Are You Prepared? The impending impact of Code on Servicing Security Systems

Similar documents
CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Fire Alarm Inspection, Testing, Maintenance. Assuring the System s Operational Reliability

Automatic Fire Alarm Association Webinar On Inspection, Testing, And Maintenance Of Fire Alarm Systems

Update all extract references to NFPA documents (including NFPA 72) in Chapter 3 and related annex material to the latest editions.

El Reno Fire Department Fire Alarm Plan Review Worksheet

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Florida Building Code Chapter 9 Fire Protection Systems Advanced Course

Proposed Changes to NFPA

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

F L O R I D A H O U S E O F R E P R E S E N T A T I V E S

MNEC NFPA 72 WHITE PAPER

Florida Building Code 2010

Report on First Revisions with Statement June 2014 NFPA 101

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Florida Senate SB 982 By Senator Bennett

STANDARDS UPDATE NOTICE (SUN) ISSUED: February 5, 2018

STATE FIRE MARSHAL S REQUIRED FIRE PROTECTION SYSTEMS NARRATIVE REPORT

CHAPTER Committee Substitute for Committee Substitute for Committee Substitute for House Bill No. 973

NFPA Siemens Industry, Inc. All rights reserved. usa.siemens.com/infrastructure-cities

THE 2012 EDITION OF THE LIFE SAFETY CODE NURSING HOME EDITION SESSION #2

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE

Questions/Comments for Richard Roux from Webinar on 7/11/13

FIRE SERVICE FEATURES

Changes to the 2018 Joint Commission Comprehensive Accreditation Manual for Hospitals (CAMH)

SECTION REGULATORY REQUIREMENTS. A. Relationship between Code, Ordinances, Standards and Contract Documents

Narrative Reports As Regulated by 780 CMR, Section 903.0

DTW Master Specification Section EMCS: Start Up, Verification and Commissioning

ALARM SYSTEMS AND EVACUATION PLANS SELF INSPECTION CHECKLIST

Audio Verification and Notification Procedures

SECTION SECURITY TESTING AND COMMISSIONING

TRI-LAKES MONUMENT FIRE PROTECTION DISTRICT

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

Developing a Healthcare Facility Fire Door Inspection Program

NFPA Changes

Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio un=l the Webcast begins

CAN/ULC-S1001, INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION & LIFE SAFETY SYSTEMS Simon Crosby, LEL, CET, CFPS October 21, 2015

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

FIRE & LIFE SAFTEY STANDARD

Procedure for the Approval of New Fire Detection and Alarm Technologies

NFPA 72 Code Changes vs 2013

FIRE SAFETY REQUIREMENTS FOR PRE RESIDENTIAL BUILDINGS OF THREE OR MORE STORIES (DOROTHY MAE ORDINANCE - NO. 158,963)

Operation & Maintenance Manual

9/20/2016 2:53 PM. Second Revision No NFPA [ Section No ] Supplemental Information. Submitter Information Verification

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION INTRUSION DETECTION

ELEVATORS. Integration of Codes between Fire Alarm, Sprinklers, and Elevators 12/5/2017

Changes in NFPA

Integration Test Plan

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

LOCAL AMENDMENTS TO THE INTERNATIONAL FIRE CODE 2006 EDITION

AMENDMENT NO.: III INVITATION FOR BID NO.: GPA FOR

Agency for Health Care Administration

The Technical Committee on Commissioning and Integrated Testing

FIRE SAFETY AND PREVENTION POLICY

Report on First Revisions with Statement June 2014 NFPA 101

The 2013 National Fire Alarm and Signaling Code

SECTION ELECTRICAL SYSTEMS COMMISSIONING

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

Medical Gas Inspections and Maintenance Programs. HESNI Annual Conference NIU Conference Center May 10-11, 2018 Presented by Mathis Carlson

Comprehensive Security for Banks and Credit Unions

Taming the Health Care Building Codes NFPA vs. The International and Chicago Building Codes JENSEN & HALSTEAD LTD.

