CONTROL NARRATIVE. Ammonia Tank Farm Aqueous Ammonia Truck Unloading, Storage Tanks, Forwarding, Vaporizer & Dilution Air Package

Similar documents
How K-Patents DD-23 System is Built to Conform to BLRBAC Recommendations

Ammonia Supply Systems for SCR

As a full service provider, Aether DBS designs and

SCC Inc. TS Series. Technical Instructions. Document No. TS 5000 February 12, TS CE Combustion Enclosures with LMV3.

TS Series. Technical Instructions. Document No. TS-4000 June 25, TS-CE Combustion Enclosures with LMV5. Description

BACnet Points List for Single Compressor Water to Water PROSSWWE-01

Safety Function: Single-beam Area Access Control (AAC)

Experiment 4: Temperature Control of Heat Exchanger ( TBC 1/21/2012, 2/11/2017 )

ADDISON SEQUENCE OF OPERATION FOR ALC CONTROL AIRSOURCE COOLING-ONLY 100% OUTSIDE AIR VERSION Telephone:

TD80 LEVEL GAUGING & OVERFILL PREVENTION SYSTEM PRODUCT MANUAL SUPPLEMENT. TPM 005 Revision 0.0

The plant meets the requirements of the current FSS 5 Checklist for Vessel Process Plants

Room controllers with manual forced ventilation function

Thin Film. Optimizing Temperature Control 2. Preventing Excessive Vacuum 3. Minimizing Air Drawback 4

HYDRATED LIME STORAGE SYSTEM PROCESS DESCRIPTION Document No

ADDISON SEQUENCE OF OPERATION FOR ALC CONTROL AIRSOURCE HEATPUMP 100% OUTDOOR AIR VERSION Telephone:

Feed Interruption Three separate incidents within Marathon petroleum. p Garyville 2005, 05 Coker Unit - Feed interruption/furnace tripped caused by wa

tcm100, tcm101 Series Temperature Control Modules and PTS100, PTS100/3 Pipe Temperature Sensors Operations Manual

Electric Coils. Blower Coils. Product Information

STEAMPAK Series BurnerPAK BMS Burner Management Systems

Corrigo E. Second generation which contains all applications and languages

EKC 347 Liquid Level Controller REFRIGERATION AND AIR CONDITIONING. Manual

User s Manual. TIGER S EYE E-Series Mark V Jockey. TIGERFLOW Systems, Inc Mint Way Dallas, Texas

DACC - NMDA BUILDINGS

RSMSD Technical Guide

Instructions R8471J Gas Controller for use with Model OPECL Open Path Eclipse IR Gas Detector 1.1 1/

MAINTENANCE & TROUBLESHOOTING GUIDE LEAK ALARM CHANNEL DRY OIL WATER AUX ALARM HIGH LOW CRITICAL WATER TANK LEVEL ALARM MODEL LDE-740 ADVANCE PAPER

1. Know your process. The following guidelines will help you navigate what can be a challenging and time consuming task.

Numerical Standards Listing

Room controller. RC is a room controller from the Regio Mini series intended to control heating and cooling in a single zone.

Gas Safety Products. Installation, operating and maintenance. Merlin 1500S Gas Interlock System. American Gas Safety LLC 1 05/10/2016

ACC RADIO CONTROL SYSTEM. Rev A 12/23/14

Meridian wiredhart. HART Field Device Specification Goldmine Rd. Monroe, NC USA

WCOX B Water-Cooled Packaged Chillers with Helical Rotary Compressors

Power Flame Incorporated

UNFIRED STEAM GENERATORS STANDARD EQUIPMENT

Digital Gas Transmitters with Auxiliary Inputs & Control. PolyGard 2 DC6

ELECTRONIC FLAME SUPERVISION MULTI-BURNER

AccuBrine automated brine maker Technical Specifications

STAR IN THE NORTH-EAST

FUSION ALARMS TROUBLESHOOTING GUIDE CURRENT LIMIT VOLTAGE LIMIT

Manual Supplement. Model Number: 8680-N2. Communications Protocol. Contents of this manual supplement include:

TDS Conductivity Probe In-Line conductivity measurement

Temperature-Relay TR210

C Command. Engine monitoring that puts you in control

ExactLogic BACnet Communicating Thermostat EXL01625 Sequence Datasheet Fan Coil with Modulatating H/C and PO-PC H/C

ROTOR COATING WET BENCH OPERATING PROCEDURE

Danfoss gas detection Controller unit

FIGURE 1 OUTAGAMIE COUNTY LANDFILL PROJECT LOCATION EAST LANDFILL LANDFILL OFFICE AND SCALE WEST LANDFILL EXISTING MRF COUNTY ROAD OO EXISTING FLARE

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

Power Flame Incorporated

SIHI Dry GD S Sizes S450, S650

Guide Specifications

Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA

The key element for your process

Control/Communicator Installation Manual

A complete, compact steam heat exchange solution for process and domestic water heating requirements.

MODULE 2. Water-Based Suppression System Basics

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

Commissioning Methodologies (CM) MUBS-09 Duct Mounted Temperature & Humidity Sensor Testing Method Statement

Operating instructions SENTRI4 Control panel based Fire detection and alarm system

Instrumentation Products and Applications

ST Series. SELECTRONIC TATTLETALE Remote Alarm Annunciators

Frequently asked questions: Intelligent Transmitter Series

Operational Overview and Controls Guide

Use of the application program

DOUBLE EFFECT ABSORPTION CHILLER /HEATER MG MODEL 1

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

Corrigo E - User Manual Ventilation

vsource GAS SOURCE SYSTEMS

PWGSC Ontario MULTIPLEX FIRE ALARM SYSTEM Sect Region Project Page 1 Number R

ACL TC 200 TEMPERATURE CONTROLLER

Smoke Vent Control Panel PCB4 V4 Installation Manual

Table of Contents 1. OVERVIEW SYSTEM LAYOUT SPECIFICATIONS FUNCTION... 11

Pre-programmed room controller with communication

MSMCR. Counter-Rotating Blenders. I Application. I Principle of operation

SECTION FIRE ALARM SYSTEMS

Analog Room Pressure Monitor RPC Series

CHECKFIRE 110 DETECTION AND ACTUATION SYSTEM

Installation, Operating and Maintenance Manual

Powell. Fabrication & Manufacturing Inc. Hypo Batch Controller with Temperature Indicator (Digital ORP/ORP/Temperature System) 2400 Series

Digital Precise Air Control - DPAC

RADIO DRIVER. * _Rev.1* User guide. Wireless programmer. RADIO DRIVER zone RADIO DRIVER zones RADIO DRIVER zones

Numerical Standards Listing

Engineering Guideline. pac-carriers Type SIEMENS ET-200M Fail-safe signal modules

Figure 1. Ejector cross-sectional drawing. Figure 2. Precondenser to left of vacuum flasher. pressure.

LOPA. DR. AA Process Control and Safety Group

ORION Mini-Rep INSTALLATION MANUAL

DSGH. Radiation-Based Detector with GEN2000 Electronics for Density Measurement QUICK REFERENCE GUIDE

150 & 200 RT MG-SERIES GAS FIRED DOUBLE-EFFECT EFFECT ABSORPTION CHILLER-HEATER

ExactLogic BACnet Communicating Thermostat EXL01622 Sequence Datasheet

Safety Transmitter / Logic Solver Hybrids. Standards Certification Education & Training Publishing Conferences & Exhibits

C1N Series - Light Industrial Heaters Tankless Water Heating Solutions

ELECTRONIC HUMIDISTAT: H200

Flopurge TS. Operation Manual


DL100 DOWNLOADABLE CONTROL COMMUNICATOR INSTALLATION MANUAL

Project: SEWPCC Ventilation Upgrades. Table of Contents

Fred C. Gilbert Co. 106 Norris Road Bakersfield, Ca fax

SPECIFICATION GUIDE NEOSYS. Air-cooled Liquid Chiller for outdoor installation (NAC) Nominal cooling capacity: 200 to 460 kw

