A Collection and Removal System for Water in the Final Cover Drainage Layer

Similar documents
LANDFILL FINAL COVER AND MANAGEMENT OF LEACHATE SEEPS BELOW FINAL COVER

EROSION & SEDIMENT CONTROL

NOTICE OF INTENT. Submitted To: Bremo Power Station 1038 Bremo Bluff Road Bremo Bluff, VA 23022

GEOSYNTHETIC-STABILIZED VEGETATED EARTH SURFACES FOR ENVIRONMENTAL SUSTAINABILITY IN CIVIL ENGINEERING JIE HAN PH.D.

Chesapeake Energy Center. Submitted To: Chesapeake Energy Center 2701 Vepco Street Chesapeake, VA 23323

Consulting Engineers and Scientists. Closure Plan. Submitted by: GEI Consultants, Inc Voyager Drive Green Bay, Wisconsin

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

EROSION & SEDIMENT CONTROL

Geosynthetics for Erosion Control and Reinforcement

HIGH PERFORMANCE COAL COMBUSTION RESIDUAL (CCR) SOLUTIONS

Post Construction BMPs

2

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Technical Specification Guidelines

2018 Annual Landfill Inspection Report

Geosynthetics. Work platforms built with geotextile tubes at the Lach Huyen Bridge. GMA TECHLINE Exposed GM? Deformations?

Super Gripnet INTEGRATED DRAINAGE SYSTEM (IDS) GEOMEMBRANE

Section Specification for Geotextile Used in Permanent Erosion Control Application

SWANA/A&WMA s. Third Annual Landfill Operator s Training Geosynthetics in Landfills. February 13, 2013

Alternative Cover Systems

CAPPING OF A GOLD MINE IN ROSIA MONTANA, ROMANIA

REHABILITATION OF SAIDA DUMPSITE

Selecting the Right Closure Cap Option for Your Surface Impoundment or CCR Landfill

Pozidrain. A guide to the selection and specification of Pozidrain drainage geocomposite

Capping waste rock at a Superfund site An innovative design tackles pollution at a mining operation s waste repository.

Drop-In Specifications INTEGRATED DRAINAGE SYSTEM GEOMEMBRANE

Chapter 8 REMEDIAL MEASURES 8.1 FACETS IN HAZARD CATEGORY

Introduction. Functions of Non woven Geotextile (TechGeo) Separation. Filtration. Drainage. Containment. Tech Geo. . Geotextile Overview

MANUAL OF DESIGN, INSTALLATION, AND MAINTENANCE REQUIREMENTS FOR STORMWATER MANAGEMENT PLANS

G E O T E X T I L E S

Structural Storm Water Best Management Practices (BMPs)

The Mercer Lecture

Technical Supplement 14D. Geosynthetics in Stream Restoration. (210 VI NEH, August 2007)

Exposed Geomembrane Cover Systems for Coal Ash Facilities

CI/SfB (16)(17) Common Arrangement D11 Uniclass L1411/ L132/ L6634. Woven Polypropylene Geotextiles.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

Leak Location Geosynthetic Materials in Base Liner Systems. NY Federation SWANA. May, 2014

Subsurface Infiltration Bed

INSTALLATION GUIDELINES. Landfills and mines

WQ-07 INFILTRATION TRENCH

Liner Construction & Testing Guidance Overview

Numerical Analysis of Leakage through Geomembrane Lining Systems for Dams

Part IV(a): BMPs for Erosion, Sediment, Velocity Control

FINAL COVER VENEER STABILITY ANALYSES FOR SCA DESIGN

Berm and Swale Complex

STANDARD SPECIFICATIONS SECTION TEMPORARY EROSION AND SEDIMENT CONTROL

Leak Drainage. A guide to the selection and specification of Leak Drainage Systems for use in Mineworks and Municipal Solid Waste containment systems.

