fulfils all requirements for extended protection of the criteria catalogue The appendix is part of the certificate and consists of 4 pages.

Similar documents
fulfils all requirements for high protection of the criteria catalogue The appendix is part of the certificate and consists of 5 pages.

Commerzbank AG Kaiserstraße Frankfurt am Main, Germany. Sicherheitszentrale DLZ

ARGE Guideline - Part 3 "System functionality fire detection and fire fighting systems in rolling stock"

Solutions for the health care sector

Site Certification Process

Annex to the Accreditation Certificate D-ZE according to DIN EN ISO/IEC 17065:2013

ednet Smart Home Quick Installation Guide

Certified Passive House Component For cool, temperate climates, valid until 31 December 2017

Technical Catalog laboratory furniture system

Our. Heaters. for your Projects

Operation Manual. Control TJ-HRC

Contents. Most Trusted and Best Rated Quality Products. PX-1 Stand-Alone Smoke Alarm. PX-1C Radiolink Smoke Alarm.

10 Year Smoke Detector and Siren

Technical Bulletin. Fire protection requirements for cabling systems MLAR 03/2000 MDBR 12/1998. Date: 08/2006

Procedure for the Approval of New Fire Detection and Alarm Technologies

Ventilator insert Silvento V... Installation directions - Please pass on to the user -

Design criteria for public cyclone shelters

AUTOMATIC FIRE EXTINGUISHING SYSTEM for TUNNEL PROTECTION with SPREAD REMOTE CONTROLLED MONITORS (TUDEM-LEGIO)

Airbrush Compressor & Vacuum Pump AS20W ARTICEL 34202

Physical and Environmental Security. CISSP Guide to Security Essentials Chapter 8

Contents. Best Trusted and Rated Quality Products. PX-1 Stand-Alone Smoke Alarm. PX-1C Radiolink Smoke Alarm. PX-AR Alarm Relay

Fire Safety Concept Hotel Jumeirah

VIESMANN. Operating instructions VITODENS 100-W. for the system user

AC THOR. Assembly Instructions

Magnetic-Inductive Flow Velocity Sensor PIT. Installation and Operating Instructions

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS AIR-CONDITIONING OF THE MAIN CONTROL ROOM (DCL)

Electronic Temperature Controller 70304,

AUTOMATIC MAKE-UP AIR DAMPER WITH TRANSFORMER READ AND SAVE THESE INSTRUCTIONS

VIESMANN. Operating instructions VITODENS 111-W. for the system user

SOUND-INSULATED FAN. Iso-K OPERATION MANUAL. Iso-K_v.1(2)-EN.indd :20:59

Leakage Sensor LS-50 SGB

Solutions for airports and railway stations

Minifog EconAqua Water mist sprinkler systems

Automation, Software und Informationstechnologie

GMS GRAPHICAL MANAGEMENT SYSTEM

Annex to the Accreditation Certificate D PL according to DIN EN ISO/IEC 17025:2005

HEAT RECOVERY AIR HANDLING UNIT

Silvento concealed variant clamped-ventilator - Replaces Skalar-; Skalar-V...; Skalar-2V... - Installation directions - Please pass on to the user -

AGC-4, GPC-3, GPU- 3 and GPC 2g with the option Al

Technical Catalog laboratory furniture system

Water mist fire suppression systems. Minifog EconAqua Water mist sprinkler systems

ednet Smart Home Quick Installation Guide

Progress Report (Excerpt)

Fire protection for emergency power supply

Operation Manual Airbrush Compressor AH28A ARTICLE 34247

ExDetector IRCO2. ExDetector IRHC. Operating and Installation Instructions. Gas Detection and Warning Systems

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

Managing technical risks

AUTOMATIC FIRE EXTINGUISHING and VISUAL GUIDE SYSTEMS for TUNNEL PROTECTION

GMA200-MT. Operation Manual. Gas detection controller for mounting rail assembly

Report Nr

Organize your security with PSIM + software

CERTIFICATE. EN tested QAL 1 certified TUV approved Annual inspection. The certificate is valid until: 28 July 2016

Organize your security with PSIM + software

Operation Manual. Airbrush Airbrush-Spray Booth Compressor Suction Unit Paint E420

Dipl.-Ing. W. Bender GmbH & Co. KG Londorfer Str Grünberg Phone: Fax:

Fire ground electrocution

CERTIFICATE of Product Conformity (QAL1 )

CERTIFICATE of Product Conformity (QAL1 )

MobiCall Silent Alarm

RISK ENGINEERING GUIDELINE.