Corrigo E - manual Ventilation application

Transcription:

CONTROL NARRATIVE Ammonia Tank Farm Aqueous Ammonia Truck Unloading, Storage Tanks, Forwarding, Vaporizer & Dilution Air Package ABOVE: Exmple of an Ammonia Tank Farm built by IFS. Document Number: CN-24729-01-3 Sandy Creek Project Customer Purchase Order Number 149060.65.0221 Revision: Date: Purpose: 0 04/13/09 Approved For Construction 1 05/13/09 Revised Per Customer Comments 2 06/29/09 Revised Per Customer Comments 3 11/24/09 Revised Per Customer Comments Page 1 of 6

TRUCK UNLOADING STATION: ------------------------------------------------------------------------------------------------------------------------- Truck Unloading Control Panel [CPL-604] (Located Off Skid-Outside Of The Hazardous Location): - available to fill amber pilot light per tank (DO) - tank start filling illuminated-push button per tank (DO/DI) - tank stop filling illuminated-push button per tank (DO/DI) - unloading skid open/closed pilot lights (DO) - six (6) channel ammonia detector-truck unloading station and ammonia tank farm monitoring (DI) - limit switch (DI) - pneumatic actuated valve-abv (DO) - tank liquid level (AI) - tank pressure (AI) 1. Visually inspect that the vapor return and liquid fill lines are properly connected to the truck. 2. The DCS operator selects the tank TNK-005A/B to be filled. The farm tanks that are available for filling can be identified with an amber pilot light located on the front of the truck unloading station control panel [CPL-604]. When the tank TNK-005A/B is available for filling, the amber pilot light will be illuminated. 3. In order to begin filling a tank TNK-005A/B the liquid level of the tank (LT-509 or LT-514) must be < 85%, the pressure inside of the tank (PT-505 or PT-510) must be < 50 psig, and no ammonia should be detected at the truck unloading station or inside of the tank farm, and no Ammonia Controller Fault should exist and Tank Discharge Valve (ABV-139 or ABV-141) must be closed. If any of the above conditions are not met during operation, the station/package will automatically shutdown. 4. Select the tank TNK-005A/B to receive ammonia by pressing the respective tank start filling push button located on the front of the truck unloading station control panel CPL-604. 4a. The operator should first manually open the vapor return line (BV-101) at the truck unloading station. Then the liquid fill line (BV-102) should be manually opened by the operator. 4b. When it has been determined that both the manual vapor return (BV-101)and liquid fill (BV-102) lines have been opened at the truck unloading station (via the indication lights on the local panel CPL-604), the operator shall press the selected tank s fill push button. The selected tank vapor return (ABV-118/120) will be commanded to open and verified (via limit switch). 4c. Verification that the tank vapor return (ABV-118/120) has opened (via limit switch) will initiate the command to open the selected tank liquid fill (ABV-114/116) and verified (via limit switch). At this point the selected tank (TNK-005A/B) can be filled and associated tank filling amber pilot light flashes. 4d. The operator can begin pumping liquid from the truck to the tank (TNK-005A/B). 5. In order to stop filling a tank (TNK-005A/B), the operator should stop pumping liquid from the truck (TNK-005A/B). 5a. After the truck pump has stopped pumping liquid to the selected tank (TNK-005A/B), the operator should press the respective tank stop filling push button located on the front of the truck unloading station control panel (CPL-604). 5b. When the stop filling push button has been pressed, the selected tank liquid fill ABV (ABV-114 or ABV-116) will be commanded to close. 5c. Verification that the tank liquid fill ABV (ABV-114/116) has closed (via limit switch) will initiate the command to close the tank vapor return ABV (ABV-118 or ABV-120). Page 2 of 6

