 2 Fire alarm Interface Shall provide the interface details of Fire alarm system for the lift & the escalator. Shall collect the details from Lift & Escalator E & M Contractor and incorporate in the Fire Alarm system. Construction stage Shall jointly check the availability of requirement (shaft/site readiness) for Lifts and Escalators installation, like Power Supply, Earthing, Cable routing, power supply Isolator points, mounting facility, water resistant pits, access and delivery Shall provide Lift & Escalator requirements in station. space as per the drawing (provided by Lift & Escalator Contractor) suitable for lifts & Escalators erection and confirm. F Rolling Stock

Shall give requires details of Rolling stock including Length of train cars, height and location of doors for station design Requires details of Rolling stock including length of train cars, height and location of doors for station design. Shall give the details of kinematic and structural gauges. Requires details of kinematic and structural gauges G Track work contractor Shall fix chainages of the Turnouts / Cross over based on the chainage of Station Centre Line furnished by the Station Building contractor. Shall ensure at design stage Shall provide Track drainage consistent with the General Drainage arrangement in Station area and agree & provide the Point of interface Shall furnish correct chainage of Station centre line. Shall ensure that the pillars / columns supporting the station structure are located clear of the minimum infringement clearances from centre of track stipulated in the S.O.D. Shall design the General drainage system in the Station area taking into account Track Drainage and accept the Point of Interface in the Station/Platform H E& M contractor with Civil Contractor Space requirement 2 Finishes E&M E& M Contractor to supply detail of room sizes,all loads,plant layouts,equipment fountations,room drainage Shall incorporate the requirement of E&M contractor. requirements,cutouts,cable gallery/shafts sizes,earthmats and earthing terminations. E& M contractor to provide chequer plate/fire rated infill where opening in floor /wall exceed the dimensions of the LV equipment and services. Civil Civil to design and build architectural finishes in public areas with provision of E&M fixtures including cutouts & Provisions in architectural finishes for passage of services and installation of fixtures.