Client's Name. Duration (Months) ESD control system upgrading in SALAM CORE PLANT. Target Engineering had conducted detailed engineering in 1993.

Similar documents
List (1992. ence )

2013 Honeywell Users Group Europe, Middle East and Africa. Erik de Groot. Safety and Fire & Gas Solutions

For Complete Fire and Gas Solutions

SAFETY/ SECURITY - FIRE FIGHTING INTEGRATED SYSTEMS

TECHNICAL SERVICES DIVISION

Andrew Brodie 26 September 2017 DISCOVER THE FASTER AND SCALABLE VERSION OF THE ENHANCED CONTROLEDGE HC900 FOR A SAFE AND PROFITABLE PLANT

The benefits of modern Integrated Control and Safety Systems architectures for FPSO facilities.

266-CS-TMS-E-2008 Automation & Instrumentation Engineer. PERSONAL DATA Nationality : Egyptian Birth Date : 23/08/1986

MAHER ABU GHAZALEH. Excellent commercial and negotiation skills with clients, suppliers and agents which lead to increase the profit of the company.

MULTIFUNCTIONAL SYSTEM

2015 Honeywell Users Group Europe, Middle East and Africa

Holds a B. Sc. in Electronics & Communication Engineering and has over 8 years hands-on experience working in I&C field.

Active or challenging position in a positive work environment where teamwork and effort are appreciated.

F&G detection system for LNG plants

operations, Environmental & Instrumentation engineering solutions to the Commercial & Industrial segment in the Middle East. ARE

THE LOGICAL SELECTION FOR YOUR SYSTEM INTEGRATION

Fire and Gas Monitoring Panel ST7-HV

Fully configurable SIL2 addressable Fire & Gas Detection solutions

Autronica Fire and Security AS ID:

Gas Value Chain Solutions. Randy Miller

Protect your investment with Safety Manager

Holds a B. Sc. in Communications & Electronics Engineering and has about 11 years hands-on experience working in I&C field.

DIPL Solutions and Services

Safety Instrumented Fire & Gas Systems

AE Security Group. Qualification Statement

Industrial Grade Gas Detection Detecting The Difference

IGD.CO.UK

Smart Wireless Sensor

Smart Wireless Sensor

Protect your Investment with Safety Manager R160 and Integrated Fire and Solutions

Industrial Grade Gas Detection

Emerson Automation Solutions Products & Services

SUPREMATouch. Modular Fire & Gas Detection System

, CFSE, Senior Manager, ABB Taiwan;, 2011/9/2. Functional Safety. ABB Group September 5, 2011 Slide 1

SUPREMATouch. Modular Fire & Gas Detection System

ICX-CMOS-E-2006 Senior I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Martin Huber 26September 2017 F&G SOLUTIONS FOR THE PROCESS INDUSTRY

RACK MONITORING SYSTEM - RAMOS Ultra

SUPREMATouch Modular Fire & Gas Detection System

Emirates Link for Integrated Technology

EGYPTO ENERGY SEVICES

THE ULTIMATE SOLUTION FOR GAS DETECTION SYSTEMS. DRÄGER REGARD

Process Solutions. Solution Note. HC900 and OneWireless. Background. Applications. Key issues. Tanks in explosion-proof areas.

Instrumentation Products and Applications

Process Alarm Solutions

Steel, Civil, MEP & Telecommunication Infrastructure Service Providers MEP Profile

Dynamic Solutions. Endless Possibilities. Steve Padasack, Finch Paper LLC Rick Van Fleet, Honeywell

Instrument Air Packages engineered for the desert and high temperature environements

Marine Solutions. Honeywell s Solution for LNG Vessels

Combustible and Toxic Gas Detection Solutions. Performance and Safety Beyond Compliance

FM Approved Fire & Gas Detection System

Gerrie Benjert 26 September INTEGRATED TERMINAL AUTOMATION Safety, Security and Operations

Honeywell SLATE ICM Platform

DATA SHEET BENEFITS CURRENT CHALLENGES SSM INFOTECH S X-FORCE AMS - THE IDEAL SOLUTION

Industrial Wireless Enabling Safety

Engineering Guideline. pac- Carriers Type Universal

Project: SEWPCC Ventilation Upgrades. Table of Contents

Table Of Contents: 1. Who We Are What We Do Quality, Health, Safety, and Environment Our Works

PROCESS CONTROL COURSES

Petrolchimico. Alimentare. Milano, 29 novembre 2012!