5d. Verification that the tank vapor return ABV (ABV-118 or ABV-120)has closed (via limit switch) will illuminate the tank stop filling pilot light, turn off the tank start filling pilot light, and the tank filling amber pilot light stops flashing. 6. The operator should manually close the liquid fill line (BV-102) at the truck unloading station. Then the vapor return line (BV-101) should be manually closed by the operator. Verification that both valves are closed can be seen with the valve closed pilot light on the control panel. 7. The operator can disconnect liquid fill and vapor return lines from the truck unloading station. Automatic Shutdowns: 1. Selected tank level (LT-509/514) is > or = 85% (This condition will turn off the selected tank available to fill pilot light and will not allow this tank to be filled until the level is again < 85% and the alarm has been reset.) 2. Selected tank pressure (PT-505/510)is > or = 50 psig (This condition will not allow this tank to be filled until the pressure is again < 50 psig and the alarm has been reset.) 3. Ammonia detection at the truck unloading station or the tank area (This condition will not allow any tank to be filled until there is no more ammonia detected and the alarm has been reset.) - AMMONIA FORWARDING SKID PACKAGE --------------------------------------------------------------------------------------------------------------------------- Forwarding Junction Box [JBX-601](Located On Skid-Outside Of The Hazardous Location): - forwarding pump outlet pressure (AI) 1. In order to begin pumping from a tank, the liquid level of the tank (LT-509 or LT-514) must be > or = 5%, the pressure inside of the tank (PT-505 or PT-510) must be less than negative 3 psig, the vaporizer level (LT-528) should be < 95 % and there should be no ammonia detected at the tank area or at the vaporizer package area. If any of the above conditions are not met during operation, the station/package will automatically shutdown. 2. The operator must verify that the manual valves (BV-138, BV-140, BV-150, and BV-151) for the pump train intended for operation are open. 3. Select (via the DCS) the tank (TNK-005A/B) to pump ammonia from. 4. With conditions normal and the tank (TNK-005A/B) selected to pump from, the recirculation ABV (ABV-161 or ABV-201) of the selected tank is commanded to open and verified (via limit switch). 5. When the recirculation ABV of the selected tank has been opened (via limit switch), the pump suction ABV (ABV-139 or ABV-141) of the selected tank is commanded to open and verified (via limit switch). 6. After the recirculation and pump suction ABVs have been opened, a pump start command is sent to the forwarding package control panel. 7. The operator must select one of the two pumps (P-012A/B) for forwarding ammonia via the DCS graphic. 8. In order to stop forwarding ammonia to the vaporizer (VPR-013), the operator will stop the pump (P-012A/B) via the DCS graphic. 9. The vaporizer ABV (ABV-165) is commanded to close and verified (via limit switch). 10. The pump suction ABV (ABV-139 or ABV-141) at the selected tank (TNK-005A/B) is commanded to close and verified (via limit switch). 11. The recirculation ABV (ABV-161 or ABV-201) at the selected tank (TNK-005A/B) is commanded to close and verified (via limit switch). Page 3 of 6