Tyco Integrated Security Monitoring Services. Helping you secure your business 24 hours a day, 365 days a year. Safer. Smarter. Tyco.

TR-1 single separator for MQL and dry processes. Explosive dusts from dry processes or MQL extracted directly at the machine and separated safely

COMMISSION ON PROCESS SAFETY

VdS Guidelines for Hazard Warning Systems (HWS) VdS 3431en. System requirements. VdS 3431en : (01)

VdS 5477en : (01) Key deposit boxes

TECHNICAL WHITE PAPER AUTOMATIC WARNING DEVICES FOR LIGHT LIQUID SEPARATORS

FIRE PROTECTION ISSUES IN THE HOT CELLS OF A NUCLEAR FACILITY

Fire Detection and Fire Fighting Testing and Approval on Railway Vehicles

Extinguishing water technology Minimax Mobile Services

Construction Method, Material Selection, Fire Prevention & Building Security System For Project 9a : Board 4 ; For Project 9b : Part 4

Totally Integrated Power

DECOMMISSIONING OF THE REACTOR VESSEL OF THE COMPACT SODIUM COOLED NUCLEAR REACTOR FACILITY (KNK)

F.R.A.M.E. calculation report. This report is generated by the "FRAME for Windows program " The calculation is made for: Airport_building

Installation and Operating instructions for. C9900-U battery pack. Version: 2.0 Date:

Hazardous Goods Warehouse. VOSSCHEMIE GmbH. Preventive Fire Protection. Case study

F.R.A.M.E. EVENT NETWORKS used in "FRAME".

Operating and Maintenance Instructions

CERTIFICATE of Product Conformity (QAL1 )

designed for rail 5000 Series

PLAN THE INSTALLATION Planning the installation first requires selecting the most appropriate installation approach. The chart below offers suggestion

AirUnit. Installation instructions. mfh systems modern floor heating. Decentralised domestic ventilation

EXTINGUISHING WATER TECHNOLOGY

Data sheet referring to EU group safety data sheet adapted to EC-degree 1907/2006 (REACH)

Ventilation and air conditioning QUALITY FOR LIFE. Refrigerating systems and heat pumps. Operating manual

CERTIFICATE of Product Conformity (QAL1 )

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS 2. COMPONENT COOLING SYSTEM FOR THE NUCLEAR ISLAND (RRI [CCWS])

LICENCE. to use the European Mark. Licence No Date of issue: Wien, Rev. No. 03 Wien,

speed pipe indoor system. Secure indoor networks.

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit


CERTIFICATE of Product Conformity (QAL1 )

OPERATIONS AND STORAGE BUILDING

Operating instructions

GMA200-MW16. Operation Manual. Gas detection controller for wall mounting

Part No KEMPER Filter-Master XL

Acoustic Verification Report

R E P O R T D I N E N

Alarm System SECURE AS 302

BUILDING INDUSTRY TUNNEL RAIL TUNNEL FIRE FIGHTING WITH HIGH PRESSURE WATER MIST

Transcription:

The certification body of TÜV Informationstechnik GmbH hereby awards this certificate to the company Beiersdorf Shared Services GmbH Quickbornstraße 24 20253 Hamburg, Germany to confirm that its security location Data Centre 5 fulfils all requirements for extended protection of the criteria catalogue Trusted Site Infrastructure TSI V2.0 Level 2 (extended) of TÜV Informationstechnik GmbH. The requirements are summarized in the appendix to the certificate. The appendix is part of the certificate and consists of 4 pages. The certificate is valid only in conjunction with the corresponding evaluation report until 2012-12-31. Infrastructure TSI66121.10 Certificate-Registration-No.: TUVIT-TSI66121.10 Essen, 2010-12-10 Dr. Christoph Sutter Head of Certification Body TÜV Informationstechnik GmbH Langemarckstr. 20 45141 Essen, Germany www.certuvit.de

