John Palmer Elementary School

Similar documents
Joseph Brennemann Elementary School

Richard Henry Lee Elementary School

Washington Irving Elementary School

Genevieve Melody Elementary School

Agustin Lara Elementary Academy

Josefa Ortiz De Dominguez Elementary School

Alessandro Volta Elementary School

Charles W Earle Elementary School

Edward Jenner Elementary Academy of the Arts

DeWitt Clinton Elementary School

Sidney Sawyer Elementary School

Calmeca Academy of Fine Arts and Dual Language

Francis M McKay Elementary School

Oscar DePriest Elementary School

George B Swift Elementary Specialty School

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

Mechanical Inspection Plumbing

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

DOCUMENT TABLE OF CONTENTS

PLAN REVIEW SUBMITTAL GUIDE

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

Florence High School / Middle School Page 1 of 3 Florence, WI

2014 Bond Project Guide

Briar Crest Elementary

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

NYC Department of Education

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

RECAPP Facility Evaluation Report

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education

NYC Department of Education

PLATTEVILLE MIDDLE SCHOOL

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

NYC Department of Education

NYC Department of Education

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

Inspection Report 123 My Street Midland, GA

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Estimated Repair, Replacement, and Upgrade Costs

Master Facility Planning Update School Board Meeting May 26, 2016

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

New High School Concept

Axiom Property Inspections

NYC Department of Education

NYC Department of Education

Mechanical System Description

Appendix B. Facilities Assessment Report

NYC Department of Education

NYC Department of Education

MOUNT PLEASANT MIDDLE SCHOOL HVAC. M-01 Heating Plant: M-02 Heating & Ventilating Systems: Livingston School District Mount Pleasant Middle School

NYC Department of Education

1354 CHECKLIST for Project Closeout

NYC Department of Education

RECAPP Facility Evaluation Report

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

NYC Department of Education

GARCIA GALUSKA DESOUSA Consulting Engineers

RECAPP Facility Evaluation Report

NYC Department of Education

Cook - Wissahickon Elementary School

NYC Department of Education

NYC Department of Education

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

CHAPTER 7 ALTERATIONS LEVEL

Ashland School District Facility & Capacity Assessment Report 2005

NYC Department of Education

NYC Department of Education

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

Building Self-Inspection Program

Massachusetts School Building Authority

Residential Construction and Remodeling Estimates. compliments of. pillartopost.com

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

School District of Milton 5- Year Capital Maintenance and Improvement Plan

NYC Department of Education

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions : The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. : The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. : The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Metal Canopy CHIMNEY GRE 6 64 64 SF $1,540 $1,540 Brick Chimney - Concrete/ Mortar Liner Metal Flue GRE 6 70 GRE 7 49 70 LF $35,035 49 LF $35,035 Assessment Date: 2/26/2013 Page 1 of 17

CORNICE Cornice - Terra Cotta DOORS Exterior Steel Door Exterior Wood Door Transom Lite ENTRANCE Concrete Exterior Stairs Entrance Controls - Audio Entrance Controls - Audio and Video Stair Handrails FOUNDATION GRE 6 352 0 YEL 4 4 GRE 6 6 BLU 5 270 GRE 6 80 352 LF $10,797 $10,797 20 EA $6,607 4 EA $12,836 6 EA $1,699 $21,141 270 LF $86,873 2 EA $858 $1,430 80 LF $89,161 Concrete Foundation 0 1,718 1,728 LF $4,464 $4,464 LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted 4 9 14 EA $7,007 19 EA $4,076 $11,083 Assessment Date: 2/26/2013 Page 2 of 17

