SOP: LFA SOP For Alu Blister Pack Machine

Similar documents
SOP: LFA SOP For Automatic Capsule Filling Line

SOP: LFA SOP For Automatic Capsule Filling Machine

Bliss Box Former Troubleshooting. 6.1 Troubleshooting Chart. Troubleshooting INTRODUCTION SAFETY PROCEDURES

FD Heavy Duty Feeder for FD 280 Tabbing System

CERTI CRIMP Hand Crimping Tool is used to crimp the closed end splices onto the wire sizes listed in Figure 1.

VT-DESOL2 DESOLDERING STATION DESOLDEERSTATION STATION DE DESSOUDAGE ENTLĂ–TSTATION USER MANUAL GEBRUIKERSHANDLEIDING MANUEL D'UTILISATION

HP 1200,1300 CARTRIDGE REMANUFACTURING INSTRUCTIONS

PREXIMA THC TABLET PRESS MACHINE

RTP9 ROTARY TABLET PRESS USER MANUAL

Seidenader. for Tablets and Capsules

TA-12/HT12 Tabber. OPERATING GUIDE Revised:

ANNEXURE-A SPECIFICATIONS FOR HOT MIX PLANT

SECTION ELECTRICAL IDENTIFICATION

This instruction sheet covers the Hand Crimping Tools listed in Figure 1, which are used to crimp the terminal types listed in Figure 2.

TA-12. Tabbing System USER'S GUIDE

MODEL PR16 POWER ROTARY

STANDARD LEVEL 1 PROCEDURE

HEDMAN DI-50. Endorser Instructions. Hedman DI-50 Operators Guide

LTP50 TABLET PRESS USER MANUAL

Easy-Lam School Budget Roll Laminator

Product instruction manual Easymount Wide Format Laminators

Reasons for reissue are provided in Section 6, REVISION SUMMARY. Figure 1. Figure 2

1. STANDARD CONTINUOUS LAMINATING MACHINE FOR THE PRODUCTION OF FLAT WALL PANELS

ASG EZ-9000GR Tape Dispenser User Manual ASG #66136

E Labelers Wraparound Labeling for Cylindrical Containers

Standard Test Method for the Evaluation of Texture Appearance Retention of Carpets for Minimum Carpet Standards Program 1. Scope

SEAL EP42 OWNER'S MANUAL

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

STANDARD OPERATING PROCEDURE FRIABILITY TESTER WITH ABRASION DRUM

XEROX WORKCENTER

Tablet press PT1090 WIP Washable and flexible

INDIVIDUAL DRIVE, CHAIN DRIVE AND U- SEAL MECHANISM IN ROLLER HEARTH NORMALISING FURNACE

Ventura MC Book Sewing Machine. Perfect thread sewing at highest production efficiency

Reasons for reissue are provided in Section 6, REVISION SUMMARY.

SuperKlean Washdown Products

WSD 1734 Issue 4 Automotive 150 C Rated MPCB Cable Specification

SPECIFICATIONS: FIREGUARD CROSS CORRIDOR CC

OTO BONDER OWNER S MANUAL WITH CIRCULATING SYSTEM MACHINERY DIVISION - - L to R Unit Shown

Mfg For : FOIL, PAPER & FLEXIBLE PACKAGING MACHINERY

Crimping machine RC AS Operating instructions

OPERATING MANUAL Gfp 255C Please read this manual carefully before operating!

fi-4530c & fi-5530c CONSUMABLE REPLACEMENT

Caution PROTECT YOUR FACTORY WARRANTY!

OPERATING INSTRUCTIONS MIGHTYLAM 2700 ROLL LAMINATOR

DOCUMENT CREASING MACHINE

45 Wide Format Hot and Cold Laminator

Owners Manual. SM-HP A SM-HP8-10 Meter. Manual D

FORMATIC Instruction Manual

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

XC-18. NOTE: *Machine shown without Lift-Up Safety Guard. This guard is included with machine. Machine should not be operated without this guard.

SD Industries.

PRODUCT SPECIFICATION FireMaster NVS Horizontal Simplex

HEDMAN The HEDMAN Company 189 Gordon St. Elk Grove Village, IL

FORMATIC Instruction Manual

INTERNATIONAL MACHIINE CONCEPTS. Operating Manual. Tablet Counting and Filling Machine. Model IMC

STOKES PACER' TABLETTING PRESS

Cleaning Kit Instructions - DTC550 Printer

OPERATING MANUAL Gfp 800 Series

MES COURSE MODULES IN TEXTILES COTTON SPINNING

A. Product Data: For each electrical identification product indicated. B. Comply with 29 CFR and 29 CFR

Semi Auto Multiple Shrink Wrapping Machine

OWNERS MANUAL. Minikote EZ

INSTALLATION and OPERATION BALL WASHER MODEL NO: BW-022

Kimseed Seed Cleaner

CBT LW MAINTENANCE GUIDE

User Manual for ICB Meat Grinders Models HM-12, HM-22B

Cleaning (Preventative Maintenance) on the magicolor 2400 Series

WASHER/DRYER CONTROL PANEL PARTS

OPERATING AND SETTING MANUAL

SPECIAL SPECIFICATION 2242 LATH, STUCCO AND PLASTER

WATER POWERED OSCILLATING MONITOR

Roll Heated Flatwork Finisher

MAINTENANCE MANUAL TAIYO SEIKI CO., LTD.

Fiber Optic Connector Cleaning and Inspection Kit Instructions

SPECIFICATION DELETED SECTION CENTRIFUGAL HVAC FANS

UPPER FUSING HEAT ROLLER REPLACEMENT

2How does a vibratory fluid-bed dryer work?

