Goat Island Masterplan

Similar documents
Project Location. Jay and Patty Baker Park and Gordon River Greenway Connector Bridge. Naples Beach Golf Club. Gordon River. East. Naples.

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

Popp s Ferry Causeway Park Back Bay Environmental Educational Center CASHIO COCHRAN LLC

Preliminary Regulatory and Engineering

ASHTABULA COUNTY COASTAL MANAGEMENT PLAN

VIRGINIA KEY CONSENSUS MASTER PLAN

Las Colonias Park Master Plan

HURON WATERFRONT DEVELOPMENT AND AMPHITHEATER

Martin Pastucha, Director of Public Works Karen Ginsberg, Director of Community and Cultural Services

TASK FORCE MEETING #6 SUMMARY

Don Narrows Workshop DRAFT MEETING REPORT Saturday, May 24, 2008 South Regent Park Recreation Centre

City Center Neighborhood Plan

City of Iowa City Department of Neighborhood and Development Services Department of Parks and Recreation Department of Public Works City Manager s

Monday, October 5, THE LIGHTHOUSE, PIER 61 at CHELSEA PIERS, HUDSON RIVER PARK, NEW YORK CITY SPONSORSHIP DECK

DRAFT MAP AMENDMENT FLU 04-4

Port of Camas-Washougal Waterfront Trail Master Plan

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Sanford/Lee County Technical Review Committee (TRC) DEADLINES & MEETING DATES

Terra Nova Rural Park Plan

Grand River Ravines Georgetown Township

PURPOSE AND NEED FOR ACTION PUBLIC SCOPING LETTER SILVER GLEN SPRINGS RECREATION ENHANCEMENT PROJECT. Ocala National Forest

ELLIOTT HEADS STRUCTURE PLAN

The 21st Century Waterfront Executive Summary

Naomi Weiss, Executive Director, DBPA Jason Jeffries, Project Manager, City of Daytona Beach

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Summary of Changes in the DRAFT Rivers Project Natural Resource Master Plan from the 2001 approved plan to 2014 plan

TASK FORCE MEETING #10 SUMMARY

Preliminary Sketch Plan for Fort Hunter Park

2. Would the proposed project comply with the Land Use map? 3. Would the proposed project require a rezoning? 4. What is the proposed zoning district?

Comprehensive Study N A G L E H A R T R A Y A R C H I T E C T U R E GILBANE BUILDING C O M P A N Y P R O J E C T M A N A G E M E N T A D V I S O R S

Pleasant Garden Community Center MASTER PLAN

Arkansas River Corridor

MASTER PLAN for the EARL NEWHOUSE WATERFRONT

ENVIRONMENTAL / OPEN SPACE

Weston Conservation Commission

4.1 AESTHETICS EXISTING ENVIRONMENTAL SETTING ALAMITOS BAY MARINA REHABILITATION PROJECT CITY OF LONG BEACH

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

North Shore Trail. Council Meeting June 10, 2002

CONCEPT PLAN APPLICATION

Burrowing Owl Habitat Project at the Albany Plateau. (a component project of the Gilman Street Playing Fields Project City of Berkeley) March 10, 2006

Description of Preferred Alternative

Town of Lyons Parks Flood Recovery Planning Process. Photograph courtesy of Ed Bruder

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

10.0 Open Space and Public Realm

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS

LAND USE PLAN 7. Housing

Public Workshop 2 December 11, 2014 OLIN

City of Heath. Town Center Concept

Abingdon Urban Path System

Winter Island Park Public Meeting #1 Salem, Massachusetts

Appendix N. Preliminary Design

RE: Application for FERC Project No , Scott s Mill dam hydropower proposal

Mariposa Lakes. Planned Community. Project Overview. Stockton, CA

RFP REQUEST FOR PROPOSALS CITY OF PORTSMOUTH, NH. DESIGN ENGINEERING SERVICES North Mill Pond Trail and Greenway

MILL POND OVERLOOK. A project of the Town of Oyster Bay. Prepared by Cameron Engineering & Associates, LLP

