Eastbourne Borough Council. Summary Proof of Evidence Of Barry John Cansfield BA (Hons), BTP, MRTPI on behalf of PRLP

Similar documents
Paignton Neighbourhood Plan (Submission version 2017)

intu Bromley Planning Summary Bringing more to Bromley February 2014

Appendix A: Retail Planning Assessment

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

GREENFORD HALL & ADJOINING LAND

Valuing Historic Places

SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK

PLANNING STATEMENT. On behalf of Hindle Property Investments Ltd. Site of the Former Hippodrome Henblas Street, Wrexham LL13 8AD

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

INTRODUCTION BACKGROUND

PLANNING STATEMENT. Market House Market Place Kingston upon Thames KT1 1JS

A. The sites in Table 16 below, as identified on the Policies Map, are allocated for retail-led development:

SWLP 42: Worcester City Centre

Euston Area Plan - Examination: Statement in response to the Inspector s Matters, Issues and Questions

WOLVERHAMPTON CITY CENTRE AREA ACTION PLAN

Draft Proposals relating to Market Place, Burgess Hill

2.0 Strategic Context 4

HS2 Interchange Station Design

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING

Former North Works, Lickey Road, Longbridge, Birmingham

Regeneration of Wigan CECA NW : Supply Chain Conference Emirates Old Trafford, Manchester 21 June 2017

Newcourt Masterplan. November Exeter Local Development Framework

Consultation Response to Lisburn and Castlereagh City Council LDP Preferred Options Paper (POP)

Aylesbury Estate, Southwark. Notting Hill Housing Trust. Planning Statement Revised February 2015

Welcome to the community information evening about Taylor Wimpey Central London s proposed development of Mount Pleasant.

Sheffield Victoria Station Development Prospectus January 2014

APP/G1630/W/15/

Ebbsfleet Development Corporation

RULE 6 (6) STATEMENT OF CASE

3.1 The hybrid planning application proposes the following description of development:

The Proposed Auckland Unitary Plan (notified 30 September 2013)

Has there been interest in the site from other parties since St. Modwen owned it? No

1. Welcome. Background

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016

Date: 23 January Grange and Riverside Ward. Deputy Chief Executive

Seaburn. Planning Application Summary. For: Siglion. Date: 15/11/2016

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

Response to the London Bridge Area Vision and Site Allocations within the New Southwark Plan

Southend-on-Sea Borough Council Department for Place! Peter Geraghty Head of Planning & Transport

4 Proposed masterplan 4.1 Proposed masterplan: The scheme The scheme s component parts Urban form and grain

A VISION FOR THE FUTURE

Vision for East Cowes

08 MARCH 2016 PLANNING COMMITTEE. 6N 15/1330 Reg d: Expires: Ward: GE. of Weeks on Cttee Day:

London Bridge London Bridge Area Vision Map

Exeter Princesshay. (1) Background to the Scheme Why Princesshay? Bedford Circus (Princesshay Site) Aerial View of Bedford Circus

2. The application, which is a full plans application, is for a commercial development comprising B1, D1, D2 and A3 uses.

Welcome. Proposals for land at Smug Oak Lane BRICKET WOOD

4.5 Key Development Sites Site Development Frameworks

Department of the Environment June 1996

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

0 9 Areas of Change 59

The Five Components of the McLoughlin Area Plan

Ipswich Issues and Options for the Ipswich Local Plan Review, August 2017, Public Consultation

NO: R035 COUNCIL DATE: FEBRUARY 24, 2014

1. Creating a liveable, vibrant, safe and inclusive city centre for the benefit of people of all ages to live, work, learn and enjoy.

PHASE III: Reserved Matters Submission

Basic Conditions Statement Exmouth Neighbourhood Plan

RE: THE MALL, WALTHAMSTOW PLANNING APPLICATION REF: 17/1355 RESPONSE TO LBWF NEIGHBOUR CONSULTATION

Place Brief. National Collections Facility (NCF site)

Rotherhithe Rotherhithe Area Vision Map

Evesham 7. Reasoned Justification

SOUTH WORCESTERSHIRE DEVELOPMENT PLAN - PREFERRED OPTIONS 2011: SCHEDULE OF ISSUES AND RECOMMENDED RESPONSES Row No.

Chapter 3 Core Strategy

CASE STUDY 3 : ROSCOMMON BALANCING URBAN AND RURAL ISSUES

Land use strategy. Chapter 4. high density mixed use. mixed use housing. limited intensification. market consolidation. industrial intensification

THE DEVELOPMENT SPECIALISTS

Peckham Peckham Area Vision Map

Policy and Resources Committee 10 th October Green Infrastructure Supplementary Planning Document (SPD) Summary. Title

APPENDIX 1

Ongar. Residential Sites. Vision for Ongar

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Longbridge Town Centre Phase 2 Planning Application

Horwood Map of London, Westminster & Southwark First edition

Can town centres retain the social heart of our communities?