LINTELS Lintels - Steel Lintels - Stone Lintels - Terra Cotta 60 239 GRE 6 316 15 499 LF $9,816 316 LF 115 LF $9,816 PARAPET Coping - Stone Coping - Terra Cotta Parapet < 16" Height Parapet > 30" Height Parapet 16" to 30" Height ROOF SYSTEM GRE 6 336 BLU 5 646 GRE 6 60 BLU 5 60 80 176 GRE 6 606 336 LF 646 LF $115,473 60 LF $9,344 316 LF $137,400 606 LF $125,827 $388,044 Asphalt Shingle Roof Exterior Downspouts Interior Downspouts Metal Roof Modified Bitumen Roof Roof Structure: Concrete Roof Structure: Steel/Metal Deck/Concrete Topping BLU 5 4,260 30 GRE 6 304 BLU 5 17,990 BLU 5 28,235 GRE 7 31,065 4,992 4,260 SF $28,144 130 LF 304 LF 17,990 SF $321,571 28,235 SF $333,102 31,065 SF 14,992 SF $682,818 SUPERSTRUCTURE Concrete Steel GRE 7 68,290 4,992 68,290 SF 14,992 SF Assessment Date: 2/26/2013 Page 3 of 17

WALLS Brick Prefabricated Metal Panel Wall Stone - Cast Stone - Cut Terra Cotta,195 35,823 3,293,052 831 GRE 6 3,492 GRE 7 217,014 40,311 SF $263,736 1,883 SF $8,936 3,492 SF $49,936 217 SF 1,014 SF $29,000 $351,608 WINDOWS Curtain wall - Louver Window - Guards perforated Windows - Decorative Windows - Sash Aluminum Double-pane Windows - Wood - Single-pane EXTERIOR GRE 7 204 GRE 7 3,812 GRE 7 40 GRE 7 7,616 BLU 5 176 204 SF 3,812 SF 40 SF 7,616 SF 176 SF $18,876 $18,876 $1,624,382 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency A/C power - Auditorium and aisle lighting Emergency A/C power - Corridors and Stairs Emergency A/C power - Gym and Lunch rooms Emergency A/C power - Students Toilets Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Toilets Emergency generator below 60 KW natural gas - Outdoor Exit Signs - Auditorium GRE 7 3,652 3,731 GRE 6 3,893 GRE 6 3,561 GRE 6 5 GRE 6 5 3 EA 2,652 SF $3,603 13,731 SF $5,891 3,893 SF $2,060 3,561 SF $1,528 5 EA $536 2 EA $215 $7,508 5 EA $1,165 Assessment Date: 2/26/2013 Page 4 of 17

Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - CCTV Security System - Intrusion detection MAIN SERVICE 0 GRE 6 5 GRE 7 2 GRE 6 83,282 GRE 6 83,282 GRE 6 83,282 20 EA $4,662 5 EA $1,165 2 EA 83,282 SF $50,019 83,282 SF $119,093 83,282 SF $77,411 $274,855 Main Electrical service 1000 A and below 120/208/3PH Main Electrical service 1600 A 120/208/3PH POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels above 600 amp Main distribution panels less than 400 amp ELECTRICAL 10 GRE 7 2 GRE 7 2 1 $715 2 EA 2 EA $715 $275,570 FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System GRE 6 83,282 GRE 7 83,282 83,282 SF $29,773 83,282 SF $29,773 Assessment Date: 2/26/2013 Page 5 of 17

SPRINKLER SYSTEM Sprinkler Heads Wet Sprinkler System FIRE PROTECTION MECHANICAL AIR CONDITIONING Window A/C AIR HANDLING SYSTEMS 4,992 4,992 1 14,992 SF $858 14,992 SF $8,575 $9,433 $39,206 1 $2,360 $2,360 Air Handling Package - Multi Zone - Hot Water 6,001 to 10,000 cfm Air Intake - Built Up Air Handling Multi Zone Built Up Air Handling - Steam 15,001 to 25,000 cfm Multi Zone Built Up Air Handling Auxiliaries - Steam 15,001 to 25,000 cfm Reheat Boxes With Steam Coils Return Duct Work - Indoor - Vertical Shaft and Ducts Return Fans - Indoor 5,000 to 10,000 CFM Return Fans - Outdoor l0,001 to 20,000 CFM Single Zone Built Up Air Handling - Steam 4,000 to 8,000 cfm Single Zone Built Up Air Handling - Steam 8,001 to 15,000 cfm Single Zone Built Up Air Handling Auxiliaries - Steam 4,000 to 8,000 cfm Single Zone Built Up Air Handling Auxiliaries- Steam 8,001 to 15,000 cfm GRE 6 4 3 GRE 7 400 $5,577 4 EA $5,720 2 EA $22,594 2 EA $5,720 13 EA $13,571 400 LF 2 EA $3,432 2 EA $6,578 $5,005 $7,150 $2,145 $3,575 $81,067 Assessment Date: 2/26/2013 Page 6 of 17

