Installation, operating and servicing instructions

Similar documents
Installation, operating and servicing instructions

INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS BG 2000-S (V13) RU PL DE IT ES NL EN 1 662Y0600 A

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc

VIESMANN. Service instructions VITOCELL 300-B VITOCELL 300-V. for contractors

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

Installation, Operating and Servicing Instructions

TECHNICAL MANUAL MULTI-ELEC STANDARD BOILER 09/2011 CODE:

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

GB24 & GB30. User Manual

Installation, Operation and Maintenance Instructions Electric Flow Heater OM009

Installation, Operating and Servicing Instructions

Unvented Electric Water Heater 10/15 litre Undersink

INSTALLATION & TECHNICAL MANUAL

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

FHHT 18 3 PHASE /32A / 400V ELECTRIC HEATER PRODUCT MANUAL P

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

USER INSTRUCTIONS & CUSTOMER CARE GUIDE Si II SERIES

1592P01. for liquids in piping DN

Installation, Operating and Servicing Instructions

Digital Control Unit- Installation, Operation & Maintenance IMPORTANT INFORMATION

ELECTRIC BOILERS FOR CENTRAL HEATING

OPERATING AND MAINTENANCE MANUAL FOR ELECTRIC STAINLESS STEEL HEATER FOR DEIONIZED (DI) WATER ELECTRIC HEATER COMPANY BASE MODEL D

Immersion heaters for ATEX/IECEx hazardous areas or in non-atex version

Logic+ Combi

HEATRAE SADIA. Installation and User Instructions for the UTC Undersink Vented Water Heater

INSTRUCTION FOR THE USER THC V E OIL BLU

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

VIESMANN. Installation instructions VITOCELL 300-B. for contractors. Vitocell 300-B Type EVBA-A. Dual mode DHW cylinder, 300 and 500 l

ProCon Streamline Gas Condensing Boiler. Installation and Operating Manual.

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

USERS GUIDE. Esprit eco 24, 30. For installation guide see reverse of book

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

MAINTENANCE AND SERVICE GUIDE

Combi C30 & C35. User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS COMBINATION BOILER

1592P01. for liquids in piping DN max. DC 48 V, 1 A, 20 W

VIESMANN. Installation instructions VITOCELL 300-V/W. for contractors. Vitocell 300-V/W Type EVIA-A

MULTI ELEC. Electric Boilers TECHNICAL MANUAL

Bosch Group. 15SBi / 24SBi. WALL MOUNTED BOILERS FOR CENTRAL HEATING and Indirect supply of domestic hot water

RE-PR3-E-27 3-Phase Panel Mount 27kW

Cat. N. Cat. N (s) 1. DESCRIPTION - USE 3. OVERALL DIMENSIONS. Technology : 4. PREPARATION - CONNECTION 2. PRODUCT RANGE

HeatMaster. Installation, operating and servicing instructions. HeatMaster 71 HeatMaster 101 HeatMaster 201 ENGLISH FRANCAIS NEDERLANDS ESPAÑOL

GEM-C Wireless User & Installation Manual. Revision October Apollo Solar Electric Limited. Documentation

USERS GUIDE 24, 30. For installation guide see reverse of book

USER GUIDE VOGUE COMBI GEN2 C26 C32 C40

PLEASE LEAVE THIS INSTRUCTION WITH THE USER. Ecomfort 30 HE. User instructions

Speedflow Undersink Unvented Water Heater. Models SF05K, SF10K and SF15K. Instruction Manual

Installation and User Instructions HS10U, HS15U.