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

Report on First Revision November 2013 NFPA 731

INSPECTOR I SKILLS ADMINISTRATION

Bold items are particular to the City of Euless

VERIFICATION OF FIRE ALARM SYSTEMS

MULTI-PHASED FIRE ALARM AND MASS NOTIFICATION SYSTEM UPGRADES: The Authority Having Jurisdiction (AHJ) and Proper Planning

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

2018 IFC Update. Based on the 2018 International Fire Code, (IFC ) Goal. Objectives. Content

MANUAL OF DESIGN CRITERIA AND SPECIFICATIONS FOR FIRE DETECTION AND ALARM SYSTEMS PUBLIC SCHOOLS IN NEW MEXICO

Agency for Health Care Administration

Delayed Action Closer. Mechanical self-closing device that incorporates an adjustable delay prior to the initiation of closing.

S 2758 S T A T E O F R H O D E I S L A N D

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC

4/18/2017. *2012 edition of NFPA 99 has gone through a major overhaul. *This document is now a Code.

Danilo B. Concepcion, CBNT, CCHT-A Operations Manager St. Joseph Hospital Renal Services

Resolution: FR-2-NFPA Statement: The new language requires the action completed by NFPA 557 be prepared by a person that is approved.

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

1.3 REFERENCE STANDARDS

September 1, Sincerely, Mike Montgomery Fire Marshal. M.S. Montgomery Fire Marshal

Fire and Smoke Door Inspections Qualified Training 02/03/17

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

PROPOSED REGULATION OF THE STATE PUBLIC WORKS BOARD. LCB File No. R102-11

Agency for Health Care Administration

Unified Fire Authority - Fire Prevention Bureau

Fire Protection Coffee Break Training May 2016

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

IN2 Lighting Control Devices

Chapter 4: Fire Protection Systems

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector Permit

ALARM SYSTEMS AND EVACUATION PLANS SELF INSPECTION CHECKLIST

Fire Protection System Contractors and Systems. Submission of the Application for a Water-Based Fire Protection Inspector

Cedar Hammock Fire Rescue Standard Operational Guidelines FIRE WATCH. General. Requirements for a Fire Watch

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

A. The requirements of this Section and the other Division 26, 27 & 28 Sections apply to all the video surveillance system work.

Transcription:

Sam Docknevich, PSP, Security Service Portfolio Manager Are You Prepared? The impending impact of Code on Servicing Security Systems Siemens AG 2015 All rights reserved. usa.siemens.com/infrastructure-cities

Share current and upcoming standards and show how they can positively improve your Security service program Agenda Guidelines, Standards, Laws and Regulations Developing a Security System Service Program NFPA 730 Guide for Premises Security, 2014 Edition NFPA 731 Standard for the Installation of Electronic Premises Security Systems, 2015 Edition NFPA 101 Life Safety Code, 2015 Edition Questions & Answers Siemens AG 2015 All rights reserved. Page 2

Guidelines, Standards, Laws and Regulations Describes a best practice for how Guideline ASHRAE 90.1 something should be done Code or Standard Law Prescribes behaviors that shall be followed in order to comply with the legal and regulatory requirements Prescribes behaviors that shall be followed in order to comply with the legal and regulatory requirements NFPA 70 E ADA, The Clean Air Act Regulation Dictates legally binding requirements that must be followed CFR 21 (Food & Drugs) Siemens AG 2015 All rights reserved. Page 3 02-27-2015 Sam Docknevich Siemens Building Technologies

The best practices in guidelines and standards provide a foundation for a Security Service Program Service Program Elements Governance Model Service Level Agreements Service Personnel Qualifications System Test Requirements Device Test Methods Inspection and Test Frequency Records and Reports Siemens AG 2015 All rights reserved. Page 4

NFPA 730 Guide for Premises Security, 2014 Edition The 2014 edition been revised to clarify some of the requirements of security planning, including the prioritization of risks identified in the SVA and the frequency of when to review and update the SVA. This edition has also included a graph that can be used as a guide to sort the risks identified in the SVA. The responsibility for the SVA has been clarified, and other changes relative to the qualifications of the SVA provider have been addressed. Section 8.4 has also been revised to further detail both the need and criteria for protective lighting. Siemens AG 2015 All rights reserved. Page 5

NFPA 731 Standard for the Installation of Electronic Premises Security Systems, 2015 Edition Siemens AG 2015 All rights reserved. Page 6 The 2015 edition has been revised to update dates of many of the referenced publications. The requirements for low-power radio (wireless) systems have also been updated. Requirements have been clarified relative to the provisions of the security vulnerability assessment versus the risk assessment. Chapter 10 has been updated to permit a written performance-based program for inspection, testing, and maintenance as an alternative means of compliance subject to the approval of the AHJ.