North Somerset Council Local Development Framework

Canterbury City Council Military Road Canterbury Kent CT1 1YW. Title: CA/16/02745/ADV. Author: Planning and Regeneration.

DEVELOPMENT BRIEF. Broadmarsh Car Park and Bus Station Nottingham

Anston House, Brighton

City Regions Ireland

COURTHOUSE CAMPUS BARNSLEY Executive Summary March 2010

WELCOME. We are interested in your ideas and feedback, so please fill out one of our feedback forms.

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

MALL REVITALIZATION CASE STUDIES

UDF PLANS AND GUIDELINES

Welcome to our exhibition

11. ISLINGTON ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS OVERVIEW OF ISLINGTON ROUTE SECTION... 2

Existing offices occupy part of the site and Policy E5 of the Local Plan seeks to retain appropriate employment sites.

75-89 Wallis Road & 59 Berkshire Road, Hackney Wick, London, E9 5LN

Application Guide. Should you have any questions on the Outline Application please contact:

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

6 Growth Management Challenges and Opportunities

Droitwich Spa 6. Reasoned Justification

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

5 Gratton Terrace London NW2 6QE. Reference: 17/5094/HSE Received: 4th August 2017 Accepted: 7th August 2017 Ward: Childs Hill Expiry 2nd October 2017

heuston gateway: sections heuston gateway: regeneration strategy and development framework plan

YMCA Erdington (Phase 2), 300 Reservoir Road, Erdington, Birmingham, B23 6DB

Shaping the heart of Stroud - Policy options

Unity Square, Nottingham Environmental Statement Non Technical Summary December 2013

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

Transcription:

Eastbourne Borough Council (Arndale Centre and surrounding Land at Terminus Road, Sutton Road and Ashford Road) (Compulsory Purchase Order 2015) Section 226 (1)(a) of the Town and Country Planning Act 1990 And Section 13 of the Local Government (Miscellaneous Provisions) Act 1976 And The Acquisition of Land Act 1981 Summary Proof of Evidence Of Barry John Cansfield BA (Hons), BTP, MRTPI on behalf of PRLP November 2015

Contents 1. Introduction 1 2. The Scheme 2 3. The Need for Regeneration 3 4. Planning Policy Framework 4 5. Benefits of the Scheme 5 6. Authority and justification for CPO 6 7. Responses to Objections 7 8. Conclusions 8 Contact Barry Cansfield barry.cansfield@turley.co.uk November 2015

1. Introduction 1.1 My name is Barry John Cansfield. I hold a degree of Bachelor of Arts with honours in Town and Country Planning and also hold a Bachelor of Town Planning. I am a Member of the Royal Town Planning Institute. 1.2 For the reasons I shall state, I believe that there is compelling need in the public interest for the redevelopment of the Order Land subject to the Eastbourne Borough Council (Arndale Centre and Surrounding Land at Terminus Road, Sutton Road and Ashford Road) Compulsory Purchase Order 2014 (the CPO ). The redevelopment would contribute substantially to the economic, social and environmental wellbeing of the area and accords directly with the planning framework for Eastbourne town centre. 1

2. The Scheme 2.1 The Council s planning committee resolved on 25 th March 2014 to grant planning permission subject to the completion of a S106 Agreement (reference 131071) for. Demolition of existing buildings to provide for an extension to the existing shopping centre for new Class A1. A2, A3, a4 and A5 (retail) use at ground floor levels and a multi-screen cinema complex (Use Class D2) plus ancillary space at second floor, a two storey extension to the existing car park deck, new pedestrian access including new shopfronts on to Terminus Road, associated highway works and minor alterations to the external appearance. 2.2 The Order Land extends to approximately 1.98 hectares and covers a large part of the Primary Retail Area of Eastbourne town centre. 2.3 The comprehensive redevelopment of the site to provide a major town centre destination will transform the status of Eastbourne as a retail and leisure destination in accordance with its sub-regional centre, particularly through the following key elements: The introduction of two MSU stores which will anchor the western edge of the scheme; The introduction of modern retail units which will attract national and international retailers - providing a step change in the depth, breadth and quality of the retail offer; The provision of an improved leisure offer which will enhance and diversify the night time economy and support the town centre s vitality and viability; The provision of a number of food and beverage and dining options that will help improve the vibrancy of the town centre and cater for families; A much improved town centre car park offer which will be in keeping with current retail and leisure centre requirements and support the rest of the centre supporting the vitality and viability of the centre as a whole. A high quality landmark development for a substantial part of the town s Primary Retail Area, replacing dated architecture with a bright, modern and attractive new development which pays particularly attention to the quality of pedestrian movement and public realm. 2

3. The Need for Regeneration 3.1 The Development Plan sets out the need to secure growth, investment and regeneration within Eastbourne Town Centre. This is not a new goal for the town centre. Over the last decade there has been a consistent recognition of the need for major change, as well as a series of policy initiatives to attempt to facilitate that change. 3.2 The scale and growth of competing facilities within the sphere of influence of Eastbourne town centre may in part explain why it has proved so difficult to regenerate the town centre. 3.3 Against the background of strong market forces, Eastbourne town centre needs to fight back. 3