MEMORIAL PARK MANAGEMENT PLAN

Appendix E Preliminary Design

CHARLES COUNTY GOVERNMENT RFP NO POPES CREEK RAIL TRAIL DESIGN

FORT MISSOULA REGIONAL PARK

CITY COUNCIL AGENDA REPORT

Community Conversation. Thursday, March 30, James St N 7:00 pm 9:15 pm

JACKsON STREET PIER CONCEPTUAL DESIGN PACKAGE SEPTEMBER 21, 2017

6.0 Development of Amenities,

C ity of Grande Prairie Development Services Department

SAN FRANCISCO. and. A Sampling of Installations in San Francisco, California

Mitchell Ranch South MPUD Application for Master Planned Unit Development Approval Project Narrative. Introduction

River Bend Area Plan Map Amendment ARPP Analysis Camp Fire Day Camp November 20, 2014

Alderson, West Virginia. Prepared for the Town of Alderson. Strategic Riverfront Enhancement Plan

Planning for Waterfront Communities

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

OPPORTUNITIES AND CONSTRAINTS - OXBOW PARK ENTRANCE AND PUT-IN

City of Edmonton. Walterdale Bridge Replacement and Approach Roads Evaluation. Concept Planning Study. Final Report

2.1 Location and Size

SAN MARTIN BOULEVARD OVER RIVIERA BAY PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY

T H A T E V E R Y O N E

Re: Application Type: Proposed Highlands Redevelopment Area Designation

Recreation and Open Space Vision: To be a place where open space for passive and active recreation is an integral part of development and growth.

SITE PLAN (REVISED 8/13/18) l. Development Data Table

Drexel, Barrell & Co.

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

FIRST AMENDMENT WATERSHED MANAGEMENT AREA 16 MASTER PLAN

Town Centre Master Plan Sub-Committee Meeting 23/03/2017

OVERMOUNTAIN VICTORY TRAIL BURKE CALDELL CORRIDOR FEASIBLITY STUDY REQUEST FOR QUALIFICATIONS CALDWELL COUNTY PATHWAYS

BRADENTON RIVERWALK EXPANSION MASTER PLAN

GRAND COUNTY Planning Commission April 27, :00 P.M. Regular Meeting GRAND CENTER North End Meeting Room 182 No. 500 W.

Bourne Downtown Site Planning

SUMMARY. Support the Southeast Arkansas Regional Intermodal Facility.

Cohasset Municipal Harbor Plan Public Meeting #1. Harriman GEI Consultants FXM Associates May 31, 2018

Academics Efficient use of space will be used to enhance investments in new pedagogies such as active learning classrooms.

SCTPO Project Summary September 2014

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

138 ATTACHMENT 17. DEPARTMENT OF THE ARMY WlLMlNGTON DISTRICT, CORPS OF ENGINEERS

Chapter 9: Economic Development

Pinellas County Greenways

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

LANGAN QUALIFICATIONS FOR THE MORGAN COMPANIES

MAYFIELD WEST SECONDARY PLAN PHASE 2

6 August 11, 2010 Public Hearing APPLICANT AND PROPERTY OWNER: CAVALIER GOLF AND YACHT CLUB

Request for Proposals

Transcription:

Goat Island Masterplan City of Georgetown Georgetown, South Carolina December 4, 2013 City Council: Mr. Jack Scoville, Mayor Ms. Peggy Wayne, Mayor Pro-Tempore Mr. Brendon Barber, Sr. Mr. Clarence Smalls Mr. Rudolph Bradley Ms. Carol Jayroe Mr. Ed Kimbrough, Jr. City Administrator: Mr. Chris Carter Prepared by: Consulting Engineer:

Goat Island is a small, wooded island that sits within the Sampit River, separating the Port of Georgetown and the Georgetown Historic District. Goat Island is, in reality, a series of wooded hummocks or smaller islands, connected together by low-lying wooded tracts. In fact, most of the land comprising Goat Island is actually regulated wetland, which would inhibit its future development. Goat Island was created by virtue of a dredging project, which was conducted near the beginning of the twentieth century. In order to provide better navigation to the port, and to the Sampit River, in general, a cut was created to eliminate a severe horseshoe bend in the river. The isolated remainder of highground became Goat Island. The name of the island presumably results from the goats which inhabited the island at one time; however, there are currently no goats on the island. Before being isolated as an island, the property was owned by the Atlantic Coast Lumber Company, one of the largest sawmills in the world in the nineteenth and early twentieth century. It is thought that some of the company s operations may have been conducted on Goat Island, which was then connected to the mainland. The Island was purchased as a speculative investment in the early nineteen nineties by Mr. Jerry Blackmon of Charlotte, North Carolina. Mr. Blackmon has numerous real estate interests in the City of Georgetown (the City) and Georgetown County. Prompted by the commercial development of the boating channel and the City of Georgetown s commercial district, coupled with a concern over how Goat Island would be developed, Mr. Blackmon made a proposal to the City. In short, Mr. Blackmon would donate most of the island to the City, provided it would prepare a master plan for the Island that met with Mr. Blackmon s approval, and would commit to developing the elements of the master plan at some point in the future. Mr. Blackmon desired to retain the southernmost piece high ground, consisting of approximately three acres, located at the mouth of the boating channel. On this basis, the City placed a Request for Qualifications, and SGA Architecture (SGA) was selected for the task of master planning the Island. SGA s liaison with the City was Mr. Chris Carter, the City Administrator. Mr. Carter was enormously helpful in guiding the process, and he provided many useful ideas, which subsequently became part of the masterplan. SGA also wants to thank Mayor Jack Scoville and the City Council for its interest, support, and facilitation of the planning effort.

The Process The first step in the planning process was to assemble base maps, from which could be utilized in developing the masterplan. The City had a copy of a site survey prepared by the surveying and engineering firm, Stantec. This survey indicated property boundaries, wetland lines, and limited topography. SGA was also able to download satellite imagery from the Georgetown County GIS website. These two sources provided enough information for a base plan to be created. SGA next met with Mr. Blackmon and Mr. Blackmon s representative, Vernon Goode, in order to obtain programmatic direction. In this meeting, Mr. Blackmon suggested various types of passive recreation, including boardwalks, nature trails, and boat dockage and access. Mr. Blackmon also expressed concern over squatters and boaters tying up to the island, who were either transient or living on boats while anchored to the island. Mr. Blackmon was concerned about his riparian rights and the possibility of boaters mooring at the island to the detriment of the island itself. Abandoned boats, refuse, and lack of economic advantage were issues of concern to Mr. Blackmon. On this basis, Mr. Blackmon suggested that a walkway which ran along the perimeter of the island, rather than through the island, might form more of a barrier and would be easier to manage by the City in future years. He also believed that space for vessels to tie up could be economically advantageous for the City. SGA next turned its attention to the City itself, and in preparation, prepared a site analysis of Goat Island, titled Opportunities and Constraints, a copy of which is included in this document. One of the obvious opportunities afforded by Goat Island, in addition to recreational opportunities, was the Island s function as a visual buffer. The island separates the historic district and the commercial district from the more industrial and maritime functions relating to the port. SGA views this buffering quality significant to maintaining the view shed from the downtown and boardwalk areas of the historic district. Its demise would certainly have economic impact and would impact upon the quality of life of the City s residents. The public meeting was conducted on October 8, 2013, at the Georgetown City Hall, and the discussion was lively. It was noted that the recreational boating traffic had significant economic impact on downtown businesses. Sailboats and yachts traveling the intracoastal waterway make Georgetown an important stopover, and the opportunity for that business to increase in future years is significant. Moorage for the sailing club was suggested, and eventually included in the master plan. Many similar suggestions relating to the types of nature trails, boardwalks, and observation decks for birding and other passive recreation opportunities were discussed. Primitive Camping for a limited number of campsites was recommended. Connecting the island to the mainland was discussed, but ultimately discounted due to the significant cost and regulatory hurdles required for implementation. Armed with the combined input of the current landowner and community, SGA proceeded to develop a final conceptual masterplan for the island. The masterplan was presented to the City Council on October 28, 2013. Based upon the City s approval of the Conceptual Masterplan, a cost estimate was produced, which endeavored to define costs for the three phases in which construction and implementation are contemplated. The cost estimates were submitted to the City for its Council Workshop on December 5, 2013. This document represents the culmination and finalization of all elements of the Conceptual Masterplan for The City of Georgetown.