Terminal Automation Solutions SmartRadar FlexLine Global Experience. Locally Applied.

Touchpoint Pro Flexible Gas Control System

L automazione al servizio della manutenzione

DCS DSS OSS EIB OBPS OPTS FDS AFSS

Global Gas Detection and Monitoring Solutions

designed for rail 5000 Series

Practical Distributed Control Systems (DCS) for Engineers & Technicians. Contents

PHARMACEUTICAL INDUSTRY CLEANING SYSTEMS

Gas Controller Module GC-06

L automazione al servizio della manutenzione nell industria di processo

5New features & EXtreme design, now with HART Protocol and DuraSource Technology. Ultima X Series Gas Monitors

2013 Honeywell Users Group Americas. Joe Bastone. Experion PKS Slick Tricks

System Design and Engineering AutroSafe Interactive Fire & Gas Detection System (IFG)

The organization has been a loyal partner on the Bulgarian and European market for 25 years already.

TYPE APPROVAL CERTIFICATE

Milano, 25 novembre 2015

Engineered Solutions for Safety Instrumented Systems

Combustible and Toxic Gas Detection Solutions. Performance and Safety Beyond Compliance

FUNCTIONAL SAFETY IN FIRE PROTECTION SYSTEM E-BOOK

CCU Family of Modules

PLC / HMI Modbus (Slave) Addressing

ABB Month DD, YYYY. Slide 1

GasGard 100 Control System

Product Guide Low Voltage Switchboard & Switchgear

SIL 2. Ultima X Series Gas Monitors CERTIFIED

Size and rating wise typical Third Party Inspection certificates for the models of Valves

VTScadaLIGHT for Small Water & Wastewater Systems

Safegard V4 Bespoke Intelligent Damper Control and Monitoring System

DET-TRONICS. SPECIFICATION DATA Eagle Quantum Premier Fire and Gas Detection / Releasing System APPLICATION FEATURES

ULT NE WORKSHOP ON THE PREVENTION OF WATER POLLUTION DUE TO PIPELINE ACCIDENTS

MINERVA. Marine. Fire Detection. MX T2000 Panel Range. Features: MINERVA Marine Panel Range

Engineering Guideline. pac-carriers Type SIEMENS ET-200M Fail-safe signal modules

Control System Structure

Upgrade of PSTN network Alarm System

APPLICATION DATA SHEET

System 57. An advanced World of intelligent gas detection system management

DCS integration and CCR solution

ELECTRICAL. Global Energy Partners & INSTRUMENTATION. Putting People First Since The Right Choice. The Right Solutions.

X11CA COMPUTER ANNUNCIATORS

P R O D U C T D ATA S H E E T

Transcription:

Year Category Sub-Category Job description 1994 System Integration ESD 1997 System Integration PCS Client's Name End User Industry Country Duration (Months) ESD control system upgrading in SALAM CORE PLANT. Target Engineering had conducted detailed engineering in 1993. KHALDA KHALDA Oil & Gas Egypt 2 PLC-based control system for water injection project. KHALDA KHALDA Oil & Gas Egypt 2 Remarks Assembly of a new panel with new backup PLC System. Assembly of redundant GE-Fanuc 90-30 PLC's with 60 I/O's. 2003 System Integration PCS 2003 System Integration F&G 2003 System Integration ESD 2004 System Integration F&G 2004 System Integration F&G 2005 System Integration PCS/ESD/F&G Upgrading the process control system for oil processing plants using PLC, SCADA systems. Fire detection system for safe areas and buildings. Fire detection system for safe areas and buildings. Detailed engineering to upgrade the control system and wireless& leased line communication system for 3 Oil plants. KHALDA KHALDA Oil & Gas Egypt 3 SUMED SUMED Oil& Gas Egypt 6 GE-Fanuc TPS Oil & Gas Tunisia 4 A/G gas detection system for oil process and gas plants. GUPCO GUPCO Oil & Gas Egypt 1 Gas detection system for RAZZAQ gas plant. Process control systems, SIL- 3 ESD system and SIL-3 F&G system for 4 sites, QASR project. GUPCO GUPCO Oil & Gas Egypt 1 KHALDA KHALDA Oil& Gas Egypt 6 Assembly of PLC/ SCADA system, 2 GE 90-30 PLC, redundant CPUs, Redundant fiber optics network, redundant HMI server, 350 graphics, and 1,250 I/Os Install new fire detection system for control room, sub-stations, warehouse, and administration buildings. Train end user staff. Assembly of the PLC and SCADA systems and conduct the FAT in Target Engineering facilities, before shipping the system to Tunisia. Upgraded three 90-70 PLC's to be redundant (200AI, 70AO, 700DI, 800DO). The data had been transferred via RF communication to the SCADA system in a central plant. Assembly of the new system using Det-Tronics EQP logic solver and HMI. Assembly of the new system using Det-Tronics EQP logic solver and HMI. Assembly of the 3 systems, PCS used 90-30 (1,868 I/Os, 168 closed loops). ESD, F&G systems used 90-70 GMR (I/Os for ESD is 871, I/Os for F&G 545). The graphics screens for these systems are 565. 2006 System Integration PCS 2006 System Integration F&G 2006 System Integration F&G Upgrading control system of two propane compressors. Fire & gas system for gas compressor in Happy gas plant. SIL-3 PLC- based fire fighting system at Obayied site. GPC GPC Oil& Gas Egypt 3 MORGANTI Water treatment Authority Utilities Egypt 0.5 PETROJET KHALDA Oil& Gas Egypt 4 Assembly of the new system and The system is 90-30 redundant PLC with 16AI, 8AO, 64DI, and 24DO, The system has a quick panel as HMI. Assembly of the new Det-Tronics EQP with the power supply and power supply monitor units. Assembly of the new system,

2006 System Integration F&G 2007 System Integration F&G 2007 System Integration PCS 2007 System Integration ESD 2007 System Integration ESD 2007 System Integration PCS 2008 System Integration PCS/ESD/F&G 2008 System Integration PCS/ESD/F&G 2009 System Integration PCS/ESD/F&G 2010 System Integration F&G 2010 System Integration F&G 2011 System Integration F&G PLC-based system for oil tanks firefighting system. Fire and gas system for 2 gas compressors. Process control systems for three platforms and one central plant, in addition to SCADA and wireless communication. Upgrade PLC and SCADA system at ZAAFRANA platform and FPSO. SIL-2 Emergency shutdown system for RAS BADRAN platform. PLC-based control system and SCADA. Process control system, SIL-3 ESD system and SIL-3 F&G system for & SCADA system for Northern Pipeline Compressors. QASR phase II process control system, SIL-3, ESD, SIL-3 F&G systems for QASR site extension. Re-location of AKIK Gas Plant. Process control system and SIL3 ESD / FGS system. KHALDA KHALDA Oil& Gas Egypt 2 AGIBA AGIBA Oil& Gas Egypt 2 PIRECO El-BIBANE Oil& Gas Tunisia 4 GEMSA GEMSA Oil& Gas Egypt 3 ENPPI SUCO Oil& Gas Egypt 3 JUTON JUTON Chemical Egypt 4 Apache KHALDA Oil& Gas Egypt 6 PETROJET KHALDA Oil& Gas Egypt 6 EMC KHALDA Oil& Gas Egypt 5 SIL-2 F&G system for KALABSHA oil facilities. ENPPI KHALDA Oil& Gas Egypt 4 SIL-2 F&G system for ZETICO Fire Alarm System for different buildings, control room, warehouse at DAHSHOUR gas plant. ZETICO ZETICO Oil& Gas Egypt 2 GUPCO GUPCO Oil& Gas Egypt 4 Assembly of a small wall mound panel, including 90-30 PLC. Assembly of the new Det-Tronics EQP control system, and conduct FAT. Assembly of the control system and Assembly of the system and develop the application program and SCADA graphics. The existing 90-70 PLC's are upgraded to be redundant (48AI, 24AO, 564DI, 282DO), RF communication is used fro data transfer between the platform and FPSO. Assembly of the new system and develop the application program. Assembly of the system, conduct FAT. Assembly of the new systems, develop the application programs, and create SCADA graphics. Used 90-30 redundant PLC for PCS (112AI, 40AO, 144DO, 160DO), and 90-70 GMR for ESD (42AI, 224DI, 144DO), AND 90-70 GMR for F&G (136AI, 288DI, 160DO). Assembly of new remote I/O's marshalling cabinets, and modify the application programs. Assembly of the new systems, and Used RX3i redundant PLC for PCS (128AI, 64AO, 32DI, 8DO), and 90-70 GMR for ESD/ F&G (48AI, 32DI, 48DO). Assembly and program the new system, Matrix and Mimic panels. Create the graphics displays. Assembly of the new system, configure the Det-Tronics logic solver (MTL Safetynet), and The system include 16 point watch gas detectors, 24 AI / 8 DI / 8 DO. Configur 16 NOTIFIER addressable panels, and create HMI displays. The new system includes 330 smoke detectors, 25 heat detectors, 30 Horns, 30 MCP, 30 Strobe

