GESTRA Steam Systems ER 50-1, ER Installation Instructions Level electrode

Similar documents
GESTRA Steam Systems LRG English. Installation Instructions Conductivity Electrode

GESTRA Steam Systems NRGS 11-2, NRGS Installation Instructions Level Electrode Types

MK 45-1 MK 45-2 MK 45 A-1 MK 45 A-2

TRG 5-6x. GESTRA Steam Systems. Installation Instructions

GESTRA Steam Systems BK 37 BK 28 BK 29. Installation Instructions Steam Trap BK 37, BK 28, BK 29 BK 37 ASME, BK 28 ASME, BK 29 ASME

GESTRA Steam Systems BK 15. Installation Instructions Steam Trap BK 15, DN 40-50

NRG NRG NRG NRG

Level Electrode NRG NRG Original Installation Instructions English

Conductivity Electrode LRG Original Installation Instructions English

Level Electrode NRG Original Installation Instructions English

Installation & Operating Instructions

TRG 5-53 TRG 5-54 TRG 5-55 TRG 5-57

Temperature Sensor TRG Original Installation Instructions English

SMK 22 SMK SMK SMK 22-82

BK 46. Installation Instructions Steam Trap BK 46

MK 45 A. Stainless Steel Design. Installation Instructions Steam Trap MK 45 A

GESTRA Steam Systems NRS English. Installation Instructions Level Switch NRS 1-51

GESTRA Steam Systems DK 45. English. Installation Instructions Steam Trap DK 45

GESTRA. Program for Universal Connections. The Smart Solutions

BK 45 BK 45-U BK 45-LT BK 46

GESTRA. GESTRA Steam Systems NRS For ONE Electrode. English. Installation Instructions Level Switch NRS 1-50

GESTRA Steam Systems OR Installation Instructions Oil & Turbidity Detector OR 52-7

GESTRA Steam Systems NRS For TWO Electrodes. English. Installation Instructions Level Switch NRS 1-50

Steam Trap BK 45 BK 45-U BK 45-LT BK 46

GESTRA. GESTRA Steam Systems TRS English. Installation & Operating Instructions Temperature Switch TRS 5-50

LP30 High Integrity Low Level Alarm Probe Installation and Maintenance Instructions

Flow switch. Operating Manual. English manual page Page 1 of 15 Fax:

opening trap 30 mm Space required for Space required for opening trap 30 mm MK 45-1 with flanged ends (to DIN)

GEM TRAP FITTING & MAINTENANCE INSTRUCTIONS

1592P01. for liquids in piping DN

1592P01. for liquids in piping DN max. DC 48 V, 1 A, 20 W

VIESMANN. Installation instructions VITOMAX 200-HW. for contractors

FSW300 Series Flow Switch

Mechanical seals external, single or double, to DIN EN 12756

GESTRA Steam Systems OR 52-5 OR English. Installation & Operating Instructions Oil & Turbidity Detector OR 52-5, OR 52-6

Installation, operating and servicing instructions

CEILING FED RISER RAIL KIT. Installation Guide. tritonshowers.co.uk/digital

GESTRA. Product Overview. The optimum components for every application

GESTRA. Product Overview. The optimum components for every application

Water level controller and limiter

COMPACT FLAME CONTROLLER CFC 100

Conductivity Monitoring with Manual or Automatic Temp. Compensation LRG... / LRR 1. (Conventional Design)

ph Measuring System Start-up and maintenance manual e Contents

VIESMANN. Installation instructions VITOCROSSAL 200. for contractors. Vitocrossal 200 Type CM2 Gas fired condensing boiler with MatriX radiant burner

Inverted Bucket Steam Traps

INSTALLATION INSTRUCTION

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-i.

52 CEILING FAN READ AND SAVE THESE INSTRUCTIONS FAN RATING AC 120V.

Product overview. the optimum components for every application

S and SF Inverted Bucket Steam Traps Installation and Maintenance Instructions

Flameproof Manual Call Points

ø D ø g ø k Max. service [barg] pressure [psig] H 1 96 L BK 45 with butt-weld ends End connections Screwed Socket-weld

Adsorption dryer PDAD. (en) Operating instructions g [ ]

EXFG Oxygen Analyzer System. Installation Guide. EXFG Probe. ABB Process Analytics

COMPACT FLAME CONTROLLER CFC 200 (Formerly 8.XX)

