Cross Reference Table for Area Classification Details

Similar documents
SEMICONDUCTOR FABRICATION FACILITIES

SEMICONDUCTOR FABRICATION FACILITIES

Setting A Standard on Fire Safety in Laboratories

Safety Considerations for Hydrogen Installations

SEMICONDUCTOR FABRICATION FACILITIES

August Process Industry Practices Electrical. PIP ELEHA01 Engineering Guide for Determining Electrical Area Classification

SEMICONDUCTOR FABRICATION FACILITIES

HAZARDOUS AREA CLASSIFICATION AND SELECTION OF EQUIPMENT FOR SAFE USE THEREIN FROM AN ELECTRICAL VIEWPOINT

Explosion Protection Engineering Principles

First Revision No. 1-NFPA [ Chapter 2 ]

INTRODUCTION TO DUSTS AND THEIR EXPLOSIVE PROPERTIES

AREA CLASSIFICATION AND ELECTRICAL EQUIPMENT SPACING FOR NORTH AMERICAN APPLICATION

Electrical Area Classification 101 An Introduction to Area Classification the Basics IEEE Houston CED

RULES FOR CLASSIFICATION OF MOBILE OFFSHORE UNITS

PIP ELEHA01 Engineering Guide for Determining Electrical Area Classification

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 07/16/08 TSEWG TP-8: ELECTRICAL EQUIPMENT ENCLOSURES AND HAZARDOUS LOCATIONS

Overview of Hazardous Locations as They Relate to Solenoid Valves

Boiler Basics. Design and operation

Design and Construction Standards SECTION PLUMBING EQUIPMENT

Hazardous Area Classification in Oil & Gas Industry. A Fire Prevention Tool

DEHYDRATION AND DESALTING

NFPA 45 NFPA 211 NFPA 1600

Laboratories and Hazardous Materials. Company Overview

SECTION PLUMBING EQUIPMENT

International Safety Guide Chapter 30 for Inland Navigation Tank-barges and Terminals. Chapter 30 FIRE-FIGHTING

DuPont Formacel Z-2. Safety and Handling of DuPont Formacel Z-2: Thermoplastic* Foam Extrusion Applications FOAM EXPANSION AGENT TECHNICAL INFORMATION

Knowledge Objectives (2 of 2) Fuel Gas Systems. Skills Objectives. Introduction. Fuel Gas Systems (1 of 6) 12/20/2013

MINIMUM TANK GAP. Greater of 3 or one-sixth of sum of adjacent tank diameters. one-half of sum of adjacent tank diameters 20

WILLIAM HICKS. MSc, CFEI, CFPS, IAAI-CFI, MIFireE, EFO, CFOD, F-IAFI. Associate Professor Eastern Kentucky University

Correctly Classifying and Determining Fire Protection Requirements for High- Hazard Group H Occupancies in New York State (2010 codes)

NFPA 33 Standard for Spray Applica4on Using Flammable or Combus4ble Materials

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

ELECTRICAL SAFETY Information Bulletin

Products Solutions Services CT287. Hazardous Area Classifications and Protection Systems

Dust Explosions. health & environmental sciences failure analysis & prevention

ELECTRICAL SAFETY Information Bulletin

Preventing Fires And Explosions In Pilot Plants And Laboratory Units

***DRAFT - NOT FOR FILING***

Application Bulletin. LNG / LPG Facilities FLAME AND GAS DETECTION FOR LNG FACILITIES

PIPING SYSTEM EQUIPMENTS

Numerical Standards Listing

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

Numerical Standards Listing

PART 2. Basic Code Requirements - Semiconductor & Microelectronic Facilities using HPM s

Industrial Explosion Suppression Technology

The regulatory section first discusses codes and standards and then Federal and State legislative and local requirements.

