THEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC

Similar documents
CITY OF VIRGINIA BEACH PLANNING COMMISSION DESIGN AWARDS PROGRAM 2012

AIA Albuquerque 2016 Design Awards

GREEN BUILDING AT EVERGREEN SEMINAR II BUILDING

2010 Update to the Los Angeles Valley College Facilities Master Plan Board of Trustees February 23, 2011

Lord Stirling Community School

BAINBRIDGE ISLAND MUSEUM OF ART

building tour

SMEAL COLLEGE OF BUSINESS BUILDING University Park, PA

University of West Florida s New School of Science and Engineering Building Adheres to PKAL Principles

CEFPI James D. MacConnell Award

North Elevation Existing trees along Pike Street were preserved and enhanced with extensive planting.

Antelope Valley College

Project Description/Project Title and Data: A001.01

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

New High School Concept

2014 Exhibition of School Planning and Architecture

Butler Junior High School

Lighting Proposal Memo. Lighting Proposal. Angela Nudy Lighting/Electrical Dr. Mistrick Lighting Proposal Memo 1

2010 Campus Master Plan Update - USF TAMPA Campus Master Plan Update USF TAMPA

SOCIAL SUSTAINABILITY RESPONSE POST ON GEORGIA 349 W GEORGIA ST REZONING APPLICATION REV 2 - UDP ADDENDUM

Gifts to the Breaking New Ground

r.i.s.e demonstration center

Scholarly Pursuits: Inspirational New Academic Buildings

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

No.2 Whitehall Riverside, Leeds July 2013

PEDESTRIAN ROUTE. Fig 202. Route to entrance of building

Diamond Schmitt Architects MEDIA RELEASE November 24, 2011

2014 Michael G. Meyers Design Competition

University of the District of Columbia Van Ness Campus Master Plan Community Open House 3. December 8, 2010

Design Presentation. Chief Operations Officer Willie Burroughs

campus master plan VIRGINIA STATE UNIVERSITY

Appendix E: Illustrative Green Infrastructure Examples

Intelligent Design: Can a design revolution meet humanity's greatest challenge? KS State University 6 Jan 06 Bob Berkebile, FAIA

GUIDING LIGHT ASSEMBLY CHURCH MIXED-USE ARCHITECTURE

Academic Building Naming Prospectus. Environment Hall HOME OF THE NICHOLAS SCHOOL OF THE ENVIRONMENT AT DUKE UNIVERSITY

REX BELL ELEMENTARY SCHOOL NVB17055

PROJECT DESCRIPTION & INTRODUCTION

PROJECT INFORMATION UNBUILT PUBLIC LIBRARY LATE 2017 TYPE II-B CONCRETE MASONRY WEATHERING STEEL GLASS GABION WALLS $6.4 MILLION 13,000 SF

THE LANDMARK PROJECT: ST. GEORGE CAMPUS BEFORE AND AFTER

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

City of Redlands Architectural Guidelines for Non-Residential Development

TRINITY LUTHERAN SCHOOL RENOVATIONS

Verona Area School District New High School Site Plan Review Written Description EUA Project No.:

LANGAN LANDSCAPE ARCHITECTURE + PLANNING FOR COLLEGES & UNIVERSITIES

Master Facility Planning Update School Board Meeting May 26, 2016

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

USGBC Illinois Chapter Chicago South Suburban Branch

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

CONTROL SYSTEM. How to design daylight into your building using electronically tintable glazing.

Riverfront Park Redevelopment, USA

Nu Skin Innovation Center. Location: Provo, Utah Lot Size: 435,600 GSF Building Size: 168,000 GSF Project Type: Commercial LEED Gold Certified

r.w. kern c e n t e r R. W. Kern Center OPENING WINTER 2015 / 2016 Bruner/Cott architects and planners

Federal Way Public Schools Support Services Center 1211 S 332 nd Street Federal Way, WA Federal Way Public Schools Completion Fall 2012

San Francisco State University Campus Master Plan. Chapter 7. Urban Design Plan

QUEENS BOTANICAL GARDEN S VISITOR & ADMINISTRATION CENTER SITE DESCRIPTION SITE LOCATION 8/13/2009

r.i.s.e demonstration center washington, dc project category: architecture

Appendix 1. Private Projects with Respective On Site PUS and Public Parks in the Silver Spring CBD

2014 Exhibition of School Planning and Architecture. White Hill Middle School Campus Master Plan & Design. Ross Valley School District Fairfax, CA

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

EDUCATIONAL SPECIFICATIONS NEW CONSTRUCTION TO: Oxford Middle School Location to be determined November 4, 2016 Approved by BOE on November 29, 2016

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

A Building Area: (sf) 65,000. Cost per Square Foot: $246. Construction Cost $16,000,000. Date of Completion: Est. May 2014

FACILITIES FOR 21 ST CENTURY LEARNING

Lindsey Beane. Executive Summary

Solana Ranch Elementary School

ENGINEERING BUILDING UNIVERSITY OF CAPE TOWN

Duke University Medical School. Duke School of Nursing

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

WESTERN ILLINOIS UNIVERSITY

Schematic Design Presentation December 15, 2006 David Smith

PROGRAM: A mixed-use (retail, residential, commercial) infill project encompassing two blocks and nearly 20 acres of downtown Salt Lake City.