FITTING, OPERATION, INSTALLATION & SERVICING INSTRUCTIONS

Installation & Servicing Instructions

Duct heaters for ATEX/IECEx hazardous areas or in non-atex version

Powerstock Storage Tank

TEMPRA. Wall Mounted Fan Flue System boiler. Wall mounted fanned flue boiler INSTALLATION AND USE INSTRUCTIONS. Appr. nr. B A - CE 0063 AQ 2150

USER GUIDE. IMAX XTRA EL kW. For Installation Guide see reverse of book

Instruction Manual WARNINGS

USERS GUIDE. LOGIC+ Combi 24, 30, 35

Installation and Operating Instructions ISH ELECTRIC STEAM SUPERHEATER

Circulation heaters for ATEX/IECEx hazardous areas or in non-atex version

Closomat Lima Vita installation & user guide

Instructions for installation and use RE/I. Industrial electric heater for swimming pool

User and Installation Instructions. Wall Mounted Water Boiler WMB3F/B and WMB3F/W IS435 ECN3461

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

PLEASE LEAVE THIS INSTRUCTION WITH THE USER ECOMFORT PLUS 25 HE. User instructions

SURFACE WARM CEILING HEATERS

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00

WATLOW ELECTRIC MFG CO. FIREBAR Screw Plug Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.

SERVICE MANUAL. Bradford White ElectriFLEX HD (Heavy Duty) Commercial Electric Water Heater CEHD SERIES Immersion Thermostat Models

Servicing Instructions Type C Boilers G.C.N: LEAVE THESE INSTRUCTIONS ADJACENT TO THE GAS METER

American Dish Service

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS,

Multi-Elec COMPACTE BOILER

Electronic Dual Cylinder Thermostat Installation Instructions

Bosch Group. 35CDi WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS.

A/23 MFFI - A/27 MFFI

CRU-S Series Stainless Steel Condensate Recovery Unit

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

SLIM-LINE RC FAN CONVECTOR.

Alpha CD13R,18R and 24R

OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS. Technical Control Systems Limited MODELS "VIHS"

DIGITAL MODULATING BOILERS

ELECTRIC COMBINATION BOILER. (European Patent No: Design Right Protected.) TH12-450U MRK 2

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB

DOMESTIC HOT WATER Follow operational sequence

Powermax HE 85, 115 & 150 Litre Condensing Boilers with Integrated Hot Water Storage

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

FSW300 Series Flow Switch

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS, for the User and the Installer. SMART Line. Smart ME A Y2000 B

HW3 Handwash Installation and Operating Instructions

INSTALLATION AND SERVICE MANUAL

Engineers manual. Pass Through machines P500 P500 A P500 AS P500 A WS P500 AS WS. A- AirBreak WS Water Softener. AS Dual Rinse Element

British Gas 330+ High Efficiency Condensing Boiler. Instructions for Use. To b e l e f t w i t h t h e u s e r. British Gas Service Tel:

! The Caution Symbol (exclamation point) alerts you to a "CAUTION", a safety or

Bosch Group. 24CDi OF WALL MOUNTED COMBINATION BOILER FOR CENTRAL HEATING AND MAINS FED DOMESTIC HOT WATER INSTALLATION AND SERVICING INSTRUCTIONS

Powerflow Unvented water heater

Forced draught gas burner

PANDORA HEAT BANKS OXFORD BROOKES, HARCOURT HILL. Operation and Maintenance. THERMAL INTEGRATION LTD. Tel: Internet:

GAS FIRED ATMOSPHERIC ELECTRONIC VERSION kw

Pressurisation units & expansion vessels

Transcription:

English 57-115 - 144-1 - 259 Installation, operating and servicing instructions ITALIA EN 1

ITALIA English INDEX WARnINGS 3 Who should read these instructions 3 Symbols 3 Recommendations 3 Importants notes 3 introduction 4 Description of the specifications 4 instructions 5 User data 5 Setting up 5 Heating system pressure 5 Control panel legend 5 technical characteristics 6 Electrical data 7 Power 7 Nominal current per phase 7 installation : General 8 Dimensions 8 Installation room 8 installation : Hydraulic 9 Heating connection 9 Heating connection + DWL 9 installation : Electric supply 10 General safety rules 10 Important 10 Electrical connections 10 Sizing of supply wires 11 Power variation (kw) relative to voltage 11 Wiring diagrams 12 Power limitation 13 Control circuit terminal 13 Powers wiring / Model : E-Tech P / 57 14 Powers wiring / Model : E-Tech P / 115 15 Powers wiring / Model : E-Tech P / 144 16 Powers wiring / Model : E-Tech P / 1 18 Powers wiring / Model : E-Tech P / 259 commissioning 22 Commissioning - Water 22 Commissioning - Electrical 22 Starting the boiler 22 maintenance 23 spare parts EN 2 See at the end of this manual