COMPACT FLAME CONTROLLER CFC 2000

Operating Manual MS220KA and MSR220KA

Mechanical Seal RG-4 stationary, double, liquid sealed

Operating and installation instructions

VERSAFLOW VORTEX Supplementary instructions

Installation and maintenance instructions

CalMag Filter Installation Instructions

PA ma Loop Powered Level Preamplifier

Glass and Dishwashers AMX / AUX Series

Global Series. Installation and Maintenance Instructions. Model G-STR Strobe Beacon. For Use in Hazardous Locations

MODELS N150/300/675/900/1500/2500/2600 INSTALLATION, SERVICING AND MAINTENANCE INSTRUCTIONS

13-1. Temperature Regulator

LC3000 Level Controller Installation and Maintenance Instructions

Maintenance Manual WATER SLUG CONTROL SWITCH PART NUMBERS: F528 AND F528B

GESTRA Information A 1.5

MFP14 Automatic pumps. for condensate and other industrial fluids

AC 4 & 5 HORIZONTAL SERIES Sealed Metallic Centrifugal Pumps Installation and Maintenance Instructions ASSEMBLY ELECTRICAL CONNECTIONS INSTALLATION

Instruction Manual, Toftejorg Rotary Spray Heads Toftejorg MultiMidget, Toftejorg MultiMagnum

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-nA.

Hodge Clemco Ltd. MJC Mini Cartridge Filters Owners Manual. TSOM 556 Date of issue 13/07/04. Hodge Clemco Ltd

Additional Operating Instructions SITRANS F. Vortex flowmeters. SITRANS FX330 Ex-d.

Model: 1413 Model: 1418 Float-Controlled Condensate Trap, PN 100

CRU-S Series Stainless Steel Condensate Recovery Unit

COMPACT FLAME CONTROLLER CFC 1000

Friwa Compact. Operating instructions EN

METIS. Installation instructions. Riser rail kit INSTALLERS PLEASE NOTE THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER.

Operating Instructions. Boilermag XL Filter. High Intensity Magnetic Separator

Operating Instructions for Limit switch Model: NBK-R NBK-RM NBK-RT NBK-RA

Condensate Monitor CGKW. Operator s Manual 42/23-36 EN Rev. 2

Lo-Carbon SELV Tempra

INSTRUCTION MANUAL. DECKMA HAMBURG GmbH. Type OMD-12. Oil-in-Water Monitor

SERVICE MANUAL. IPP Cooled incubator with Peltier technology HPP 108 Constant Climate Chamber with humidification

Catalog. Self-operated Regulators Volume 2 Temperature Regulators

Consignes d installation

Snifter ATEX22 VERSION. User Manual. Distributor

Mounting and Operating Instructions EB 2231 EN

Self-operated Temperature Regulators Series 43 Temperature Regulators Type 43-1 Type 43-2

MULTISENSOR SMOKE AND HEAT DETECTOR DMP-100 OPTICAL SMOKE DETECTOR DRP-100 FIXED TEMPERATURE / RATE-OF-RISE HEAT DETECTOR DCP-100

Installation & Operating Instructions

OPERATING MANUAL. ba75825e03 12/2015 LR 925/01 LR 925/01-P LR 925/01(-P) ULTRAPURE WATER CONDUCTIVITY MEASURING CELL

Instruction manual. Submersible sump pump. Safety instructions Application Electrical connection Installation Maintenance Technical data

ECONOBOOST EB II & EB III Compact Water Booster

Safety. Operating instructions UV sensor UVS 10 DANGER WARNING. Contents CAUTION Edition Please read and keep in a safe place

Heat Exchanger Block Replacement Instructions

VIESMANN. Installation instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

Transcription:

GESTRA Steam Systems ER 50-1 ER 56-1 Installation Instructions 818781-00 Level electrode ER 50-1, ER 56-1

Contents Important Notes Page Usage for the intended purpose...4 Safety note...4 Danger...4 Attention...4 ATEX (Atmosphère Explosible)...4 Explanatory Notes Scope of supply...5 Description...5 Function...5 Design...5 Technical Data ER 50-1, ER 56-1...6 Corrosion resistance...6 Sizing...6 Name plate / marking...7 Dimensions...8 Design ER 50-1, ER 56-1...9 Key...11 Functional Elements ER 50-1, ER 56-1...10 Key...11 Installation ER 50-1, ER 56-1...12 Table Functions...12 Attention...12 Note...12 Tools...12 Examples of installation...13 Key...14

Contents continued Electrical Connection Page ER 50-1, ER 56-1...15 Wiring diagram...15 Tools...15 Commissioning Checking electrical connection...16 Checking the assignment of the switching functions...16 Operation ER 50-1, ER 56-1...16 Water level limiter...16 Troubleshooting Fault finding list...17 3

Important Notes Usage for the intended purpose The level electrodes ER 50-1 and ER 56-1 are designed for signalling liquid levels. Safety note The equipment must only be installed and commissioned by qualified and competent staff. Retrofitting and maintenance work must only be performed by qualified staff who through adequate training have achieved a recognised level of competence. Danger When loosening the electrode steam or hot water might escape. This presents the danger of severe scalds to the whole body. Before removing the electrode make sure that the boiler pressure is zero bar. The electrode becomes hot during operation. Touching the hot equipment presents the risk of severe burns to hands and arms. All installation and maintenance work must only be performed when the equipment is cold. Attention The name plate specifies the technical features of the equipment. Note that any piece of equipment without its specific name plate must neither be commissioned nor operated. ATEX (Atmosphère Explosible) According to the European Directive 94/9/EC the equipment must not be used in potentially explosive atmospheres. 4

Explanatory Notes Scope of supply ER 50-1 1 Level electrode ER 50-1 1 Joint ring D 33 x 39 DIN 7603-1.4301 1 Installation manual ER 56-1 1 Level electrode ER 56-1 1 Joint ring D 33 x 39 DIN 7603-1.4301 1 Installation manual Description The level electrodes ER 50-1 and ER 56-1 work according to the conductivity measurement principle. The ER 50-1/56-1 can signal a maximum of three levels in electrically conductive liquids: Low level alarm (MIN alarm), pump ON, pump OFF with one NO contact ER 50-1 for vessels up to PN 6, e. g. for condensate and low-pressure systems as well as (pressurised) hot-water installations, concrete vessels, feedwater tanks. PN 6 flanges only available on request. ER 56-1 for vessels up to PN 40, e. g. in high-pressure steam plants. For the operation of the level electrodes ER 50-1 and ER 56-1 an external GESTA level switch is required, e. g. NRS 1-1 for fill and discharge control with first low-level alarm, NRS 1-5 for fill and discharge control with high-level alarm, NRS 1-2 as first low-level alarm and high-level alarm or NRS 1-3 as water level limiter with test button. Function The conductivity of the liquid is used to signal the liquid level. Some liquids are conductive, which means that they allow an electric current to flow through them. For the safe functioning of this device a minimum conductivity of the liquid to be monitored is required. The conductivity measurement method can detect two conditions: electrode rod submerged or exposed, meaning switchpoint reached (or exceeded) or not yet reached. Before installation, the length of the electrode rod must be cut to the required switching levels, e. g. for limit alarm or the switching of a valve or pump. Design ER 50-1: Screwed 1" to EN ISO 228-1, PN 6 ER 56-1: Screwed 1" to EN ISO 228-1, PN 40 5

Technical Data ER 50-1, ER 56-1 Type approval TÜV WR/WB 03-302 Service pressure ER 50-1: 6 bar g at 159 C ER 56-1: 32 bar g at 238 C Connection Screwed 1" to EN ISO 228-1 Materials Stem:.4571 CrNiMoTi17-12-2 Body:.4571 Flange:.0460 C22.8 Measuring electrodes: 1.4571 CrNiMoTi17-12-2 Electrode insulation: PTFE Spacer disks: PTFE Lengths supplied 1000 mm, 1500 mm Response sensitivity 10 μs/cm at 25 C, cell constant 0.3 cm 1 0.5 μs/cm, depending on level switch NRS 1-... Electrical connection Four-pole connector, cable gland M 16 Protection IP 65 to EN 60529 Max. admissible ambient temperature 70 C Weight Approx. 0.8 kg Corrosion resistance Provided that the equipment is used for its intended purpose, its safety is not impaired by corrosion. Sizing The body must not be subjected to sharp increases in pressure. Welds and flanges of the electrode are designed to withstand dynamic loading (bending and alternating stress). The dimensional allowances for corrosion reflect the latest state of technology. 6

Technical Data continued Name plate / marking Equipment designation Fig. 1 Fig. 2 7

Technical Data continued Dimensions 270 42 1" to EN ISO 228-1 1000, 1500 Fig. 3 8

Design ER 50-1, ER 56-1 4 2 1 3 40 1" to EN ISO 228-1 50 14 65-70 N 8 N 10 0.5 Fig. 4 Fig. 5 9

Functional Elements ER 50-1, ER 56-1 MAX 70 C % MAX 95% IP 65 5 6! 7 " 8 9 0 Fig. 6 10

Design / Functional Elements continued Key 1 Thermal insulation, provided on site, d = 20 mm (outside of thermal insulation of steam generating unit) 2 Seating surface 3 Joint ring D 33 x 39 to DIN ISO 7603 1.4301 4 Electrode thread 1" to EN ISO 228-1 5 Screw M4 6 Cover 7 Upper part of terminal box 8 Connecting plate 9 Sealing element 0 Contact plate for level electrode! Cable clamp " Cable gland M 16 (PG 9) 11

Installation ER 50-1, ER 56-1 1. Determine required measuring lengths of the electrode tips and enter data in the table Functions, Fig. 4. 2. Cut electrode tips 1, 2, 3 and 4 accordingly. 3. Deburr faces of electrode tips. 4. Strip off 50 mm of PTFE insulation from the ends of the electrode tips. 5. Check seating surfaces of threads or flange provided on vessel or boiler standpipe, Fig. 5. 6. Place joint ring 3 onto seating 2 of the electrode, Fig. 4. Use only joint ring (of stainless steel 1.4301) D 33 x 39 to DIN 7603 supplied with electrode. 7. Apply a light smear of silicone grease (e. g. DOW Corning 111 Compound) to electrode thread 4. 8. Screw level electrode into threads or flange provided on vessel or boiler standpipe and tighten with a 41 mm open-end spanner. The torque required is 140 Nm when cold. Table Functions Function Function Electrode tip Length [mm] Reference electrode 1 e. g. pump OFF 2 e. g. pump ON 3 e. g. high-level alarm 4 Please enter data. Attention The seating surfaces of the threads or flange provided on the vessel or boiler standpipe must be accurately machined, Fig. 5. Do not bend electrode tips when mounting. Do not include electrode body in the thermal insulation of the boiler. Note For the approval of the boiler standpipe with connecting flange the relevant local and national regulations must be considered. See four examples of installation on page 13. Tools Open-end spanner 41 mm A. F. Bolt cutter Hacksaw Flat file, medium cut 12

Installation continued Examples of installation 1" BSP DN 50 $ 1" BSP DN 50 $ & = 20 20 % / ( 1500 & 20 20 / ( 90 c Fig. 7 20 Fig. 8 b 90 20 10 b c 1" BSP $ DN 20 20 ¾" BSP 1" BSP DN 100 24.5 24.5 3000 $ / ) Centre distance & / a % 20 20 90 Fig. 9 20 4 = b d DN 20 Fig. 10 20 DN 20 b 13

Installation continued Key Flange PN 40, DN 50, DIN 2527 Flange PN 40, DN 100, DIN 2527 $ For the approval of the boiler standpipe with connecting flange the relevant regulations must be considered. % Vent hole & High water (HW) / Electrode tip = 5 mm ( Protection tube DN 80 ) Protection tube DN 100 = Electrode distance 14 mm a Electrode distance 40 mm b Low water (LW) c Reducer DIN 2616, part 2 K-88.9 x 3.2 42.4 x 2.6 W d Reducer DIN 2616, part 2 K-114.3 x 3.6 48.3 x 2.9 W 14

Electrical Connection ER 50-1, ER 56-1 Wiring via four-pole connector. Screened four-core cable, e. g. I-Y(St)Y 2 x 2 x 0.8 or LIYCY 4 x 0.5 mm². Max. length 100 m with conductivities from 10 μs/cm. Max. length 30 m with conductivities from 0.5 μs/cm. Max. length 15 m with conductivities from 0.5 μs/cm and application of the ancillary unit URN 1 (24 V DC). 1. Loosen screw 5, Fig. 6. 2. Take the terminal box off the level electrode, leaving the sealing element 9 on the contact plate 0. 3. Remove cover 6. 4. Press connecting plate 8 out of the upper part of the terminal box 7. The upper part of the terminal box can be turned in steps of 90. 5. Detach cable gland and cable clamp! from the upper part of the terminal box 7. 6. Run cable through cable gland " and upper terminal box 7 and connect the terminals of the connecting plate 8 according to the wiring diagram. 7. Press connecting plate 8 into the upper part of the terminal box and align the cable. 8. Hold cable with cable clamp! and cable gland " in position. 9. Mount cover 6 and insert screw 5. 10. Put upper part of the terminal box onto the level electrode and fix it firmly with screw 5. Wiring diagram Fig. 11 Tools Screwdriver for cross-recess head screws, size 1 Screwdriver for slotted screws, size 2.5, completely insulated according to DIN VDE 0680 Open-end spanner 17 mm A. F. 15

Commissioning Checking electrical connection 1. Make sure that the system ER 50-1/ ER 56-1 has been wired in accordance with the wiring diagram, Fig. 11. 2. Make sure that the mains supply corresponds to the wiring carried out on the equipment. Checking the assignment of the switching functions 1. Check the switching function High Level Alarm (HW) of the electrode tip 4. For this purpose raise the water level in the vessel above the high water mark. As soon as the water exceeds the high level mark the level switch must trigger a high level alarm. 2. Check the switching functions Pump ON and Pump OFF, see table Functions. Operation ER 50-1, ER 56-1 Operation in conjunction with level switch NRS 1-1 for fill and discharge control with first low level alarm. Operation in conjunction with NRS 1-5 for fill and discharge control with high-level alarm. Operation in conjunction with NRS 1-2 as first low-level alarm and high-level alarm in (pressurised) hot water and steam plants to TRD 401, TRD 602, TRD 604, EN 12952, EN 12953 or according to national regulations. Operation in conjunction with NRS 1-3 as water level limiter with test button for steam boilers up to max. 0.5 bar or in feedwater or condensate tanks. Water level limiter Note Should malfunctions occur during the commissioning procedure refer to chapter Troubleshooting on page 17 in order to analyse and correct them. 16

Troubleshooting Fault finding list Level has exceeded switchpoint High Water no function Fault: Remedy: Fault: Remedy: Fault: Remedy: Mains voltage has not been applied. Apply mains voltage. Wire equipment according to the wiring diagram. The electric conductivity is too low. Use level switch with higher response sensitivity (0.5 μs/cm). The electrode body does not have earth connection to the boiler. Clean seating surfaces and insert metal joint ring (of stainless steel 1.4301) to 33 x 39 to DIN 7603. Do not insulate compact system with hemp or PTFE tape! Level has fallen below switchpoint Low Water no function Fault: Remedy: Fault: Remedy: Fault: Remedy: The electrode tips have earth connection. Change installation position. The vent hole in the protection tube does not exist, is obstructed or flooded. Check protection tube and, if necessary, provide vent hole. The isolating valves of the external measuring pot (optional) are closed. Open isolating valves. Switchpoint has been reached incorrect function Fault: Remedy: The switching function has not been correctly allocated. Electrode tips have been cut to the wrong length. Identify electrode supply wire and reconnect accordingly. If faults occur that are not listed above or cannot be corrected, please contact our service centre or authorized agency in your country. 17

For your notes 18

For your notes 19

GESTRA Agencies all over the world: www.gestra.de España GESTRA ESPAÑOLA S.A. Luis Cabrera, 86-88 E-28002 Madrid Tel. 00 34 91 / 5 15 20 32 Fax 00 34 91 / 4 13 67 47; 5 15 20 36 E-mail: aromero@flowserve.com Polska GESTRA Polonia Spolka z.o.o. Ul. Schuberta 104 PL - 80-172 Gdansk Tel. 00 48 58 / 3 06 10-02 od 10 Fax 00 48 58 / 3 06 33 00 E-mail: gestra@gestra.pl Great Britain Flowserve GB Limited Abex Road Newbury, Berkshire RG14 5EY Tel. 00 44 16 35 / 46 99 90 Fax 00 44 16 35 / 3 60 34 E-mail: gestraukinfo@flowserve.com Portugal Flowserve Portuguesa, Lda. Av. Dr. Antunes Guimarães, 1159 Porto 4100-082 Tel. 0 03 51 22 / 6 19 87 70 Fax 0 03 51 22 / 6 10 75 75 E-mail: jtavares@flowserve.com Italia Flowserve S.p.A. Flow Control Division Via Prealpi, 30 l-20032 Cormano (MI) Tel. 00 39 02 / 66 32 51 Fax 00 39 02 / 66 32 55 60 E-mail: infoitaly@flowserve.com USA Flowserve GESTRA U.S. 2341 Ampere Drive Louisville, KY 40299 Tel.: 00 15 02 / 267 2205 Fax: 00 15 02 / 266 5397 E-mail: dgoodwin@flowserve.com GESTRA AG P. O. Box 10 54 60, D-28054 Bremen Münchener Str. 77, D-28215 Bremen Telephone +49 (0) 421 35 03-0 Fax +49 (0) 421 35 03-393 E-Mail gestra.ag@flowserve.com Internet www.gestra.de 818781-00/1007cm 2007 GESTRA AG Bremen Printed in Germany 20