Principle 7. Architectural Style and Historic Preservation PRINCIPLE 7

University of Pennsylvania, Neural and Behavioral Sciences Building

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

Smart Growth Development Checklist

Shenzhen-Hong Kong International Center. Shenzhen, China

Preci nct P l ans Figure 56 Campus Aerial Photo, 2008 CAL STATE EAST BAY, HAYWARD CAMPUS MASTER PLAN

OLBRICH BOTANICAL GARDENS Public Stakeholder Meeting 4

Technical Report IVb: Proposal

Assignment 1: Narrative

Growing Sustainable Communities Conference

University of Illinois Business Instructional Facility LEED Gold Design. University of Illinois Business Instructional Facility

NORTH TORONTO COLLEGIATE INSTITUTE. the Journey to a New Urban School + the Partnerships which gave it Life

Badge of Honor. In an ultra-green Lamy home, form stylishly follows function and does its owners proud. SU CASA WINTER 2012

DOUBLE LEED PLATINUM U.S. GREEN BUILDING COUNCIL (USGBC) MEMBER. tour guide

Jason Greer Lighting / Electrical L/E Consultant: Dr. Mistrick. Villanova University: School of Law Villanova, PA

Jennifer Mers. Rio Hondo Library and Learning Resource Center. Executive Summary. General Building. Lighting/Electrical Option

R.O.M. = Rough Order of Magnitude

Goals. Precedent Analysis arc 572 UT Solar Decathlon 2009 elementhouse University of Illinois at Urbana-Champaign 2007

Boise State University October 8 - Workshop # 2. MASTER PLAN UPDATE Executive Committee Ayers Saint Gross

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

Orchard Commons will target social, environmental and economic sustainability, with a minimum LEED Gold certification.

SMALL LOT DESIGN STANDARDS. An Illustrated Working Draft for Test Implementation

SOFIA UNIVERSITY AUDITORIUM CONCEPTUAL DESIGN 08/03/2013

EXTERlOR DESlGN LANGUAGE. Exterior Design Language PAGE 1 OF 27

Sustainable Tower CHOICE 1

Landscape and Streetscape Design 2.5

John Palmer Elementary School

PALOMAR COLLEGE LEARNING RESOURCE CENTER

Transcription:

THEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC

PROJECT SUMMARY Project Name: Theodore Roosevelt Senior High School Modernization Client: DC Department of General Services Program: Roosevelt Senior High School Curriculum: Comprehensive, International Baccalaureate High School Grades: 9-12 Projected Enrollment: 800 Roosevelt STAY Curriculum: Alternative Day/Evening High School Grades: 9-12 Projected Enrollment: 300 approx. Building Size: 330,000 gsf Dates of Original Construction: Main Academic Building, Theater and Gym: 1932 North, 4th Floor and Pool Additions: 1977 LEED Certification: Pursuing LEED for Schools 2009 Platinum Ribbon Cutting: August 19, 2016

COMPLETING THE CIRCULATION SYSTEM & ENHANCING NATURAL LIGHT THROUGHOUT PAVILION 1st Floor Plan After With the addition of the Pavilion, the circulation between each of the four buildings comprising the campus is finally complete, easing access to all of the school s resources. 1st Floor Plan Before To realize the goal of natural light and views throughout, the team removed the 1970 s windowless infill from the northern courtyard and added skylights and windows to the remaining 1970 s additions.

THE NEW ATRIUM The heart of the school Situated at the crossroads of the campus, the Heart of the School will become the literal and social center of the school community. The acoustical baffles celebrate all of the nationalities represented in the RSHS community.

THE HEART OF THE SCHOOL In reorganizing the school, an atrium was created in the former little used central courtyard. With a new monumental stair, this move allowed the organization of the community oriented program elements around this heart along an axis beginning at the historic front door and ending in the new amphitheater. Amphitheater Cafeteria Culinary Arts Media Center The Heart The Steps Cosmetology Career Center The Terrace 13th Street

ATRIUM & The courtyard before modernization was largely unused. Stripped of ornament in the 19070s, the cupola was restored and is celebrated by being visible through the atrium s 10,000 sf electro-chromic glass ceiling.

UNCOVERING THE PAST Two historic frescos were discovered beneath decades of paint. After restoration, the frescos are featured at the top of the grand stair.

WATERWORKS & The northern courtyard was infilled in the 1970s. Windows were blocked and natural light cut off from surrounding program spaces. With the infill demolished, the restored courtyard celebrates rainwater and the hydrologic cycle. Water from the roof cascades down the new terraces accented by public art to be captured into one above-ground cistern and two beneath the landscaped terraces.