WHO SHOULD READ THESE INSTRUCTIONS These instructions should be read by: - the specifying engineer - the installer - the user - the service engineer Importants notes Warnings The manufacturer reserves the right to change the technical characteristics and specification of its products without notice. English Symbols Essential instruction for the correct operation of the installation. Essential instruction for the safety of persons and the environment. Danger of electrocution. Danger of burns The availability of certain versions and their accessories can vary following the market. Warning : Do not switch ON if there is a possibility that the water in heater is frozen. Recommendations These instructions are an integral part of the equipment to which they relate and must be handed to the user. The product must be installed and serviced by qualified engineers in accordance with the regulations in force. The manufacturer declines all liability for any damage caused as a result of incorrect installation or in the event of the use of appliances or accessories that are not specified by the manufacturer. ITALIA Any failure to follow instructions relating to tests and test procedures may result in personal injury or risks of pollution. It is important to switch the boiler off from the external switching device before carrying out any work. There are no user parts inside the control panel. The installation must be in accordance with the current standards. EN 3

English introduction Description of the specifications: This floor standing electric boiler is available in 5 models : - Model 57 with a power of 57,6 kw - Model 115 with a power of 115,2 kw - Model 144 with a power of 144 kw - Model 1 with a power of 1,6 kw - Model 259 with a power of 259,2 kw The power circuit is supplied with 400 Volt tri phases without neutral. The control circuit is supplied with 230 Volt single phase. Casing The boiler is protected by a steel casing that has a red stove enamelled finish. Heating body The boiler heating body is constructed from mild steel with welded joints. It is hydraulic tested at a pressure of 5,2 bar (maximum working pressure = 4 bar). Heating elements Immersion heaters, constructed from stainless steel Incoloy 800 are mounted in the front of the boiler, provide the heating source to the boiler. 4 CONNECTION The boiler is suitable for connection to most heating and water process systems, with a maximum working pressure of 4 bars and a maximum temperature of 90 C. It can also be used in multiple boiler installations allowing greater outputs to be achieved. The boiler and connection glands are provided for the power supply, the control supply and optional external controls. Control The boiler is equipped with an electronic sequencing control that constantly adapts the power required thanks to a four stage modulation. The boiler is commonly controlled by an external contact (i.e. room thermostat). The maximum power can be limited to 25%, 50% or 75% by moving electrical bridges. ELECTRICAL PROTECTION The control circuit is protected by an internal 3 Amp MC. The power circuit is protected at its input by 3 power fuses. Moreover, each contactor - supplying a pair of electric stars (28,8kW) - is protected by an automatic thermal and magnetic safety relay. 5 1 2 ITALIA 6 1. Control panel 2. Heating elements 3. Contactor and safety relays 4. Optional controller 5. Control circuit 6. Main fuses and power connections 7. Removable access panel 3 EN 4 7

