Eglinton West/Allen Road Station Potential South Side Entrance Options. Online Consultation April 2 nd to April 16 th

Similar documents
Preliminary Construction & Traffic Planning Intro to Shop Local/Shop Eglinton Initiative. June 27, 2012

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

2

Mount Dennis Mobility Hub Study Public Meeting December 12 th, :30pm 9:30pm York Memorial Collegiate, Cafeteria 2690 Eglinton Avenue West

Allen Road-Eglinton West Station Public Consultation Report Open House & Online Consultation #1

CROSSTOWN LRT Central Open House March 21, 2018

Open House Wellesley Station Second Exit Construction Update and Public Art Concept

2

STATION AND STOP NAMES Eglinton Line. September 2015

3.5.7 Black Creek to Don Mills

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

DRAFT DRAFT DRAFT DRAFT

Eglinton Connects Planning Study Phase 1 (Part 2) Implementation Report

Planning and Growth Management Committee. Acting Chief Planner and Executive Director, City Planning Division

CROSSTOWN LRT Central-West Open House April 18, 2018

CRYSTAL CITY BLOCK PLAN # CCBP- G 1 DRAFT

PUBLIC MEETING AND OPEN HOUSE: Don Mills Crossing Phase 2 Celestica Development Applications. February 21, 2017

Welcome. Walk Around. Talk to Us. Write Down Your Comments

TONIGHT S PURPOSE INFORMATION SESSION CANORA & WEST JASPER PLACE SIDE STREETS CONCEPT PLANNING STUDY. Share draft side streets concept plan

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Port Credit Local Advisory Panel October 20 th Meeting

Transit Terminal Design Surveillance Access Control - Territoriality. Ian Trites Supervisor Facilities and Architectural Design

Coordinated Transit Planning in Toronto SmartTrack GO RER Scarborough Relief Line Waterfront Transit

Eglinton West LRT Update

Reconfiguration of The Six Points Interchange. Community Update #2 June 18, 2014

Welcome. to the 95th Street Terminal Improvement Project Public Hearing

Monroe Street Reconstruction. Business Roundtable March 29, 2017

Yonge Eglinton Town Centre DEVELOPMENTS

WELCOME. The Yonge-Eglinton area has experienced significant growth and change in the last decade.

CITY OF VAUGHAN D R A F T YONGE STREET STUDY. June 2008 YOUNG + WRIGHT /IBI GROUP ARCHITECTS DILLON CONSULTING LTD.

TORONTO TRANSIT COMMISSION REPORT NO.

Clairtrell Area Context Plan

Coxwell Station Easier Access

CRYSTAL CITY BLOCK PLAN # CCBP- G 1

planningalliance City of Toronto Lawrence Allen Revitalization Project Transportation Master Plan

Relief Line Project Assessment

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

Monroe Street Reconstruction. Final Corridor Design Presentation & Open House August 16, 2017

From: Director, Community Planning, Scarborough District. Ward 40 Scarborough-Agincourt

Transit-supportive development and city-building

770 Don Mills Road and 805 Don Mills Road - Official Plan Amendment and Zoning By-law Amendment Application Preliminary Report

SHERIDAN PARKING STRUCTURE PUBLIC INFORMATION MEETING November 11, :00 pm - 8:00 pm

Expo Light Rail Line. Expo Line Community Meeting Phase 2 Design Update November 2011

Broadway/Lawrence Streetscape Design Charrette March 7, 2014

VAUGHAN METROPOLITAN CENTRE STATION

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

St. Clair Avenue West Area Transportation Master Plan

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Strachan Ave. Overpass Community Design Update. October 26, 2010 Stephen Lipkus Executive Director Georgetown South Project GO Transit

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Yonge Eglinton Centre Urban Design Guidelines

City of Toronto Official Plan Indicators

3.1. The Kodak Lands. The Kodak Lands Today. 22 Mount Dennis Mobility Hub Study

Canal Road City Limits (East of Van Dyke Ave) to Saal Road

Union Station Master Plan Task 2 Briefing

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Laird in Focus Community Information Session

1 Eglinton Avenue East Zoning Amendment Application Final Report

Minto In Kensington Open House. Thursday March 23, pm Hillhurst Sunnyside Community Association Ave NW

Construction Contract A47CN01: Wollaston Station Improvements and Quincy Center Garage Demolition. June 2017

MOBILITY HUB GUIDELINES 2012 TAC Sustainable Urban Transportation Award Submission BACKGROUND MOBILITY HUB GUIDELINES

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

DOWNTOWN GEORGETOWN PLANNING STUDY

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

844 Don Mills Road & 1150 Eglinton Avenue East - Official Plan Amendment Application - Preliminary Report

Long Branch-Wayne Local Park Renovation Project

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

Building the transportation network we need for the future

L E A R N LEARN. Is there additional information or existing conditions that should be considered as part of the planning process?

