Condensate Monitor CGKW. Operator s Manual 42/23-36 EN Rev. 2

Similar documents
System Components and Accessories for Sample Gas Conditioning. Data Sheet 10/ EN June 2004

Micro/Ultra Filtration System StamoClean CAT 430

System components for sample gas conditioning Sample gas cooler, gas feed unit, converter, accessories

SCC-E Sample Gas Feed Unit. Operator s Manual 42/23-58 EN Rev. 1

Continuous Gas Analyzers AO2000 Series AO2040-CU Ex Central Unit in Category 2G. Operator s Manual 42/24-13 EN Rev. 3

Advance Optima Continuous Gas Analyzers AO2060-Caldos15, -Caldos17, -Magnos106, -Uras14 Category 2G Analyzer Modules

Oxiperm C 164 Fully automatic chlorine dioxide processing plant C, -6000C, -7500C, C. Service manual. Oxiperm 164C 4-10 kg Service en

IMAGE V. Parts and Service Manual

INSTALLATION AND OPERATING INSTRUCTIONS General operating instructions for sample gas conditioner Model: MAK 6

Emission Monitoring System

Humidifiers Dealer Parts List Model 400/400M Humidifiers

Laboport Chemically-resistant Laboratory Pumps and Systems

Vacuum Switch, Differential Pressure Adapter, Switching Amplifier

INSTRUCTIONS RHS 700. Recovery, Recycling, Evacuation and Charging Station RHS 700

Flow switch. Operating Manual. English manual page Page 1 of 15 Fax:

Humidifiers Dealer Parts List

30 Professional Cooling Unit. Model Number: XC3000. Owner s Manual READ AND SAVE THESE INSTRUCTIONS

CBU144. Compact Booster Unit - single pump To ensure the quality of potable water according to EN1717. Product specification sheet

INSTRUCTION- AND MAINTENANCE MANUAL FOR ELECTROMAGNETIC AIR PUMP JDK-60, JDK-80, JDK-100, JDK-120

LABOPORT. Chemically-resistant Laboratory Pumps with Modular Accessories. Operating Instructions for Laboratory Pumps. and for LABOPORT Systems

Instructions for use. WT 40 Wine Cooler

rev3 INSTALLATION & OPERATION MANUAL OIL CIRCULATING HEATING SYSTEM MODEL OSM

HVAC Module Assembly Replacement. Tools Required. J A Halogen Leak Detector. Removal Procedure

LS Condensate Removal Pump INSTRUCTION MANUAL REVISION A

Important Safeguards (For your safety, please follow the instructions below.) Specification. Warning. Thermal mixing valve faucet.

Water Purifier, Auto Still WA 200. Instruction Manual. - First Edition -

PLATE HEAT EXCHANGERS. Operation and Maintenance Manual

Installation, Operating and Servicing Instructions

FLT93 Installation, Operation and Troubleshooting Guide

Karlsruher Glastechnisches Werk KGW-ISOTHERM

1592P01. for liquids in piping DN max. DC 48 V, 1 A, 20 W

Heated Gas Sampling Probe PSG Basic

PowerVac G Single to Twin Conversion Kit [ ]

8008 CIRCULATION UNIT FOR SOLAR THERMAL SYSTEMS, FLOW AND RETURN.

Humidifiers. Model 400/400M Humidifiers NO. BLUE/GRAY UNITS - PART NAME QTY/CTN PART NO. PART NO.

DIRTMAG dirt separator with magnet, adjustable for vertical or horizontal pipe

SET-2000 Oil/Sludge. Alarm Device for Oil Separators. Installation and Operating Instructions

User manual. Juice machine Torn U / EN Rev Your retail dealer

BERMAD Fire Protection

NEPTUN I Sole cleaning unit Art.-No.:

DS 96/48 P. Digital indicator. Short manual 41/33-89 EN Rev. 00 DIM

A AD Oil burners fuel unit. deltapumps.com. DE A-AD_en_0709.pdf Page 1/1

Wiring Instructions for the 2900 Series FIREGUARD Combination Door Closer-Holder and Releasing Device with Integral Smoke Detector

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

MODEL /4" Conduit. (By others) Terminal Strips Companion unit (without electronics) not shown. Approximate Preload

Level Electrode NRG NRG Original Installation Instructions English

INSTALLATION & OPERATION MANUAL

HD 525 S 06/03 A ! 5.960

Model: 1100 Float-Controlled Condensate Trap, PN 25

MANUAL Overflow sensor NVF-104/34-PF

Installation, commissioning and servicing instructions

Oil burners fuel unit with solenoid valve

MANUAL. OEM (Unit) OZONE GENERATOR (100VA, 200VA and 300VA) INDEX

Specifications. Vacuum motor power consumption(w/hp) 1200 / 1.6. Exhaust water pump power consumption(w/hp 800 / 1.1

