Ashbridges Bay TTC Maintenance and Storage Facility

Similar documents
St. Clair Avenue West Area Transportation Master Plan

TTC Ashbridges Bay Maintenance and Storage Facility for New Streetcars and Leslie St. Connecting Track Transit Project Assessment Process

Rapid Transit Implementation Working Group

Mavis Road Class Environmental Assessment

Burloak Drive Grade Separation

Public Information Centre #1

Ashbridges Bay Erosion and Sediment Control Project

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Rapid Transit Implementation Working Group September 14, 2017

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Director, Community Planning, Toronto and East York District

Landscaping Conceptual Design of 94 Northcliffe Boulevard, Toronto

13 THORNHILL YONGE STREET STUDY IMPLEMENTATION CITY OF VAUGHAN OPA 669 AND TOWN OF MARKHAM OPA 154

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

Building the transportation network we need for the future

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

1071 King Street West Zoning Amendment Application - Preliminary Report

London s Bus Rapid Transit System

Relief Line Project Assessment

City of Toronto. Emery Village Transportation Master Plan

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report

WELCOME TO OPEN HOUSE # 3

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Public input has been an important part of the plan development process.

New. Stations. Smart Track I tlo MTDRONIO. Public Information Centre

Yonge Street Zoning Amendment Application - Preliminary Report

Queen St E & Leslie St Noise Analysis Toronto, Ontario. Toronto Transit Commission Streetcar Department 1900 Yonge Street Toronto, ON M4S 1Z2

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

Purpose of Open House #3

Public Meeting #3 May 9, 2009 MVVA Team

Canadian Consulting Engineering Awards 2016 Queens Quay West Revitalization. Category B: Transportation

5959 Yonge Street Rezoning Application - Preliminary Report

Red Hill Valley Project More Than A Road October 16, 2006

Don Mills Crossing Study and Celestica Lands Development Application Community Meeting, Open House, and Breakout Discussions

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

WELCOME and introduction

Welcome. Green Line LRT. Beltline Alignment Options. Stay engaged! Follow the Green Line story at calgary.ca/greenline

Report to: Development Services Committee Report Date: April 24, 2017

Toronto Complete Streets Guidelines

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Scarborough Waterfront Project

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Streetcar Noise Reduction King & Sumach Intersection. Community Meeting Toronto Transit Commission. Tuesday, June 27, 2017

QUEEN-RIVER SECONDARY PLAN

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

Garden District Heritage Conservation District Study

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

APPENDIX F: EXTERNAL APPROVALS

4/8/2015 Item #10D Page 1

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

The purpose of tonight s PIC is to:

Appendix B-13: Community Stakeholders Group Meeting Materials and Minutes

Boca Raton II Tri-Rail Station PD&E Study and 30% Documents Public Kick-Off Meeting. August 29, 2017 Spanish River Library

Commissioners Road West Realignment Environmental Assessment

THAT the attached Terms of Reference for the Thornhill Centre Street Study be approved.

Bloor St. W. Rezoning - Preliminary Report

TORONTO TRANSIT COMMISSION REPORT NO.

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

Figure 1- Site Plan Concept

WELCOME TO OPEN HOUSE TWO November 28, 2018

ARTICLE VI: SITE PLAN REVIEW

Report to: Development Services Committee Report Date: September 11, 2017

Appendix M4 - Part 1. Public Information Centre Summary Report. Appendix M4

NEW SMARTTRACK/GO RER STATIONS TECHNICAL & PLANNING UPDATE

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

523, 525 and 525A Adelaide Street West - Zoning Amendment Application - Preliminary Report

Fairfax County Parkway (Route 286) Widening Project

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

Minister of the Environment Representative

Queens Quay East & Lake Shore Boulevard East & 26 Richardson Street Public Art Plan

Baselands Trails Master Plan Public Meeting. April 28, 2015 Fire Academy, 895 Eastern Avenue, Toronto 6:30 p.m. to 9:00 p.m.

