MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

Similar documents
TABLE OF CONTENTS CHAPTER 1 GENERAL RULES CHAPTER 2 WIRING AND PROTECTION... 51

APPENDIX - L INTERNATIONAL RESIDENTIAL CODE ELECTRICAL

Michigan Chapter IAEI Annual Meeting Ann Arbor, Michigan Code Panel Questions December 5 th and 6 th, 2013

SECTION 2 NEC REFERENCES SECTION 1 LOW-VOLTAGE AND POWER- LIMITED SYSTEMS...1. CHAPTER 1 GENERAL Introduction...35

ll. Consistency Questions

Chapter 1 General... 5

Building Division 201 SE 3 rd STREET (Second Floor) OCALA, FL Phone: (352) BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS

Rocky Mountain Chapter IAEI Annual Meeting Northglenn, CO March 18-19, 2004

NEC CODE QUESTIONS. Western Section IAEI 103 rd Annual Meeting September 17-19, 2007

TABLE OF CONTENTS CHAPTER 2 WIRING AND PROTECTION CHAPTER 1 GENERAL RULES... 19

ONE- AND TWO-FAMILY DWELLING ELECTRICAL CODE HANDOUT (2015 Michigan Residential Code Effective February 8, 2016)

RESIDENTIAL ELECTRICAL INSPECTIONS CHECKLISTS

NEC CODE QUESTIONS and ANSWERS Wisconsin Chapter IAEI Green Lake, Wisconsin May 16-18, 2012

A. Connected to the equipment ground B. Bonded to the box C. Connected to nearest water pipe D. Connected to a ground rod

Electrical Tech Note 107

CHAPTER 15 PART IV NATIONAL ELECTRICAL CODE, 2017

RESIDENTIAL OVER. 4. Would it be permissible to hard- wire the dishwasher in question 3? If so, under what conditions?

Spring Test 6 due 04/26/2013

SDEC 2017 Questions, Group 1

2010 Residential Ques. & Ans.

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SW District 1. 1 Tony Tadysak Craig Mulder

District 1. 1 Tony Tadysak Craig Mulder

NEC 2017 Changes and Their Effect Upon the ICT Industry

Informational Bulletin on Mobile office Units Prepared by Mark Hilbert May 17, 2017

TABLE OF CONTENTS CHAPTER 5 SPECIAL OCCUPANCIES CHAPTER 1 GENERAL RULES... 19

Overview of Significant 2017 NEC Changes

Chapter 1 General...9 Article 100 Definitions...11 Article 100 Questions Article 110 Requirements for Electrical Installations...

2009 WESTERN SECTION CODE PANEL QUESTIONS

Fire Alarm Systems ARTICLE. Introduction to Article 760 Fire Alarm Systems. Part I. General

2009 ELECTRICAL CODE REQUIREMENTS

P-16 ENGINEER NO. DATE DESCRIPTION 1 01/19/2016 FOR CONSTRUCTION 2 03/11/2016 REVISION # 2 DRAWN BY: CHECKED BY: DATE: SCALE: DRAWING NUMBER

2017 NEC Presented by: Russ LeBlanc

8. Multi-Family Residential Buildings

ELECTRICAL - WIRING DESIGN AND PROTECTION SELF INSPECTION CHECKLIST

Second Revision No. 601 NFPA [ Section No [Excluding

Proposed Amendments To The 2008 National Electrical Code

AFCI. RECEPTACLEFAQs. What is an arc fault? What causes arc faults?

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

Revisions for the 2011 National Electrical Code - Part 1

Student Guide. Wiring Edition. Compliments of. Georgia EMC East Exchange Place Tucker, GA (770)

National Electrical Code Forum. Your Questions Answered

FIRE ALARM: BY OTHERS, IF REQUIRED.

Residential Wiring (2014 NEC) (Homestudy)

FIRE ALARM: BY OTHERS, IF REQUIRED.