Ashirwad Carbonics (India) Private Limited

FIXED PROTECTION FOR OIL AND CHEMICAL PLANTS

Foam Products ENGLISH

Numerical Standards Listing

Government Gazette Staatskoerant

2.07 Permit Application Checklist for Diesel Generators, Diesel Fire Pumps, and Fuel Tanks Serving Generators and Fire Pumps (2016)

Module 7: Air Supply System

THE SIGNIFICANCE OF RELIABLE PRESSURE CONTROL IN OILFIELD BURNER SYSTEMS

Fire is No Accident Fire is No Accident It can be prevented.

Performance and safety features of a 2 x cbm LPG-import terminal built in China

Ontario Fire Code SECTION 5.10 COMBUSTIBLE DUST PRODUCING PROCESSES. Illustrated Commentary. Office of the Ontario Fire Marshal

FUNDAMENTAL SAFETY OVERVIEW VOLUME 2: DESIGN AND SAFETY CHAPTER I: AUXILIARY SYSTEMS 2. COMPONENT COOLING SYSTEM FOR THE NUCLEAR ISLAND (RRI [CCWS])

Contents. xiii. 4. PHYSICAL PROPERTIES OF HYDROCARBONS General Alkene Series... 28

ELECTRICAL SAFETY Information Bulletin

Burner Fuel Use vs. Tank Temperature

APPLICATION BULLETIN COMBUSTION TURBINE FACILITIES. Overview

Above Ground Fuel Tank Requirements

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

DEPARTMENT OF DEFENSE HANDBOOK COVERED STORAGE 1. THE FOLLOWING PAGES OF MIL-HDBK-1032/2 HAVE BEEN REVISED AND SUPERSEDE THE PAGES LISTED:

MODULAR INTEGRATION OF PROCESS EQUIPMENT PACKAGES FOR OIL AND GAS FACILITIES

IMO. Resolution A.951(23) Adopted on 5 December 2003 (Agenda item 17) IMPROVED GUIDELINES FOR MARINE PORTABLE FIRE EXTINGUISHERS


The correlating committee has revised the numbering in these sections to provide clarity for the next edition of the document.

a. CFCs. b. HCFCs. c. Pressurized nitrogen. d. Compressed dry air. 17. The state of the refrigerant leaving the condenser of a refrigeration system

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

HEADWORKS PERFORATED PLATE FILTER SCREEN ROTARY DRUM SCREEN IN CHANNEL PERFORATED DRUM SCREEN

International Journal of Advance Engineering and Research Development

CO2 COCO GAS FLOODING SYSTEM

Owners Manual OWNERS MANUAL. Australia s original Outdoor brand. Part No. Comp827. SAI Global Cert. SAI AS

SECURITY BLANKET Foam Fire Protection Products

& Fire Extinguisher Training

POWDER GUIDE. Trouble shooting tips to maximise the benefits of Apcoshield Powder Coatings

CNG. PSB Industries. NG Series - Natural Gas Dryers N G-S R NG-SR D N G - E V N G - SV N G R

Ammonia Supply Systems for SCR

Chapter 11 REFRIGERATION CYCLES

There are two devices used together for heating crude oil in petroleum refinery as in figure (1), and these devices are:

Understanding. Combustible Dust Hazards: Basic Measures to Ensure the Safety of Combustible Dust Handling Operations

Process Hazard Analysis Facility Siting Checklist

COURSE SYLLABUS HVAC AND MECHANICAL CONSIDERATIONS FOR PART 3 BUILDINGS CORRESPONDENCE COURSE

Varec Biogas Digester Gas Safety and Handling Equipment

Committee on NFPA 51A

Part I Extraction Process Equipment

Beneficial Use of Landfill Gas for Leachate Evaporation and Power Generation

Fire protection on chemical manufacturing sites

BETACURE 100 CO-REACTANT

OPERATING INSTRUCTIONS AND OWNERS MANUAL GAS-FIRED INFRA-RED TANK TOP HEATER

2. Gas B. The column of hot gases, flames, and smoke rising above a fire; also called convection column, thermal updraft, or thermal column

