Bold items are particular to the City of Euless

Similar documents
Rancho Cucamonga Fire Protection District Prevention Bureau Standard

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

FIRE & LIFE SAFTEY STANDARD

1.3 REFERENCE STANDARDS

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

International Fire Code 2006 Requirements for Construction Plan Reviews of Commercial and Multi-Family Structures

Brighton Area Fire Authority

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Fire Alarm, Water Flow Alarm & Signaling Systems

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

You are required to READ ALL PAGES. of this application

Florida Building Code 2010

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Type of Fire Alarm Control Panel: System is: Existing OR New If new, provide Electrical Permit Number:

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

THIS ORDINANCE ONLY AFFECTS EXISTING FIRE ALARM SYSTEMS.

AUTOMATIC FIRE SPRINKLER SYSTEMS

SECTION : FIRE ALARM & DETECTION SYSTEMS

2. HVAC and smoke control systems; fire, smoke, and combination fire/smoke dampers. 5. Central control and monitoring system.

New Construction Fire Inspection Process

FIRE ALARM SYSTEMS INFORMATION PACKET. Des Moines Fire Department Fire Prevention Bureau

Table of Contents CHAPTER 10 ADMINISTRATIVE RULES FOR CERTIFICATION OF CHILD CARE FACILITIES FIRE STANDARDS FOR FAMILY CHILD CARE HOME

NFPA 72 Code Changes vs 2013

Project No Belleville Fire Hall/Headquarters and Emergency Operations Centre Section Belleville, Ontario Page 1 of 10

FIRE PREVENTION OFFICE Placer Hills Fire Protection District NEW PROJECT GUIDELINES

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Valuation: # of Plans Submitted: # of pages: Type of Work (select one): New Addition Existing System/Modification Project Name: Scope of Work:

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

H BUTCH BROWNING FIRE MARSHAL BUILDING REHABILITATION

September 30, Dear Fire Suppression System Contractor/Designer:

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU PLAN REVIEW CHECKLIST FIRE ALARM SYSTEM INSTALLATION

FIRE ALARM PLAN REVIEW PERMIT REQUIREMENTS

COUNTY OF KINGS KINGS COUNTY JAIL EXPANSION PHASE III

Smoke Detector Activation of any smoke detector shall start the alarm verification mode.

Date Issued: December 14, 2017 Revision: 2.1

2012 OBC Changes. Summary of key changes to Life Safety and Fire Protection Systems for CFAA January 22, 2014

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

The following information shall become and form part of the contract documents.

Fire Alarm Acceptance Testing & On-Going Maintenance with The Joint Comm. Standards / Reporting. Prepared Especially for : OSFM TEC 2016

APPENDIX H (DESIGN SUBMISSION CRITERIA)

El Reno Fire Department Fire Alarm Plan Review Worksheet

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

780 CMR: STATE BOARD OF BUILDING REGULATIONS AND STANDARDS

Unified Fire Authority - Fire Prevention Bureau

Large Family Daycare Guideline

BULLETIN. Permitting Tips (11/10)

May 1, Dear Fire Suppression System Contractor/Designer:

HIGH-RISE RETROFIT ORDINANCES - NO and NO

Rocky Mountain Fire Protection District 4390 Eldorado Springs Drive Boulder, CO

FIRE CODE. Coal City Fire District International Fire Code Update. 35 S. DeWitt Place Coal City, IL

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

SECTION 907 FIRE ALARM AND DETECTION SYSTEMS

Fire - Rescue. November 2016

CHAPTER LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE, 2000 EDITION SECTIONS

FIRE ALARM SYSTEM 1.1 GENERAL REQUIREMENTS

Standard of Practice - Fire Alarm Systems. NOTE: Significant revisions or additions to the previous standards are highlighted in italics.

Full Service Central Station Fire Alarm Listing Evaluation

MINOOKA FIRE PROTECTION DISTRICT Fire Prevention Bureau Fire Inspector Rodney Bradberry

a) Establishment of emergency procedures to be followed at the time of an emergency;

WEST VIRGINIA UNIVERSITY

SPECIAL AMUSEMENT OCCUPANCIES HAUNTED HOUSE, SCARE HOUSE OR MAZE

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

Fire Sprinkler Plan Submittal Form

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

SPECIFICATION FOR A TOTAL FLOOD ECARO-25 TM CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE CHEETAH Xi 50 CONTROL PANEL SYSTEM