OPERATING MANUAL MODEL AIR 1500TM AIR DRYER

ph Measuring System Start-up and maintenance manual e Contents

Slim Line Service Manual

Dynapac Chip Spreader is an accessory that enables the spreading of stone chippings, gravel or other similiar granulates in conjunction with the

Vacuum Pump V-300 Operation Manual

Operating Instructions

Thermo 230 / 231 / 300 / 301 / Troubleshooting

Installation instructions. Pump Group. For wall hung gas-fired condensing boiler GB162-50/65/80/ TD UK/IE (2014/09)

1ZSE en, Rev. 4. On-load tap-changers, type UZ User s manual

Operating Instructions

Installing a Fast Oven Upgrade Kit

POWERS TM Controls HU 186 Room And Duct Hygrostats

OilSET Installation and Operating Instructions. Oil Separator Alarm Device with SET/DM3AL sensor

3. DISCONNECT AIR CONDITIONING TUBE ASSY SST HINT: Disconnect in the same way as the cooler refrigerant suction hose No.1.

Manual Power relay SR853

CIRCO 6 Solar Circulation Unit

Installation and instruction manual SOLAR STATION

120 VAC SYSTEM CONTROL KIT

L24TWS. Beverage Tower Kit Components. L24TWD Lynx Beverage Kits Model L24TWS Single Tower and L24TWD Double Tower

MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS)

Betriebsanleitung Operating Instructions

DIAPHRAGM PUMP OEM KNF /18 N TRANSLATION OF ORIGINAL OPERATING AND INSTALLATION INSTRUCTIONS ENGLISH

QVE1901U Flow Switch. Technical Instructions Document No September 20, Description. Features. Application.

Gen II Entree Bath. Maintenance Manual. All Models. Important Safety Instructions Read & Follow All Instructions Thoroughly

Installation and Use Manual

VPMmini. Operator's Manual

Equipment Alert. P-Trap Must Be Installed to Exhaust or Warranty will be Voided. Refer to this Manual for installation Instructions

AQUAMAC MODELS

Installation Instruction. Puritan Bennett. Wall Air Water Trap For 800 Series Ventilator Basic Cart. Pla

1998 Expedition/Navigator Workshop Manual

Vacuum Pumps for moist Gases. Self-drying Vacuum Pump for moist Gases. Series LABOPORT SD N FT Vacuum Pump. Spare parts.

LS Condensate Removal Pump Installation, Operation and Service Instructions

Illustration shows item no Z Original operating manual. Operating manual. BlueMobil 60. Item no: Z-3285

Installation and Use Manual

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-400 INDIRECT FIRED SPACE HEATERS

EBAC MODEL CD30 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

MIX Boiler & Font Range Service Manual

EBAC MODEL CD425 ( ) INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Phoenix C4XE - Membrane Based Portable Lube and Hydraulic Oil Purifier Cart For use in Hazardous Duty Locations.

Installation and Operating Instructions DÜRR Regeneration Unit for X-ray developers XR 24, XR24 II, XR 24 Nova, XR 24 Pro

FSW300 Series Flow Switch

STEAM - WATER MIXERS ADCAMIX MX20

GESTRA Steam Systems DK 45. English. Installation Instructions Steam Trap DK 45

MiniVap Humidifier Models LMV2 & LMV4

GESTRA Steam Systems ER 50-1, ER Installation Instructions Level electrode

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

Transcription:

Condensate Monitor CGKW Operator s Manual 42/23-36 EN Rev. 2

Parts Supplied with the Unit Qty. Description 1 Mounting bracket 2 Nozzles G1/4 2 O-rings for nozzles 25 Filter membranes (of glass fibre) Examples of Use Process gas is presented unpressurized or at negative pressure > The sample gas is pumped by the diaphragm pump 1 (controlled by the flow meter 6), the condensate is blocked by switching the pump off through the switching unit 4 (signalled by the signal lamp 5). The condensate monitor 2 and analyzer 7 must be arranged above the sample gas conditioning chain. (The diaphragm pump is controlled by the switching unit ER 144A via output relay 1 or 2.) Process gas is presented unpressurized or at slight overpressure > The sample gas is pumped by the diaphragm pump 1 (controlled by the flow meter 6), the condensate is blocked by switching the pump off and switching in a 3/2 way solenoid valve 3 (de-energized state: sample gas path to analyzer blocked) by the switching unit 4 (signalled by the signal lamp 5). The condensate monitor 2 and analyzer 7 may be arranged as desired. (The diaphragm pump and the solenoid valve are controlled by the switching unit ER 144A via output relay 1 or 2.) Process gas is presented at overpressure > Process gas presented at overpressure (controlled by the flow meter 6), the condensate is blocked by switching in a 3/2 way solenoid valve 3 (de-energized state: sample gas path to analyzer blocked) by the switching unit 4 (signalled by the signal lamp 5). The condensate monitor 2 and analyzer 7 may be arranged as desired. (The solenoid valve is controlled by the switching unit ER 144A via output relay 1 or 2.) 2 Condensate Monitor CGKW Operator s Manual 42/23-36 EN Rev. 2