USER DATA All user controls are situated on the front panel of the boiler, there are no user controls inside the boiler casing. The following instructions assume that the boiler has been commissioned, and that the system is filled with water and has been fully vented. SETTING UP efore switching on any electrical supplies to the boiler ensure that the combined temperature and pressure gauge reads at least 1 bar and the control thermostat is set to the desired temperature. If any other auxiliary controls are fitted e.g. programmer, room thermostats, cylinder thermostats etc, consult appropriate manufacturers instructions to switch these on. Switch the winter/summer switch to winter position. Switch on any local means of isolation to boiler. Ensure all the jacket panels are secured before switching on electrical supply from the external isolator. Switch the boiler on using the ON/OFF switch (a test of the lights is done). After a short period of time the boiler temperature should start to rise, indicated on combined temperature and pressure gauge. The modulation level is displayed on the front panel by the stage indicator lights. If the boiler fails to operate, the overheat safety thermostat should be checked. Access to the thermostat reset button is obtained by unscrewing (anticlockwise) the domed button cover on the front panel (a screwdriver is not required).the reset button can then be seen - press the button, a click should be heard and the button is reset. If no click was heard the device is not at fault and further investigation is required by a suitably qualified engineer. The external programmer can now be set to allow on/off periods as desired. The ON/OFF switch should be left in the ON position during normal use. The power level indicator will automatically light on and off during normal boiler operation, depending on boiler temperature. If the boiler is not in regular daily use during cold periods, it is recommended that it is fitted with a frost sensing thermostat to prevent the system from freezing. As with most boilers and heating appliances the casing and pipework can get hot during normal running so the boiler must not be covered and the surrounding area must be kept clear. HEATING SYSTEM pressure The CH pressure must be a minimum of 1 bar and must be checked by the end user on a regular basis. If the pressure drops under 0.5 bar, the integrated water pressure switch blocks the appliance until the pressure in the system returns to a level above 0.8 bar. The installer must fit an external filling loop to the system. For more information, please ask your installer when the system is delivered. A pressure safety valve is provided with the appliance. If the system pressure exceeds 4 bars, this valve opens and drains the water from the system. In this case, please contact your installer. Control panel legend 1. Control thermostat : 1 = 25 C 2 = 40 C 3 = 55 C 4 = 70 C 5 = 85 C 2. ON/OFF switch 3. Summer/Winter switch 4. Manual reset high limit thermostat 5. Overheating warning light 6. Minimum water pressure warning light 7. Combined temperature and pressure gauge 8. Power level indicators 9. Optional internal controller introduction ITALIA English 4 5 6 7 8 1 2 3 9 EN 5

English technical characteristics Model 57 115 144 1 259 Power 57,6 kw 115,2 kw 144 kw 1.6 kw 259,2 kw Nominal supply voltage Power circuit 3 x 400 V 3 x 400 V 3 x 400 V 3 x 400 V 3 x 400 V Control circuit 1 x 230 V 50/60 Hz 1 x 230 V 50/60 Hz 1 x 230 V 50/60 Hz 1 x 230 V 50/60 Hz 1 x 230 V 50/60 Hz Heating element type 4 x 3 x 2.4 kw 4 x 3 x 2.4 kw 4 x 3 x 2.4 kw 4 x 3 x 2.4 kw 4 x 3 x 2.4 kw Number of elements 2 4 5 7 9 Ohmic value of single resistance (2,4 kw) Water capacity (Litres) Max. working pressure (bars) 22,0 Ohm 22,0 Ohm 22,0 Ohm 22,0 Ohm 22,0 Ohm 60 60 60 102 102 4 4 4 4 4 Min. working pressure (bars) Max. working temperature ( C) Hydraulic pressure drop (mbar) [ T = 10 C] 0.8 0.8 0.8 0.8 0.8 90 90 90 90 90 79 123 33 Heating connection 2 [F] 2 [F] 2 [F] DN 100 (*) DN 100 (*) ITALIA Height (mm) 1495 1495 1495 1495 1495 Width (mm) 542 542 542 542 542 Depth (mm) 567 567 567 567 567 Weight empty (kg) 110 123 131 187 0 (*) DN100 flanges to be welded EN 6

technical characteristics POWER English Models Power (kw) Power (kw) Power (kw) Power (kw) Total Power (kw) E-Tech P / 57 14,4 14,4 14,4 14,4 57,6 E-Tech P / 115 28,8 28,8 28,8 28,8 115,2 E-Tech P / 144 36,0 36,0 36,0 36,0 144,0 E-Tech P / 1 50,4 50,4 50,4 50,4 1,6 E-Tech P / 259 64,8 64,8 64,8 64,8 259,2 Models (A) Nominal current per phase (A) (A) (A) Total current per phase (A) E-Tech P / 57,9,9,9,9 83,6 E-Tech P / 115 41,7 41,7 41,7 41,7 166,8 E-Tech P / 144 62,7 62,7 41,8 41,8 9 E-Tech P / 1 83,5 83,5 62,6 62,6 292,2 E-Tech P / 259 83,5 104,4 83,5 104,4 375,8 ITALIA EN 7