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

Commercial Remodel/ Add On Rules and Regulations

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL

SECTION WET-PIPE SPRINKLER SYSTEMS

2018 NICET Code Transition Changes

Residential-based Care Facility R-4 Guideline

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

FIRE ALARM APPLICATION CITY OF MADISON HEIGHTS

Fire Alarm System Inspection and Testing Report

CALIFORNIA DEPARTMENT of FORESTRY and FIRE PROTECTION OFFICE OF THE STATE FIRE MARSHAL UL 300

SECTION FIRE ALARM SYSTEMS

Clark County Department of Building & Fire Prevention 4701 West Russell Road, Las Vegas, NV (702) FAX (702)

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

Design & Construction Standards, Revised January

Agency for Health Care Administration

MAINTENANCE OF FIRE PROTECTION DEVICES WITHIN RESIDENTIAL SUITES OF MULTI-FAMILY BUILDINGS

For additional information regarding R-3.1 residential care facilities please contact (951)

S a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

Transcription:

EULESS FIRE DEPARTMENT FIRE MARSHAL S OFFICE INFORMATION LINE: Revised 8/2004 Fire Chief Lee Koontz Fire Marshal Paul Smith EFD-FMO 3-1 2003 International Fire & Building Code as Amended NFPA Standards Adopted BASIS FOR REQUIREMENTS Rules & Regulations adopted by the State Board of Insurance and the State Fire Marshal s Office. 2003 International Codes Applicable NFPA Standards. 1. NFPA 70 National Electric Code 2. NFPA 72 National Fire Alarm Code 3. NFPA 13 Installation of Sprinkler Systems 4. NFPA 90A Installation of Venting Systems 5. NFPA 90B Installation of Heating & Air Conditioning. 6. NFPA 101 Life Safety Code SCOPE This document is designed to assist you in designing and testing a fire alarm system or component thereof in the City of Euless. It is not intended to supplement other available standards and codes related to this topic. Call 817-685-1600 if you have any questions specific to your project. Bold items are particular to the City of Euless GENERAL REQUIREMENTS ALL SYSTEMS APPROVAL The Fire Marshals office shall be notified prior to any installation or alteration of equipment on a fire alarm system. Complete information regarding the system or system alterations, including specifications, wiring diagrams, location of equipment and floor plans shall be submitted for approval. A permit is required for most fire alarm installations or alterations. OBTAINING PERMIT Permits must be applied for and issued in the name of the licensed installing company. Any portion of the installation, which is not a part of the applicant s contract, must be clearly noted in the submittal outline. Unless specifically exempted, the contractor of record will be held responsible for all aspects of the fire alarm system installation. Prior to issuance and commencement of any work, three (3) copies of detailed plans, pertinent product cut sheets, battery calculations, voltage drop calculations and any other required information for review shall be submitted to Fire Administration at 201 N. Ector Dr. All permit fees must be included with your application at the time of submittal. Permit fees are based upon the value of the work to be performed. Permit fees for your job may be obtained by calling 817-685-1600. Plans shall be standard blueprint quality and have been prepared by a State of Texas registered engineer, planning superintendent or NICET qualified designer. Plans shall include all information listed in the current edition of NFPA 72 and have a title box with name and address of installation location and the name, address, and phone number of installing company. Plans shall be signed and sealed by the designer with an original signature on one set. When a third party engineer is utilized, he shall provide a submittal letter indicating that he is working as an agent of the licensed contractor and specify their field of expertise. Page 1 of 2

NOTE: Plans drawn atop of building plans, electrical, mechanical, etc., will not be accepted for review. LOCAL AMENDMENT RELATED TO GROUP E OCCUPANCIES: Group E. A manual fire alarm system shall be installed in Group E educational occupancies. When automatic sprinkler systems or smoke detectors are installed, such systems or detectors shall be connected to the building fire alarm system. An approved smoke detection system shall be installed in Group E day care occupancies. Unless separated by a minimum of fifty (50) feet open space, all buildings, whether portable buildings or the main building, will be considered one building for alarm occupant load consideration and interconnection of alarm systems. Exceptions: a) Group E educational and rooms in day care occupancies that are not used for sleeping purposes and with an occupant load of less than 50 when provided with an approved automatic sprinkler system. b) Residential In-Home day care with not more than 12 children may use interconnected single station detectors in all habitable rooms. (For child care of more than five children 2 ½ or less years of age, see Section 907.2.6.) SUBMITTAL OUTLINE All plans must be accompanied with a submittal outline. The submittal format is included with this document. NOTE: Permits issued AFTER THE WORK HAS BEGUN will be assessed at double the combined permit fee. Definition of work being done is the installation of any part of the fire alarm system, including conduit and back box, whether it is being done by the primary contractor or his subs, prior to this office issuing a permit for installation of the fire alarm system. MINIMUM REVIEW TIME The contractor submitting plans for review should allow a minimum of seven (7) working days for the review process. Upon completion of the plan review a stamped REVIEWED set of plans and comment review sheet from the Fire Marshal will be returned to the contractor. The comment sheet will detail the status of the review. PULL STATIONS Manual Pull stations shall be double action. ACCEPTANCE TESTS Upon completion of an installation or alterations, a satisfactory audit of the system shall be made by the licensed technician of records, in the presence of a representative of the Fire Marshals office. The alarm contractor shall be responsible for providing all equipment necessary to perform a complete functional test ( i.e., radios, ladder, testing tools, etc). All functions of the system shall be tested including operation of the system in various alarm and trouble modes for which it was designed. ( i.e., open circuit, grounded circuit, commercial power failure, etc.) If the system is monitored, all equipment functions and signal responses will be tested as well. Duct detectors will be tested as approved by the manufacturer. Smoke detectors shall be tested in accordance Page 2 of 8