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

S150 S300 CONSTRUCTION HEATERS. Rev: August 15, 2008 SERVICE AND MAINTENANCE MANUAL No PLEASE RETAIN FOR FUTURE REFERENCE PRODUCTS

APPENDIX D LOSS PREVENTION CHECKLIST

Refrigeration Technology in Building Services Engineering

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST

GAS EXTINGUISHING SYSTEMS INERT GAS. Argotec with argon or nitrogen

TABLE OF CONTENTS. Site preparation 2 Placement. 2 Chimney and stove pipe connections. 2

Transcription:

Cross Reference Table f Area Classification Details Area Focus Drum Filling Station (Outdos Indos in an Adequately Ventilated Building)) Marine Terminal Tank Car Tank Truck Loading and Unloading Via Closed System Tank Car Tank Truck Loading and Unloading Via Open System Below Grade (Inadequately Ventilated at Grade (Outdos) Adjacent Areas Adequately ventilated nonenclosed 2 area adjacent to a classified area Enclosed area with vaptight barriers 3 adjacent to a classified area Enclosed area with non-vaptight 4 barriers adjacent to a classified area and in contact with its Division 1 hazardous influence boundary Enclosed area with non-vaptight 5 barriers adjacent to a classified area and in contact with its Division 2 hazardous influence boundary Bulk Loading Unloading Handling Flammable 5.9.6 Product Transfer through Bottom Only f Flammable Product Transfer through Dome Only f Flammable Product Transfer through Bottom Only f Liquefied Gas, Compressed Gas, Cryogenic Product Transfer through Dome Only f Flammable Liquefied Gas, Compressed Gas, Cryogenic Product Transfer through Top Bottom f Flammable 19 5.9.14 11 10 13 Tank Truck: 5.9.4(d) Tank Car: 5.9.4(c) Tank Car Only: 5.9.4(b) 9 5.9.5 12 s 101 Gas Highly Volatile s Gas Handling Highly Volatile 51 93 5.9.4(e) 5.9.2(a) Page 1 of 10

Cross Reference Table f Area Classification Details (cont.) (Inside Adequately Ventilated Shelter) (Inside Inadequately Ventilated Shelter) (Outdos but Under Roofed Building without Sides) (Inside Adequately Building with One Me Sides) (Inside Inadequately Building with One Me Sides) (Indo with Enclosed Operating ) (Indo with Open Semi-Enclosed Operating ) (Indo, Walled Off Area, Enclosed Operating ) s (cont.) 23 5.9.9(a) Gas Handling Highly Volatile Gas Gas dust cloud, dust layer less than 1/8 inch and surface col not discernable dust cloud dust layer and surface col discernable Group E Dust with moderate dense dust cloud, dust layer greater than 1/8 inch to less than 1/8 inch and surface col not discernable Groups F G Dust with moderate dense dust cloud to no visible dust cloud, dust layer greater than 1/8 inch to less than 1/8 inch and surface col not discernable Group E Dust 25 52 52 with 93 105 53 94 106 54 95 5.9.9(b) 5.8(c) 5.8(d) 5.8(b) 5.8(a) 5.8(f) Page 2 of 10