Important Upcoming Dates

CODE PANEL QUESTIONS

MEDIUM, LOW AND CONTROL VOLTAGE CABLES

ORDINANCE NO

Fee $15 Course: NEC Changes 5 This course is valid for these credentials: Credential Description Cred Code Credit Hours

Electrical Essentials corrected calculation slides only

Residential Wiring According to the 2011 NEC

The following report was prepared for the buyers of the home and property at 1400 Main St. Anywhere City, Tennessee. The inspection was conducted on

TABLE 1-E (2017) Effective July 1, 2017

SOUTHERN NEVADA PROPOSED AMENDMENTS TO THE 2011 NATIONAL ELECTRICAL CODE

Town of Cicero Local Code Amendments

ELECTRIC and NEON SIGN STANDARDS. By Randy Wright RKW CONSULTING

2011 and 2014 National Electrical Code Changes Residential Only

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

HVAC Equipment Access Equipment Location

TOM BURNS, PLANNING DIRECTOR

Graded Project. National Electrical Code

Corra/Clad MC Cable The contractors cable of choice in place of conduit and wire.

SUBJECT: NFPA 70 Second Draft TC Ballot Final Results (A2016)

Municipal Code of Chicago TITLE 14E ELECTRICAL CODE

NEC Requirements for Standby Power Systems. New England Building Officials Education Association Annual Conference October 5, 2015

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (600 VOLTS AND BELOW)

2014 National Electrical Code & NFPA 70E/Arc Flash

Electrical Code Incorporating the 2014 International Building Code as amended

Program, Code Panel Questions, & Survey/Comments

Land Use and Environmental Services Code Enforcement. Table of Contents

EFCOG Best Practice #213

Installation Manual. Electric Range LSC5622W / LSB5611S / LST5601S / LSC5633W LSC5674W / LSC5683W / LSB5682S / LST5651S. Website:

Read these instructions carefully and completely. NOTE This appliance must be properly grounded.

Residential Wiring (2017 NEC) (Homestudy)

TECHNICAL ARTICLE. Inspecting Existing Dwelling Electrical Systems Using NFPA 73 by Skip Walker September 2009

Dwelling unit feeder/service conductor calculations

Residential Wiring According to 2011 NEC (Homestudy)

Revisions for the 2011 National Electrical Code - Part 4

Sundance Spas SPA EQUIPMENT SYSTEM. Installation Instructions. P/N Rev. A

TABLE LIGHTING POWER DENSITIES FOR BUILDING EXTERIORS ASHRAE Uncovered Parking Areas. Building Grounds. Walkways 10 feet wide or greater

CHAPTER 20 SERVICE EQUIPMENT

NEC Study Guide CORRECT: C NEC (A)(1)

Part Two. Wiring Procedures CHAPTER 3. Design and Layout

I dedicate this book to the Lord Jesus Christ, my mentor and teacher. Proverbs 16:3 NOTICE TO THE READER ABOUT THE AUTHOR

SECTION ELECTRICAL IDENTIFICATION

IMPORTANT NOTICE BUILDERS AND CONTRACTORS WORKING IN NORTH RICHLAND HILLS, TEXAS. June 17th, 2016

Are Open Bottom Electrical Handholes a NEC Violation? Proposals to Change the 2002 NEC Traffic Signal and Roadway Lighting Related

ARTICLE 760 FIRE ALARM SYSTEMS

Subpanels. Bring Big Amps to Distant Spaces. A subpanel is a secondary breaker box BY CLIFFORD A. POPEJOY

IDENTIFICATION FOR ELECTRICAL SYSTEMS July Electrical Systems

DIVISION 16 ELECTRICAL

White Paper: Installation Guidelines for Receptacles on Small Appliance Branch Circuits in the City of Chicago

SECTION ELECTRICAL GENERAL PROVISIONS

Installation Instructions 30 French Door Built-in Wall Ovens

GPS 140 NEC Requirements for Generators. Professional Development Seminar Series NEC Requirements for Generators

MEMORANDUM. According to the final ballot results, all ballot items received the necessary affirmative votes to pass ballot.