with manufacturers recommendations. The fire alarm contractor shall be responsible for arranging and contacting all parties involved in the acceptance test. In occupied buildings the alarm contractor shall notify all building occupants of the fire alarm test prior to the scheduled arrival of the fire inspector. REQUIRED DOCUMENTATION FOR ACCEPTANCE TEST The following items of documentation shall be provided prior to the beginning of the acceptance test: a. Fire alarm installation certificate, properly completed and signed. b. Letter of installation, per City code. c. Fire alarm system installation inspection form, required by State rules. d. Fire alarm installation record label, required by State rules. INSTALLATION A. A set of as-built drawings showing details of system wiring and control panel terminal identification with function information shall be provided to the owner when installation is complete. Any subsequent modifications, additions or alterations shall be legibly noted on updated drawings. These drawings shall remain at the business location and shall bear the signature of a licensed fire alarm planning superintendent, his license number and date of installation. Complete instructions on the operation of the system shall be provided at the control panel. B. The primary fire alarm contractor shall provide and install a framed or laminated VISUAL ZONE MAP in accordance with the following guidelines: 1. Map shall show a black line footprint of building, minimum size shall be 10 x 14. 2. Zones shall be both numerical and color-coded, using solid coloring or colored zone boundaries, if applicable. 3. Fire zones will be defined by common geographical boundaries, floor levels, or other subdivisions approved or required by this authority. 4. Zone map shall show location and type of each device. Addressable systems shall show device address numbers as well. EXCEPTION: Single device zones such as water flow, supervisory/tamper valve, fixed hood extinguishing systems, etc., may be identified by a numerical zone reference. C. All installations shall be in accordance with the State of Texas, the current adopted edition of the International Fire Code, appendixes and adopted amendments of the fire code, this document and the current editions of the following National Fire Protection Association (NFPA) Standards and References: 1. NFPA 70 National Electric Code 2. NFPA 72 National Fire Alarm Code 3. NFPA 13 Installation of Sprinkler Systems 4. NFPA 90A Installation of Venting Systems 5. NFPA 90B Installation of Heating & Air Conditioning 6. NFPA 101 Life Safety Code STATE INSTALLATION CERTIFICATE Upon completion of an installation and prior to requesting acceptance test by this office, the Fire Alarm Planning Superintendent or Alarm Technician shall properly post a completed State Certificate of installation form as prescribed in the State Fire Alarm Rules and provide a copy to the Euless Fire Department. Page 3 of 8