Automatic Shutdowns: 1. The liquid level of the selected tank (TNK-005A/B) is < 5%. 2. The pressure inside of the tank is less than or equal to negative 3 psig. 3. The nitrogen purging pressure is not satisfied (low) 4. The vaporizer level is > 95%, which is indicated by LT-528 5. Ammonia detection at the tank farm. AMMONIA VAPORIZER SKID --------------------------------------------------------------------------------------------------------------------------- Vaporizer Junction Box [JBX-602] (Located On Skid): - vaporizer liquid level (AI) - limit switch (DI) - pneumatic actuated valve-abv (DO) - control valve (AO) - line pressure (AI) - line flow (AI) 1. In order for the ammonia vaporizer package to operate, there must be an appropriate level (> or = to 55%) of liquid inside of the vaporizer (VPR-013), and the pressure must be at an operable pressure (< 135 psig). 2. When the vaporizer ABV (ABV-165) has been opened and verified (via limit switch), the ammonia level control valve (ACV-168) will maintain the level inside of the vaporizer (VPR-013) using the vaporizer level transmitter (LT-528) as the process variable. The level will be maintained based on a fixed set point. When a higher liquid level is required inside of the vaporizer (VPR-013), the level control valve (ACV-168) will open more, allowing more liquid to flow. When the desired level is reached, the level control valve (ACV-168) will close. 3. The pressure control loop will be based on an operator set point. For this loop, the pressure inside of the line (PT-526) is the process variable and will be controlled by the steam control valve (ACV-180). When the pressure needs to be increased, the steam control valve (ACV-180) will open more, allowing more steam to flow. As the pressure reaches the desired pressure, the pressure control valve (ACV-180) will actuate accordingly to maintain the appropriate pressure. 4. The ammonia flow control loop will be based on a DCS demand. As more flow is required, the ammonia flow control valve (ACV-177 or ACV-221) actuates to maintain the appropriate flow. As more ammonia is generated, the steam pressure loop and liquid level loop will adjust accordingly. Automatic Shutdowns: 1. Liquid level (LT-528) inside of the vaporizer reaches a shutdown level. 2. Pressure (PT-526) inside of the line reaches a shutdown level. 3. Low low vapor temperature (TE-524) going to the dilution air package. 4. Dilution Air Fan Trips 5. Low Dilution Air Flow (FT-525/523) 6. Ammonia Leak 7. Aux Steam Pressure Low (PI-520/522) 8. Aux Steam Pressure High (PI-520/522) 9. Aux Steam Temperature High (TI-521) Page 4 of 6

AMMONIA DILUTION AIR PACKAGE -------------------------------------------------------------------------------------------------------------------------- Dilution Air Heater Control Panel [cpl-605] (Located On Skid-Outside Of The Hazardous Location): - emergency shutdown push button - run permissive (DO) - heater status (DI) - heater temperature control (AO) - pressure switch (DI) - air flow rate (AI) - heater vessel temperature (AI) - heater outlet temperature (AI) - limit switch (DI) - pneumatic actuated valve-abv (DO) 1. In order for the dilution air package to operate, there must be a minimum air flow through the heater vessel, measured with the fan discharge flow transmitters (the sum of FT-537 and FT-538). This means that the fan outlet valve (Fan 21A = ABV-197; Fan 21B = ABV-198) must be open before starting the fan in the same line. There must not be a high heater bundle temperature (internal to CPL), high heater outlet temperature (TE-536), or high vessel temperature (TE-535). 2. There must first be a run permissive from the DCS. 3. After the run permissive is received at the heater control panel (CPL-605), the heater will start if the local high temperature output in not active. 4. An analog signal is sent to the heater control panel (CPL-605) from the main control system in order to fire the heater controllers. 5. In order to stop the heater, the run permissive is removed or the local emergency stop is pressed. Automatic Shutdowns: 1. No air flow through the heater vessel (FT-537/538). 2. High heater bundle temperature/internal to control panel (CPL-605) 3. High heater outlet temperature (TE-536) 4. Low Heater outlet temperature (TE-536) 5. High Vessel (HT-025) temperature (TE-535) --------------------------------------------------------------------------------------------------------------------------- Page 5 of 6

Look to IFS for Engineered-to-Order & Ready-to-Plug Ammonia Tank Farm Systems & Modular Units For Ammonia in Any State: o Aqueous o Anhydrous IFS can configure an entire Ammonia Storage Tank Farm, or replace or add a process unit on an existing one (unloading station, forwarding skid, etc.) to meet your specifications and needs anywhere in the world. Below is a schematic of a system with four (4) ammonia storage tanks and two (2) truck unloading stations. We all so do train tank car unloading towers, and systems for hot and cold ammonia. Typical Schematic for a Four (4) Tank Ammonia Storage SCR Ammonia Handling System with Two(2) Truck Unloading Stations and a Single Forwarding Skid Page 6 of 6