Figure 5. Previously Identified Viable Corridors

Similar documents
PD&E STUDY SR 9/I-95 FROM SOUTH OF SR 870/COMMERCIAL BOULEVARD TO NORTH OF CYPRESS CREEK ROAD FM # ETDM 14222

East Central Florida Corridor Task Force Study Area

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

Public Hearing. Charlotte County-Punta Gorda MPO - Meeting Rooms A and B March 14, open house at 4 p.m., formal presentation at 5 p.m.

Poinciana Parkway Extension Project Development & Environment Study

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

MDX SR 836/DOLPHIN EXPRESSWAY SOUTHWEST EXTENSION

AGENDA ITEM 3A Red Hills Coastal Parkway

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

SUMMARY Downtown Malabar Meeting on July 30, 2013 State Road (SR) 514 (Malabar Road) Project Development and Environment (PD&E) Study

Gratigny Parkway East Extension Project Development & Environment (PD&E) Study

Issues Requiring Future Study

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

I-4 Poinciana Parkway Connector Project Development and Environment (PD&E) Study. OCX Board Meeting

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

FEASIBILITY / PROJECT DEVELOPMENT & ENVIRONMENT STUDY LAKE / ORANGE COUNTY CONNECTOR (US 27 TO SR 429) ENVIRONMENTAL ADVISORY GROUP MEETING NO.

Mississippi Skyway Preliminary Engineering Report

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

I-95 Interchange & Ellis Road PD&E Study

Public Information Centre #1

TAC/CAC, TPO Project Update February 2016

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. November 30, 2017

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

ROAD CONSTRUCTION. 36 June 2014 ROADS&BRIDGES

Existing Transportation System 5-1

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

Southeast Extension to RidgeGate Parkway Scoping Booklet

STATE OF FLORIDA OFFICE OF THE GOVERNOR EXECUTIVE ORDER

HILLSBOROUGH COUNTY Greenways and Trails Plan Update. Executive Summary. Date

DOWNTOWN JACKSONVILLE MASTER PLAN S T R E E T H I E R A R C H Y

Plan Review for High-Capacity Transit in the Project Corridor: S. 200th Street to Federal Way City Center

Kick-off Meeting. FM No: ETDM No: 14050

SR 836 Southwest Extension

Planning Commission Report

SCTPO Project Summary September 2014

PROJECT BACKGROUND. Preliminary Design Scope and Tasks

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Eastern Terminus TECHNICAL MEMORANDUM CENTRAL BROWARD EAST-WEST TRANSIT ANALYSIS BROWARD COUNTY, FLORIDA

Pine Island Road Corridor Master Plan

Preliminary Sea Level Rise Case Study: Navarre Beach, FL

Ann Arbor Intermodal Station Environmental Review

A Connected Region for Our Future. Tampa Bay Regional Planning Council

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Poinciana Parkway Southport Connector Project Development and Environment (PD&E) Study

DRAFT SECTION 4(f) EVALUATION INTERSTATE 73 FEIS: I-95 to I-73/I-74 in North Carolina

Executive Summary. NY 7 / NY 2 Corridor

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

Onondaga County Sustainable Streets Project. Onondaga County Planning Federation June 7, Onondaga County Sustainable Streets Project 1

ORANGE COUNTY IMPLEMENTING THE FOUR C s

master plan of highways bus rapid transit amendment

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. Board of County Commissioners Public Hearing

MEMORANDUM AGENDA ITEM #6c

open public hearing and allow public comment request to continue LPA public hearing to January 16, 2014 at 10:30 am

Portage Parkway Environmental Assessment Public Information Centre No. 1

Mavis Road Class Environmental Assessment

St. Clair Avenue West Area Transportation Master Plan

DRAFT Subject to modifications

TRANSPORTATION ELEMENT

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

Date: April 10, 2017 City Council Work Session April 24, 2017: Status Report on the Comprehensive Plan Update and Transportation Master Plan

master plan of highways

EXECUTIVE SUMMARY. Introduction

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

I. INTRODUCTION. Project Background and Study Area

FDOT/FTBA Construction Conference Work Plan

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

A LONG-TERM PLAN FOR GREAT NEW PLACES TO GROW JOBS

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014

Table of Contents. Elm Avenue Improvement Plan City of Waco, Texas. Introduction 1. Existing Context 1 Figure 1 2.