2012 System integration PCS 2012 System Integration PLC & SCADA 2012 System Integration PCS 2012 System Integration PLC & SCADA 2012 System Integration F&G 2013 System integration F&G 2013 System integration PCS 2013 System Integration Detailed Engineering Integrate full system of one PLC panel C/W HMI and one MCC panel C/W all V/A/Watt monitoring and 9 Level/ flow transmitters to achieve efficient oily water treatment for "Upgrading RAS BAKR Skimmovex treatment station" project. Kurdistan Gas & Crude Oil Pipeline communication & SCADA system. GPC GPC Oil& Gas Egypt 3 GE-IP KAR for Construction & Engineering Oil& Gas IRAQ 5 Alameen Shipping Pumps control system, PLC-based system. KHALDA KHALDA Oil& Gas Egypt 2 Kalabsha(Pico) Gas Facility Upgrade H2S Detection System for offshore platforms (P-A,P-PP/B,P-C) plus solar system at platforms (P-A and P-C) KHALDA KHALDA Oil& Gas Egypt 4 SUCO SUCO Oil& Gas Egypt 4 Integrate full system of "1" PLC panel for "ONSHORE F&G EXPANDING AMER-8 STORAGE AREA PROJECT" project. ENPPI GPC Oil& Gas Egypt 1 PCS system for potable water lifting station. Ras Bakr Fire Alarm Control Panel GEDAC SEC Electromechan ical K.S.A. 2 GUPCO GUPCO Oil& Gas Egypt 4 Using one IP65 PLC cabinet and one IP 54 MCC panel painted with anti corrosive painting. GE-IP Rx3i PLC and Cimplicity SCADA are used for this project. Engineering and program 11 RTU's using GE-IP Safetynet and the SCADA system. The system used a high tech. fiber optic network to monitor and control all the RTU's from the main control room at the end of the pipeline. Assembly of the new system. Use 90-30 redundant PLC's (15AI, 12AO, 24DI, 40DO). Assembly of an ICSS (PCS, ESD, and fire and gas system) to control the Existing and new facilities for PICO & SIGMA facilities. Used GE-IP Safetynet and Cimplicty SCADA. 1- The H2S detection system has been built for three offshore platforms including three control panels and with total No of IOs "67" (AI=26, AO=9, DI=13, DO=19). 2- The solar system is to power the control panels at platforms (P- A, P-C) and continue supplying the power to the panel when the sunlight absence for four days. Wireless RF communication was used to monitor the platfors. Using IP54 PLC cabinet accommodate 2 expanding I/O racks communication with the existing PLC over control net redundant network Engineering, Programming and Supervision on the assembly. Perform FAT for the assempled system. Issue documents to replace the existing panel by upgraded one. The panel is networking wih about 1,000 devices. Issue As-Built loop diagrams and wiring diagrams. 2013 System Integration F&G Ras Bakr Fire Alarm Control Panel GUPCO GUPCO Oil& Gas Egypt 2 Assemble the new system in the existing cabinets.