HEAP LEACH PAD DESIGN AND CONSTRUCTION PRACTICES IN THE 21 ST CENTURY

D.P.E. Enviroliner. geotextile protection layer. covering new ground 2016

COIR GEOTEXTILES. Er. Sheela Mary Cherian, M.Tech, Assistant Executive Engineer. Woven coir netting / Mesh matting used as geotextiles

Geosynthetics for the Management, Containment and Closure of Coal Combustion Residual Disposal Facilities

J. Paul Guyer, P.E., R.A.

New Development Stormwater Guidelines

Lessons Learned From the Failure of a GCL/Geomembrane Barrier on a Side Slope Landfill Cover

Landscape Rebate: Rainwater Harvesting Rain Garden Installer Guidelines

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

2018 Annual Landfill Inspection Report

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

Town of Essex Small Site Erosion Control Guide

We Don t Have No Stinkin Dirt! Coal Ash Pond Closures (Traditional and an Alternative Method)

Capillary Action Subsurface Irrigation

Preventing Storm Water Pollution: What We Can Do

Maintaining Your Neighborhood Stormwater Facilities

Elements of Design of Multi-linear Drainage Geocomposites for Landfills

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

TRANSMISSIVITY BEHAVIOR OF SHREDDED SCRAP TIRE DRAINAGE LAYER IN LANDFILL COVER SYSTEM *

CHAPTER 8 SLOPE STABILITY ANALYSIS

Maintaining Your Neighborhood Stormwater Facilities How to identify stormwater facilities and keep them working

The use of geosynthetics in the installation of ballast layers

Rhyno. Woven Polypropylene Geotextiles. Geosynthetics Limited

Workshop On Capping Design In South Africa. Product Showcase By. Tyrone Naidoo

A geosynthetic alternative to traditional sand filter drains in a piggy-back tailings storage facility

Evaluating Tubular Drainage Geocomposites for use in Lined Landfill Leachate Collection Systems

4.5 City of Indianapolis Stormwater Green Infrastructure Guidance: Bioretention (rain gardens) Bioretention Fact Sheet Bioretention Technical Design

6.1 Bioretention Areas

BIORETENTION CELLS. Green Infrastructure For Stormwater Management WHAT ARE BIORETENTION CELLS? WHERE ARE BIOCELLS INSTALLED?

A PVC geomembrane integrated in the landscape

GEOWEB slope & shoreline protection OVERVIEW

Geosynthetic materials Solutions for improved ground structure. Name it. We ll do it.


2016 Annual Inspection Report

Woven Polypropylene Geotextiles

Low Flow Rates Low Filtration Sandy Soils Medium Flow Rates Medium Filtration Clayey Soils [1] High Flow Rates High Filtration Polluted Soils

Geosynthetics and Their Applications

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

SOUTHEAST TEXAS CONTINUING EDUCATION ENGINEERING USE OF GEOTEXTILES

GSI. Director Geosynthetic Institute. GSI White Paper #30. In-Situ Repairs of Geomembrane Bubbles, Whales and Hippos GRI

A. INTRODUCTION OVERVIEW

ABBREVIATIONS. Dwg LID of 1. Abbreviations

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

Session 1: Construction of Landfill Facilities

Acronyms. TRI TRI Environmental, Inc. Table of Contents. iii

Experiences with Placement of Alternative Final Covers Presented by

South Fraser Perimeter Road (SFPR)

High Point Community: Site Drainage Technical Standards. High Point Community Site Drainage Technical Standards

Transcription:

Landfills A Collection and Removal System for Water in the Final Cover Drainage Layer A rainwater toe drainage system, by removing water from the final cover drainage layer, eliminates the possibility of pore pressure build up in the drainage layer at the lower portions of the landfill slope, thus creating a condition that promotes stability of the slope. n By Ali Khatami, Ph.D., P.E. Rainwater falling on landfill slopes is managed by various systems developed at the stage of the design/permitting of the landfill. The surface water runoff is managed through swales and downchute systems on the slope, while a portion of the water percolates into the final cover soil layer. The collected water in the swales is conveyed to downchute pipes and then to the landfill perimeter storm water management system. Rainwater that percolates into the final cover generally exits the final cover in two different ways: 1) a portion of the water stored in the final cover soil layer evaporates out of the final cover; and 2) water that percolates through the final cover soil layer reaches the drainage layer overlying the cover geomembrane. By design, the final cover geomembrane is generally textured to improve the interface friction within the final cover structure. The drainage layer may be a granular drainage layer or a synthetic drainage layer. The widely accepted synthetic material used for the final cover drainage layer is geocomposite. Geocomposite consists of a single layer of geonet heat bonded on both sides to geotextiles. The lower geotextile acts as the friction layer against the underlying textured geomembrane, and the upper geotextile acts as the filter to prevent soil particles from entering and clogging the geonet, which acts as the drainage medium. The subject of this article is related to those final covers including a synthetic drainage layer overlying a geomembrane barrier layer. Managing Rainwater Rainwater reaching the geocomposite in the final cover percolates through the upper geotextile and flows down the slope primarily through the geonet layer of the geocomposite. The water in the geonet at the bottom of the landfill Figure 1: Rendering of RTDS location. Figures and photos courtesy of SCS Engineers. 30 Waste Advantage Magazine November 2014 www.wasteadvantagemag.com

slope must be managed in such a manner that water is not backed up in the geonet. The backing up of water in the geonet causes saturation of soil in contact with geocomposite, and saturation could potentially cause instability issues within the final cover. The best management practice for managing water in the geonet would be to provide a collection system at the lowest point of the slope to efficiently remove water from the geocomposite and drain it out of the final cover. In the event that depressions exist in the landfill slope by design (such as benches, terraces, or access roads) with a low point toward the landfill slope on the bench, it is anticipated that the geocomposite conforming to the depression will have a low point as well. Water can get trapped in the geocomposite low point and back up in the geonet if a collection and removal system for the water in the geocomposite is not provided. This article only addresses the collection and removal system at the toe of the landfill slope near the perimeter berm of the landfill. A collection and removal system at the low point of a terrace on the landfill slope may be similar to the system discussed below with slight variations to address the width and inward slope of the terrace. This subject is not discussed in this article. The Rainwater Toe Drain System A collection system, called the rainwater toe drain system, or RTDS, was developed approximately 15 years ago. Up to that point in time, the water in the geocomposite was directly discharged out of the lower edge of the Photo 1: Sloping line marks the weld line of the RTDS flap to the cover geomembrane. Photo 2: The RTDS flap weld follows the marked line. Photo 3: The opposite side of the RTDS flap is placed over a small soil berm at the slope toe. www.wasteadvantagemag.com November 2014 Waste Advantage Magazine 31

A Collection and Removal System for Water in the Final Cover Drainage Layer Photo 4 A depression is created above the RTDS flap for positioning the RTDS burrito. geocomposite exposed to the open environment or buried in a gravel bedding on top of the landfill perimeter berm. Over time, it was proven that such designs could potentially fail to effectively remove water from the geocomposite due to the clogging of the geocomposite end point. Dirt accumulation, soil from erosion of cover soils from higher up on the slope, or vegetative growth around the geocomposite end point clogged the pathway for water out of the geocomposite and caused saturation at the toe of the landfill slope at the perimeter berm. The RTDS proved to be an efficient system requiring no maintenance, while performing effectively for an extended period of time. Like almost every new idea, the design had to be upgraded over time to improve performance and reduce maintenance of the system. Figure 1, page 30 illustrates the most efficient version of the RTDS with respect to location and geometry, which was adopted by clients as a standard feature in all of their final cover systems. The RTDS includes a geomembrane flap (RTDS flap) welded to the cover geomembrane along a sloping line a short distance above the lowest point of the landfill slope. Prior to the welding of the flap, a sloping line is marked on the cover geomembrane by a surveyor or the installer of the RTDS flap (see Photo 1, page 31). The sloping line extends from a low point to a high point with an approximately 2 ft. elevation difference between the low and high points. The lateral distance between a low point and a high point may be 150 ft., with a 300-ft. distance between each two consecutive low or high points. The RTDS flap may be only 7 ft. wide and welded on one side along the line marked on the cover geomembrane (see Photo 2, page 31). The other side of the RTDS flap is positioned over a small soil berm 32 Waste Advantage Magazine November 2014 www.wasteadvantagemag.com