Eglinton Connects Planning Study Phase 1 (Part 1) Implementation Report

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

North York Centre South Service Road

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

GOLDEN MILE SECONDARY PLAN. Community Consultation Meeting #3 June 26, 2018

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

Urban Planning and Land Use

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

Institutional Master Plan The Arnold Arboretum of Harvard University

Toronto Transit Consultation Meetings June 2 nd, 2016 Highlights Report

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Eglinton Avenue East & 50 Thermos Road - Official Plan Amendment Application Preliminary Report

ACTION SUMMARY FOR DESIGN REVIEW COMMITTEE MEETING May 21, :00 PM

PLZ HD Broker/Floorplan BrochureReV3.indd 1-2

Enhanced Planning Process

70 and 80 Wicksteed Avenue, 202, 204 and 206. Parkhurst Boulevard and 99 Vanderhoof Avenue

Meeting Display Boards for Public Hearing on the Wilson Transfer Station Project held Tuesday, February 18, 2014.

South Side. Landscape/Utility Zone. Curb & Buffer Cycle Track. Sidewalk. 2.5 m. Travel Lane. Turn Lane. Landscape. Utility Zone.

Ballston Station Multimodal Study. Stakeholder Meeting October 5, 2010

Public may provide comments on the GDP within the next two weeks (December 24)

WHY INVEST THE EGLINTON CONDOS

This Review Is Divided Into Two Phases:

Summary of Results from the Toronto Planning Review Panel Meeting held June 10, 2017 Executive Summary

Assessing City of Toronto and Metrolinx Rapid Transit Priorities

Pine Hills Bus Transit Center Community Design Workshop. Presentation April 21, 2018

Complete Streets Guidelines & Implementation Strategy. Public Open House #2 June 12, :30-8:00 pm

BeltLine Corridor Environmental Study

Northwest LRT Downtown to. Northwest Edmonton Study. Public Workshops

TSAWWASSEN TOWN CENTRE REDEVELOPMENT BLOCK A 004

Transcription:

Eglinton West/Allen Road Station Potential South Side Entrance Options Online Consultation April 2 nd to April 16 th

Eglinton West/Allen Road Station Consultation #1 Most common comment: south side entrance very important Most common location requested Ben Nobleman Park Conversely, comments also expressed to avoid park (community orchard) Other locations requested: Police Station Lot and Everden Road Many expressed concerns crossing Eglinton and Allen

Crosstown Station Design: Principles for ALL Stations One fully accessible main entrance (elevators and escalators) One secondary entrance Cannot provide multiple secondary entrances (& multiple accessible entrances) at all stations for budgetary reasons

Potential South Side Entrance for Eglinton West/Allen Road Station Final Decision to include an additional secondary entrance on the south side of Eglinton will be made based on cost, community input & engineering factors over coming months Must get input from local community tonight and going forward Final Decisions on project scope & budget will be made by Metrolinx who is funding transit expansion

The Eglinton Crosstown LRT 10km Underground Central Section 10 km central underground: Keele Laird

The Eglinton Crosstown LRT Crosstown Plan Underground from Keele Street to Laird Drive in Leaside Dedicated transit lane from Laird Dr to Kennedy Station in Scarborough 60% faster than bus service today (e.g. only 15 minutes Keele to Yonge) Design Philosophy Integrate with surrounding neighbourhood Preserve space for future re-development Enhance the local sense of place Long-term sustainability Safe and enjoyable user experience Accessibility 6

Pedestrian Challenges Eglinton Avenue - looking West Eglinton looking West No Crosswalk Today New Crosswalk proposed at Strathearn, discussions with City Transportation

Pedestrian Challenges Allen Road - looking South

Context: Eglinton West Allen Station

Eglinton West Station Current Plan Two Crosstown Station Entrances on North Side South Entrance Dependent on Future Development at Police Station

Pedestrian Improvements New Walkway & Sunken Garden under Allen Rd Walkway connecting northside station entrances will allow pedestrians to cross Allen Road underground Existing crossings at street level will remain Existing entrance to Eglinton West Subway Station remains New Crosswalk Proposed at Strathearn

