Edward Jenner Elementary Academy of the Arts

Similar documents
Agustin Lara Elementary Academy

Josefa Ortiz De Dominguez Elementary School

Richard Henry Lee Elementary School

Washington Irving Elementary School

Genevieve Melody Elementary School

Joseph Brennemann Elementary School

Charles W Earle Elementary School

Oscar DePriest Elementary School

Calmeca Academy of Fine Arts and Dual Language

Francis M McKay Elementary School

Sidney Sawyer Elementary School

John Palmer Elementary School

George B Swift Elementary Specialty School

DeWitt Clinton Elementary School

Alessandro Volta Elementary School

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

MUKWONAGO AREA SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

SITE SYSTEMS: FANNIE MAE EXPECTED USEFUL LIFE TABLES (FMEUL)

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Mechanical Inspection Plumbing

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

2014 Bond Project Guide

NYC Department of Education

NYC Department of Education

NYC Department of Education

MARY CRAPO CENTER Miller Road, Swartz Creek, Michigan

NYC Department of Education

MUKWONAGO SCHOOL DISTRICT CAPITAL IMPROVEMENT / MAINTENANCE STUDY

NYC Department of Education

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

Briar Crest Elementary

NYC Department of Education

NYC Department of Education

NYC Department of Education

PLAN REVIEW SUBMITTAL GUIDE

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

DOCUMENT TABLE OF CONTENTS

Cook - Wissahickon Elementary School

NYC Department of Education

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

NYC Department of Education

Master Facility Planning Update School Board Meeting May 26, 2016

Facility Condition Assessment Summary Report. British Columbia Institute of Technology NE6 - Plumbing and Pipefit Building

NYC Department of Education

NYC Department of Education

NYC Department of Education

CAPITAL OUTLAY REQUEST - IDENTIFIED AND EMERGING PROJECTS - RANKED 3-Jun-14

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education Building Condition Assessment Survey :49AM :00PM

NYC Department of Education

NYC Department of Education

NYC Department of Education

Florence High School / Middle School Page 1 of 3 Florence, WI

2 Main Office Building BLDG-955A Building Purpose Building Area Administration offices. Training room 7,610 SF Inspection Date August 16, 2016 Inspect

NYC Department of Education

NYC Department of Education

ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

RECAPP Facility Evaluation Report

Ichabod Crane Central School District 2018 Capital Project Preliminary Estimate

NYC Department of Education

DEERFIELD SCHOOL DISTRICT REFERENDUM Committed to Excellence and Equity in Educating Our Students

RECAPP Facility Evaluation Report

NYC Department of Education

NYC Department of Education

NYC Department of Education

NYC Department of Education

WILLIAM & MARY CUSTODIAL TASK & FREQUENCY LIST. PUBLIC SPACE: ENTRANCES, LOBBIES, AND CORRIDORS Daily Weekly Monthly Quarterly Yearly

$ Each additional variance per petition. $ All Other Zoning Districts: One variance per petition

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

NYC Department of Education

Appendix B. Facilities Assessment Report

NYC Department of Education

New High School Concept

PLATTEVILLE MIDDLE SCHOOL

NYC Department of Education

Ashland School District Facility & Capacity Assessment Report 2005

RECAPP Facility Evaluation Report

Mechanical System Description

NYC Department of Education

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

SCHEDULE OF FEES. Penalty Fees. Building Fee Schedule FEE

1354 CHECKLIST for Project Closeout

Transcription:

Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual observation only; they do not test operability or perform destructive testing inside walls, ceilings or floors. The rankings below reflect the assessors visual evaluations of the property condition as of that date. For additional information, you may review the detailed assessment report linked on this school s profile page and visit the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/about_cps/policies_and_guidelines/pages/facilitystandards.aspx. Condition ings and Descriptions : The item/system is new or in good condition and no work is required. : The item/system requires general cleaning and/or routine maintenance. : The item/system requires repairs and has not reached the end of its serviceable life. : The item/system has reached its expected useful life, but is still fully operational. CPS will maintain until replacement occurs. 3: The item/system has surpassed its expected useful life and has limited operability. CPS will maintain until replacement occurs. 2: The item/system has surpassed its expected useful life and has low operability. CPS will maintain until replacement occurs. 1: The item s/system s failure leads to an immediate life safety condition for occupants or to the potential of an uninhabitable facility.¹ Definitions means, for each item, the total number (or amount) of that item that exists and was evaluated. Within that, different portions may have different rankings. means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement EA for each. Other items, like chimneys, are measured in terms of linear feet ( LF ). Still other items, like flooring, are generally measured in square feet ( SF ). means a basic estimate for each item needing some level of repair or replacement. does not include all expenses that would be necessary to complete a repair or replacement project. This is because, depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and additional work triggered by building codes. For the same reason, the Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features. Campus Need also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to alleviate overcrowding; these are viewed as separate capital needs. EXTERIOR CANOPY Metal Canopy CHIMNEY 1 2 3 GRE 6 880 880 SF $21,179 $21,179 Metal Flue 1 2 3 GRE 7 5 5 LF Assessment Date: 8/9/2012 Page 1 of 16

DOORS Exterior Steel Door Side Lite Store Front Door Transom Lite 1 2 3 7 GRE 7 8 6 GRE 7 5 17 EA 8 EA 16 EA 5 EA ENTRANCE Concrete Ramp Entrance Controls - Audio Ramp Handrails 1 2 3 GRE 7 30 GRE 7 3 GRE 7 38 30 LF 3 EA 38 LF FOUNDATION Concrete Foundation 1 2 3 GRE 7 893 893 LF LIGHTING Exterior Lights - Parapet or Roof Mounted Exterior Lights - Wall Mounted LINTELS 1 2 3 GRE 6 2 15 GRE 6 1 13 17 EA $10,368 14 EA $4,362 $14,729 Lintels - Stone 1 2 3 GRE 7 963 963 LF Assessment Date: 8/9/2012 Page 2 of 16

PARAPET Coping - Stone Parapet > 30" Height 1 2 3 BLU 5 1,553,553 1,553 LF $135,424 1,553 LF $135,424 ROOF SYSTEM Interior Downspouts Modified Bitumen Roof Roof Structure: Steel/Metal Deck/Concrete Topping 1 2 3 GRE 6 48 3,443 GRE 6 30,675 GRE 7 30,676 3,491 LF $5,148 30,675 SF $217,133 30,676 SF $222,281 SUPERSTRUCTURE Steel 1 2 3 GRE 6 60 96,104 $1,570 $1,570 WALLS Brick Concrete Block Stone - Cast 1 2 3 GRE 6 8 49,203 GRE 6 200 3,370 GRE 7 4,465 49,211 SF $181 3,570 SF $3,861 4,465 SF $4,042 WINDOWS Curtain wall - Glazed Double Pane Window - Guards perforated Windows - Sash Aluminum Double-pane 1 2 3,816 GRE 7 3,168 GRE 7 6,864 1,816 SF 3,168 SF 6,864 SF Assessment Date: 8/9/2012 Page 3 of 16

EXTERIOR $399,225 ELECTRICAL EMERGENCY SYSTEM Automatic Transfer switch Emergency Battery Packs - Corridors and Stairs Emergency Battery Packs - Toilets Exit Signs - Corridors and Stairs Exit Signs - Lunchroom - Gym - multipurpose rooms Independent Electrical Service for emergency power Public Announcement System Security System - Intrusion detection 1 2 3 4 GRE 7 5 GRE 6 32 GRE 6 8 14 EA 5 EA 32 EA $7,459 8 EA $1,865 $9,324 MAIN SERVICE Main Electrical service 2000 A 277/480/3PH 1 2 3 POWER DISTRIBUTION Lighting and power panels Main distribution panels 400-600 amp Main distribution panels less than 400 amp Transformers 277/480-120/208 ELECTRICAL 1 2 3 4 GRE 7 2 GRE 7 2 GRE 7 4 14 EA 2 EA 2 EA 4 EA $9,324 Assessment Date: 8/9/2012 Page 4 of 16

