I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

Annual Report of Inspection, Testing & Maintenance of Automatic Sprinkler System

1 Exam Prep NFPA 14 Stand Pipe Systems Questions and Answers (Plumbing Contractors)

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

New Construction Fire Inspection Process

Design & Construction Standards, Revised January

CONSTRUCTION REQUIREMENTS

COBB COUNTY SCHOOLS /S&A % BID DOCUMENTS 2/18/11 SECTION SPRINKLER SYSTEM

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

DIVISION 21 FIRE SUPPRESSION

Western Michigan University Facilities Management Engineering Division

NFPA CODE TESTING & INSPECTION. Requirements & Recommendations for. Licensed Florida Hospitals, Ambulatory Surgery Centers,

Oxnard Fire Department 360 W. Second Street Oxnard, CA (805) Fax (805)

Fire Sprinkler Submittal Requirements and Acceptance Testing

MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

Fire Protection System Impairment Procedure

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

Deluge/Preaction Systems Annotated Instructor s Guide

Deluge/Preaction Systems Annotated Instructor s Guide

Inspection of Fire Sprinkler Systems. NFPA 25, Inspection, Testing & Maintenance of Water Based Fire Protection Systems

WALL ESCUTCHEON PIPE SEAL WITH APPROVED FIRE CAULKING (SEE SPECIFICATIONS) NOTE: 12" 12" 24"

SECTION : FIRE PROTECTION SYSTEMS

AUTOMATIC FIRE SPRINKLER SYSTEM STANDARDS Development Standard #4.1 (Commercial Installations)

FIRE PROTECTION. 1. Vertical fire pumps shall not be used at the University.

ADDENDUM #1 ITB# Fire Protection Maintenance Services Responses to Clarification Questions 10/06/2015

LIFE SAFETY & FIRE PREVENTION MANAGEMENT PLAN

5.07 Air Replenishment Systems

A. This section includes design and performance information for fire protection and suppression systems.

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

Backflow Prevention for Fire Sprinkler Systems. State of Illinois Plumbing Code

False Sense of Security???

RESIDENTIAL MULTI-USE FIRE SPRINKLER SYSTEMS PERMIT SUBMITTAL REQUIREMENTS

CLARK COUNTY FIRE DEPARTMENT Fire Prevention Bureau

FIVE YEAR AUTOMATIC FIRE EXTINGUISHING SYSTEMS CERTIFICATION REPORT

PURPOSE OF THE PROCEDURE

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

Established /10/2015. Doran Pruisner Dan Wood

DIVISION 21 - FIRE SUPPRESSION

UBC Technical Guidelines Section Edition Fire Protection General Requirements Page 1 of 6

DESIGN & CONSTRUCTION GUIDELINES

Sprinkler Inspection Certificate

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

The Owner will provide the QEI inspection and certification services.

GLENDALE FIRE DEPARTMENT FIRE MARSHAL S OFFICE

DIVISION 21 - FIRE SUPPRESSION

SPRINKLER SYSTEM DRY WET

SECTION WET-PIPE SPRINKLER SYSTEMS

Environmental Health & Safety

Facilities Management

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

SECTION WET-PIPE SPRINKLER SYSTEMS EASY RISER CHECK VALVE

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL F SERIES DRY VALVE

TECHNICAL DATA 1. SYSTEM DESCRIPTION 2. SYSTEM OPERATION 3. INSTALLATION. Page 1 of 5

S a n F r a n c i s c o F i r e D e p a r t m e n t B u r e a u o f F i r e P r e v e n t i o n & I n v e s t i g a t i o n 1 of 8 P a g e

FIRE SUPPRESSION SPRINKLER SYSTEM

1 Exam Prep. Questions and Answers

UC Santa Cruz Campus Design Guide. Includes the following sections: None DESIGN REQUIREMENTS

Bold items are particular to the City of Euless

Winnipeg Fire Department Fire Prevention Branch

Black Diamond Fire Department Building Owner s Responsibilities for Fire Safety Equipment

Revision May All designs must be submitted to FM Global for review and approval prior to issuing such for bids.

Skilled Healthcare Documentation Requirements Life Safety and Fire Protection

Zurn Pex, Inc. Residential Fire Protection Presentation. PEX Plumbing, Radiant Heating and Residential Fire Protection Systems

Hot Work Policy and Procedures

Date Issued: December 14, 2017 Revision: 2.1

Safety Practices Fire Protection Equipment Cold Weather

Box-in-Box Cold Storage Fire Protection Options

EXHIBIT D ATTACHMENT G - UNIT PRICING DMS-14/15-039B - SIMPLEXGRINNELL, LP FIRE SPRINKLER SYSTEM INSPECTIONS YEARS 1-5

Quick Guide for Fire Sprinkler Inspection Requirements Key Deficiencies with NFPA References NFPA & NFPA 13/

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Emergency Response Plan

Chapter 4: Fire Protection Systems

FIRE AND SAFETY PROJECT REVIEW REPORT

1.3 REFERENCE STANDARDS

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

2-SUPPRESSION REQUIREMENTS - CODE REQUIRED INSPECTIONS TEST Page 1 of 7

CONSTRUCTION SERVICES GUIDE FOR UNIVERSITY OF FLORIDA FACILITIES

Expectations (continued)

CRU-S Series Stainless Steel Condensate Recovery Unit

SUMMARY. Building receiving sprinkler credit: SPRINKLERED. Grade: 68. Percent of Building Sprinklered: 100% Sprinkler Demand Met: 91%

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

FIRE & LIFE SAFTEY STANDARD

PLAN REVIEW CHECKLIST

Inspection Report Nursing Home Life Safety Code Section 4 - Annual Fire Alarm Testing and Maintenance. For

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN

INVITATION TO QUOTE. Page 1 of 7. Fire & Emergency Safety Plan Control Number: 2018-CFS-003 Issue Date: March 7, Purpose

Fire Sprinkler System Design and Installation Requirements

PVE SERIES POWER VENTER SYSTEM MANUAL

Transcription:

Revision No.: 4 Page 1 of 5 I. PURPOSE This procedure identifies how to conduct a sprinkler system main drain test for Strong Memorial Hospital. II. PERSONNEL AFFECTED Fire Safety Unit III. DEFINITIONS EH&S- Environmental Health and Safety Department of the University of Rochester Fire Safety Unit Representatives of the University Fire Marshal s Office out of the EH&S department. IV. RESPONSIBILITIES The Fire Safety Unit representative conducting this test is responsible for following the proper procedures related to these systems and for contacting Public Safety when the test begins and ends. Failure to do so may result in injury, damage or prevent the proper operation of equipment. V. PROCEDURES A. Contact the University Public Safety Communications Center and advise them you will be testing the sprinkler system main drain in SMH and to ignore water flow alarms from the SMH and G-3000 fire alarm panels. B. Contact facilities work center (ext. 34567) and advise them you will testing the sprinkler system main drain in SMH. C. Disable SMH (1-3452) fire alarm panel, G-3000 Simplex and Johnston Fire panels per the fire alarm disconnect/reconnect procedures. D. