heuston gateway: sections heuston gateway: regeneration strategy and development framework plan

Similar documents
development framework plan

development framework

4.00 STAKEHOLDERS. urbanprojects

heuston gateway: summary report

stakeholders Zoning Conservation Connections

development framework

3.1.1 Heuston Square. heuston gateway: regeneration strategy and development framework plan. Heuston Gateway: public domain: Heuston Square location

public spaces and associated development

public spaces and accociated development

public spaces and associated development

HEUSTON GATEWAY PART 2: REGENERATION STRATEGY AND DEVELOPMENT FRAMEWORK PLAN

heuston gateway: scope and context

Page 1 of 19 URBAN DESIGN FRAMEWORK FOR BOLTON STREET WATERFORD

EVALUATION OF MASTER PLAN ALTERNATIVES

survey 2.4 OWNERSHIP AND USE introduction:

Site 2 Development Brief

28. Coolaney-Rockfield Mini-Plan

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

17. Coolaney-Rockfield Mini-Plan

2.0 Strategic Context 4

Appendix 7 Precinct Analysis Carlton

20. Ballysadare Mini-Plan

Colchester Northern Gateway Master Plan Vision Review Draft. July 2016

Site 5 Development Brief

01 the vision NEW LYNN IS WAITING FOR THE GREAT LEAP FORWARD

GREENFORD HALL & ADJOINING LAND

6.0 Development of Amenities,

Environmental Impact Statement

8.0 Design and Form of Development 43/

35. Gorteen Mini-Plan

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

A. The sites in Table 16 below, as identified on the Policies Map, are allocated for retail-led development:

Memorial Business Park Site. Proposed Future Development. Design guidelines. August

WELCOME. Welcome to our second public exhibition on proposals for the redevelopment of the Paddington Central Management Office.

burlington mobility hubs study Downtown Burlington Mobility Hub

3.1 The hybrid planning application proposes the following description of development:

13. London Bridge London Bridge Area Vision

DRAFT. October Wheaton. Design Guidelines

3.5 Principle 5/Response

I539. Smales 2 Precinct

Horwood Map of London, Westminster & Southwark First edition

ALTERNATIVE PROPOSAL FOR TRI LOCATED NATIONAL PAEDIATRIC HOSPITAL BY 2016 ON A 20.5 ACRE (8.3 HECTARE) SITE

5. Bankside and The Borough 5.1. Bankside and The Borough Area Vision

Clairtrell Area Context Plan

PUBLIC REALM STUDY AREA

SUB AREA 3 CENTRAL STRATFORD AND SOUTHERN QUEEN ELIZABETH OLYMPIC PARK

Keystone Business Park Precinct Structure Plan North East Industrial Precinct. Part 2 Design Principles

County Development Plan Consolidated Draft + Adopted Amendments August 2017 Volume 2, Chapter 22 Easky Mini-Plan

I615. Westgate Precinct

3.3. Urban Structure Defining a New Hierarchy of Routes and Spaces >Images

3.0 Area-Wide Strategies 30

Appendix C: Interim Mixed-Use Evaluation Criteria

Chapter 13 Residential Areas: Appendices APPENDIX 1 Residential Areas

Euston Area Plan - Examination: Statement in response to the Inspector s Matters, Issues and Questions

Newcourt Masterplan. November Exeter Local Development Framework

Place Brief. National Collections Facility (NCF site)

Housing Land Initiative. Feasibility Study. Update

Chapter 5 Urban Design and Public Realm

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

REMARKABLES PARK ZONE

Hockessin Community Redevelopment Plan

I209 Quay Park Precinct

E c o n o m i c D e v e l o p m e n t

4.5 Key Development Sites Site Development Frameworks

17.11 Establishment of Land Use Districts

DRAFT NORTH DOCKS LOCAL AREA PLAN

The Master Plan Framework

MOUNT AVENUE MASTERPLAN WORKING DRAFT NOVEMBER 2006

0 9 Areas of Change 59

ELMVALE ACRES SHOPPING CENTRE MASTER PLAN

Integrated Multi Modal Public Transit Hub

TRANSPORT ARCHITECTURE. JOHN McASLAN + PARTNERS

Woodbrook - Shanganagh

Poolbeg West SDZ Draft Planning Scheme

PUTTING THE HEART INTO BATTERSEA. A vision

UDF PLANS AND GUIDELINES

Vision for Irvine: a self-confident town where people aspire to live and work and which they are proud to call home

YONGE STEELES CORRIDOR SECONDARY PLAN. Young + Wright / IBI Group Architects Dillon Consulting Ltd. GHK International (Canada) Ltd.