English Installation : General Dimensions Models A mm mm C mm D mm E mm F mm Heating connection E-Tech P / 57 1495 567 550 183 542 125 2 [F] E-Tech P / 115 1495 567 550 183 542 125 2 [F] E-Tech P / 144 1495 567 550 183 542 125 2 [F] E-Tech P / 1 1495 567 1100 183 542 125 DN 100 E-Tech P / 259 1495 567 1100 183 542 125 DN 100 A C F D E ITALIA Installation room The minimum clearance around the appliance must comply with the figure shown opposite. oiler room Electric boilers must be installed in boiler rooms complying with the relevant technical standards and applicable regulations. The appliance should never be installed outdoors, because it has not been designed for and is not equipped with automatic defrosting systems. If possible, install the boiler above the ground level, to reduce the risk of flooding the electrical components. Top view 500 mm FROST PROTECTION The boiler is T fitted with frost protection. If the boiler is being installed in a position where freezing could take place, then a suitable external frost thermostat should be fitted. CONNECTING TO THE SYSTEM The boiler is designed to operate on a sealed system (ie. no open vent or feed and expansion tank). An adequate expansion vessel, sized accordingly must be installed in the system. 500 mm EN 8

English 9 10 11 12 13 14 15 16 9 10 11 12 13 14 15 16 17 18 17 18 L N Pk W W I max = 5A 19 19 ITALIA 9 10 11 12 9 10 11 12 G R V G G R V G Heating connection Installation : Hydraulic Adjustable temperature 1 = 25 C 2 = 40 C 0-90 C 3 = 55 C 4 = 70 C 5 = 85 C heating connection + dhw (2 Circulating pumps) Pk The controller is factory programmed with DHW priority. To cancel the DHW priority, remove the black wire from I7 and connect to I8 in the electronic controller. I1 I2 I3 I4 I5 I6 I7 I8 I9 I10 I11 I12 Warning : Size the flow rate in hydraulic circuit to insure a 10 C maximum T. 0-90 C Pk W W L N I1 I2 I3 I4 I5 I6 I7 I8 I9 I10 I11 I12 Pk 1 = 25 C 2 = 40 C 3 = 55 C 4 = 70 C 5 = 85 C I7 = DHW priority Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 I8 = DHW priority Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 13 14 13 14 15 16 15 16 EN 9 17 18 19 17 18 19

English installation : Electric supply WARNING!!! Size the flow rate in the hydraulic circuit to ensure a 10 C maximum T. GENERAL SAFETY RULES The boiler must be installed by a competent person or registered company. After the installation work, the installer must issue a statement of compliance, declaring that the installation has been carried out in a workmanlike manner, as defined for by the applicable regulations. Make sure that the wiring system and the power input lines are designed and installed by skilled engineers in compliance with the applicable regulations. Important As far as the power input to the boiler is concerned, the installation must comply with IEC 364 standards and other provisions concerning installation conditions. The default electrical safeties integrated in the boiler protect the internal parts of the boiler. Electrical safeties, including isolators must be installed in an external box. For protection against electrical hazard, it is always recommended to install a differential cut-out device (Ground Fault Isolator) on the power supply circuit, upstream of the boiler. For protection against overheating, it is advisable to place an external positive safety power cut-out, controlled by the boiler safety thermostat. Electrical connections 1. Remove the right panel cover and the top panel 2. Connect the electrical supply to the control circuit and all accessories (room thermostat, ) 3. Pass the power cabels thought the cable glands located in the rear panel. 8. Remount the bottom protection and close the power connections box. 1 2 1 Models Standard cable gland Optional cable gland (*) E-Tech P / 57 1 x PG 36 4 x PG 21 E-Tech P / 115 1 x PG 48 4 x PG 21 E-Tech P / 144 1 x PG 48 4 x PG 21 E-Tech P / 1 4 x PG 29 1 x PG 48 E-Tech P / 259 4 x PG 29 1 x PG 48 4 5 3 ITALIA (*) Optionally, the installer has the possibility to remove the standard cable glands and install the optional cable glands (not supplied) on site. 4. Connect the earth using a ring terminal. 5. Open the power connections box. 6. Remove the bottom protection. 7. Connect the power wires to the main connections using ring terminals. (*) a transormation kit is supplied with the boiler in order to connect the power wires using compression terminals (see detailled instructions sheet in the kit). Optional connection EN 10 6