Section 10.1 establishes clear criteria for applying and implementing the standard 10.1* Application. The inspection, testing, and maintenance of electronic premises security systems shall comply with these requirements. 10.1.1 This chapter shall apply to those systems installed under the provisions of this standard. 10.1.2* Inspection, testing, and maintenance programs shall do the following: (1) Satisfy the requirements of this standard (2) Conform to the equipment manufacturer s recommendations Service Program > Governance Model (3) Verify correct operation of the electronic premises security systems 10.1.3* The system user or the premises security system provider for the protected premises shall be responsible for the inspection, testing, and maintenance of the systems and alterations of the systems. 10.1.4 Inspection, testing, or maintenance shall be permitted to be performed by a person or organization other than the owner if conducted under a written contract. Siemens AG 2015 All rights reserved. Page 7

A Security service program must include agreed to SLAs for repairing system defects and malfunctions 10.2 Impairments. 10.2.1* System defects and malfunctions shall be corrected. 10.2.1.1* The repair shall begin within 24 hours of the indication that repair is required unless the system user or party responsible for the protected premises agrees to a delay. 10.2.1.2* If the electronic premises security system at the protected premises is impaired for more than 24 hours from the time of the defect or malfunction is identified, the owner or the designated party responsible for the protected premises shall be notified. 10.2.2* When it is determined that there is not a risk to the protected property or the occupant, repair to the system shall be permitted to begin outside the time required by 10.2.1.1 if the owner or responsible party is notified. Service Program > Service Level Agreements Siemens AG 2015 All rights reserved. Page 8

Service Personnel must be qualified to ensure that services are properly and completely executed 10.3.4 Service Personnel. 10.3.4.1* Service personnel shall be qualified in the inspection, testing and maintenance of electronic premises security systems, including the mechanical components incorporated into the premises security systems. 10.3.4.2 Examples of qualified personnel shall be permitted to include, but not be limited to, individuals with one or more of the following qualifications: (1) *Personnel trained and certified by the equipment manufacturer Service Program > Service Personnel Qualifications (2) Personnel licensed or certified by a federal, state, or local authority (3) Personnel certified by an accreditation program or industryrecognized program acceptable to the AHJ (4) Trained and qualified personnel experienced in the servicing of electronic premises security systems and employed by an organization listed by an approved testing laboratory Siemens AG 2015 All rights reserved. Page 9

The critical components of System Testing include the test methods that ensure 100% functionality 10.4 System Testing. 10.4.1 Acceptance Testing. All new systems shall be inspected and tested in accordance with the requirements of 10.4.3. 10.4.2 Re-acceptance Testing. 10.4.2.1 Re-acceptance testing shall be performed after any of the following: (1) Added or deleted system components (2) Any modification, repair, or adjustment to system hardware or wiring (3) Any modifications to the structure being protected Service Program > System Test Requirements 10.4.2.2* All components, circuits, systems operations, and site-specific software functions known to be affected by the change or identified by a means that indicates the changes shall be tested. 10.4.3 Test Methods. Electronic premises security systems and other systems and equipment that are associated with security systems and accessory equipment shall be tested according to Table 10.4.3(a) and.... Siemens AG 2015 All rights reserved. Page 10

NFPA 731 contains detailed test methods for most of the typically Security devices and systems Intrusion Detection Devices Audio sensors Service Program > Device Test Methods Using a sound level meter designed, constructed, and calibrated in accordance with ANSI S1.4, Specification for Sound Level Meters, determine that the average ambient sound does not exceed the manufacturer s recommendation for the ambient sound level during the period the intrusion detection system is armed. The area covered by a single detector shall not exceed the area of coverage spec. by the detector manuf. Utilizing the method recommended by the manuf., test the operation of the system. Motion detection (1) Passive infrared (PIR) Walk across the field of detection at the point farthest from the detector in an upright position at a rate of 760 mm ±80 mm (30 in. ±3 in.) per second. (2) Microwave Walk into the field of detection at the point farthest from the detector in an upright position at a rate of 760 mm ±80 mm (30 in. ±3 in.) per second. Siemens AG 2015 All rights reserved. Page 11