Land Use and Environmental Service Agency (Code Enforcement) Mechanical Q&A 2007

COMMON WORK RESULTS FOR ELECTRICAL: Basic Electrical Materials Methods

Units 2, 3, 4, 5, 6, 8, 9, 10, Electrical Wiring Residential Unit 2 (Unit 5 Fourth Edition)

Transcription:

MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 8/10/11 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. Is low voltage cable allowed to be run through drilled holes in wood studs along with normal 15 and 20 amp branch circuits in a single family dwelling? Maybe and Yes. Per 725.136 there are many instances where the two are not allowed to be run together; however at 725.136(I) it states: I) Other Applications. For other applications, conductors of Class 2 and Class 3 circuits shall be separated by at least 50 mm (2 in.) from conductors of any electric light, power, Class 1 non power-limited fire alarm or medium power network-powered broadband communications circuits unless one of the following conditions is met: (1) Either (a) all of the electric light, power, Class 1, non power-limited fire alarm and medium-power network-powered broadband communications circuit conductors or (b) all of the Class 2 and Class 3 circuit conductors are in a raceway or in metal-sheathed, metal-clad, non metallic-sheathed, or Type UF cables. (2) All of the electric light, power, Class 1 non power-limited fire alarm, and medium-power network-powered broadband communications circuit conductors are permanently separated from all of the Class 2 and Class 3 circuit conductors by a continuous and firmly fixed nonconductor, such as porcelain tubes or flexible tubing, in addition to the insulation on the conductors. 2. I ran a 50a circuit to a wall mounted oven and tapped a #10 to feed a counter-mounted cooking unit. The inspector turned me down and said this was only for the factory leads that came with the oven. Is this correct? Per NEC Article 210.19(A)(3). This is not totally correct. 700 North Tryon Street Charlotte, North Carolina 28202 Phone (704) 336-3821 Fax (704) 336-3839

Page 2 of 5 210.19(A)(3) covers factory-installed and field-installed tap conductors. The supply conductors included in a factory-installed pigtail are considered to be tap conductors in applying this exception. As illustrated below, this exception permits a 20-ampere tap conductor from a range, oven, or cooking unit to be connected to a 50-ampere branch circuit if the following four conditions are met: 1. The taps are not longer than necessary to service or permit access to the junction box. 2. The taps to each unit are properly spliced. 3. The junction box is adjacent to each unit. 4. The taps are of sufficient size for the load to be served. 3. Is a ground rod required to be driven when a generator is installed to feed a building as a NON-separately derived system? What if it s a separately derived system. No, Yes. (See Attached) System Bonding Jumper 250.30(A)(1)

Page 3 of 5 Connects the equipment grounding conductors of the derived system to the grounded conductor of the derived system. The system bonding jumper is sized in accordance with 250.28(A) through (D) based on the size of the derived phase conductors. Sized per Table 250.66 or 12½% rule if derived phase conductors exceed the values in Table 250.66 Locate system bonding jumper inside source enclosure or at any point to and including the first disconnecting means or OC device of the system The point of connection shall be made at the same point as the grounding electrode conductor connection to the system 4. During an inspection of a new restaurant located in a mall, there is a shaft for rooftop equipment and there is no way to enter the shaft for installation of raceways. The contractor wants to install five runs of ½ flexible metal conduit with a maximum of four # 12 AWG conductors. Section 348.30(A) Exception permits flex to be unsupported where fished. Do product standards limit the maximum weight a flex connector can withstand and is this installation permitted? If permitted is there a maximum vertical length flex can be fished? It appears that the language in 348.30(A) does permit FMC to be unsecured and unsupported when fished. Also unless the shaft is one of the areas not permitted by 348.12 and it appears it is not, then the NEC would permit it. There are rules for conductor support in 300.19. The UL white book PG 115 does not address the pull out requirements however; UL 514B requires a 50 lbs pull for 5 minutes for FMC connectors. To me, this is a classic decision for the AHJ on site. I don't believe that the CMP intended the unsupported length to be open ended. In response to your FMC question, the UL pullout requirement for the 1/2 size is 75 lbs. I would think that the length of the run would be a major consideration for this installation. Obviously the longer the run the more weight the connector would have to contend with. 5. At a 4-story hotel, we are installing 480-volt feeders up to each floor and the design calls for the grounding electrode conductor for the transformers to be installed in the power wiring conduit that feeds into the transformer disconnect at each floor. The bonding is done in the transformer. The building is poured concrete so the grounding electrode system consists of the underground water piping and the concrete encased electrode. The power wiring is installed in PVC conduit with an equipment-grounding conductor. Doesn t the NEC require the GEC to be run separately? No, as long as all the applicable Code rules are followed. For the raceway aspect that is the majority of the question, section 250.64(B) covers this. The grounding electrode conductor