SIZING OF SUPPLY WIRES The supply wires are sized depending of the type and current of the MC. The MC last is sized depending of the nominal current of the boiler. The admissible current of the supply wires depends of the ambient temperature, the section, the length and the insulation of the wires, the wires ducts, the mounting and the environment. The following values are given for information for an ambient temperature of 25 C and a maximum length of 5 meters. In all the circumstances, the installation must be in accordance with the current IEE wiring regulations. Diameter mm2 Current Amp 1,5 16 2,5 25 4,6 36 installation : Electric supply Power variation (kw) relative to voltage Models 3 x 380 V 3 x 400 V 3 x 415 V 3 x 440 V E-Tech P / 57 51,4 57,6 62,0 70 E-Tech P / 115 103,8 115,2 124,0 139 E-Tech P / 144 130,0 144,0 155,0 174 E-Tech P / 1 181,4 1,6 217,0 244 E-Tech P / 259 233,7 259,2 279,0 314 English 10 47 16 65 25 87 35 115 50 143 70 178 95 2 1 265 150 310 185 355 240 480 For higher temperatures, the supply wire diameter should be adapter according the derating factor. T ambient C Current derating % 25 100 30 92 35 85 40 75 45 65 ITALIA 50 53 55 38 EN 11

English installation : Electric supply Wiring diagrams 11 12 W 1 2 3 3 Amp MC r r r Y/Gr 5 Y/Gr 15 Y/Gr 18 A F 2 G C Or 1 t 4 C 1 Pk C R 2 P Or 7 8 6 R R D R Pk E C 2 t Pk 23 24 1 9 10 R W Pk Pk K1 V L N W 25 26 28 30 R G Pk R W V V V K2 W W K3 W R G Pk I1 I2 I3 I4 I5 I6 I7 I8 I9 I10 I11 I12 Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 G K4 27 29 W W 13 14 V V 16 18 R R 19 Or Or 21 22 R Or ITALIA r G Or Pk R V W Y Y/Gr : lue : lack : rown : Grey : Orange : Pink : Red : Violet : White : Yellow : Yellow/Green A : ON/OFF switch : Manual reset high limit thermostat C : Water pressure switch D : Summer / Winter switch E : oiler thermostat 0-90 C F : Alarm indicator G : Electronic controller I1 : High temperature I2 : Water pressure I3 : Common alarm signal I4 : oiler demand I5 : Central heating demand I6 : DHW demand I7 : DHW priority I8 : Without DHW priority I9 : SW1 (power limitation) I10 : SW2 (power limitation) Q1 : K1 Q2 : K2 Q3 : K3 Q4 : K4 Q5 : Heating pump Q6 : DHW pump Q7 : Water pressure warning light Q8 : High temperature warning light EN 12