Queen Street East/Ashbridge Precinct Planning Study- City-Initiated Official Plan Amendment and Urban Design Guidelines Final Report

Public Information Centre

SUBJECT: Proposed Downtown Mobility Hub Precinct Plan and Proposed Official Plan Policies

2002 TAC Sustainable Transportation Award

Elfrida Growth Area Study

McKay Road Interchange and Salem / Lockhart Crossing

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Committee of the Whole (Public Hearing) Report

WELCOME CPT CORRIDOR AREA PROJECT BACKGROUND BROOKSIDE BLVD. The objectives of the CPT Functional Design Study included:

Welcome to the Public Consultation Exhibition

5 TOWN OF MARKHAM OFFICIAL PLAN AMENDMENT NO. 144 MILLIKEN MAIN STREET SECONDARY PLAN

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

SCARBOROUGH RAPID TRANSIT ENVIRONMENTAL PROJECT REPORT CHAPTER 2 PROJECT DESCRIPTION. Table 2-4: North Segment Alignment Analysis 2-21

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

3 MARKHAM NORTH-SOUTH LINK CORRIDOR PUBLIC TRANSIT IMPROVEMENTS ENVIRONMENTAL ASSESSMENT UPDATE

Services Department F May 28, 2007

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Transportation Master Plan Schedule B Projects Road Name From To Description of Works Southcote Road Garner Road Twenty Road Extension

Transcription:

Ashbridges Bay TTC Maintenance and Storage Facility September 8, 2010 Presented to Government Review Team 1

Presentation Overview Overview of the Project Status of Transit Project Assessment Process Potential Effects and Mitigation Measures Soil Removal Schedule/Next Shdl/N Steps 2

Purpose New light rail vehicles (LRVs) cannot be maintained at existing facilities. Ashbridges Bay Maintenance and Storage Facility (MSF) required to ensure new LRVs are maintained in a state of good repair. Insufficient amount of storage track at Roncesvalles and Russell carhouses. Almost double the amount of storage track required to accommodate new LRVs. Non revenue service track is required to connect the MSF to the existing streetcar network. 3

Vehicles Existing streetcars are 30 to 40 years old and have reached the end of their useful lives. Fleet of 204 new low floor LRVs have been ordered to replace the existing streetcars. Delivery of LRVs to commence in 2013. About 36 new LRVs will be delivered annually. Interior of new vehicle New Low Floor Light Rail Vehicle 4

The Project Recommended Ashbridges Bay MSF site located at Lake Shore Boulevard East & Leslie Street intersection. Leslie Street tracks will connect MSF to existing Queen Street East streetcar service. The City of Toronto Official Plan (2006) identifies Leslie Street as a future Higher Order Transit Corridor. 5 5

Recommended Site Layout Maintain 204 LRVs and store up to 100 LRVs. Includes a main building with a green roof designed in accordance with Toronto Green Standards, and an electrical substation. Approximately 470 employees to work at the facility. The facility will include the following activities: daily servicing and cleaning, preventative and corrective maintenance. On site stormwater management pond. 6

Recommended Leslie Street Connecting Track Design LRVs will operate in mixed traffic (centre lanes). On street parking maintained. Access to all driveways and parking lots maintained. Four through lanes on Leslie Street between Queen Street and Commissioners Street. Existing left turn lanes remain. LRVs will primarily operate outside of rush hour periods. 7

8 8

9 9

10 10

Key Milestones and Public Consultation Meeting Date Purpose May 2008 June 16, 17, 18, 2009 December 16, 2010 Commission approved Facility Master Plan TTC Site Selection Open House TTC Commission Meeting Site Selection February 18, 2010 TTC Preliminary Planning Public Open House #1 Introduce Transit Project Assessment (TPA) Process April 8, 2010 TTC Preliminary Planning Public Consultation Presentation #2 Present Technical Preferred Connecting Track Option May 18, 2010 May 19, 2010 June 2, 2010 City of TorontoPublicWorksCommittee Meeting Approve TTC use of Ashbridges Bay site TTC Landscape Design Competition Public Open House Meeting Ashbridges Bay site and Leslie Street Connecting Track approved by TTC Commission June 9, 2010 June 24, 2010 July 14 & 15 2010 July 28, 2010 August 8 & 10, 2010 Ashbridges Bay site and Leslie Street Connecting Track approved City Council Notice of Commencement for TPA Process Meeting with Leslie Street Resident and Property Owners Transit Project Assessment Process Public Consultation Presentation #3 Landscape Design Competition Event 11

