Owner s Manual for. PennStoker

Similar documents
TABLE OF CONTENTS. Site preparation 2 Placement. 2 Chimney and stove pipe connections. 2

K-2 & K-6 with 6 Inch Stack

B.C.S. Shop Heaters 26, 30 & 36 (36 shown)

K-2 & K-6 Direct Vent

VENTING CLEARANCES. BBT NORTH AMERICA Bosch Group. Bosch Water Heating 340 Mad River Park, Waitsfield, VT TWH-V-26 page 1 of 6 rev 01/06

OWNERS MANUAL MODEL DO110 & DO180 IS CERTIFIED TO: Unit Serial # Purchased From Company Address

INTRODUCTION TO HITZER STOVES INSTALLATION AND OPERATION

Technical Datasheet. Solo Innova Models 30 and 50. Benefits at a Glance: Solo Innova

CONVENIENCES FEATURES ADVANTAGES APPLICATIONS

Hitzer Energy Master II Stoker Furnace Model 710 Owner s Manual Installation and Operation

Draft Controls. When to use a Draft Control

Installation, Operation and Maintenance Manual Hot Water Boilers

Leisure Line Power Vent Operations & Maintenance Manual And Safety Instructions

Technical Datasheet. FHG-S Models 28, and 45. Benefits at a Glance: State Route 22 Salem, NY 12865

FIELD DRAFT CONTROLS

A-250, A-350, & A-450 Warm Air Furnace

Leisure Line Power Vent Operations & Maintenance Manual And Safety Instructions

PUSHING THE LIMITS OF WHAT IS POSSIBLE

Multi-Heat. Multi-Heat Datasheet Version Tarm Biomass 4 Britton Lane Lyme, NH 03768

Technical Datasheet. P4 Pellet Boiler Models 8/15, 20/25, 32/38, 48/60. Benefits at a Glance:

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS

qüé=`üáãåéó An effective chimney is an important part of any successful wood-burning system.

A-150 Installation Instructions

CHAPTER 8 CHIMNEYS AND VENTS

Draft Control D R A F T C O N T R O L G U I D E w w w. f i e l d c o n t r o l s. c o m August 2007

Econoburn Technical Datasheet

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

Malm Fireplaces, Inc. 368 Yolanda Avenue, Santa Rosa, CA (707) Fax: (707)

Technical Datasheet. P4 Pellet Boiler Models 8/15, 20/25, 32/38, 48/60, 80/100. Benefits at a Glance:

Installation, Operation and Maintenance Manual. 90,000 BTU & 105,000 BTU Stoker Coal Stoves

CHIMNEYS AND VENTS CHAPTER 8

THE HYPROTHERM FRONT LOADING FORCED AIR FURNACE. Manufactured by HyproTherm, LLC Salem, Arkansas

Draft and Venting. Chapter 6

CHAPTER 8 CHIMNEYS AND VENTS

Installation, Operation and Maintenance Manual. 90,000 BTU & 105,000 BTU Stoker Coal Stoves, Direct Vent

SUPER JACK/ BIG JACK OWNER S MANUAL. Model No. s BJ90 - SJ125. Assembly Installation Operation Repair Parts SUPER JACK SJ125 BIG JACK BJ90

Fire Chief Wood/Coal Burning Furnaces

Venting of Gas Fired Equipment RV

INTRODUCTION THIS MANUAL INCLUDES IMPORTANT SAFETY INFORMATION

OWNER S MANUAL. DS Greenhouse Blast GH450. Do Not Discard This Manual. High Efficiency Wood or Coal Green House Furnace. Model:

WKS 2200 SERIES (USA only) --INSTALLATION INSTRUCTIONS--

CHIMNEY INSTALLATION. Technical Bulletin #1

Repair Parts , 1537G

PVE SERIES POWER VENTER SYSTEM MANUAL

POWER VENTER. Model: PVE Series

HOMEOWNER'S GUIDE FOR YOUR CONTEMPO FIREPLACE TABLE OF CONTENTS

Specifications 3. Bladder 5. Chimney 12. Air Supply 12. Anti-Rollout Device and Ash Auger Tube 14. Timer 15

Installation and Operating manual

Shenandoah R65-E Coal Burning Heater Manual

Installation Instructions T 9822 Gas Dryer. en - US, CA. To prevent accidents

tççç= ÜÉ~íáåÖ çéíáçåë

MODELS LFP4218/LFP6018 TOP VENT GAS FIREPLACE

Corn Flame Energy Corn Stove Model 3000

Installation, Operation and Maintenance Manual. Koker, Koker Lite & Econo 90 Stoker Coal Stoves

GAS FIRED BOILERS FOR FORCED HOT WATER VENTING ADDENDUM. ECR International Ltd. - Olsen Division P.O. Box 900 Wallaceburg, Ont.

DOMESTIC WATER HEATER OIL FIRED

OWNERS MANUAL LIBERATOR ROCKET HEATER Model: RMH-1

GENERAL BASIC INSTALLATION INSTRUCTIONS DIRECT FIRED HOT WATER BOILERS PARKER BOILER CO.

SAUNA HEATER INSTALLATION AND OPERATING MANUAL

THELIN GNOME PELLET HEATER PLANNING & INSTALLATION GUIDE

St. Croix Greenfield Installation Manual

Dovre 700CBW Cast Iron Wood Stove INSTALLATION INSTRUCTIONS 700G/1095

CMO32 CMO50 DOMESTIC WATER HEATER OIL-FIRED. Models: CMO32 CMO50

Esse B MODEL Roomheater with boiler WOOD BURNING ONLY MODEL

1 Exam Prep Solar Water and Pool Heating Manual (UCF) Questions and Answers (Plumbing Contractor)

Objectives. Home Performance Diagnostics with the House of Pressure (Part 1) How can Pressure effect Building Performance?

SIERRA RADIANT HEAT MAJESTIC OAK VENTED GAS LOG KIT INSTALLATION AND OPERATING INSTRUCTIONS

2012 INTERNATIONAL FUEL GAS CODE VENTS

Boiler Technical Specifications (2013)

Troubleshooting Guide

BEST DRAFT CONTROL: MANUAL DAMPERS IN MULTIPLE BOILER SYSTEMS

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

TECHNICAL MANUAL. Multifuel Stove Model EW1MF. To be retained by the user for future reference. Serial Number. Document EW1MF 0209

WOOD STOVE SERVICE MANUAL

GENERAL BASIC INSTALLATION INSTRUCTIONS INDIRECT GAS FIRED WATER HEATERS PARKER BOILER CO.

WKS 4000 SERIES (USA only) --INSTALLATION INSTRUCTIONS--

Version 2: 23/09/2013. SLIMPEL Wood pellet Boiler Models: S25 + S40

POWER VENTER SYSTEM. Model: PVO-300, PVO-600

State of ALASKA, Weatherization Assistance Program. Technical Support Document. Combustion Safety

Integrated Ventilation System

BC Series II OIL-FIRED CAST IRON BOILER INSTALLATION, OPERATION & MAINTENANCE MANUAL FOR US AND CANADIAN SALES

Before selecting your stove, it is very important that you clearly identify what your needs are:

NY Thermal Inc. WF-200 Wood Fired Boiler

NOT INSTALL THIS UNIT IN A MOBILE HOME.

FIREPLACE SIZES FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VACINITY OF THIS OR ANY OTHER APPLIANCE.

A hydronic system controls comfort by delivering heated or cooled fluid to the conditioned space through pipes.

Read and Save These Instructions All Hoods Must Be Installed By A Qualified Installer

Cookshack, Inc. Model FEC100 Fast Eddy Oven. Version /1/10

OWNER S MANUAL. DS Anthra-Max. Do Not Discard This Manual. High Efficiency Coal Stove. Models: XV14 XV15 XV16

MX 200. MX-200 Technical Specifications FEATURES:

AHearth Products. COAL BURNING CIRCULATOR HEATER MODELS CAC/BCAC Installation, Operation and Maintenance Instructions COAL ONLY STOVE

Weatherization Assistance Program (WAP) Space Heater Policy

COMBUSTION SAFETY BASICS

MODEL CF CEILING SUPPORTED CHIMNEY

USER S INFORMATION MANUAL

MBPA Home Performance FIELD DATA COLLECTION FORM

INSTALLATION AND OPERATOR S MANUAL

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

positions, side by side, end to end and Tee configurations. and utility pedestals

HEATING WITH WOOD Wood Boiler Planning Guide. Boiler Planning Plumbing Layouts Thermal Storage Clearances Wiring.

Transcription:

Owner s Manual for PennStoker

Table of Contents 1. Installation Placement ---------------------------------------------------------------------------------------- pg.3 Chimney Hook-up --------------------------------------------------------------------------- pg.3 Plumbing ------------------------------------------------------------------------------------------ pg.3 Electrical ------------------------------------------------------------------------------------------- pg.3 Domestic Hot Water ------------------------------------------------------------------------ pg.3 Safety Aquastat ---------------------------------------------------------------------------------- pg.4 2. Chimney and Flue Draft Considerations --------------- pg.4 3. Chimney Construction ------------------------------------------- pg.5 4. Operation --------------------------------------------------------------- pg.6 5. Maintenance ------------------------------------------------------------ pg.7 6. Troubleshooting ------------------------------------------------------ pg.8 2

Installation PLACEMENT Stove should be situated on a hard surface such as concrete. Use the individually adjustable legs on the boiler to level the stove. Follow all local codes and ordinances relating to required distances from walls and ceiling. Keep sufficient room for plumbing and wiring. Position the stove as close to the chimney as possible. HOOK-UP TO CHIMNEY Keep horizontal stove pipe to a minimum. If the chimney thimble is higher than flue collar on the stove, come out the back of the stove with a tee and angle up to the thimble using adjustable elbows. Approved stove pipe materials are 22 gauge galvanized or 316 grade stainless steel. Other grades of stainless or lighter gauges of galvanized will not hold up to the coal gases. The stove can be set on blocks if necessary. PLUMBING The cold water returns are at the bottom of the boiler and the hot water supplies are at the top. The return pipe and the supply must 180 from each other to achieve proper internal boiler circulation. A loop with a constantly operating circulator must be installed (007 Taco or its equivalent) between a top fitting and its 180 counterpart at the bottom. An injection style loop is recommended. An appropriately sized expansion tank must be installed in the system. The boiler water capacity is 20 gallons. Approved pipe must be used in the installation process. This includes copper, steel and certain kinds of plastic. Do not use rubber hose. If using plastic, make sure it has a vapor barrier and sufficient temperature rating to handle 240 F water. Failure to follow this spec will void the warranty. Supply and return piping should be no less than one inch in diameter. In radiant floor heat applications, install a mixing valve(s) between the supply and return lines to modulate floor water temperature. Air bleeders should be installed at the highest points in the system. You can never use too many air bleeders. It s better to put in extra than not enough. PRESSURE RELIEF VALVE A pressure relief valve must be installed in one of the ¾ fittings on the boiler. Use a down spout to direct any expelled water to the floor. Failure to do this could result in serious injury. PRESSURE GAUGE A back mounted pressure gauge should be installed in one of the ¾ fittings on the boiler. ELECTRICAL The PennStoker is shipped prewired and only needs 120VAC from a 20 amp breaker dedicated to the boiler. Follow all applicable federal, state and local codes and ordinances. Wire line voltage into the control panel main power switch. This is the yellow disconnect switch on the side of the control panel. There is a circuit in the control panel to wire a circulator into. We recommend that this be used for the loop circulator. Carbon monoxide detectors should be installed throughout the building. DOMESTIC HOT WATER An indirect hot water heater is recommended for domestic hot water. This should be treated as a separate zone in the heating system. Make sure a mixing valve is installed either in the boiler-to-water heater circuit or in the potable water circuit. Domestic hot water temperature must not exceed 160 F. Follow water heater manufacturer s instructions for installation and maintenance of the water heater. 3

SAFETY AQUASTAT A single aquastat that makes on temperature rise should be installed using one of the ¾ fittings on the boiler. This should be set at 200 F and should operate one of the heating circuits in the house. This will prevent over-firing of the boiler and eliminate the damage that can be associated with this malfunction. CHIMNEY, FLUE AND DRAFT CONSIDERATIONS Adequate chimney and draft conditions are critical to the proper operation of all coal burning equipment. Let s first look at some ideal objectives and practical operating ranges, then take a look at some basic chimney design considerations to help achieve these objectives. TEMPERATURE OBJECTIVES Naturally, the first and foremost function of the chimney is to safely carry the products of combustion from the stove and vent them safely to the atmosphere. To accomplish this task, the chimney must operate with relatively high internal temperatures while maintaining reasonably cool external temperatures so as not to pose a kindling threat to adjacent materials or structures. Proper internal operating temperatures are fundamental in maintaining good draft. However, they can be difficult to achieve. Much of this will be determined at the time the chimney is constructed. Ideally, a chimney should not be hotter than 350 F at a point where the flue gases enter and not cooler than 250 F at the point where they are discharged to the atmosphere. A properly constructed chimney will contribute significantly to these objectives. DRAFT OBJECTIVES Draft is the negative pressure (vacuum) within the chimney and is caused by the lighter-than-air column of hot gases there attempting to rise. Another contributing factor to draft is the aspirating effect of wind blowing across the top of the chimney. These aspirations cause fluctuations in the amount of draft and, since they are neither constant nor dependable, they are somewhat undesirable but nevertheless present and must be coped with. Therefore a constant, reliable draft is another of the primary functions of the chimney. Draft is measured in inches of water column with special equipment designed for the purpose. Your dealer will be able to help you determine the draft characteristics of your chimney or refer you to someone who can. Ideal draft =.05 to.06 inches of water column. Practical operating range =.04 to.07 inches of water column. Draft less than.04 inches of water column can cause: 1. Smoking conditions when the stove door is opened 2. Reduced BTU output 3. Slow fire build up in response to load demands 4. Hard to start fires Low drafts can be corrected with draft inducers of various sorts. However, these problems are best corrected through chimney modification and/or reconstruction. Consult your local chimney repair service or ask you dealer for recommendations. Drafts greater than.07 inches of water column can cause: 1. Excessive fuel consumption 2. Stove temperature override 3. High stack temperatures. 4. Hard to manage stove temperatures High drafts can be corrected with a barometric draft control. Consult your dealer. 4

CHIMNEY CONSTRUCTION BASIC FACTS TO CONSIDER 1. Chimney must have proper height. (See section on Height ). 2. Eliminate bends and obstructions in chimney. 3. Seal all air leaks and cracks. 4. Maintain smooth interior surface in chimney. 5. Chimney should be insulated. (See section on Location and Insulation ). 6. Allow only one stove or furnace per flue. If your chimney has only one flue and more than one heater is required, another chimney should be built. HEIGHT The chimney must be tall enough to produce adequate draft. Effective chimney height must be a minimum of twenty feet. Effective chimney height is measured vertically from the point where the flue gases enter the chimney to the point where they are discharged to the atmosphere. The top of the chimney must be at least two feet above any object within ten feet (horizontally) of the chimney. INTERNAL SIZE The chimney inside should be properly sized to fit the stove connected to it. A rule of thumb is 125% of the cross sectional area of the collar outlet leaving the stove = suitable cross sectional chimney area. Example: Collar outlet size of stove is 8. This is a cross sectional area of 50.27 sq. in. X 125% = 62.83 cross sectional square inches required in the chimney. The common size flue liner most closely meeting this requirement would be the 10 X10 O.D. which is approximately 8 X8 I.D. or approximately 64 sq. in. LOCATION AND INSULATION Chimneys constructed up through the inside of a house will generally have better operating temperature characteristics than those built on the outside, because of their warmer ambient temperatures. This can be further improved by pouring insulation such as vermiculite in the space between the flue liner and chimney block and also between the webbing of the blocks. Stainless steel insulated chimneys can also meet the qualifications required for a satisfactory chimney. Specific chimney building applications can be many and varied. For more complete details on proper chimney construction, consult your local library for a book on the subject and your local building inspector for local codes governing their construction in your area. 5

Operation CONTROL SETUP The control panel comes preset for continuous operation. If any adjustments need to be made, call your PennStoker dealer for assistance. GETTING STARTED Fill the coal hopper with coal (if equipped). Turn the main power switch to the ON position and the flip the toggle switches on the front to COLD START and ENABLE respectively. Adjust the dial to 5. STARTING THE FIRE Open the access door located just above the ash door. Place some newspaper and some kindling on the grates and light. DO NOT USE LIGHTER FLUID, GASOLINE, KEROSENE OR OTHER SUCH SUBSTANCES. SERIOUS INJURY OR DEATH COULD RESULT. Place small handfuls of coal on the burning kindling to get coal started. Adjust the dial to 10. Continue to feed the fire this way until the coal gets down from the hopper. Once the coal fire has been established, close access door and monitor water temperature. Once it has reached 130 F, flip toggle switch to RUN position, and the boiler will take care of itself from there. ADJUSTMENTS Adjustments can be made to the rate and amount of feed and amount of combustion air. These adjustments should be made with the help of qualified, trained personnel. Do not attempt to change the settings without calling your dealer. FUEL TYPE The PennStoker is only designed to burn anthracite (hard) coal. The small boilers should use rice coal. The big ones can burn buckwheat. Do not use pea coal or any type of soft coal, i.e. bituminous or lignite. Only use good quality coal. ASH CONTENT AND REMOVAL Ashes should be removed on a regular basis whenever the ash pan gets full. The ashes should not contain un-burnt coal. They should be able to be easily broken apart and crushed. If equipped with automatic ash removal system, ashes should be augered out every day. 6

Maintenance CLEANING The heat exchanger should be cleaned every month or as often as is necessary to maintain good efficiency and draft. The frequency will be somewhat determined by the type of coal used. To clean, allow fire to drop to low burn. Open access door on the very top of the boiler. Using a pair of welder s gloves, remove baffles from the fire tubes and clean with an industrial vacuum. Brush out the tubes and replace the baffles. Remove the plug from the bottom of the tee at the stove pipe on the back of the boiler and brush out pipe. Clean chimney once a year. SHUTTING STOVE DOWN Flip the toggle switch on the front of the control panel to INHIBIT. Allow the fire to burn out. Do not use water to attempt to put out the fire. If this shut-down is for the summer, remove all the ashes and clean off the grate. Follow the instructions in the section CLEANING. Spray WD-40 or another type of moisture repellent on the fire tubes, around the top of the heat exchanger, and on the grate. This will keep moisture from collecting inside the boiler causing corrosion. Troubleshooting Fire won t stay burning. Un-burnt coal in the ashes Carbon monoxide emission a. Increase amount of feed at hopper b. Use better quality coal c. Increase demand d. Adjust settings a. Decrease amount of feed at hopper b. Adjust settings a. Check chimney for poor draft b. Remove one of the baffles 7