Appendix to the certificate TUVIT-TSI66121.10 page 1 of 4 Certification System The certification body of TÜV Informationstechnik GmbH performs its certificate on the basis of the following product certification system: German document: Zertifizierungsschema für TÜViT Trusted-Zertifikate der Zertifizierungsstelle TÜV Informationstechnik GmbH, version 1.0 as of 2010-05-18, TÜViT GmbH Evaluation Report German document: Prüfbericht Trusted Site Infrastructure, version 1.0 as of 2010-11-02, Report ID: 66121BD_V1.0.doc, TÜViT GmbH Evalution Requirements German document: Trusted Site Infrastructure TSI Kriterienkatalog, version 2.0 as of 2007-01-15, TÜViT GmbH For the evaluation all evaluation requirements of the TSI Level 2 are applicable. Evaluation Target The target of evaluation is the security location Data Centre 5 from Beiersdorf Shared Services GmbH. It is detailed in the evaluation report. Evaluation Result The result is Level 2 (extended) : all requirements of the evaluation aspects ENV, FIR, ACV of the next highest level are fulfilled. Summary of the Evaluation Requirements The requirements for Trusted Site Infrastructure (TSI), version 2.0:

Appendix to the certificate TUVIT-TSI66121.10 page 2 of 4 1 ENV Environment There are no surrounding hazard potentials. The decision on the location must be based on the avoidance of floods, explosions, seismic events, shock waves, danger of collapse or pollutants. 2 CON Construction Walls, doors and windows offer protection against access, fire and debris. It has also been ensured that building sections threatened by water, EM/RF interference fields, and dangerous next-door production processes are avoided. The building is protected against lightning. The security area is located in a separate fire protection area and not directly adjacent to the public. IT and technical equipment are separated. 3 FIR Fire Protection / Alarm / Extinguishing Systems A fire alarm system has been installed in the complete security area and linked with the fire brigade. Adjacent rooms, raised floors, suspended ceilings and air ducts are included in the fire monitoring. Apart from signalling an alarm, damage containment measures such as a gas extinguishing system in the security area are triggered. Furthermore appropriate hand fire extinguishers are available.

Appendix to the certificate TUVIT-TSI66121.10 page 3 of 4 4 SEC Security An access control system including appropriate access rules does exist. The protection against breaking and entering features several levels, and all security sensitive areas are monitored by means of an intrusion detection system. These security systems are connected to the emergency power supply and to a permanently manned control room. 5 POW Power Supply The electrical installations are realized in accordance with the relevant DIN standards and VDE regulations. They are protected against over voltage and realized with adapted separations and with protection of the electric circuits. The IT- and the security systems are connected to an uninterruptible power supply. For the supply alternative possibilities exist. 6 ACV Air Conditioning and Ventilation Air conditioning in redundant design for the IT systems is given. It has been ensured that air temperature, humidity and dust content comply with specified limits. The measured values are remotely controlled. Dampers are installed according to the fire protection concept. 7 ORG Organization Periodical functional tests are carried out for all safeguards. A maintenance schedule defines methods and intervals for the wear parts of the infrastructure components. The communication with the exterior is ensured, even if the PBX fails. The data backup media is stored and protected against fire and access in an area separate from the security area.

Appendix to the certificate TUVIT-TSI66121.10 page 4 of 4 8 DOC Documentation A DIM (Documentation of Infrastructure Measures) or a security concept has been provided. Rules of conduct exist, i.e. covering access control with respect to authorization or key / smart card distribution. Up-to-date plans and documentation are available for the building and all infrastructure components. Furthermore a fire protection concept does exist and has been coordinated with the local fire brigade. Additionally emergency and recovery concepts are provided. L Level Level 1 medium protection requirements (according to the BSI infrastructure requirements of the baseline protection manual) Level 2 extended protection requirements (extended requirements to all above mentioned aspects) Level 3 high protection requirements (complete redundancy of essential components, no single point of failures, climate limits according to EN 1047-2) Level 4 very high protection requirements (advanced access control, no adjacent hazard potentials, with minimal intervention time)