FDOT D4 Complete Streets

A Claustrophobic Corridor Grows Up

Intergovermental Coordination

DOWNTOWN WATERFRONT MASTER PLAN

Q:%4~ Memorandum CITY OF DALLAS

Urban Planning and Land Use

CITY COUNCIL AGENDA REPORT

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

SUBJECT: GO Station Mobility Hubs Preferred Concepts: Aldershot GO, Burlington GO and Appleby GO. Planning and Development Committee - Public Meeting

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

WELCOME TO OPEN HOUSE TWO November 28, 2018

Request for Statement of Interest in Implementation of the Roosevelt Road Redevelopment Plan

Right-of-Way Acquisitions and Relocations Technical Memorandum

All inquiries or complaints will be handled according to CFX procedure and in a prompt and courteous manner.

G. RECREATION AND OPEN SPACE ELEMENT. The following summarizes the Recreation and Open Space Element:

Farmersville Parkway Phase III

4. ENVIRONMENTAL IMPACT ANALYSIS 7. LAND USE AND PLANNING

SR 916/NW/NE 135 Street Public Hearing

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

This page left intentionally blank.

CHAPTER 2 TRANSPORTATION ELEMENT

Welcome. South Seminole Heights Civic Association, Inc. Tampa Interstate Study Supplemental Environmental Impact Statement.

REVIEW AND EVALUATION OF REGIONAL LAND USE

Transcription:

OVERVIEW The Central Florida Expressway Authority (CFX) is evaluating the potential to expand SR 408 from its current eastern terminus along SR 50 to SR 520 in northeastern Orange County, Fl. This new seven mile eastern extension of SR 408 would constitute the first component towards providing a west-east high speed corridor with eventual connectivity to I-95, enhancing safety, capacity and mobility for the region and CFX's customers. The vision of this enhanced east-west corridor has been documented in prior concept studies prepared by CFX including the SR 408 East Extension Concept Development and Evaluation Study completed in 2008. This study evaluated potential corridors for a new limited access facility between east Orange County and north Brevard County. The study area generally parallels SR 50 from east of SR 434 to I-95. After a preliminary corridor evaluation, four viable corridors were determined to meet the criteria and were further evaluated. These corridors are shown in the figure below. The results of the study indicated that "Corridor 3B (along SR 50) meets the transportation need west of SR 520, providing the greatest relief of the existing and projected future traffic congestion along SR 50 from SR 434 to SR 520. This alternative diverts the greatest number of trips, has the lowest estimated cost, and has the fewest potential impacts to environmental and community resources of any of the viable corridors. This corridor also provides for a potential future extension of the proposed limited access facility southeast along the SR 520 corridor to SR 528, affording system linkage between east Orange County and Brevard County." Figure 5. Previously Identified Viable Corridors

Governor Rick Scott signed Executive Order 13-319 on November 1, 2103 creating the East Central Florida Corridor Task Force with the purpose to evaluate and develop consensus recommendations on future transportation corridors serving established and emerging economic activity centers in portions of Brevard, Orange, and Osceola counties. The final report developed by the Task Force was completed in December 2014 and the recommendations included 21 guiding principles for planning the future of East Central Florida s transportation corridors, nine transportation corridor alternatives for further study, and a proposed action plan for implementation of the recommendations. One of the recommended corridors is to preserve and enhance the existing State Road 50/State Road 405 corridor from downtown Orlando and the University of Central Florida area to Cape Canaveral, potentially including extensions of planned State Road 50 transit services as well as an extension of the State Road 408/East West Expressway from its current terminus at the Challenger Parkway to the State Road 50/State Road 520 split. In summary, the SR 408 eastern extension is one piece of Florida s strategic transportation investments to support future growth and create connections between global trade activities from Orlando International Airport and the University of Central Florida to Cape Canaveral. Additionally, a comprehensive development of the SR 408 facility cannot be completed without consideration for issues related not only to its potential co-location within the SR 50 corridor but also to the Florida Department of Transportation District 5's plans for expansion of SR 50. In 1989 FDOT completed a PD&E Study for the widening of SR 50 and is currently in the process of implementing a series of construction projects to expand the SR 50 corridor from four to six lanes from SR 436 to SR 520, utilizing an urban typical section with curb and gutter sections and a raised 32-ft median within the existing 200-ft right-of-way. What is a PD&E Study? A Project Development and Environment (PD&E) Study is the formal process that transportation entities, such as the Expressway Authority and FDOT, use to ensure that consideration is given to engineering design, project costs, environmental and social impacts and public input in the development of major transportation projects. The basic steps of a PD&E Study include data collection, development and analysis of the alternatives, development of project documents and final approval. Public involvement is a very important part of the PD&E process and there will continue to be several formal opportunities during this study for the public to provide input on the project.