Power limitation : The maximum power of the boiler can be limited from 25 to 100% by acting on the SW1, SW2 electrical bridges as mentioned in the table below. installation : Electric supply Any change to the power limitation will alter the current once the boiler has switched to stand-by (busy signal is OFF). The external management system can then open the ON/OFF link. English Power 25% 50% 75% 100% SW1 0 1 0 1 SW2 0 0 1 1 25% = Only 1 stage 50% = Only 1 and 2 stages 75% = Only 1 to 3 stages 100% = All stages Control circuit terminal Power L Power PE Power N 230 V OUT (L) 230 V OUT (PE) 230 V OUT (N) Safety relay (L) Safety relay (N) Central heating demand (OUT) Central heating demand (IN) DHW demand (IN) DHW demand (OUT) Central heating pump 230 V Central heating pump (N) Central heating pump (PE) DHW pump 230 V DHW pump (PE) DHW pump (N) Water pressure alarm 230 V Water pressure alarm (N) Safety thermostat alarm 230 V Safety thermostat alarm (N) Heating ON signal (busy) 230 V Heating ON signal (busy) (N) ON / OFF switch ON / OFF switch Heating power SW1 Heating power SW1 Heating power SW2 Heating power SW2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 21 22 23 24 25 26 27 28 29 30 EN 13 ITALIA

English installation : Electric supply Power wiring / Model : E-Tech P / 57 35 mm 2 F-100A Q4-1 Q3-1 x 5 mm A1 A2 25 3 0 25 3 25 3 0 25 3 0 Q2-1 ITALIA Q1-1 EN 14

Power wiring / Model : E-Tech P / 115 installation : Electric supply English 95 mm 2 F-0A x 5 mm Q4-2 Q4-1 A1 A2 25 3 0 25 3 Q3-2 Q3-1 25 3 0 25 3 0 25 3 0 25 3 25 3 0 25 3 0 Q2-2 Q2-1 ITALIA Q1-2 Q1-1 EN 15

English installation : Electric supply Power wiring / Model : E-Tech P / 144 1 mm 2 F-250A x 5 mm Q4-2 Q4-1 Q3-2 Q3-1 Q2-3 Q2-2 Q2-1 ITALIA K2-3 Q1-3 K1-3 Q1-2 Q1-1 EN 16

Power wiring / Model : E-Tech P / 144 installation : Electric supply English K2-3 K1-3 ITALIA K2-3 K1-3 K2-3 K1-3 EN 17

English installation : Electric supply Power wiring / Model : E-Tech P / 1 185 mm 2 F-315A 30 x 5 mm Q4-3 Q4-2 Q4-1 K4-3 Q3-3 Q3-2 Q3-1 K3-3 Q2-4 Q2-3 Q2-2 Q2-1 ITALIA K2-4 K2-3 Q1-4 K1-4 Q1-3 K1-3 Q1-2 Q1-1 EN 18

Power wiring / Model : E-Tech P / 1 installation : Electric supply English K4-3 K3-3 K2-4 K2-3 K4-3 K3-3 K2-4 K2-3 K1-4 K1-3 K1-4 K1-3 ITALIA K4-3 K3-3 K2-4 K2-3 K1-4 K1-3 25 23 EN 19

English installation : Electric supply Power wiring / Model : E-Tech P / 259 240 mm 2 F-400A 30 x 5 mm Q4-5 Q4-4 Q4-3 Q4-2 Q4-1 K4-5 K4-4 K4-3 Q3-4 Q3-3 Q3-2 Q3-1 K3-4 K3-3 Q2-5 Q2-4 Q2-3 Q2-2 Q2-1 ITALIA K2-5 K2-4 K2-3 Q1-4 K1-4 Q1-3 K1-3 Q1-2 Q1-1 EN

Power wiring / Model : E-Tech P / 259 installation : Electric supply English K4-5 K4-4 K4-3 K4-5 K4-4 K4-3 K3-4 K3-3 K3-4 K3-3 K4-5 K4-4 K4-3 K2-5 K2-4 K2-3 K2-5 K2-4 K2-3 K3-4 K3-3 K2-5 K2-4 K2-3 ITALIA K1-4 K1-3 K1-4 K1-3 K1-4 K1-3 EN 21

English commissioning COMMISSIONING - WATER 1. The system must be thoroughly flushed prior to connection of the boiler. The system water should be treated to prevent general corrosion and deposition of scale or sludge in the boiler. If installing the boiler onto an existing system, ACV recommend that an approved system cleaner is used. 2. Fill and pressurise the boiler and system to 1.5 bar, making sure to vent the boiler via the automatic air vent on top of the boiler. Note that the black dust cap on the air vent should be left loose to allow the auto vent to function. 3. Check for leaks. COMMISSIONING - ELECTRICAL The Electrical installation supplying this boiler must conform to the current IEE Regulations. 1. Remove the front and the right-handside. Check all electrical connections for tightness. 2. Ensure all internal relays, contactors etc are secure on the DIN rails. 3. Set panel control main switches to off. 4. Set internal MC to off position. 5. Set the control thermostat to desired temperature. STARTING THE OILER 1. Switch on internal MC 2. Fit and secure all panels 3. Switch on local isolator to boiler 4. Turn the boiler on using the ON/OFF switch 5. The first stage energises as indicated by the panel light. The temperature will now rise as indicated by the combined temperature and pressure gauge. As long as the control thermostat set-point is not reached, the next stage is energised every 2 minutes until all the stages are energised. When the control thermostat set-point is reached, the last stage is de-ernergized every 30 seconds until all the stages are de-energized. Once these procedures have been followed the system can be left to operate normally. After one week of operation all electrical connections should be re-checked. The fixing nuts must of the heating elements must be re-tightened at the nominal torque of 10 Nm following the tightening sequence mentioned in maintenance section. ITALIA EN 22

MAINTENANCE For safety reasons it is recommended that the boiler is serviced annually and that servicing is carried out by a qualified service engineer. efore carrying out any work on the system ensure that the boiler is cool and all electrical supplies are isolated. 1. After removing the front and the right panels, Undertake a visual inspection of the boiler checking for signs of water leakage from gaskets, and the components on top of the boiler. 2. Undertake a visual inspection of all wiring in the boiler casing checking for signs of overheating or burning. 3. Check all push-on electrical connectors for tightness and good connection to the relative components. 4. Using a correct fitting screwdriver check all electrical terminals on DIN rails and on all components for tightness. 5. Re-tight the fixing nuts of the heating element at nominal torque of 10 Nm following the tightening sequence. 6. Check all individual circuit breakers are in the normal position. If some fuses have tripped, check the wiring and the resistance before reactivating them. 7. Replacement of the heating element (if required). maintenance 8. Replacement of the main fuses (if required) Models Fuses ACV code E-Tech P / 57 100 A 5476C006 E-Tech P / 115 0 A 5476C007 E-Tech P / 144 250 A 5476C008 E-Tech P / 1 315 A 5476C009 E-Tech P / 259 400 A 5476C010 1 2 English 5476D003 557A0088 Ohmic value : 22 Ω 1 5 7 9. Fit the right-hand panel and the boiler front cover and refit screws. 10. Switch ON the electrical supply and following the procedures described in the commissioning section. efore opening any cover and/or caring and any work on the system, ensure that the system is electrically disconnected from the power supply. ITALIA 3 4 8 6 2 torque = 10 Nm Please follow the tightening sequence EN 23

ITALIA English EN 24

E-Tech P / 57-115 - 144-1 - 259 21471436 21475436 21477436 21474436 21473436 ML 1 21478436 21472436 Spare Parts

E-Tech P / 57-115 - 144-1 - 259 54764009 54766023 54766024 54763016 54764021 54428107 Spare Parts 544445 ML 2 54428116

E-Tech P / 57-115 - 144-1 - 259 557A5005 557A3001 557A1056 54766015 557A0088 5476F001 5476D003 54766026 5476V017 557A1057 E-Tech P 1 / 259 557A0017 5476V019 55426001 547655 54766028 ML 3 Spare Parts