Goat Island Master Plan Estimate of Probable Costs Georgetown, South Carolina Prepared By: SGA Architecture URS Corporation Date: December 4, 2013 UNIT TOTAL DESCRIPTION QTY UNIT PRICE Const. Cost PHASE 1 A. Demolition/Site Preparation 1. Selective demolition of existing dock 1 LS $15,000.00 $15,000 2. Removal of abandoned boats at existing dock (By Others) 1 LS $0.00 $0 Demolition/Site Preparation Total: $15,000 B. Mobilization/Demobilization 1. Mobilization/Demobilization (pile driving rig) 1 LS $25,000.00 $25,000 Mobilization/Demobilization Total: $25,000 C. General Construction 1. Existing Dock Renovation (upfit to meet sailing club specifications) 1 LS $150,000.00 $150,000 2. 8' Boardwalk w/ low voltage lighting (930'+/- length)* 930 LF $360.00 $334,800 3. Pilings for 8' Boardwalk (2 piles per 16' LF) 116 EA $5,500.00 $638,000 4. 50' Boat slip w/ low voltage lighting (4 total)* 200 LF $270.00 $54,000 5. Pilings for 50' Boat Slips (1 Each) 4 EA $5,500.00 $22,000 6. ADA Gangway 1 EA $60,000.00 $60,000 7. Directional / Interpretive Signage 1 LS $5,000.00 $5,000 8. Island Reforestation 1 LS $20,000.00 $20,000 General Construction Total: $1,283,800 * Low voltage lighting powered via solar panels. SUB-TOTAL $1,323,800 15% Construction Contingency $198,570 PHASE 1 SUB-TOTAL $1,522,370 PHASE 2 A. Site Preparation 1. Selective clearing for nature trails & 4 primitive camp sites. 1 LS $5,000.00 $5,000 Site Preparation Total: $5,000 B. General Construction 1. 10'x10' Observation Towers w/ steel construction 2 EA $50,000.00 $100,000 2. Firepit at primitive campsite 4 EA $1,500.00 $6,000 3. 6' Nature Trail - Mulch Surface (1,170'+/- Length) 1,170 LF $10.00 $11,700 4. Dry Restroom Facility (solar powered) 1 LS $20,000.00 $20,000 General Construction Total: $137,700 SUB-TOTAL $142,700 15% Construction Contingency $21,405 PHASE 2 SUB-TOTAL $164,105 PHASE 3 A. Demolition/Site Preparation 1. Selective site demolition 1 LS $5,000.00 $5,000 Demolition/Site Preparation Total: $5,000 B. Mobilization/Demobilization 1. Mobilization/Demobilization (pile driving rig) 1 LS $25,000.00 $25,000 Mobilization/Demobilization Total: $25,000 C. General Construction 1. 8' Boardwalk w/ low voltage lighting (1,200'+/- length)* 1,200 LF $360.00 $432,000 2. Pilings for 8' Boardwalk (2 piles per 16' LF) 150 EA $5,500.00 $825,000 3. ADA Gangway 1 EA $60,000.00 $60,000 4. 20'x20' Shade/Observation Structure (w/ metal roofing) 1 LS $60,000.00 $60,000 5. Directional / Interpretive Signage 1 LS $5,000.00 $5,000 General Construction Total: $1,382,000 * Low voltage lighting powered via solar panels. SUB-TOTAL $1,412,000 15% Construction Contingency $211,800 PHASE 3 SUB-TOTAL $1,623,800 PHASE 1 SUB TOTAL $1,522,370 PHASE 2 SUB TOTAL $164,105 PHASE 3 SUB TOTAL $1,623,800 TOTAL ESTIMATE OF PROBABLE COSTS $3,310,275 * Probable Costs are reflective of the Goat Island Conceptual Masterplan, dated October 24, 2013. Estimates of quantity and costs are preliminary due to unknown field conditions and future planning, and are subject to change. * Dredging for boardwalk construction is not included in this Estimate of Probable Costs, and shall be determined if needed at a later time. * An Environmental Impact Study was not available at the time during which this Estimate of Probable Costs was prepared. SGA Architecture and URS Corporation shall not be held responsible for site removal/remediation costs incurred as a direct result of an Environmental Impact Study performed on the subject property. Page 1