In summary, the PD&E Study phase for planned transportation projects provides the interface between the planning and Design phases to evaluate and document solutions to transportation needs that are compatible with the environment. Simply stated, the PD&E study determines if there is an engineering and environmentally feasible alternative to meet the need determined in the Planning phase. This process is mandated by the National Environmental Policy Act (NEPA) and the State law. It represents a combined effort by technical professional who analyze information and document the best alternative for a community s transportation needs. Public Involvement CFX has embarked on a public involvement program as a part of this PD&E Study. Public involvement began in Summer 2015 and will continue throughout the project. This process is designed to ensure public input in the development of alternatives by actively encouraging and facilitating the participation of the general public, citizen groups, interest groups, elected and appointed officials, environmental resource agencies, and other stakeholders. Opportunities to comment include communication with project staff, attending public meetings and through the project website. Project Schedule The SR 408 East Extension PD&E project was initiated in April 2015 and is expected to be completed by November 2016. The figure below illustrates a tentative project schedule including key milestones. After the PD&E phase is completed, the final design phase will follow and then right-of-way acquisition, permitting and construction.

PROJECT INFORMATION Purpose and Need SR 408 East Extension PD&E Study Project Schedule The purpose of this study is to develop a proposed improvement strategy that is technically sound, environmentally sensitive and publicly acceptable. This study will evaluate strategies to enhance mobility in eastern Central Florida with an expansion of SR 408 from its current eastern terminus to SR 520 in northeastern Orange County, FL (see Figure below). There are four existing/projected corridor needs that serve as the main justification for the proposed improvements. These needs are: 1) providing additional capacity in the east-west direction to mitigate or eliminate capacity deficiencies; 2) providing additional emergency evacuation service to supplement the limited number of evacuation routes in this area of Central Florida; and 3) providing improved transportation connectivity/linkage induced by the continued population growth and land use development reflected in various local comprehensive plans. 4) providing transit support.

Figure 3. Project Area The proposed project is expected to satisfy the various needs in several ways: Although the Florida Department of Transportation is planning to widen SR 50 within the project limits from four to six lanes, traffic projections show the following: 1) Insufficient east-west capacity in 2025 on the segment from the existing SR 408 terminus to County Road (CR) 420 and in 2035 from CR 420 to Avalon Park Boulevard and 2) By the year 2045 even the segment from Avalon Park Boulevard to Chuluota Road is projected to reach congested conditions. The proposed 408 eastern extension will provide relief to the existing and future traffic congestion by diverting a significant number of trips away from SR 50, SR 434 and SR 520 facilities, thus improving eastwest mobility. The East Central Florida Region has been identified by the National Oceanic and Atmospheric Administration (NOAA) as a high hurricane vulnerable area within the United States and thus requires sufficient and efficient evacuation routes. SR 50 has been designated as a primary evacuation route for the eastern Orange and northern Brevard Counties and together with SR 528 and SR 46 they provide the only east-west evacuation routes for the area. A recent hurricane evacuation study conducted by the East Central Florida Regional Planning Council estimated that over 220,000 persons would potentially evacuate Brevard County during a Category 3 storm. Any future capacity deficiency along SR 50

(the main evacuation route) could seriously jeopardize the effectiveness of coastal evacuation from north Brevard County. Another critical issue deals with fire and emergency services. In the recent past the (open) natural lands generally abutting SR 50 east of SR 520 have been subjected to prescribed burns and some accidental fires have occurred necessitating the closure of some key east-west facilities in the area. The provision of an additional east-west facility would afford the desirable redundancy to accommodate diverted regional traffic due to natural or man-made emergencies. The results of the East Central Florida Corridor Task Force Final Report recommended to preserve and enhance the existing State Road 50/State Road 405 corridor from downtown Orlando and the University of Central Florida area to Cape Canaveral, potentially including extensions of planned State Road 50 transit services as well as an extension of the State Road 408/East West Expressway from its current terminus. The SR 408 eastern extension is one piece of Florida s strategic transportation investments to support future growth and create connections between global trade activities, from Orlando International Airport and the University of Central Florida, to Cape Canaveral. Within the project vicinity SR 50 is functionally classified as a major arterial facility and provides an important connectivity function between the east Orlando area on the west and I-95 just south of Titusville on the east. As traffic continues to grow within the study corridor due to the rapid development projected within the area it is essential to maintain adequate mobility on this critical roadway link. A new expressway facility would not only improve mobility but significantly reduce the existing potential exposure to at-grade conflict points associated with traffic signals, and local access issues. In summary, the proposed SR 408 Extension will greatly enhance Central Florida's regional expressway needs and provide the initial phase of an ultimate vision of an expressway connection from east Orlando to I-95 north of SR 528. A new limited access facility could support inter-agency transit service between Orange and Brevard counties. The benefits of enhanced transit service are frequently lost when the buses must travel on heavily congested roadways. The proposed roadway would support improved regional travel times and provide realistic options for commuters and visitors traveling between the two counties.