Cross Reference Table f Area Classification Details (cont.) Effluent Handling and Treatment Drain System Type 1 Open Drain System 58 (Enclosed Drain System Type 2 Open Drain System 59 (Enclosed Adequately ventilated Type 3 Open 61 (cont.) Drain System Type 4 Open Drain System 63 Inside Building handling Cryogenic Flammable s including Natural Gas Drain System Type 1 Open Drain System 58 Type 2 Open Drain System 59 Adequately ventilated Type 3 Open 60 Drain System Adequately ventilated Type 4 Open 62 Drain System Handling Cryogenic Flammable s including Natural Gas Emergency Impounding Basin (Above Grade) Oil-Water Separat handling Flammable Emergency Drainage Ditch Tempary Oil-Water Separat (Below Grade) handling Flammable Sump Below grade Open Sump handling 57 with ( Flammable Combustible Division 2 f the Enclosed remainder of the Sump (Inadequately Ventilated Enclosed Sump Above Grade Sump inside an enclosure handling Flammable Combustible Below Grade Open Sump Inside Open Vault Containment Area Below grade Open Sump handling Clean Water Below grade Open Sump handling Flammable Combustible Below grade Closed Sump Oily Water Separat with Atmospheric Vent and No Access Hatch(es) Below grade Closed Sump Oily Water Separat with Vent to Carbon Cannisters and No Access Hatch(es) enclosed area 34 63 58 57 27 Detail 4 1. 27 - Detail 4 but without Vent classification 2. Add Vent note To Carbon Cannisters 5.9.13, Top Detail 5.9.13, Bottom Detail 5.9.7, Top Detail 5.9.7, Bottom Detail Page 3 of 10

Cross Reference Table f Area Classification Details (cont.) Sump (cont.) Waste Water Treatment Above Grade Source with Closure Cooling Tower Effluent Handling and Treatment (cont.) Below grade Closed Sump Oily 1. 27 Water Separat with Atmospheric Detail 4 Vent and Access Hatch(es) 2. 100 Detail B Below grade Closed Sump Oily Water Separat with Vent to Carbon Cannisters and Access Hatch(es) 1. 27 Detail 4 but without Vent classification 2. Add Vent note To Carbon Cannisters 3. 100 Detail B Open Top Below Grade Separat 27 Preseparat Detail 1 Open Top Above Grade Separat 7 Preseparat Fixed Roof Above Grade Separat 6 Preseparat Open Top Below Grade Dissolved Air 27 Flotation (DAF) Unit Detail 2 Open Top Above Grade Dissolved Air 7 Flotation (DAF) Unit Fixed Roof Above Grade Dissolved 6 Air Flotation (DAF) Unit Open Top Below Grade Biological 27 Oxidation (BIOX) Unit Detail 3 Open Top Above Grade Biological 7 Oxidation (BIOX) Unit Fixed Roof Above Grade Biological 6 Oxidation (BIOX) Unit Injecton Well without Cellar Below 39 Grade Sump Injecton Well with Inadequately 40 Ventilated Cellar Below Grade Sump General Process Diverter Line Outlet handling 89 Flammable Combustible Pig Launching Receiving 49 Installation handling Flammable Combustible Process Filter Strainer handling Flammable Combustible Highly Volatile Mechanical Draft handling Process Cooling Water 102 28 Page 4 of 10

Dust Handling (Indo with Enclosed Operating ) Dust Handling (Indo with Open Semi-Enclosed Operating ) Dust Handling (Indo, Walled Off Area, Enclosed Operating ) Cross Reference Table f Area Classification Details (cont.) General Process (cont.) dust cloud, dust layer less than 1/8 inch and surface col not discernable dust cloud dust layer and surface col discernable Group E Dust with moderate dense dust cloud, dust layer greater than 1/8 inch to less than 1/8 inch and surface col not discernable Groups F G Dust with moderate dense dust cloud to no visible dust cloud, dust layer greater than 1/8 inch to less than 1/8 inch and surface col not discernable Group E Dust Fired Fired Heater with air-aspirated burners Unclassified entending out 10 feet from perimeter of burner bank Flammable Gas- Blanketed and Produced Water-Handling Fired Heater with FD fan FD/ID fans and safety shutdown system Fired Heater with FD fan FD/ID fans and no safety shutdown system Flare Located Outdos at Grade in a Nonenclosed Area Located at Grade in Adequately Ventilated Enclosed Area and all Vents extend outside enclosed area Located at Grade in Adequately Ventilated Enclosed Area and all Vents do not extend outside enclosed area Located at Grade in an Inadequately Ventilated Enclosed Area Unclassified 48 Unclassified entending out 10 feet from tip 50 50 with Division 2 f the remainder of the extent of enclosed area 50 with the remainder of the extent of enclosed area Division 1 50 with Division 1 f the extent of enclosed area 5.8(c) 5.8(d) 5.8(b) 5.8(a) 5.8(f) Page 5 of 10