FIRE PROTECTION FIRE ALARM Fire Alarm Strobe Lights Fire Alarm System Fire Pump Controller 1 2 3 PUMP ROOM ASSEMBLY Fire Pump 25-50hp Jockey Pump 1 2 3 SPRINKLER SYSTEM Wet Sprinkler System FIRE PROTECTION 1 2 3 MECHANICAL AIR CONDITIONING Chillers - Air Cooled - Rotary/Screw type - Roof Mounted 201 to 300 tons Condensing - Roof Mounted 5 to 10 tons Condensing - Roof Mounted less than 5 tons 1 2 3 GRE 6 1 GRE 6 3 $60,060 3 EA $2,574 $62,634 AIR HANDLING SYSTEMS Air Handling Package - Multi Zone - Hot Water 15,001-20,000 cfm 1 2 3 Assessment Date: 8/9/2012 Page 5 of 16

Air Handling Package - Multi Zone - Hot Water above 20,001 to 30,000 cfm Air Handling Package - Single Zone - Hot Water 4,000 to 8,000 cfm Air Handling Package - Single Zone - Hot Water 8,001 to 12,000 cfm Fan Power Box With Hot Water Coil Return Fans - Indoor 10,001 to 20,000 CFM Return Fans - Indoor 5,000 to 10,000 CFM Return Fans - Indoor greater than 20,000 CFM Variable Air Volume (VAV) Box With Hot Water Coil BOILER SYSTEMS GRE 7 50 GRE 6 1 GRE 6 1 GRE 6 1 7 50 EA $2,431 $1,716 $3,289 17 EA $7,436 Boiler Assembly - Non-Condensing Flexible Tube Hot Water Boiler 1,001MBH-2,000 MBH Boiler Auxiliary Non-Condensing Hot Water Boiler 1,001MBH-2,000 MBH Chemical Feed System (Steam Boilers) Chemical Pot Feeder - Hot Water Combustion Dampers Gas Boosters 1 2 3 GRE 6 3 GRE 6 3 GRE 6 2 GRE 6 2 GRE 7 2 3 EA $23,595 3 EA $15,015 2 EA $4,290 2 EA $572 2 EA $43,472 HEATING DEVICES Radiators - Hot Water Wall Heater - Electric 1 2 3 GRE 7 30 30 EA MECHANICAL PLUMBING Piping - Hydronic Supply and Return - Steel or Galvanized Pumps - Chilled Water 10 to 20 HP Pumps - Hot Water 11 to 20 HP 1 2 3 GRE 7 20,000 GRE 7 3 GRE 7 2 20,000 LF 3 EA 2 EA Assessment Date: 8/9/2012 Page 6 of 16

TEMPERATURE CONTROL Direct Digital Control (DDC) System Thermostats - Direct Digital Control (DDC) 1 2 3 GRE 7 70 70 EA VENTILATION Exhaust Fans - Roof Mounted 1,501 to 8,000 cfm Exhaust Fans - Roof Mounted 500 to 1,500 cfm Exhaust Fans - Roof mounted less than 500 CFM Type I Exhaust Hood - Kitchen or Culinary Arts MECHANICAL 1 2 3 GRE 6 5 GRE 7 2 GRE 6 1 5 EA $2,145 2 EA $157 $2,302 $115,844 PLUMBING HOT WATER Hot Water Heater - Gas more than 300,000 BTU/HR Storage Tank less than 500 gallons 1 2 3 GRE 6 2 2 EA $13,442 $13,442 PIPING Domestic Piping - Cold Water from Risers to Fixtures Domestic Piping - Cold Water Risers Domestic Piping - Hot Water from Riser to fixtures Domestic Piping - Hot Water Return Risers Domestic Piping - Hot Water Risers Domestic Piping Cold Water Horizontal lines Domestic Piping Hot Water Horizontal lines 1 2 3 Assessment Date: 8/9/2012 Page 7 of 16