Status of Transit Project Assessment Process 12

Effects Assessment The Transit Project Assessment Process assessed the potential effects associated with the facility and the connecting tracks based on the following factors: Noise and Vibration Potential effects of noise and vibration levels on sensitive receptors Natural le Environment Terrestrial Hydrogeology Contaminated Soils Air Quality Potential effects of dust, odour, fine particulates, etc. on identified sensitive receptors Socio Economic & Land Use Environment Potential effects on residences and businesses Archaeology, Cultural Heritage and First Nations Proposed & approved land uses Safety and operation of Martin Goodman Trail Potential Effects Traffic and Transportation Intersection operations Traffic operations Roadway parking/loading Constructability Operation and maintenance 13

Potential Effects Natural Environment Vegetation and Wildlife Key Effects: Removal of low quality vegetation habitat and trees that are not Provincially Significant. Mitigation: Removing vegetation between August 1 and April 14, to ensure bird nests are protected in order to be in compliance with the Migratory Birds Convention Act. Green roof on main building will sustain low herbaceous vegetation and provide some habitat for insects and birds. Trees removed that fall under the City s Tree By-Law (seven trees with diameter of 30 cm or higher at breast height (dbh) will be replaced at a 3-to-1 ratio (21 trees). New plantings will be incorporated into the Ashbridges Bay MSF landscape design. 14

Stormwater Management Potential Effects Natural Environment On-site Soil Key Effects: Stormwater quality and quantity. Mitigation: Utilize low impact development (LID) Best Management Practices and a wet pond. Final site grade will be higher than the estimated regional flood water level. Key Effects: Impacted soil (mound) to be removed from the site. Mitigation: Adhere to the Soil Removal and Capping Contract that: Complies with all federal, provincial and local licenses and certificates of approval. Identifies air quality and dust suppression measures. Identifies haul routes that minimize community effects. Establish a Construction Liaison Group. 15

Soil Removal Approximately 385,000 m 3 to be removed from site. Anticipate 9 months to remove soil. Waste Characterization study and Phase I and II Environmental Site Assessments completed. Soil mound will be removed by direct excavation and by truck off-site. Contract documents ready for tender. Timing of Notice to Proceed to be confirmed. Wood and concrete debris mixed with soil and cinders 16

Martin Goodman Trail Key Effects: Potential Effects Socio economic & Air Quality Air Quality Key Effects: Site access and new tracks will cross the Martin Goodman Trail. Mitigation: The track design has been developed to combine the access with existing crossing point. Streetcars will operate under a protected traffic phase to cross the Martin Goodman Trail minimizing conflicts with pedestrians, cyclists and conflicting automobile traffic. During construction - potential for nuisance dust. During operations - servicing and maintenance activities have the potential to produce emissions. Mitigation: During construction - a dust control / air quality monitoring program would include dust suppression (water), road sweeping, and cleaning of vehicle tires. During operations - ventilation and capture and control systems, and energy efficient i building design to reduce emissions. View of Martin Goodman Trail along the site 17

Noise & Vibration - at Site Potential Effects Noise & Vibration Noise & Vibration - along Leslie Streett Assessment based on existing streetcar data. Measurement of noise and vibration of Prototype LRV in early 2012 to determine effects of new LRVs. Key Effects: For nearest residences, noise levels may exceed MOE limits by two decibels (based on existing data). Vibration no effect resulting from MSF. Mitigation: Should noise levels remain above MOE limit, installation of an acoustic barrier along the north and west end of the site may be required to ensure noise levels are compliant with MOE Limit (Leq) (dba). Track-based technologies (e.g. lubrication) will assist in minimizing wheel screech. Key Effects: Noise - for residences 7 to 10 meters away from the tracks, noise levels would exceed MOE limits by up to 3 decibels. Vibration for residences up to 15 metres away from the tracks, vibration levels would exceed MOE limits. Mitigation: Depending on results of the noise and vibration modelling undertaken for Prototype LRV in 2012, the following measures will be explored further: Upgrades to the existing track-design to minimize vibration at the source. Receiver-side id mitigation. i i 18