2013 System Integration PLC & SCADA /ESD/F&G PLC Units Installed for D.F.F. Pumps & E.D.G'S At Sinai Fields (Offshore Platforms) Razak Control System Upgrading for RAZAK field. Build an ICSS for a new grassroot gas plant at HYDRA Petrobel Petrobel Oil& Gas Egypt 2 KHALDA KHALDA Oil& Gas Egypt 3 Apache KHALDA Oil& Gas Egypt 4 Assembly of the new PLC systems that control two Diesel Fire Pumps and one Generator for two offshore platforms. Extend the existing PLC and develop the new application program. Create 11 HMI screens. Assembly of an ICSS (PCS, ESD, and fire and gas system) to control the new HYDRA gas plant using GE-IP Safetynet and Cimplicty SCADA. The system was built with total No. of IOs as follows: PCS: 197 (AI= 49, AO= 16, DI=88, DO= 44) ESD: 96 (AI= 47, DI=9, DO= 40) F&G: 28 (AI= 16, DI=4, DO= 8) 2013 System Integration ESD and F&G Upgrading the ESD and F&G systems of the salam base KHALDA KHALDA Oil & Gas Egypt 2 1- Design & Supply of PLC & Matrix Panels. 2- Supply of Gas Detectors & Manual Call Points. 3- Installation & testing of field gas detectors & manual call points 4-Connecting the new PLC system to the existing PAGA. 5-Connecting the new PLC system to Notifier Fire system. System Integration for Sewage Plant - STEP is one of the largest Pumping station in the world it is designed to be able to push 30m3/S of sewage. The Scope include Main PLC to control the plant, Remote I/O stations, Packages PLCs (Chiller, Ventilation, Potable Water, Treated sewage Effluent and power monitor). Main SCADA system, Historian server and Local display panels. Upgrade the Existing N2 Panel controlling Nitrogen package with a new PAC8000 SafetyNet SIL II controller GE-IP AL-Taysear Trading & Contracting Abu Dhabi Sewerage Services Company QP (Qatar Petroleum) Infra-Structure U.A.E In Progress Oil & Gas Qatar In Progress It contain EGD, Profinet communication with the I/O stations and Modbus TCP communication with 3rd parties. A Dual Fiber optic synchronization link between each redundant CPU's. All CPU's, Power supplies, SCADA and Historian Servers are redundant. More than 4300 Physical I/O signals to our PLC's Plus the Modbus Data. SIL II safety system, Redundant CPUs, Redundant Power supplies, Redundant I/O. About 80 Physical I/O all are I.S signals.

2014 System integration PCS/ESD/F&G 2014 System integration PCS/ESD Process control system, SIL-3 ESD system and SIL-3 F&G system & SCADA system for Qasr Compression Project. Build ICSS system for TPS new wells at GUEBIBA cluster. ENPPI KHALDA Oil& Gas Egypt 7 Thyna Petroleum Services Thyna Petroleum Services Oil & Gas Tunisia in progress Assembly of the new systems, develop the application programs, and create SCADA graphics as follows: 7 Panels for the PCS to accommodate PLC, remote I/O racks and HART interface modules, using RX3i PLC (176AI, 80AO, 464DI, 240DO, 41 PID), created 150 graphic displays and established communication protocol (ModBus TCP/IP) with Allen Bradlly PLC and Honeywell DCS. 6 Panels for the ESD to accommodate PLC, redundant I/O Genuis modules and HART interface modules, using GMR 90-70 PLC (180AI, 1054DI, 240DO), created 200 graphic screens. Built 1 ESD Matrix Panel. 6 Panels for the F&G to accommodate PLC, redundant I/O Genuis modules and HART interface modules, using GMR 90-70 PLC (75AI, 150DI, 144DO), Develop application program using Pack 8000 Safety Net Controller SIl2 Redundant System ESD I/O: 24AI, 32DI, 48DO PCS I/O: (16AI, 48DI, 24DO)