Domestic Piping Hot Water Return Lines Sanitary Piping Storm Piping Vent Piping PLUMBING INTERIOR ADMINISTRATIVE SUITES $13,442 Ceiling - Lay-In Flooring - Carpet Flooring - Concrete Flooring - Tile/Sheet Lighting - Lay-In Walls - Concrete Block Walls - Plaster/Drywall 1 2 3 GRE 6 620 6,636 GRE 6 307 1,129 GRE 7 85 GRE 7 5,735 11 GRE 6 1,468 9,641 GRE 7 3,660 7,256 SF $1,330 1,436 SF $439 85 SF 5,735 SF 111 SF 11,109 SF $4,198 3,660 SF $5,967 CLASSROOMS Work Sink 1 2 3 GRE 7 3 3 EA COMPUTER LABS Wireless System 1 2 3 CORRIDOR Ceiling - Lay-In 1 2 3 GRE 6 25,432 25,432 SF $54,552 Assessment Date: 8/9/2012 Page 8 of 16

Flooring Terrazzo Lighting - Lay-In Lighting - Pendant/ Surface Stair Handrails Stairs - Terrazzo Walls - Structural Glazed Tile DOORS GRE 7 25,432 GRE 7 225 GRE 7 234 82 68 7,440 25,432 SF 225 SF 234 SF 182 LF 168 LF 17,440 SF $54,552 Interior Steel Doors incl hw Interior Wood Doors incl hw Side-lite Store Front Door Transom Window 1 2 3 GRE 7 46 GRE 7 93 93 GRE 7 6 GRE 7 3 46 EA 93 EA 193 SF 6 EA 3 SF DRINKING FOUNTAINS Double Water Cooler Single Fountain 1 2 3 GRE 7 6 GRE 7 4 6 EA 4 EA FINE ART ROOM Work Sink 1 2 3 GYMNASIUM / AUDITORIUM Bleacher Seating Ceiling - Exposed Flooring - Wood 1 2 3 00 GRE 7 5,026 GRE 7 5,026 100 EA 5,026 SF 5,026 SF Assessment Date: 8/9/2012 Page 9 of 16

Lighting - Pendant/Surface Walls - Concrete Block Walls - Structural Glazed Tile KITCHEN GRE 7 20 GRE 7 4,176 GRE 7 4,176 20 EA 4,176 SF 4,176 SF Ceiling - Lay-In Flooring - Concrete Lighting - Lay-In Wall - Concrete Block 1 2 3,428,428 2,720 1,428 SF 1,428 SF 12 SF 1,720 SF LIBRARY Flooring Carpet Lighting - Lay-In 1 2 3 GRE 7 3,100 GRE 7 40 3,100 SF 40 SF LOCKER/SHOWER ROOM Accessories Benches Floor Drain Flooring Epoxy/Painted Lighting - Lay-In Lockers Showers Structural Glazed Tile 1 2 3 GRE 7 475 2 GRE 7 2 GRE 7 475 GRE 7 55 GRE 7 40 GRE 7 6,030 475 SF 12 LF 2 EA 475 SF 55 SF 40 EA 6 EA 1,030 SF Assessment Date: 8/9/2012 Page 10 of 16

LUNCHROOM Ceiling - Lay-In Flooring - Tile/Sheet Lighting - Lay-In Serving Line Wall - Concrete Block 1 2 3 GRE 6 4,685 GRE 7 4,685 GRE 7 55 GRE 7 30 GRE 7 5,064 4,685 SF $10,049 4,685 SF 55 SF 30 LF 5,064 SF $10,049 MDF/IDF Finishes Ventilation and Cooling 1 2 3 48 148 SF MECHANICAL/SERVICE ROOMS Boiler Room Janitor's Closet Mechanical/Service Rooms Storage Room 1 2 3 GRE 7 2,233 GRE 7 42,662 GRE 6 280 2,638 2,233 SF 42 SF 1,662 SF 2,918 SF $1,321 $1,321 STAFF RESTROOM Accessories Ceiling - Lay-In Floor Drain Flooring - Concrete Flooring - Terrazzo Hand Dryer Lavatory 1 2 3 GRE 7 2,896 GRE 7 2,842 6 GRE 7 499 GRE 7 2,398 0 GRE 7 42 2,896 SF 2,842 SF 16 EA 499 SF 2,398 SF 10 EA 42 EA Assessment Date: 8/9/2012 Page 11 of 16