Community Commitments to Address Noise & Vibration 2010 Engage design firm from Lake Shore/Leslie project to develop concept for Leslie Street/ consult with community 2011 Present Leslie Street streetscape improvements to community 2011 Develop construction management plans and share with local community Spring 2011 Early 2012 Spring 2012 Summer 2012 Fall 2012 Mid 2013 Conduct Pre Construction surveys Prototype LRV measuring Commence connection track construction Assessment of noise and vibration levels on Leslie Street with new LRV data and identification of effects Finalize agreement with affected property owners for mitigation measures Complete connection track construction Fall 2013 Post construction surveys 19

Potential Effects Traffic Key Effects: Safety and access to Maintenance and Storage Facility site (LRVs and automobiles). Some manageable challenges anticipated for Leslie Street during LRV operations, including the Leslie Street/Lake Shore Boulevard East intersection (as most will operate outside of rush hour periods). Mitigation: Review signal timings and LRV detection capabilities along Leslie Street to optimize traffic operations along the Leslie Street corridor. Lengthen northbound left turn lane on Leslie Street at Lake Shore Boulevard to facilitate turning movements. Existing traffic at the Leslie Street and Lake Shore Boulevard intersection Provide an exclusive southbound left turn lane on Leslie Street at Commissioners Street to facilitate LRV and vehicle movements; provide an exclusive westbound right turn lane and a shared left through lane for the east leg of Commissioners Street. Expected weekday use 230 LRV trips per day Most of the LRVs will operate outside of the morning and evening rush hour periods Existing traffic at the Leslie Street and Eastern Avenue intersection 20

Landscape Design Competition: Creating an Exciting Community Vision Landscape Design Competition launched to generate an exciting and green vision for the landscaping around the MSF. Three leading urban design landscape firms participating in the competition were introduced to the public at the May 19 Public Meeting. The landscape design competition includes the areas between the existing curbs along Lake Shore Boulevard and Leslie Street to the planned Facility s outer boundary. Public comments were accepted until August 23 and forwarded to a Jury Panel. 21

Our Commitment to Consult Planning (TPA Process) Design (Landscape, Prototype Testing) Construction (Soil Removal, Facility and Connection Track) Consultation with local community throughout site planning, design and construction activities. Establishment of a Construction Liaison Group. Dedicated Community Liaison Officer: o o o o o Full time on project. Responsible for communicating with residents, business and property owners and other community stakeholders. Point of contact for the community direct communication with Project Manager, Transportation Services and other City services. Complaints process. Regular updates via e mail, website and community flyers. 22

Future Steps Fall 2010 Select Landscape Design Firm Develop selected design to detail design stage Engage community to develop concepts for Leslie Street connection File Environmental Project Report: Notice of Completion of Transit Project Assessment Process 30 day public and agency review period Anticipated receipt of Notice to Proceed from Ministry of the Environment after 35 day review period Late 2010 Spring/ Summer 2011 Spring 2012 Commence Soil Removal Commence MSF construction Commence connection track construction 2013 Complete MSF and connection track construction 23