Dimensional Drawing, Construction of Condensate Monitor Figure 2 Dimensional drawing of condensate monitor and panel cutout Figure 3 Construction of condensate monitor 8.1 Filter membrane (of glass fibre) 8.2 Lower section of condensate monitor 8.3 Round cord ring 8.4 Mounting nut 8.5 Cap 8.6 Screwed cap 8.7 Nozzle with 5 mm external diameter for hose of 4 mm internal diameter 8.8 Electrodes 8.9 Connecting cable 42/23-36 EN Rev. 2 Condensate Monitor CGKW Operator s Manual 3

Mounting of Condensate Monitor CAUTION! The vent plugs of the gas connections of the condensate monitor should only be removed immediately before connecting the sample gas lines. Only the stainless steel model of the CGKW condensate monitor is suitable for use in Zone 1 hazardous areas. Panel mounting Step Action 1 Prepare panel cutout (see Fig. 2). 2 Insert the lower section of the condensate monitor 8.2 into the panel cutout so that the securing lug is up. 3 Tighten the mounting nut 8.4 to the rear side of the panel. 4 Insert the filter membrane 8.1 and cap 8.5 and tighten with the screwed cap 8.6. 5 Connect the sample gas lines to the nozzles 8.7. The direction of flow is given by the arrow on the lower part of the condensate monitor. Wall mounting Step Action 1 Insert the lower section of the condensate monitor 8.2 into the mounting bracket so that the securing lug is up. 2 Tighten the mounting nut 8.4 to the rear side of the mounting bracket. 3 Insert the filter membrane 8.1 and cap 8.5 and tighten with the screwed cap 8.6. 4 Connect the sample gas lines to the nozzles 8.7. The direction of flow is given by the arrow on the lower part of the condensate monitor. F A solenoid valve may be secured in the mounting bracket (spacing of mounting holes 24 and 38 mm). Electrical connections Connect the 2-wire connecting lead of the condensate monitor to terminals E1 and E2 of the switching unit ER 144A (see operator s manual). The length of the connecting lead must be less than 75 m. Install the 100 kω resistor supplied with the unit parallel to the sensor and close to the sensor if possible. F When using the sample gas feed unit CGMF 2, the 100 kω resistor must be installed at terminals rt(rd) and ws(wh). With the stainless steel model of the condensate monitor, the 100 kω resistor is already integrated into the sensor. 4 Condensate Monitor CGKW Operator s Manual 42/23-36 EN Rev. 2

Condensate Builtup and Sensor Break Condensate builtup The condensate builtup will result in an electrical switching operation indicated by the red LED Kondensat (condensate) on the front panel of the switching unit. Possible causes of condensate builtup are: precipitation of condensate in the analyzer, entry of liquid from the process, failure to empty the condensate collecting vessel in the sample gas cooler. In the event of condensate builtup Step Action 1 Determine the cause and rectify the fault. 2 Evacuate and dry out the sample gas lines and sample gas conditioning units upstream of the condensate monitor. 3 Evacuate, clean and dry out the condensate monitor and fit a new filter membrane (see page 6). 4 If applicable, empty and dry out the 3/2 way solenoid valve and downstream sample gas lines. 5 Once the fault has been eliminated, press the reset button on the front panel of the switching unit to restore the unit to its previous operating state. Sensor break A sensor break will cause an electrical switching operation indicated by the red LED Kabelbruch Fühlerleitung (cable break in sensor line) on the front panel of the switching unit. The switching unit is again operational once the sensor break has been rectified. CAUTION! If the stainless steel model of the condensate monitor CGKW is in an area subject to an explosion hazard the relevant safety precautions must be observed when working on the unit. Work may only be carried out on an explosion-protected unit after the explosion hazard has been eliminated. The unit must be checked and certified by an expert if work is carried out on parts or current circuits which are critical for explosion protection. 42/23-36 EN Rev. 2 Condensate Monitor CGKW Operator s Manual 5