4. Planning Policy Framework 4.1 The CPO Circular 06/2004 identifies two specific planning matters to be addressed in the consideration of the case for the CPO, namely: i. Whether the need for planning permission represents an impediment to implementation of the scheme (paragraphs 22 and 23); and ii. Whether the purpose for which the land is being acquired fits in with the adopted planning framework for the area (Appendix A, paragraph 16). 4.2 In terms of the first matter full planning permission is already in place for the development as a whole. 4.3 Turning to the adopted planning framework for the area the NPPF requires planning policies to be positive and to promote competitive town centre environments and pursue policies to support their vitality and viability (para 23). 4.4 The Eastbourne Core Strategy forward (prepared by the Leader of the Council) explains that the main spirit of the Plan s spatial strategy is to stimulate regeneration and renewal of the town centre... Seven key issues are identified affecting Eastbourne that the Plan seeks to address. At paragraph 1.3.4 one such issue is described as The Town Centre is currently under-performing relative to many other similar sized towns. Flowing from this is a series of Key Spatial Objectives (10 in total) which are provided to help realise the overall Vision of the Plan. Key Spatial Objective 3: Town Centre Regeneration states: To strengthen Eastbourne s Town Centre as a leading subregional shopping and leisure destination. 4.5 The Order Land is then identified on the Plan s Key Diagram (page 17) as a Key Area of Change. In Section 3 of the Plan the Order Land is identified as a Major Retail Development Opportunity (Fig 2). 4.6 The Order Land forms part of the town centre s Primary Shopping Area. 4.7 The Eastbourne Town Centre Local Plan (TCLP) was adopted in November 2013 and sets out the detailed strategy and proposals for the town centre area. The Order Land falls within the Primary Retail Area (Policy TC4) and within Development Opportunity Site One (Policy TC18). 4

5. Benefits of the Scheme 5.1 The delivery of a new retail led, mixed use development, by a prominent and respected developer, will enable the town to attract national retailers which it has failed to secure or retained to date. 5.2 In line with the aspirations of the Core Strategy and the Town Centre Local Plan, the Scheme will assist the town centre to truly function as a sub-regional centre and act as a catalyst for further investment and wider regeneration across the town. 5.3 The design of the new scheme itself is of a high quality, setting new standards for the town centre. The additional height at the corner of Terminus Road and Ashford Road gives a greater emphasis to this element as a gateway into the town centre. 5.4 The scheme would also generate a wide range of additional local economic and other benefits. Those benefits should not be under estimated. The principal local economic benefits will include: The scheme would generate an increase of approximately 700 net additional jobs; Substantial employment generated by the construction phase of the scheme; Retail jobs are particularly suited to employment groups who are otherwise disadvantaged within the labour market; PRLP is committed to working with the Council and stakeholders to maximise local benefits for the local community and training initiatives; The development represents a tangible sign of investor confidence in the town. 5.5 All these benefits are in direct accordance with national and local planning policy. 5

6. Authority and justification for CPO 6.1 The Order Land has been identified as being a Key Area of Change in the adopted Core Strategy as well as a Major Retail Development Opportunity. 6.2 The adopted Town Centre Local Plan shows the Order Land as falling within Development Opportunity Site One (Policy TC18). The key development components of the Policy are delivered in all respects by the scheme. Such as: Active frontages along Terminus Road; Principal pedestrian entrance to address Terminus Road and at the Ashford Road junction; Providing a key landmark feature adjoining the public transport interchange and the railway station ; a gateway into the Town Centre ; Height increasing towards the corner of Terminus Road and Ashford Road; Providing new comparison floorspace and D2 assembly and leisure above ground floor; A new pedestrian link through the Order Land linking into the existing Arndale Centre; Service and vehicular access from Ashford Road. Additional Parking; Developer contribution towards Terminus Road improvements. 6.3 Development of the site including the Order Land has developer support and there are no financial impediments to implementation. 6.4 The Order Land enjoys unique advantages as a statement of regeneration for the town centre as a whole not replicated elsewhere. 6.5 I conclude that there is a compelling case in the public interest for the compulsory acquisition of the Order Land. 6

7. Responses to Objections 7.1 My main proof responds to the planning related issues raised in objection to the CPO. In each case, it finds that the objections have little merit having regard to the clear and pressing need for the scheme. 7

8. Conclusions 8.1 Given the pressing need for major investment in and enhancement of the town centre shopping and leisure provision and the significant benefits which will flow from it there is a compelling case in the public interest to acquire the Order Land and to complete the land assembly exercise to facilitate the implementation and completion of the development. 8.2 In reaching this conclusion I have had particular regard to the planning matters set out in the CPO Circular 06/2004. 8

Turley Office The Charlotte Building 17 Gresse Street London W1T 1QL T 020 7851 4010