LETTER OF INSTALLATION CERTIFICATION At the completion of the installation and prior to requesting an acceptance test, the permitted contractor of record shall provide this office with a letter of certification. The letter shall include the following information and may be required to be notarized: 1. Letter shall be on company letterhead. 2. Letter shall indicate the business name and complete address of the installation location. 3. The letter shall include the following typed statements: This document is to certify that the Fire Alarm System at the above address has been designed and installed in accordance with all applicable NFPA standard(s) (identify applicable NFPA standard(s) you are following), City of Euless and State of Texas codes and requirements. 4. Letter shall be signed by the signature of a company executive, alarm planner or engineer planner if applicable. NOTE: This letter will become a permanent record on file as to the installation standard. POWER CIRCUIT SURGE PROTECTION In addition to any built-in surge protection of the fire alarm panel, Each fire alarm panel and power supply panel shall have an added surge protector installed in addition to the surge protector which is built into the panel. The secondary surge protection device must be installed in such a manner that it is isolated a minimum of two (2) feet from the panel as measured along the route of electrical travel. If data lines run between separate buildings data line surge/spike protection is required on each data line where the line enters and/or exits each building. DUCT DETECTION All duct detection devices shall be powered by the fire alarm control panel for primary and secondary power supply. In addition, each duct detector shall be CFM rated for its intended use. The duct detectors shall be resettable from the fire alarm panel, and give a supervisory signal at the fire alarm panel. WIRING METHODS A. All runs of installation wiring (both notification and initiation) shall be continuous and shall not be spliced except in approved junction or splice boxes. These boxes shall remain accessible for inspection. Wiring shall be separated by a minimum of one foot vertically and six feet horizontally. B. Fire alarm wiring for alarm initiating and notification appliance circuits shall be Class A arranged for operation with a single open or ground fault, or the removal of single device. Refer to NFPA 72 for appropriate wiring on Class A circuit. C. Wiring shall be run in a workman like manner. D. Multi building complexes shall have a main fire alarm panel at a location approved by the Fire Marshal. All other panels shall report back to the main panel. Exception: unless otherwise approved by the Fire Marshal. UNDERGROUND WIRING Underground wiring shall be used only for the purpose of signal transmittal. No power circuit wiring will be allowed. Wiring shall be a listed waterproof underground fire alarm wire, and shall be placed in conduit. FIRE ALARM SYSTEM POWER SERVICE Connections to light and power service shall be on a dedicated branch circuit. The circuit disconnecting means shall be accessible only to authorized personnel and shall be marked as FIRE ALARM CIRCUIT CONTROL in a red color with a material that will not easily peel off. Page 4 of 8

ALARM CONTROL PANEL Alarm control panels shall be of a size and type capable of handling the full potential of the building, whether the building is fully built out or not. Alarm and communicator panels shall be located in the main entry area. Fire alarm panels shall not need a tool, enable key, password, or other such knowledge or device to reset, or silence, with the exception of the fire alarm box panel key to open the door. EXCEPTION: With approval of the Fire Marshal, panels may be located in other areas if a suitable remote annunciator is provided in its place. Alarm Systems with fifty or more initiating devices: All alarm systems new or replacement serving fifty (50) or more initiating devices shall be addressable fire detection systems. Alarm systems serving more than seventy-five (75) smoke detectors or more than two hundred (200) total initiating devices shall be analog intelligent addressable fire detection systems. SIGNAL INITIATING CIRCUITS All installation wiring for signals initiated by the operation of fire alarm boxes, fire detectors or other appliances or devices, which initiate or transmit signals either manually or automatically shall be a supervised Class A circuit. AUDIBLE ALARM NOTIFICATION CIRCUITS All installation wiring for operating audible alarm indicating appliances shall be electrically supervised as a Class A circuit. AUDIBLE SIGNAL APPLIANCES Audible signal appliances employed in fire alarm systems for alarm, supervisory, and trouble signals shall be of a suitable type for the particular application and location, so as to provide protection from the effects of vermin, temperature, humidity, corrosion and other physical damage. External weatherproof audio/visual device(s) shall be installed at a location approved by the fire code official. All visible and audible notification devices shall be of a type approved by the fire code official and shall have the word Fire on the device when received from the manufacturer. DISTRIBUTION OF AUDIBLE SIGNALS Fire alarm systems provided for evacuation of occupants shall have one or more audible signaling appliances approved for the purpose on each floor of the building, so located that their operation will be heard clearly regardless of the maximum noise level from machinery or other equipment under normal conditions of occupancy and spaced as per NFPA 72. One or more signals shall be installed on the exterior of the building. All systems will be tested for compliance with NFPA sound level requirements by use of a sound decibel meter. In buildings equipped with a sprinkler system, an audio visual device is required in each occupied space to alert occupants that the sprinkler system has activated. SMOKE DETECTORS All new installations shall use only smoke detectors listed as capable of electronic sensitivity testing or those equipped with onboard sensitivity testing. Smoke detectors installed in hotels, motels, and apartment buildings shall be photoelectric only; ionization detectors are not acceptable. Sensitivity testing shall be done as required per NFPA 72. Page 5 of 8