BOILER SYSTEMS Boiler Assembly - Non-Condensing Scotch Marine Hot Water Boiler 2,001MBH-3,000 MBH Boiler Assembly - Steam - Low Pressure Scotch Marine Boiler 50-75 HP Boiler Auxiliary - Steam Boiler 50-75 HP Boiler Auxiliary Non-Condensing Hot Water Boiler 2,001MBH-3,000 MBH Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Feed Water Pumps and Tank - Steam Boilers Gas Boosters BLU 5 2 GRE 7 2 GRE 7 2 GRE 6 4 2 EA $165,880 2 EA 2 EA 2 EA $11,154 $2,145 $300 4 EA $1,144 $8,437 2 EA $2,603 $191,663 HEATING DEVICES Cabinet Heaters With Hot Water Coils Radiators - Steam Heater - Electric Heater - Gas Heater - Hot Water MECHANICAL PLUMBING Condensate Assembly - Pumps and Tank Piping - Condensate - Steel or Galvanized Piping - Hydronic Supply and Return - Steel or Galvanized Piping - Steam - Steel or Galvanized Pumps - Hot Water 5 to 10 HP GRE 6 6 GRE 6 6 5 BLU 5 800 GRE 6 400 BLU 5 800 6 EA $3,003 6 EA $841 15 EA $21,450 $2,145 $1,430 $28,869 $715 800 LF $26,026 400 LF $3,546 800 LF $39,582 2 EA $4,004 $73,874 Assessment Date: 2/26/2013 Page 7 of 17

TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) Zone Dampers UNIT VENTILATION Packaged Terminal Air Conditioner (PTAC) Ventilators - Hot Water and Self Contained Electric Cooling VENTILATION Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm MECHANICAL PLUMBING HOT WATER GRE 6 68,290 GRE 6 37 GRE 6 37 1 GRE 6 3 68,290 SF $68,358 37 EA $5,291 37 EA $5,291 $78,940 $1,430 1 $17,303 $18,733 2 EA $858 3 EA $686 $1,544 $477,049 Hot Water Heater - Gas 150,000-300,000 BTU/HR Hot Water Heater - Gas less than 150,000 BTU/HR Storage Tank less than 500 gallons $3,575 $3,575 PIPING Domestic Piping - Cold Water from Risers to Fixtures YEL 4 68,290 68,290 SF $22,461 Assessment Date: 2/26/2013 Page 8 of 17

Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping PUMPS YEL 4 68,290 YEL 4 68,290 YEL 4 68,290 YEL 4 68,290 BLU 5 68,290 14,992 BLU 5 68,290 14,992 BLU 5 68,290 14,992 BLU 5 68,290 14,992 BLU 5 68,290 14,992 BLU 5 68,290 14,992 68,290 SF $43,945 68,290 SF $14,648 68,290 SF $31,250 68,290 SF $37,109 83,282 SF $163,083 83,282 SF $134,763 83,282 SF $78,124 83,282 SF $47,994 83,282 SF $35,442 83,282 SF $26,772 $635,590 Domestic Booster Pump simplex Sump Pump PLUMBING INTERIOR ADMINISTRATIVE SUITES $1,716 $1,359 $3,075 $642,240 Ceiling - Lay-In Ceiling - Plaster/Drywall Flooring - Carpet Flooring - Concrete Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Lighting - Lay-In Lighting - Pendant/Surface Walls - Concrete Block Walls - Plaster/Drywall 93 GRE 6 76 1,913 897 GRE 7 714 GRE 6 76 GRE 6 659 BLU 5 948 682 GRE 6 3 6 19 GRE 6 696 539 561 GRE 6 451 4,081 1,797 193 SF $414 2,886 SF $5,847 714 SF 76 SF $359 659 SF $1,677 1,630 SF $6,344 3 SF $2 35 SF $11 1,796 SF $6,797 6,329 SF $11,757 Assessment Date: 2/26/2013 Page 9 of 17