Filter Membrane Replacement Step Action 1 Loosen the retaining nut 8.4 and take off the cap 8.5. 2 Remove the used filter membrane 8.1 and replace it with a new membrane. When re-inserting the membrane ensure that no particles of dirt lodge between the round cord ring 8.3 serving as a seal in the condensate monitor lower section 8.2 and the sealing surface of the cap (the leakage air would result in a false measured value). 3 Replace the cap and secure with the screwed cap. Seal Integrity Test Step Action 1 Close off the sample gas outlet of the condensate monitor. 2 Set up an overpressure of 50 hpa (approx. 500 mm water column) on the sample gas inlet. There must not be any marked drop in pressure within 3 minutes. In the event of a pressure drop: 3 Check that the sample gas connectors and retaining nut 8.4 are correctly in place. If so: 4 Change the round cord ring 8.3 in the condensate monitor lower section 8.2. Function Check of the Condensate Monitor Step Action 1 Loosen the retaining nut 8.4 and take off the cap 8.5. 2 Remove the filter membrane 8.1 and insert a moist filter membrane. The red LED Kondensat (condensate) on the switching unit ER 144A must light up. Further, the gas delivery pump must be switched off and/ or the 3/2 way solenoid valve switched in via the two relay contacts. If the LED fails to light up or if there is no switching of the gas delivery pump and/or solenoid valve, inform ABB Service. 3 Remove the moist filter membrane and re-insert the old membrane. When re-inserting the membrane ensure that no particles of dirt lodge between the round cord ring 8.3 serving as a seal in the condensate monitor lower section 8.2 and the sealing surface of the cap (the leakage air would result in a false measured value). 4 Replace the cap and secure with the screwed cap. 5 Press the reset button on the front panel of the switching unit to restore the unit to its previous operating state. 6 Condensate Monitor CGKW Operator s Manual 42/23-36 EN Rev. 2

Description Condensate monitor CGKW The condensate monitor CGKW is used to indicate the builtup of moisture (condensate) or another electrically conducting fluid into the sample gas line to the gas analyzer. The condensate monitor is at the same time a membrane filter so that it has a twofold function filtering of sample gas and signalling of moisture. The filter membrane holds back the condensate for a short period. The condensate monitor and switching unit ER 144A can be combined to form a self-contained condensate trap. Technical Data Technical data Flow rate (air) max. 300 l/h Gas pressure p abs PVC: max. 150 kpa (1.5 bar) Stainless steel: max. 200 kpa (2 bar) Gas temperature PVC: max. 55 C Stainless steel: max. 100 C Retention rate 99.99 % for particles with 1 µm Pressure drop 2.5-20 hpa at a flow rate of 30-250 l/h (air) Filter surface approx. 24 cm 2 Dead volume approx. 15 cm 3 Materials of gas-conducting parts Case: PVC or stainless steel (Mat. No. 1.4571) Gas connections: PTFE (nozzles) Electrodes: Stainless steel (Mat. No. 1.4305) Round cord rings: Viton Filter membrane: Glass fibre Supply voltage for electrodes U = 11.1 VAC Gas connections G 1/4 (DIN lso 228/1) or nozzles for hose inside diameter 4 mm Electrical connection Two-core cable, approx. 1 m, for connecting to the switching unit ER 144A Mounting Panel and wall mounting Dimensions 85 mm x 144 mm Weight PVC: approx. 0.59 kg Stainless steel: approx. 1.4 kg Explosion protection (only with stainless steel case) The condensate monitor is a device without voltage source (VDE 0165/2.91 Section 6.1.3.1.3). If the condensate monitor is being operated in the intrinsically-safe control circuit of the switching unit ER 144A, the apparatus is permitted in hazardous areas of Zones 1 and 2 up to a gas and ambient temperature of 55 C without restriction of the explosion groups and temperature classes. 42/23-36 EN Rev. 2 Condensate Monitor CGKW Operator s Manual 7

Spare Parts Spare parts Designation Symbol 1) Catalog No. Filter membrane (pack with 25 units) 8.1 23105-5-0801717 O-ring 60 x 3.5 NBR (round cord ring for condensate monitor lower section) 8.3 94091-4-0651635 Mounting nut (for condensate monitor lower section) 8.4 20005-4-0299104 Filter cap, PVC 8.5 20105-4-0465346 Screwed cap (for cap) 8.6 20105-4-0465347 Nozzle G1/4 (with external 5 mm for hose of internal 4 mm) O-ring 13 x 2 for nozzle (order nozzle and O-ring together) 8.7 20005-4-0402180 94091-4-0673183 Mounting bracket 23104-4-0548765 1) see Figure 3, page 3 Subject to technical changes Printed in the Fed. Rep. of Germany 42/23-36 EN Rev. 2 07.02