OPERATING & SERVICE PARTS MANUAL HDS-215 COMBINATION SHRINK SYSTEM

Product instruction manual Easymount Wide Format Laminators

PREPARED BY: Jeff Geraci, Environmental Scientist I. REVISED BY: Kristina Davis, Environmental Scientist III

HAWK GAS STOVE. Installation and Servicing Instructions

Integrated Packaging Systems, Inc.

Maintenance. Maintenance

PRODUCT SPECIFICATION FireMaster Plus

Mastech Machinery.

5KSMPRA, 5KSMPSA W B_01_EN_v02.indd 1 3/4/16 3:59 PM

TLA-1245 EFFICIENT HEAT CYCLE SHRINK TUNNEL OPERATION MANUAL

Gfp 400 Series August Gfp 463 TH. Please read this manual carefully before operating!

ASTRO ENVELOPE FEEDER AMC FOR HEIDELBERG PRINTMASTER INSTALLATION AND OPERATING INSTRUCTIONS

HE360 Humidifier Installation Kit

REFRIGERANT PIPING

Technical Documentation G.Mondini S.p.A. Tray Sealer TRAVE-384

c. Oko-Tex (European environmental health standard)

ANSI Z50.1. Safety Standards. In this standard the following definitions shall apply:

Product instruction manual Easymount Wide Format Laminators

Softgel Encapsulation System

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Fully automatic, pneumatic machine to install eyelets and washers

1. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for detention furniture.

WASHER/DRYER CONTROL PANEL PARTS

Transcription:

SOP For Alu Blister Pack Machine Alastair Sanderson 31/08/16 1 Objective To provide a guideline for operating the Alu blister pack machine 2 Scope Applicable to Alu-Alu blister packing machine in production department 3 Responsibility By Operator (execution) By Production Pharmacist and Above (checking) 4 Accountability Head of the Department for Production/Assigned Designee 1

5 Procedure 5.1. Check the cleanliness of the area especially of the machine. Switch the compressed air supply on. 5.2. Switch the main electrical supply on. 5.3. Switch the cooling unit on. 5.4. Switch the Sealing Heater and set the temperature between 180 C to 200 C. 5.5. Set the knob switch to the starting speed. 5.6. Switch the electric supply on and press both clean button on. 5.7. Check and ensure that the punching unit is clean and lubricated. 5.8. Attaining the operating temperature: 5.8.1. Start the machine for fresh blister web. 5.8.2. Stop the machine and insert aluminium foil for sealing. 5.8.3. Insert a sealed web in the punching unit. Check the web tension located behind the indexing roller. 5.8.4. Start the machine and adjust the idler roller of the BCP unit to get uniform overprinting. 5.8.5. After the batch printing, engage the tablet-feeding unit. Open the gate for filling tablets after 2 revolutions of blister forming rollers. 5.9. Base Laminated Foil Change: 5.9.1. Before the roll ends, stop the tablet feeding. 5.9.2. Stop the machine and then reduce the speed setting. 5.9.3. Disengage the idler roller to stop printing. 5.9.4. To change the base laminated foil, do a lap joining. 5.9.5. Start the machine with PRC. 5.9.6. Switch the machine on until the joint reaches the indexing roller. 2

5.9.7. Insert the web into the punch while checking that the joint is outside the punch, 5.9.8. Start the tablet feeding. Once running is smooth, increase the speed. 5.10. Aluminium Foil Roll Change: 5.10.1. Switch the tablet feeding off. 5.10.2. Switch the machine and reduce the speed. 5.10.3. Switch the PRC off. 5.10.4. Stop the printing unit. 5.10.5. Measure the previous roll position and change the rolls. 5.10.6. Load the foil through the BCP unit and the sealing roller. 5.10.7. Set the PRC operation. 5.10.8. Check to make sure that the foil path is straight and even. 5.10.9. Switch the machine and PRC on. 5.10.10. Remove the unsealed aluminium foil. 5.10.11. Check the printing operation and foil path between guide covers 5.10.12. Adjust the BCP pressure roller for the printing. 5.10.13. Start the tablet feeding and then gradually increase the speed once the operation is smooth. 5.11. Machine Stopping Procedure: 5.11.1. Switch the tablet feeding off; make sure that there are no loose tablets in the hopper. 5.11.2. Switch the machine and shut off the printing after the packed tablets are out of the machine. 5.12. Machine Shut Down Procedure (follow the guide as per 5.11): 5.12.1. Switch the electronic off. 5.12.2. Switch the sealing heaters off. 5.12.3. Remove the dust from the tablet channel feeders. 3

5.12.4. Clean the rollers and BCP printing drum do not disassemble the drive gears. 5.12.5. Use a brass brush to clean the sealing roller. 5.12.6. Switch the compressed air supply off. 5.12.7. Turn the compressed air supply off. 5.12.8. Close the Isolator off. 5.12.9. Switch the Mains off. 5.13. Note: Check that there is water circulation before starting the machine. Check the cooling of the blister-forming roller. Do not use the sealing roller without an aluminium foil. Frequently remove the water that is collected in the moisture trapper. Do trial runs until satisfactory stripping is observed before doing the actual packing operation. Documented and written line clearance should be obtained from the QA personnel before doing any blister packing or any changeover of different product to a new one. If on lunch or break, check that there are no tablets left in the feed channel. Any leftover can cause spoilage. To start the machine, try out several blank blisters to make sure that proper overprinting of the batch details from the Coda reel in the plain foil is observed. After, commence doing regular blistering. During the trial run, collect all the blisters and send out to be de-foiled immediately. 5.14. Check the blister during operation or intervals for any sign of leakage. 5.15. Once operation is done, fill out the Equipment Log Book; 4

6 Abbreviations SOP Standard Operating Procedure IPA Isopropyl Alcohol BPR Batch Packing Record QA Quality Assurance 5