DISTINCTIVE SIGNALS Audible signal appliances for a fire alarm system shall produce signals, which are distinctive from other similar appliances used for the purposes in the same area. The distinction among signals shall be as follows: 1. Fire alarm signals shall be distinctive in sound from other signals and this sound used for no other purpose (usually 15 db s over ambient noise level). 2. Supervisory signals shall be distinctive in sound from other signals and this sound shall not be used for any other purpose except that it may be employed to indicate a trouble condition. 3. Fire alarm, supervisory and trouble signals shall take precedence over all other signals. 4. Authority having jurisdiction shall have final approval concerning signal identification. (Temporal) VISUAL ZONE/ALARM INDICATION A. Alarm zones shall be indicated by building, fire zone, devices, or other subdivisions as approved or required by this authority. The visual indication shall not be canceled by the operation of an audible alarm-silencing switch. B. Where duct detection devices are concealed and alarm indication is not apparent, compliance shall be met as follows. 1. Remote LED indicators shall be installed in the ceiling directly below the air handling unit, and have the zone or address labeled on it. C. Kitchens equipped with fixed hood fire protection shall be connected to the alarm panel and initiate an alarm by separate zone. D. Alternative fire protection systems shall be connected to the alarm panel and initiate an alarm by separate zone. E. Sprinkler system supervising switches shall be on a separate zone. F. Water flow switches shall be on a separate zone. MONITORING OF FIRE ALARM SYSTEM When alarm systems are monitored, the provision for equipment, installation and monitoring service shall be addressed in the submittal package. Note that the 2003 IFC requires monitoring of most systems. EXCEPTION: When the alarm control panel and monitoring equipment are installed by separate contractors, both shall be submitted and permitted separately. Permits will only be issued after a completed review of both systems. In buildings with automatic sprinkler systems, communicators shall send four (4) basic signals: 1. General fire alarm 2. Water flow alarm 3. Supervisory/Tamper valve 4. General trouble condition LOCAL FIRE ALARM SYSTEMS ONLY Local protective signaling systems whose main purpose is to provide an evacuation alarm for the occupants of the building and the system is not required to be monitored by a monitoring service shall have, at the location of each pull station, wording on a red laminated plate with white letters, a minimum of one-fourth (1/4 ) inch stroke as follows: LOCAL ALARM ONLY MUST DIAL 9-1-1 TO REPORT FIRE EMERGENCY SUBMITTAL FORM OUTLINE Page 6 of 8

DESCRIPTION OF SCHEDULED EQUIPMENT AND COMPONENTS NOTE: A description of alarm system equipment, number of components and operation shall accompany the detailed plans in the following format. All items shall be UL or FM listed for their intended use and compatibility with other system components. I. HEADING INFORMATION A. A name and address where installation is to take place. B. Provide copy of that portion of contract that defines full scope of work and materials. II. APPLICABLE CODE STANDARD THE INSTALLATION IS TO FOLLOW; (I.E., CENTRAL STATION FIRE ALARM SYSTEM, NFPA 72, 1993 EDITION, SECTION 4-3. i.e. - Installation will be certified by Acme Alarm and Monitoring Service, Cross-Roads, Texas 1234, Main St., Ph. 817-555-5555.) III. ALARM INITIATING DEVICES A. Indicate the type and amount of initiating devices to be installed, and location within building or complex. B. Duct detection and systems operation. IV. ALARM INDICATION A. Location of all devices. B. Type of device Make and model of devices, manufacturer s brochure or certification number is to accompany submittal forms. C. Design level of audibility-sound level rating of device. D. Reporting provisions How the alarm is to be reported. E. Visual indication Features of visual alarm indicating devices. V. ELEVATOR RECALL Outline provisions for code compliance. VI. ALARM SUPERVISION A. Human Specify responsible party. B. Monitoring Service Company name, address, and phone number. Also, include name of company representative for account. Access code number to be provided at time of acceptance. If monitoring service is not known, or if it is to be installed by others, please indicate. VII. POWER SUPPLY AND CIRCUITRY A. Primary Power How received and marked. B. Secondary Power Back up system specifications and operations, including auxiliary connections for elevators, special egress controls, etc. C. Zoning Provisions Explain how system is to be zoned for easy recognition of alarm or trouble condition. D. Annunciation provisions. E. Control panel provisions. F. Schematic Drawings Detail wiring of system and zones. VIII. SYSTEM OPERATION SEQUENCE Provide system operation matrix. IX. TESTING AND MAINTENANCE PROCEDURES X. SYSTEMS ACCEPTANCE PROCEDURES XI. HIGH RISE PROVISIONS XII. DESIGNER/INSTALLER INFORMATION A. Company name B. Current copy of company state license C. Current copy of planning superintendent license D. Copies of brochures/pamphlets identifying major system components E. Wiring method and specific type of wire Page 7 of 8

PLANS AND SPECIFICATIONS Plans shall be drawn to a minimum of 1/8 th inch scale showing room dimensions, ceiling heights, room and area by use. Plan shall bear an equipment symbol legend and relevant North indicator. Plans shall indicate occupancy classification of installation and specify the type of system being installed as defined by NFPA 72. Page 8 of 8