Eglinton West (Allen Rd) Station Interchange Station Two north side entrances to Crosstown Station North West entrance is fully accessible Underground Walkway between Entrances Fare lines below street level allows crossing underground (with or without using the TTC Existing Eglinton West Station Entrance remains Accessible Transfer to Subway 95 metre passenger platform Temporary and Long Term Bicycle Storage Potential Secondary Entrance, on South side of Eglinton Avenue 1/25/2012 Eglinton West Station - Preliminary Design Overview 12

Longitudinal Section Detail PERSPECTIVE SECTION VIEW ALONG EGLINTON AVENUE INTERIOR VIEW: CONCOURSE LEVELS INTERIOR VIEW: UPPER CONCOURSE

North East Entrance New Crosswalk Proposed at Strathearn

Eglinton West Subway Station Plaza Entrance + Sunken Garden Area

North West Entrance

Current Site with Potential Locations for South Entrance Potential South Side Entrance Locations

Option 0 No South Entrance (current design) Artistic Interpretation of Study Area

South Station Entrance Options

Option 1 Ben Nobleman Park Pavilion Artistic Interpretation of Study Area

Option 1 Ben Nobleman Park Pavilion Consists of a pavilion type entrance located at the north west corner of Ben Nobleman Park. The concept is to have a structure that is very open; almost transparent. It has continuous glazing on three sides permitting visibility from the street to the park, and from the park to the street. It serves as an entrance to the park, through a loggia in front of the entrance, and permits an easy connection to the existing east to west cross path in the park. The structure is located as far northwest as possible to limit impacts to the Park and Community Orchard as much as possible.

Option 1 Ben Nobleman Park Pavilion

Option 1 Ben Nobleman Park Pavilion FARE LINE AT LOWER CONCOURSE LOWER CONCOURSE AUTOMATIC DOOR STAIR TO BELOW ROOF ABOVE STREET/LOWER CONCOURSE OVERLAY PLAN

Option 1 Ben Nobleman Park Pavilion

Option 2 Ben Nobleman Park Green Roof Artistic Interpretation of Study Area

Option 2 Ben Nobleman Park Green Roof Consists of a green roof structure designed so as to appear to grow out of the park s topography. It follows the pavilion concept in providing an entrance to the park and visibility to and from the park. The green roof s sloped structure will appear to be continuous with the park, but controls will be put in place to limit access onto the roof structure.

Option 2 Ben Nobleman Park Green Roof

Option 2 Ben Nobleman Park Green Roof FARE LINE AT LOWER CONCOURSE LOWER CONCOURSE AUTOMATIC DOOR STAIR TO BELOW ROOF ABOVE STREET/LOWER CONCOURSE OVERLAY PLAN

Option 2 Ben Nobleman Park Green Roof

Option 2a Ben Nobleman Park Green Roof - Facing Everden

Option 2a Ben Nobleman Park Green Roof Facing Everden Option 2a consists of the green roof structure, reoriented to open to the west at Everden Road, rather than to the east. This design eliminates the logia and entrance to the park in favour of a more compact footprint, and less impact to the park. It still provides the amenities of a south side entrance; the cost benefits of a more economical entrance; all the while integrating into the park to be much less noticeable from within the park.

Option 2a Ben Nobleman Park Green Roof Facing Everden

Option 2b Ben Nobleman Park Glass Box Artistic Interpretation of Study Area

Option 2b Ben Nobleman Park Glass Box Option 2b consists of a simple rectangular volume entrance located at the north west corner of Ben Nobleman Park. The concept is to have a structure that is very open; almost transparent. It has continuous glazing on four sides permitting visibility from the street to the park, and from the park to the street. The mullions recall the arboreal nature of the park. The structure is located as far north west as possible to avoid impacting the existing Community Orchard as much as possible. Entry is directly from the Everden Road sidewalk located on the west side of the building as shown in the rendering below.

Option 2b Ben Nobleman Park Glass Box Update with Glass box from pa

Option 2b Ben Nobleman Park Glass Box FARE LINE AT LOWER CONCOURSE LOWER CONCOURSE ROOF ABOVE STAIR TO BELOW AUTOMATIC DOOR STREET/LOWER CONCOURSE OVERLAY PLAN

Option 2b Ben Nobleman Park Glass Box

Option 3 Division 13 Police Station Parking Lot Artistic Interpretation of Study Area

Option 3 Division 13 Police Station Parking Lot Option 3 consists of a south side entrance similar in design and material to the east and west entrances within the Division 13 Police Station parking lot. The entrance is located further south than the park side options due to the presence of utilities running on the south of Eglinton Avenue that must be avoided. The concept is similar to the North East Entrance in that it provides an entrance structure that can be easily incorporated into any future development of the site.