Me than One Piping System With Multiple Valves, Screwed Fittings, Flanges, Hoses, etc. in Close Proximity: Metering Skid Manifolds Prover Skid Sampler System Chemical Injection Skid Plate and Frame Filter Press (Adequate Ventilation) Product Dryer (Inside Adequately Ventilated Butilding) Cross Reference Table f Area Classification Details (cont.) General Process (cont.) Located Outdos at Grade handling 96 Flammable Combustible Highly Volatile Located Outdos at Grade handling Cold Liquefied Flammable Gas including Liquefied Natural Gas Located in Inadequately Ventilated 22 Process Location handling Heavier- Than-Air Flammable Combustible Gas Highly Volatile Located in Inadequately Ventilated Process Location handling Lighter- Than-Air Flammable Combustible Gas Located Inside Roofed Building with One Me Sides handling Flammable Combustible Highly Volatile Located Inside Roofed Building with One Me Sides handling Cold Liquefied Flammable Gas including Liquefied Natural Gas Located Inside Inadequately Building with One Me Sides handling Flammable Combustible Highly Volatile Handling a Solid wet with a Flammable Handling a Solid wet with a Flammable 26 5.9.1(g) 5.9.11 97 5.9.13 98 5.9.12 5.9.3(b) 5.9.3(a) Hydrocarbon Pressure s (e.g. Heat Exchanger (Hazardous Material Shell-side), Fin-Fan Heat Exchanger, React, Accumulat, Oil-gas Separat, Tower) Multiple Sources of In Building 5.9.1(n) Leakage from Process Located on Me than One Flo Handling a Flammable In Outdo Process Area Handling a Flammable 5.9.1(k) 5.9.1(l) 5.9.1(m) Page 6 of 10

(Inside Inadequately Ventilated Process Enclosure) (Inside Adequately Building with One Me Sides) (Inside Inadequately Building with One Me Sides) (Indo with Enclosed Operating ) (Indo with Open Semi-Enclosed Operating ) (Indo, Walled Off Area, Enclosed Operating ) Cross Reference Table f Area Classification Details (cont.) Hydrocarbon Pressure s (cont.) (e.g. Heat Exchanger (Hazardous Material Shell-side), Fin-Fan Heat Exchanger, React, Accumulat, Oil-gas Separat, Tower) Handling Heavier-Than-Air Highly Volatile Source above Flo Level handling Flammable Combustible Highly Volatile Handling Cold Liquefied Gas including Liquefied Natural Gas dust cloud, dust layer less than 1/8 inch and surface col not discernable dust cloud dust layer and surface col discernable Group E Dust with moderate dense dust cloud, dust layer greater than 1/8 inch to less than 1/8 inch and surface col not discernable Groups F G Dust with moderate dense dust cloud to no visible dust cloud, dust layer greater than 1/8 inch to less than 1/8 inch and surface col not discernable Group E Dust 22 26 105 97 106 98 5.9.1(j) 5.9.1(d) 5.9.12 5.9.1(i) 5.8(c) 5.8(d) 5.8(b) 5.8(a) 5.8(f) Page 7 of 10