Inspection and Testing Frequency is dependent on the SVA and the manufacturer s recommendations 10.5* Inspection and Testing Frequency. Service Program > Inspection and Test Frequency 10.5.1 The inspection and testing frequency shall be performed in accordance with the security vulnerability assessment for the protected premises. 10.5.2 The inspection and testing frequency shall be performed in accordance with the manufacturer s published instructions for the devices and appliances that are used. 10.5.3 As an alternative means of compliance with 10.5.1 or 10.5.2, subject to the approval of the AHJ, electronic premises security systems shall be permitted to be inspected, tested, and maintained under a written performancebased program. Siemens AG 2015 All rights reserved. Page 12

The maintenance, inspection and testing data that must be recorded and stored are defined 10.6.2.3 A record of all inspections, testing, and maintenance shall be provided that includes the following information regarding tests: (1) Date (2) Test frequency (3) Name of property (4) Address (5) Name of individual or company performing inspection, maintenance, tests, or combination thereof, and affiliation, business address, telephone number, and, if applicable, license information (6) Name, address, and representative of approving agency(ies) (7) Designation of the device(s) tested, for example, Tests performed in accordance with Section of NFPA 731 (8) Functional test of devices (9) Functional test of required sequence of operations (10) Other tests as required by equipment manufacturers (11) Other tests as required by the AHJ (12) Signatures of tester and approved owner representative (13) Disposition of problems identified during test (e.g., Owner notified, Problem corrected/ successfully retested, Device abandoned in place ) Siemens AG 2015 All rights reserved. Page 13 Service Program > Records and Reports

NFPA 101 Life Safety Code, 2015 Edition The 2015 edition includes: Means of egress provisions were revised or added relative to rooms opening directly onto an exit enclosure. The high-rise building provisions of Chapter 11 were expanded to include remote video monitoring of exit stair enclosures. The day-care and residential board and care occupancy provisions were revised to permit more than one floor level to be considered the level of exit discharge The first reference to NFPA 731. Siemens AG 2015 All rights reserved. Page 14

New requirements for security systems and their maintenance and service were added in 2015 11.8.8.1.1 For high-rise buildings having an occupant load of 4,000 or more persons, real-time remote monitoring of exit stair usage shall be provided in accordance with 11.8.8.2 through 11.8.8.4 and shall be displayed at the emergency command center. 11.8.8.1.2 Where the monitoring system is integrated with a security system, the security system shall be in accordance with NFPA 731, Standard for the Installation of Electronic Premises Security Systems. 11.8.8.1.3 Where the monitoring system includes video cameras also used for video image smoke detection, the portions of the system used for such detection shall be in accordance with NFPA 72, National Fire Alarm and Signaling Code. 3.3.36.7* High-Rise Building. A building where the floor of an occupiable story is greater than 75 ft (23 m) above the lowest level of fire department vehicle access. 3.3.269.1 Occupiable Story. A story occupied by people on a regular basis. Siemens AG 2015 All rights reserved. Page 15

The location of the approved video monitoring equipment is explicitly called out 11.8.8.2 Approved video monitoring equipment shall be provided at the exit stairs immediately adjacent to exit stairway discharge doors to capture discharge from, entry to, and passage through the discharge floor landing. 11.8.8.3 Approved video monitoring equipment shall be provided for exit stairs above the level of exit discharge, at building height intervals not exceeding 5 stories, so that descent and ascent flows on the stairways, at the floor entry landings, can be remotely monitored. 11.8.8.4 Approved video monitoring equipment shall be provided, at locations stipulated by the authority having jurisdiction, for exit stairs below the level of exit discharge where levels are normally occupied by the public. Siemens AG 2015 All rights reserved. Page 16

Since standards represent best practices, they can add value to a comprehensive Security Service Program Codes and standards are always evolving May evolve to a standard A standard without current adoption Contains new Security requirements Siemens AG 2015 All rights reserved. Page 17

Questions and Answers Sam Docknevich, PSP Manager, Security Service Portfolio 85 John Road Canton, MA 02021 Phone: +1 (508) 558-3353 E-mail: sam.docknevich@siemens.com Answers for infrastructure and cities. Siemens AG 2015 All rights reserved. Page 18