Lighting - Lay-In Partitions Urinals Wall - Structural Glazed Tile Water Closet VERTICAL CONVEYANCE GRE 7 66 GRE 7 27 0 GRE 7 6,401 GRE 7 42 66 SF 27 EA 10 EA 6,401 SF 42 EA Elevator - Roped Holeless Hydraulic 1 2 3 VOCATIONAL SHOP Work Sink INTERIOR 1 2 3 GRE 7 31 3 $71,890 ROOM ADMIN_WALL Administrative Office Walls 1 2 3 GRE 7 507 507 SF CASEWORK Casework 1 2 3 GRE 7 969 969 LF CEILING Lay-In/Drop 1 2 3 GRE 6 8,172 16,795 24,967 SF $17,529 Assessment Date: 8/9/2012 Page 12 of 16

$17,529 CHALK BOARD 1 2 3 Chalk Board YEL 4 248 248 LF $30,144 $30,144 CLASSROOM Science Lab Elements 1 2 3,180 1,180 SF FLOOR Tile/Sheet 1 2 3 GRE 6 2,162 22,805 24,967 SF $3,092 $3,092 LIBRARY_CEILING Drop/Lay-In LIBRARY_WALL 1 2 3 GRE 6 3,100 3,100 SF $6,650 $6,650 Concrete Block 1 2 3,512 1,512 SF Plaster/Drywall GRE 7 620 620 LIGHTING Lay-In 1 2 3 GRE 7 355 355 EA Assessment Date: 8/9/2012 Page 13 of 16

MARKER BOARD Marker Board 1 2 3 GRE 7 316 316 LF RESTROOM_CEILING Restroom Ceiling 1 2 3 GRE 7 55 55 SF WALL Concrete Block Plaster/Drywall ROOM 1 2 3 GRE 6 6,050 13,575 GRE 6 5,364 7,049 19,625 SF $17,303 12,413 SF $12,656 $29,959 $87,374 SITE CIVIL/DRAINAGE Catch Basin Site Manhole 1 2 3 GRE 7 6 GRE 7 2 6 EA 2 EA FENCING Chain Link Ornamental Iron 1 2 3 5 GRE 6 3 816 15 LF 819 LF $15,969 $15,969 Assessment Date: 8/9/2012 Page 14 of 16

LANDSCAPE Benches Grass Hardscape - Concrete Irrigation Parkway trees Planting Beds/ Areas Trash Receptacles 1 2 3 6 GRE 6 17,297 GRE 7 2,828 BLU 5 5,826 GRE 6 2 20 GRE 7 4,881 GRE 7 7 16 EA 17,297 SF $6,926 2,828 SF 5,826 SF $10,997 22 EA $4,908 4,881 SF 7 EA $22,831 PARKING LOT Asphalt Concrete Concrete Curbs Lighting Parking lot interior plantings Trash Compactor Vehicular Screening 1 2 3 GRE 6 18,032,810 GRE 7 744 GRE 7 4 89 GRE 7 387 18,032 SF $15,471 1,810 SF 744 LF 4 EA 189 LF 387 LF $15,471 PLAYGROUND Playground Equipment - Combo 3-12 Playground Equipment - School Age 5-12 Playground Surfacing - Square Rubber Mats 1 2 3 YEL 4 3,602 3,602 SF $79,838 $79,838 SIDEWALKS Internal Walks 1 2 3 GRE 6 11 847 858 LF $104 Assessment Date: 8/9/2012 Page 15 of 16

Perimeter Sidewalks SIGNAGE GRE 6 20 7,259 7,279 SF $38 $142 Flag Pole Monument Sign - Lighted SITE Campus Need ² ³ 1 2 3 $134,251 $831,350 ¹ It is very rare for an assessor to find a feature in this condition. If they do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked 1 in summary reports; by the time the report is compiled, they have been resolved. ² As stated above, Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Assessed Campus Need includes current deficiencies and is based on current unit cost estimates; it does not reflect a complete project cost. ³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are estimates only and are based solely on the data that was collected as of the assessment date in the footer below. Assessment Date: 8/9/2012 Page 16 of 16