Below Grade (Inadequately Ventilated at Grade Above Grade Control Panel (Enclosure) f Instruments having Connections to Flammable Combustible Fluids (Instruments located Inside Attached to Panel) Process Control Valve Cross Reference Table f Area Classification Details (cont.) Hydrocarbon Pressure s (cont.) (e.g. Heat Exchanger (Hazardous Material Shell-side), Fin-Fan Heat Exchanger, React, Accumulat, Oil-gas Separat, Tower) Handling Cold Liquefied Flammable Gas including Liquefied Natural Gas Handling Highly Volatile Handling Cold Liquefied Flammable Gas including Liquefied Natural Gas Handling Liquified Compressed Flammable Gas Cryogenic Flammable 101 48 99 21 with 99 Instrumentation When Flammable Gas is vented to the 64 inside of enclosure (control panel) Adequately ventilated control panel (enclosure) with instruments inside Inadequately ventilated control panel (enclosure) with instruments inside Located in nonenclosed adequately ventilated area Located in enclosed adequately ventilated area Located in enclosed inadequately ventilated area 66 65 Division 2 extends 18 inches from stem seal (not shown on plot plan suppt drawing) Division 2 to the extent of the enclosed area Division 1 to the extent of the enclosed area Sample Valve Adequately ventilated area 61 (Discharge located in Enclosed Inadequately ventilated area 63 5.9.1(g) 5.9.11 5.9.1(b) 5.9.1(h) 5.9.2(b) 5.9.1(b) 5.9.1(h) 5.9.11 5.9.2(b) Page 8 of 10

Cross Reference Table f Area Classification Details (cont.) Pump Below Grade but External to Associated (Inadequately Ventilated Pump at Grade (Outdos) Pump (Outdos but Under Roofed Building without Sides) Pump (Inside Adequately Building with One Me Sides) Pump (Inside Inadequately Building with One Me Sides) Stage Area Stage Tank Stage Tank f Cryogenic and other Cold Liquefied Flammable Gases (Outdos) Pumps Pump associated with Oil-gas Separat, Receiver, Sump, etc. handling Flammable Combustible Handling Highly Volatile Handling Liquefied Compressed Flammable Gas Flammable Cryogenic Handling Highly Volatile Stage Bags Drums Closed Hoppers handling Groups E, F, G Dusts Fixed Roof Flammable Stage Tank Fixed Roof Flammable Stage Tank with Internal Floating Roof Open Top Floating Roof Flammable Stage Tank Fixed Roof Combustible Stage Tank Dike height less than distance from container to dike Dike height greater than distance from container to dike Conainer with liquid level below grade top of dike 101 51 93 52 52 with 93 53 94 54 95 6 6 7 8 5.9.2(a) 5.9.1(a) 5.9.2(a) 5.9.1(c) 5.9.1(e) 5.9.1(f) 5.9.4(a) 5.9.10(a) 5.9.10(b) 5.9.10(c) 5.8(e) Page 9 of 10

Cross Reference Table f Area Classification Details (cont.) Stage (cont.) Stage f Hydrogen Gaseous Hydrogen only 5.9.8(b) (Indos in an Hydrogen only 5.9.8(a) Building) Stage f Hydrogen Gaseous Hydrogen only 5.9.8(b) (Outdos) Hydrogen only 5.9.8(a) Vents Vent To Atmosphere From a Division 1 Area 16 87 ) From a Division 2 Area 17 88 From Instrument Control Device 15 (Low Pressure) From Process 14 From Relief Valve 18 From Rupture Disk 18 From source handling Cryogenic Flammable s including Natural Gas Vent To Atmosphere From source handling Cryogenic (Indos Adequately Flammable s including Natural Ventilated Building) Gas 5.9.13, Bottom Detail 5.9.13, Top Detail Notes: 1. NFPA s above use Division nomenclature. The use of NFPA s with Zone nomenclature is discouraged. 2. See Section 5.10 f Highly Volatile, Flammable, and Combustible definitions. 3. radius dimensions f use with the s above should be obtained from Gas/ Dispersion modeling results. 4. If modeling results cannot be obtained (e.g. composition of material is unknown), use the recommended radius per the specific figure. Page 10 of 10