Page 4 of 5 can be installed in the power conduit, in a separate conduit where physical protection is required or open where protection from physical damage is not necessary. If any of the raceway parts or enclosures are ferrous metal then those parts must be bonded at the entry and exit to the grounding electrode conductor per 250.64(E). The other key part is terminations. The question states the connection is in the transformer and that is fine, but the connection where the feeder originates has to be considered. To meet the definition in Article 100 and section 250.24 the end of the grounding electrode conductor at the beginning of the feeder must be connected directly to a grounding electrode or to a common grounding electrode conductor by one of the connection means specified in 250.70. 6. I need to supply four 40-amp, 3-phase, 120/208 receptacles. These receptacles are all adjacent to one another but the supply panel is quite some distance away. There is an existing unused 90-amp (#4's & #8 ground) set of conductors less than 10 ft. from the proposed new receptacles. The nameplate ampacity rating for each appliance is 25 amps (ovens). Am I correct in understanding that the 10 ft. tap rule can be used to supply the new receptacles provided that the tap conductor s ampacity is not less than the combined calculated loads of the tap feeder? If the tap conductors are individually routed properly, do I need to provide an additional disconnecting means for these individual openings other than the receptacles themselves? These commercial ovens are considered to be non-continuous loads. The installation method in this question does not meet NEC compliance. If the following code sections are adhered to however, this installation is possible. 220.14 (A) [Specific Appliances or Loads] requires the branch circuit loading to be calculated based on the equipment rating. In this case the branch circuit would need to be rated for 100 amperes (4 @ 25 amps) not 90 amperes. 210.19 and 210.19(A)(4) require the branch circuit conductors to have an ampacity not less than the maximum load served for non continuous loads. Receptacles (not outlets) are mentioned in the question, so I m assuming the ovens are cord and plug connected and also portable. Section 210.19(A)(2) requires the conductors serving more than one receptacle to have a rating not less than the rating of the branch circuit.

Page 5 of 5 7. I ran a raceway (tucked in a corner) up the entire length of a stairwell in a five-story building. The raceway was for some new signs on the outside of the building. The Building Inspector red-tagged it without leaving any explanation. Is this a violation of the NEC? If not, what code is it from? NO. Not an NEC violation. However there are many instances when the applicable building codes prevail. Building codes do not allow anything in stairwell shaft enclosures unless they are related to the stairwell. Example lighting, Fire Alarm etc. In the ICC building code sections are 707.8.1 Prohibited penetrations. Penetrations other than those necessary for the purpose of the shaft shall not be permitted in shaft enclosures 8. We have quite a bit of abandoned low-voltage communication cable in our facilities. Where are the requirements in the NEC to remove this cable? When do cables have to be removed? As a general rule, where the majority of the ceiling tiles are removed or replaced during the project that portion of the ceiling shall have all abandoned cables removed and / or supported and tagged for future use. The remaining cables shall be properly supported. Section 640.3(A) for Audio Cable, Section 645.5(D)(6) for cables in Information Technology Equipment spaces, Section 725.3(B) for Class 2 & 3 Circuits, Section 760.3(A) for Fire Alarm Cables, Sections 770.3(A), 770.154(A) & 770.154(B)(1) for Optical Fiber Cables and Raceways, Sections 800.3(C), 800.154(A) & 800.154(B)(1) for Communications Circuits, Sections 820.3(A), 820.154 (A) and 820.154(B)(1) & (D) for CATV systems, Section 830.3(A) for Network-powered Broadband cables. 9. If service drop conductors are increased in size due to voltage drop, is it required to increase the size of the grounding electrode conductor? No, 250.66 it must be sized based on the SE conductors not the service drop conductors.