Notice of Completion of Environmental Project Report Ashbridges Bay Maintenance and Storage Facility for New Streetcars The Project The City of Toronto and the Toronto Transit Commission have completed an Environmental Project Report in accordance with Ontario Regulation 231/08 for the Ashbridges Bay Maintenance and Storage Facility for New Streetcars and Leslie Street Connecting Tracks Project. Background The City of Toronto and the Toronto Transit Commission have ordered 204 new streetcars (Light Rail Vehicles) which will provide significant customer service improvements: Low-floor accessibility for people with disabilities, seniors, families with strollers, bicycle storage; Almost double the passenger capacity of current streetcars; Multiple doors and a proof of payment system to increase the speed of boarding and exiting; and Design enhancements to reduce noise and vibration. A new Maintenance and Storage Facility is required to support the new streetcars which will begin to replace the current fleet in 2013. One hundred of the 204 new streetcars will be stored at the 8.6 hectare Ashbridges Bay site, located at the southeast corner of Lake Shore Boulevard East and Leslie Street. Connection tracks to the Facility will be constructed on Leslie Street from Commissioners Street to Queen Street (0.8 kilometres). Streetcars will access the Facility, operating on these tracks in mixed traffic, in order to preserve access to all Leslie Street properties. The Process The environmental impact of this transit project was assessed and an Environmental Project Report prepared according to the Transit Project Assessment Process prescribed in Ontario Regulation 231/08, Transit Projects and Greater Toronto Transportation Authority Undertakings. The Environmental Project Report for the Ashbridges Bay Maintenance and Storage Facility for New Streetcars and Leslie Street Connecting Tracks Project will be made available for a 30-day review period beginning September 30, 2010 on the project website: www.toronto.ca/involved/projects/lrv and at the following locations: Locations for 30-day Review Period City of Toronto City Clerks Office Toronto City Hall 100 Queen Street West, 10th Floor West Tower Toronto, ON M5H 2N2 416-392-8032 Toronto Transit Commission Transit City Department 5160 Yonge Street, 3rd Floor Toronto, ON M2N 6L9 416-981-1172 Toronto Public Library Jones Branch 118 Jones Avenue Toronto, ON M4M 2Z9 416-393-7715 Ministry of the Environment Central Region Office 5775 Yonge Street, 8th Floor North York, ON M2M 4J1 416-326-6700 Toronto Public Library Beaches Branch 2161 Queen Street East Toronto, ON M4L 1J1 416-393-7703 South Riverdale Community Health Centre 955 Queen Street East Toronto, ON M4M 3P3 416-461-1925 Ministry of the Environment Environmental Assessment & Approvals Branch 2 St. Clair Avenue West, Floor 12A Toronto, ON M4V 1L5 416-314-8001/ 1-800-461-6290

There are circumstances where the Minister of the Environment has the authority to require further consideration of the transit project, or impose conditions on it. These occur if the Minister is of the opinion that: The transit project may have a negative impact on a matter of provincial importance that relates to the natural environment or has cultural heritage value or interest; or The transit project may have a negative impact on a constitutionally protected Aboriginal or treaty right. Before exercising the authority referred to above, the Minister is required to consider any written objections to the transit project that he or she may receive within 30 days after the Notice of Completion of the Environmental Project Report is first published. Interested persons are encouraged to review the project documents and provide comments by October 30, 2010. Comments and concerns may be directed to the project contacts listed below. If you have unresolved concerns, you have the right to submit an objection to this transit project to the Minister of the Environment no later than October 30, 2010 (135 St. Clair Avenue West, 12th Floor, Toronto, ON M4V 1P5; Fax: 416-314-7337; E-mail: Minister.moe@ontario.ca Attn: Minister of the Environment). Although not required, a copy of the objection is requested to be forwarded to the Director and project contacts listed below: Lito Romano Community Liaison Officer Toronto Transit Commission 5160 Yonge Street, 13th Floor Toronto, ON M2N 6L9 Ashbridges@ttc.ca Fax: 416-338-0251 TTY: 416-397-0831 Phone: 416-397-8699 Web: www.toronto.ca/ involved/projects/lrv Director Environmental Assessment & Approvals Branch Ministry of the Environment 2 St. Clair Avenue West, Floor 12A Toronto, ON M4V 1L5 Attn: Lorna Zappone, Project Officer Email: lorna.zappone@ontario.ca Phone: 416-314-7106 or 1-800-461-6290 Fax: 416-314-8452 Under the Freedom of Information and Protection of Privacy Act and the Environmental Assessment Act, unless otherwise stated in the submission, any personal information such as name, address, telephone number and property location included in a submission will become part of the public record files for this matter and will be released, if requested, to any person. Issue Date: September 30, 2010