Urban Design Brief. Watson Parkway North & Watson Road North Guelph, Ontario. Prepared by Coletara Development

FRUITVALE TRANSIT VILLAGE (Phase 2) Residential Project

London Bridge London Bridge Area Vision Map

TABLE OF CONTENTS 1.0 INTRODUCTION... 3

HS2 Interchange Station Design

AOTEA SUPERMARKET ZONE. Zone Introduction

Rotherhithe Rotherhithe Area Vision Map

SWLP 42: Worcester City Centre

Queensborough Eastern Neighbourhood Node. Community Open House

SCHEDULE 12 TO THE DESIGN AND DEVELOPMENT OVERLAY GLEN WAVERLEY ACTIVITY CENTRE STRUCTURE PLAN

The Proposed Auckland Unitary Plan (notified 30 September 2013)

Bank Street Secondary Plan

17A. Wind Microclimate

Elephant and Castle. Elephant and Castle Area Vision Map. Elephant and Castle. 216 New Southwark Plan Proposed Submission Version NSP42 NSP49 NSP44

BLETCHLEY PARK AREA - DEVELOPMENT FRAMEWORK

DUBLIN DOCKLANDS MASTER PLAN AND RELATIONSHIP WITH OTHER PLANS

Walnut Creek BART Station

Housing Development at Balloonagh Tralee Co Kerry

APPENDIX 1: SITE ALLOCATIONS. GREAT WEST CORRIDOR Local Plan Review

6. Bermondsey 6.1. Bermondsey Area Vision

30. Riverstown Mini-Plan

Eastbourne Borough Council. Summary Proof of Evidence Of Barry John Cansfield BA (Hons), BTP, MRTPI on behalf of PRLP

Transcription:

B B1 A B1 B C A heuston gateway: sections B B1 C 117

4.3.3 Zoning The station is the central hub of the area and this function must be preserved and developed. However large areas of the Heuston Station lands are underused and should be integrated into the city fabric. The Conyngham Road Bus Depot should be relocated and the site developed along with the Heuston Station lands. The arc of the proposed pedestrian / cycle route effectively defines the gateway to the city and development adjacent to this line should have a high profile and high standard of architectural design. Sites to the west should generally be of lower density. The present zoning of the Heuston Station lands is Z6, to provide for the creation and protection of enterprise and facilitate opportunities for employment creation. The predominant proposed uses, offices and hotel, are permissible uses. Residential is open for consideration. An area of recreational amenity (Z9) is shown along the river. The bus depot site is presently zoned Z1. Office use is therefore not a permissable use although enterprise, light industry, retail and cultural uses are permitted. It is proposed that the zoning objectives are reviewed. Lands adjacent the arc of the proposed pedestrian and cycle route should be designated as Z5, to consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity. This reflects the civic importance of these sites. Lands in the western section of the site and required for use by the station should remain Z6. Part of the lands to the west of the new road on Site 1 should become Z5, to provide for and improve mixed-services facilities. The areas of recreational amenity (Z9) should be retained and extended to include the public space of the West Terrace. present zoning: CIE lands The station lands should be accessed by a new bridge over the river from the Conyngham Road site. The proposed pedestrian / cycle route links the Phoenix Park with the south city and Royal Hospital Kilmainham, defining the city centre elevation to the west. An additional pedestrian bridge from the Heuston Station Lands / Clancy Barracks, should be hung from the existing rail bridge. proposed zoning: CIE lands stakeholders urbanprojects 118

4.3.4 Conservation The station building is a protected structure. The proposal retains the sandstone building but suggests the possible removal of all internal cast iron structures as these are not architecturally significant, restrict sustainable and efficient development (number of platforms) and create a low quality environment in terms of light and space. The listed terrace on Conyngham Road should be restored and found an appropriate new use. Sean Heuston Bridge and Heuston Station 119