Photo 5: The RTDS geotextile and pipe are positioned. Photo 6: The pipe is encased in gravel. Photo 7: Then wrapped in geotextile is sewn, creating an RTDS burrito. constructed over the cover geomembrane at the toe of the landfill slope (see Photo 3, page 31) such that a depression is created above the RTDS flap (see Photo 4) for positioning a perforated pipe (RTDS pipe) encased in gravel and wrapped in geotextile (RTDS burrito) inside the depression (see Photos 5 to 7). The small berm is constructed such that the extrusion weld of the RTDS flap is located at the bottom of the depression. The sloping extrusion weld of the RTDS flap provides the slope along the RTDS burrito for the flow of water inside the RTDS pipe. The geocomposite drainage layer on the slope is terminated at the bottom of the LTDS flap depression (Photo 4) and the RTDS burrito is positioned directly above the end point of the geocomposite. With this design, water in the geocomposite drains directly into the RTDS burrito and into the RTDS pipe. No soil should exist between the geocomposite and the bottom of the burrito, otherwise a hydraulic bottleneck will be created that will significantly reduce efficiency of the system. Water in the RTDS is drained out of the final cover through drainpipes (lateral pipes) positioned perpendicular to the perimeter berm alignment. The lateral pipes are positioned at 300-ft. spacing (at the converging low ends of two adjacent 150 ft. long RTDS) along the landfill perimeter berm. The lateral pipe extends from the RTDS flap to the perimeter ditch, sloping toward the perimeter ditch to create gravity flow out of the RTDS. Each lateral pipe is connected to the RTDS burrito at the high end of the pipe by penetrating the RTDS flap, and discharges to the landfill perimeter ditch at the low end of the pipe. The penetration through the RTDS flap must be booted to prevent water from leaking into the perimeter berm structure. An erosion control mat should be installed at the low point of the RTDS lateral pipe to eliminate soil erosion at the point of discharge (see Photo 8, paeg 34). Photo 9, page 34 shows the RTDS in service and depicts the amount of water that can flow out of a single lateral pipe after a large storm. If the RTDS did not exist at the toe of the landfill slope, the water in the geocomposite would have been trapped in the final cover and would have potentially caused instability issues for the final cover, or at least created a washout near the lower portion of the slope due to the backing up of water in the cover geocomposite, and causing it to enter the soil above the geocomposite. to project depending on the components included in the design. The unit cost of construction may vary from $30 to $40 per linear foot. The expense may seem an additional cost item to the construction of a final cover system without a RTDS; however, through the construction of numerous landfill final cover systems with the RTDS, it has proven to be an important component for keeping the final cover intact and stable on the slope for very long periods of time. The RTDS was specifically developed to drain the final cover drainage layer at the toe of the landfill slope. A simple construction technique was developed to facilitate construction of the RTDS. Through numerous final cover construction projects, contractors have not indicated that the construction technique is cumbersome or complicated. The RTDS, by removing water from the final cover drainage layer, eliminates the possibility of pore pressure build Keeping Stability The construction cost of an RTDS varies from project www.wasteadvantagemag.com November 2014 Waste Advantage Magazine 33

A Collection and Removal System for Water in the Final Cover Drainage Layer Photo 8: An erosion control mat eliminates soil erosion at the discharge. up in the drainage layer at the lower portions of the landfill slope, thus creating a condition that promotes stability of the slope. WA Ali Khatami, Ph.D., P.E. is a Vice President and Project Manager for SCS Engineers (Coconut Creek, FL). He has more than 30 years of research and professional experience in the areas of mechanical, structural and civil engineering. Dr. Khatami Photo 9: The RTDS working to eliminate trapped water following a storm. has more than two decades of experience in the lifecycles of environmental projects. He has acquired extensive experience and knowledge in the areas of geology, hydrogeology, hydrology, hydraulics, construction methods, material science, construction quality assurance (CQA) and stability of earth systems. Dr. Khatami can be reached at (954) 571-9200 or via e-mail at AKhatami@scsengineers.com. 34 Waste Advantage Magazine November 2014 www.wasteadvantagemag.com