Option 3 Division 13 Police Station Parking

Option 3 Division 13 Police Station Parking FARE LINE AT LOWER CONCOURSE LOWER CONCOURSE STAIR TO BELOW AUTOMATIC DOOR STREET/LOWER CONCOURSE OVERLAY PLAN ROOF ABOVE

Option 3 Division 13 Police Station Parking

Option 4 Division 13 Police Station Glass Box Artistic Interpretation of Study Area

Option 4 Division 13 Police Station Glass Box Consists of a Glass Box design for the south entrance. The minimal sized entrance can be easily removed in the future so as to offer greater flexibility in design for future developments on the site while still maintaining an entrance.

Option 4 Division 13 Police Station Glass Box

Option 4 Division 13 Police Station Glass Box FARE LINE AT LOWER CONCOURSE LOWER CONCOURSE STAIR TO BELOW AUTOMATIC DOOR STREET/LOWER CONCOURSE OVERLAY PLAN ROOF ABOVE

Option 4 Division 13 Police Station Glass Box

OPTION O - No South Side Entrance Option 0 No South Entrance Advantages 1.No interference with existing utilities 2.More available space for the proposed utility relocates and construction staging area. 3.No impact in Ben Nobleman Park or 13 Division Police parking lot. Disadvantages 1.No Southern Entrance into Eglinton West (Allen) Station. 2.Pedestrians must cross Eglinton West to enter station West (Allen) Station. Prelim Additional Construction Cost based on Concept Excludes Contractor fees/overhead None no south entrance

Options 1, 2/2A & 2b Ben Nobleman Park Options Ben Nobleman Park Options Option 1 Park Pavilion 88 sq. M. ground floor area 120 sq. m. stair construction Option 2/2a Park Green Roof Pavilion 88 sq. M. ground floor area 120 sq. m. stair construction Option 2b Park Glass Box 60 sq. M. ground floor area 150 sq. m. stair construction Advantages (all Park Options) 1. Excellent access for people from south side of Eglinton West. 2. This location should capture 100% of the pedestrians south of Eglinton West. The green roofs in Option 2&2A integrate the building into the park. 2A and 2B face Everden. 2B smallest surface footprint 3. Entrance potentially serves as additional amenity to the community. 4. No major interference with existing or relocated utilities. 5. Lighting, safety, and security potentially improved within Ben Nobleman Park. Disadvantages (all Park Options) 1. Requires public park land at Ben Nobleman 2. Tree impacts TBD (replacement would be done based on City policy.) Prelim Construction Cost based on Concept Excludes Contractor fees/overhead Option 1 2.6MM Option 2/2a 2.4MM Option 2b 2.6MM

Options 3 &4 - Police Station Parking Lot Division 13 Police Station Parking Option 3 13 Division South Entrance 81 sq. M. ground floor area 146 sq. m. stair construction Option 4 13 Division Glass Box 81 sq. M. ground floor area 146 sq. m. stair construction Advantages 1. Provides south entrance without impacting Ben Nobleman Park. 2. Excellent south access into station. 3. Allows for future development to have access to station. Disadvantages 1. Significant conflict between proposed stairwell and relocated sanitary and storm sewers. 2. 3 parking spots lost for Option 3 and 14 spots lost for option 4. 3. Severe police mobility disadvantage for option 3 due to elimination of police vehicles direct access to Eglinton West Ave. Prelim Construction Cost based on Concept Excludes Contractor fees/overhead Option 3 3.4MM Option 4 3.2MM

The Crosstown Team Please Get in Touch with Us! Franca Di Giovanni, Devin Horne, Denise Jayawardene E-mail: eglintontransit@ttc.ca Online: www.thecrosstown.ca Tel: 416-338-6310 Fax: 416-397-8193 TTY: 416-481-2523 Please Visit our Community Office At 1848 Eglinton Avenue West (at Dufferin) ( Community Office Hours 2012 Monday, Wednesday, Friday: 9:00 a.m. 5:00 p.m. Tuesday & Thursday Please contact us for an appointment

Allen Road Thank you!