$33,208 AUDITORIUM - DEDICATED Balcony Seating Main Floor Seating Sound System Stage Curtains Stage Lighting System GRE 6 75 88 0 75 EA $2,761 288 EA $10,601 10 EA $13,361 CORRIDOR Stair Handrails Stairs - Tile DOORS Interior Steel Doors incl hw Interior Wood Doors incl hw Transom Window DRINKING FOUNTAINS 20 GRE 6 57 GRE 6 53 BLU 5 92 80 120 LF 57 LF $430 $430 53 EA $15,006 92 EA $43,415 280 SF $5,205 $63,626 Single Fountain 0 10 EA GYMNASIUM / AUDITORIUM Ceiling - Lay-In Flooring - Wood GRE 7 2,767 GRE 7 2,767 2,767 SF 2,767 SF Assessment Date: 2/26/2013 Page 10 of 17

Lighting - Metal Halide/Sodium Vapor Scoreboards Walls - Concrete Block Walls - Plaster/Drywall KITCHEN 2 GRE 7 2,628 GRE 7 2,628 12 EA $2,145 2,628 SF 2,628 SF $2,145 Ceiling - Plaster/Drywall Flooring - Tile Quarry Lighting - Pendant/Surface Wall - Plaster/Drywall GRE 7 336 GRE 7 336 GRE 7 6 GRE 7 890 336 SF 336 SF 6 SF 890 SF LUNCHROOM Ceiling - Plaster/Drywall Flooring - Tile/Sheet Lighting - Pendant/Surface Serving Line Wall - Plaster/Drywall,126,126 8 2,672 1,126 SF $3,188 1,126 SF 18 SF 12 LF 1,672 SF $3,188 MDF/IDF Finishes Ventilation and Cooling 98 1 198 SF $674 2 EA $1,401 $2,075 MECHANICAL/SERVICE ROOMS Air Handling/ Mechanical Room Air Tunnels GRE 7 358 GRE 7 3,590 358 SF 3,590 SF Assessment Date: 2/26/2013 Page 11 of 17

Boiler Room Crawl Space - Unfinished Janitor's Closet Mechanical/Service Rooms Storage Room STAFF RESTROOM BLU 5 2,444 4,481 GRE 6 4 GRE 7 2,972,795 251 2,444 SF $27,680 14,481 SF $27,334 4 SF $19 2,972 SF 2,046 SF $8,471 $63,504 Accessories Ceiling - Plaster/Drywall Floor Drain Flooring - Concrete Flooring - Terrazzo Flooring - Tile Ceramic/Porcelain Flooring - Tile/Sheet Hand Dryer Lavatory Lighting - Lay-In Lighting - Pendant/ Surface Lighting - Wall Mounted Partitions Urinals Wall - Concrete Block Wall - Plaster/Drywall Water Closet GRE 6 41 3,303 612 GRE 6 3,602 354 8 GRE 6 41 1,134 38,289 268 GRE 7 86 GRE 6 9 19 GRE 6 3 32 2 GRE 6 5 38 GRE 6 8 45 GRE 7 22 GRE 6 733 4,840 GRE 6 947 1,748 130 4 47 3,956 SF $26,551 3,956 SF $10,199 18 EA 1,175 SF $193 138 SF $781 2,557 SF $5,826 86 SF 28 EA $1,954 35 EA $1,115 12 SF 43 SF $4 53 EA $1,435 22 EA 5,573 SF $2,096 2,825 SF $8,593 53 EA $5,205 $63,953 THEATER Ceiling - Plaster/Drywall Flooring - Concrete Lighting - Pendant/ Surface,652 GRE 7 2,652 GRE 7 28 2,652 SF $22,678 2,652 SF 28 SF Assessment Date: 2/26/2013 Page 12 of 17