4.3.5 Connections The CIE site is an integral part of the following connections through the Heuston Gateway as described in section 3.2: 5. 1. 6. 2. 3. 4. Pedestrian / Cycle route connecting Phoenix Park and IMMA The Phoenix Park and the gardens of IMMA at the Royal Hospital Kilmainham have been separated since the construction of Heuston Station in the mid 1800s. Consequently both parks have lost any direct connection to each other and with the river. Both parks also suffer from poor linkage to the city or public transport nodes, despite their proximity to Heuston Station. The largest section of the pedestrian / cycle route connecting the parks should be accommodated on CIE lands: (Please refer to section 3.2.1.1) The pedestrian/cycle route from Victoria Quay to Memorial Gardens The CIE lands make up the largest section of this route. The route should have 2 distinct characters through the CIE lands; the River Terrace at the station and a Riverside Walk along the south bank of the river. The River Terrace is described in section 3.1.3. The new Riverside Walk should run below the new bridges through the area to the existing rail bridge. The route should respond to the more natural condition of the river in this area and provide a relatively secluded amenity linking the station to Clancy Barracks. Please refer to section 3.2.1.3. Traffic link: St John s Road (N4) to Conyngham Road This is a new route proposed to reduce traffic considerably on Heuston Square in front of Heuston Station and provide access to the CIE lands from the west and north. (Please refer to section 3.2.2.1.) Public Transport Connections: Bus Bus connections to the station lands should be improved, principally by providing stops directly onto the West Terrace for routes along Conyngham Road / North Quays. A bus connection through the station lands and Clancy might be examined in the future. 7. Public Transport Connections: Taxis It is proposed that the taxi rank is relocated to the West Terrace. (Please refer to section 3.2.2.5.) Private cars It is proposed that the West Terrace should provide safe and ample provision for drop-off / pick-up away from a main road. Access and egress are as for taxis. The present access to the car park for the station is between the station and the river. With increased development on the site a bridge from Conyngham Road to the West Terrace is necessary to provide adequate access. Therefore access to the ground level car park should be off the West Terrace. Pedestrian access to the Station/ River should be provided from the car park. Please refer to section 3.2.2.6. Clancy Barracks to Heuston Station Lands: At present Clancy Barracks and the Heuston Station Lands are cut off from each other and the general network of the city. It is proposed that a tunnel vehicular link is created using the height difference of the sites at the railway line. It is proposed that the Heuston Station Lands should be accessed from the new West Terrace. These links will help integrate both sites into the city fabric and increase accessibility. Adequate provision should be made for pedestrians and cyclists. east bound west bound access to lands pedestrian / cycle amenity stakeholders urbanprojects 120

4.3.6 Conclusions The development of the CIE Lands is critical to the overall development of the Heuston Station Environs. The advantages to the CIE, the city and nation are summarised below: 1. The lands represent significant development potential for a mix of uses. 2. The current access is not adequate in light of future increased loading on station and introduction of LUAS 3. Without new infrastructure and a reorganisation of the adjoining spaces, the station will be unable to function efficiently and the lands development potential will not be realised. 4. New infrastructure on the lands is critical to the development of the wider area, and will greatly benefit adjoining stakeholders who will be required to contribute to the costs by levies. Neighbouring stakeholders will contribute significantly to costs via a system of levies. 5. The proposals will provide infrastructure and public space to allow the station to function efficiently 121

stakeholders urbanprojects 122

4.4 Department of Defence: Clancy Barracks site area (sq.m): CLA area: 55 482 CIE area A 8 959 CIE area B 5 298 total 69 739 Gross floor area (sq.m): CLA area residential 43 255 (77%) commercial 12 635 (33%) total 55 890 CIE area A residential 0 (0%) commercial 23 710 (100%) total 23 710 CIE area B residential 6 930 (97%) commercial 200 (3%) total 86 730 plot ratio: 1.2:1 site coverage: 34% present zoning: Z1 proposed zoning Z1 / Z9 The Clancy Barracks site is substantial in size and represents an opportunity for immediate redevelopment. It has a strategic location within the study area and forms the western boundary. Within the context of the city it has high profile and is a well-known landmark. The site s eastern boundary fronts onto the Heuston Station lands. Clancy Barracks is on the south side of the River Liffey beside Sarah Bridge. The site was until recently used as a military barracks and is fully enclosed and secure with one principal entrance. Lands in CIE ownership between Clancy Barracks and the railway tracks should be developed along with Clancy to significantly increase gross development capacity and ensure a sustainable and efficient use of land. The site can be divided into 3 distinct zones: Heuston Gateway: stakeholders: Clancy Barracks (and CIE lands) 123