CAFETERIA & Before the modernization, the dark and uninviting cafeteria was in the bottom of the infilled north courtyard. After, the dining has been moved back into the 1930s academic wing with views and access into the reopened north courtyard.

SUSTAINABILITY FEATURES Plaques describing the sustainable features of this LEED Platinum (pending), high performance learning environment are placed around the school to help students, teachers, and the community understand its many green features. There are a total of 20 different sustainable features illustrated throughout the site. WATERWORKS Rainwater harvested from the roof is stored in three cisterns in the Waterworks Courtyard and reused for flushing toilets and urinals. With two 15,000-gallon cisterns buried below the landscaped terraces and one 25,000-gallon cistern above ground, the school can collect up to 55,000 gallons of rainwater for reuse. By diverting rainwater from running off the site, the Roosevelt campus will reduce its impact on the Anacostia River watershed. FOOD PRODUCTION The greenhouse and garden serve the school and community as teaching tools for local, sustainable agriculture. Growing food locally puts us in touch with the seasons, yields fresh and tasty fruits and vegetables, and reduces pollution from long-distance shipping and refrigeration. ELECTROCHROMIC The atrium skylight features electrochromic glass, which automatically tints throughout the day based on the amount of sunlight. This keeps the atrium comfortable and saves energy. Electrochromic glazing on the south-facing sections provides daylight and views while blocking solar heat gain and glare. This smart skylight helps reduce the need for air conditioning in the warmer months. DAYLIGHT & VIEWS Ample natural light and views to the outdoors improve the quality of the interior environment and enhance learning. Natural light is provided to over 90% of classrooms and offices at Roosevelt. Daylighting and views to the outside have been correlated with improved student performance, while glare and direct sunlight can be negative factors. To allow ample daylight yet prevent excessive brightness and glare, the building uses high-performance glazing, and interior roller shades. RECYCLED CONTENT Selecting products made with recycled content keeps useful materials out of landfills and preserves natural resources. Twenty percent of the building materials at Roosevelt, including windows, doors, ceramic tile, and acoustic ceiling panels, are made with recycled content. GEOTHERMAL A ground-source heat pump system (also known as a geothermal system) under the north athletic fields supports Roosevelt s commitment to energy efficiency. The geothermal system, made up of more than 200 wells that measure 500 feet deep, takes advantage of the earth s constant year-round temperature to help heat and cool the building. This system reduces the building s demand for energy from fossil fuels.

AMPHITHEATER & Students used to enter the east side of the building and, despite the fact that it faced the stadium, the east side was definitely the back of the campus and not an appropriate replacement for the historic front door. Featuring bio-retention gardens, the new amphitheater creates a new outdoor gathering place on the east side, allows natural light and views into and from the new media center, and graciously ends the axis beginning in the historic front door on the other side of campus.

COMMUNITY ENTRY & The south courtyard was previously neglected and hard to secure. After, the new Pavilion addition enclosed the courtyard and now provides a gracious entrance for the alternative STAY program and for after-hours community use of the health clinic, gym, and pool.

GYMNASIUM & Like the theater, the gym had great DNA and natural light but could not seat the entire school for major events. By removing the floor above the entrance and a large blank brick wall, a new 1,000 seat bleacher could be installed. New artwork on the acoustical panels celebrates sport.

AUDITORIUM & The theater had great DNA before the modernization. Water damage and quirky acoustics marred its use, however. After the modernization, the acoustics have been refined and the notable architectural features have been restored to their former glory including historic lighting housing new LED fixtures.

MUSIC ROOMS & Before the modernization, the northernmost 1970s addition was windowless, dark, and hard to navigate. By simplifying the plan, adding large windows, and raising the roof for new skylights and clerestories, this wing was transformed into a daylight-filled home for the Visual and Performing Arts.

GALLERY SPACE & The dark core (smaller photos) of the northern 1970s addition was opened up with skylights as a new daylight-filled Arts Gallery.

CLASSROOMS & One of the great attributes of the 1930s building is its generous windows. The original austral action windows were restored in the atrium. In addition to the natural light, new instructional spaces feature enhanced acoustics, new LED lighting, technology, furniture and in many spaces, new hard wood floors.

SERVING ALL STUDENTS As Roosevelt serves a large number of children with Autism, a suite of classrooms, OT/PT, and sensory rooms were designed.located directly outside of these classrooms is a terrace designed as a breakout space, featuring a garden and a sculpture made up of bundled tubes. The contrasting textures of planters and 3D artwork provides sensory and tactile opportunities for the students. The smooth bundled tubes also filter light, offering shade above benches. In addition to these features, motion activated fans will soon be installed for cooling and sensory stimulation.

RESTORING PRIDE Gathered to once again arrive through the historic front door reopened after 25 years the mayor, the school, the alumni and the community celebrated by cutting the ribbon on the renewed Roosevelt Senior High School.

THEODORE ROOSEVELT SENIOR HIGH SCHOOL WASHINGTON,DC