Stage Wall - Plaster/Drywall Wall - Structural Glazed Tile VOCATIONAL SHOP GRE 7 436 GRE 6 4,161,387 436 SF 4,161 SF $35,701 1,387 SF $58,380 Work Sink INTERIOR ROOM CASEWORK $386 $386 $304,257 Casework GRE 6 532 78 610 LF $19,019 $19,019 CEILING Lay-In/Drop Plaster/Drywall GRE 6 5,488 9,093 BLU 5 10,727 4,847 760 14,581 SF $50,582 16,334 SF $74,469 $125,051 CHALK BOARD Chalk Board YEL 4 660 660 LF $80,223 $80,223 CORRIDORS Drop/Lay-In Lay-In GRE 7 2,563 GRE 7 2,563 2,563 SF 2,563 EA Assessment Date: 2/26/2013 Page 13 of 17

Pendant/Surface Plaster/Drywall Stair Handrails Student Lockers Terrazzo Tile/Sheet Flooring CORRIDORS CEILING,632 9,568 1,702 17,990 GRE 6 305 GRE 6 480,796 GRE 6 8,892 2,563 12,200 EA $1,882 29,692 SF $27,611 305 LF 480 EA $68,640 2,796 SF $15,833 11,455 SF $12,716 $126,681 Plaster/Drywall,632 9,568 12,200 SF $7,452 $7,452 FLOOR Carpet Tile/Sheet Wood,247 GRE 6 5,488 10,294 3,126 760 1,247 SF $1,783 15,782 SF $45,798 13,886 SF $99,107 $146,688 LIGHTING Lay-In Pendant/Surface 42 48 94 86 190 EA $10,153 280 EA $13,871 $24,024 MARKER BOARD Marker Board 41 141 LF $4,033 $4,033 Assessment Date: 2/26/2013 Page 14 of 17

STAIRS Terrazzo WALL 45 145 SF $1,642 $1,642 Concrete Block Metal/Folding Panel Plaster/Drywall Wall ROOM GRE 6 7,163 GRE 6 7,192 GRE 6 4,173 24,140 1,456,391 7,163 SF $20,486 7,192 SF $16,970 29,769 SF $76,651 1,391 SF $3,282 $117,388 $652,201 SITE ATHLETIC Basketball - Asphalt CIVIL/DRAINAGE GRE 6 6,624 6,624 SF $5,020 $5,020 Catch Basin Site Manhole GRE 7 6 GRE 7 5 6 EA 5 EA FENCING Chain Link Ornamental Iron 33 GRE 7 2,007 133 LF 2,007 LF Assessment Date: 2/26/2013 Page 15 of 17

LANDSCAPE Asphalt Play Area/Hardscape Benches Grass Hardscape - Concrete Parkway trees Planting Beds/ Areas Trash Receptacles 4,572 GRE 6 52 GRE 6 31,652 BLU 5 2,377 1,495 GRE 7 39 GRE 6 7,855 GRE 6 5 24,572 SF $21,083 52 EA $12,269 31,652 SF $12,673 3,872 SF $17,642 39 EA 7,855 SF 5 EA $1,038 $64,706 MODULAR 8-Classroom Modular Building BLU 5 1 PARKING LOT Asphalt Trash Enclosure PLAYGROUND Playground Equipment - Combo 3-12 Playground Surfacing - Square Rubber Mats SIDEWALKS Internal Walks Perimeter Sidewalks 1,123 GRE 6 555 YEL 4 2,584 GRE 6 828 GRE 6 780 15,643 21,123 SF $18,124 555 SF $5,952 $24,076 2,584 SF $57,274 $57,274 828 LF $7,815 16,423 SF $44,251 Assessment Date: 2/26/2013 Page 16 of 17

$52,066 SIGNAGE Flag Pole Monument Sign SITE Campus Need ² ³ $203,142 $4,218,047 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 2/26/2013 Page 17 of 17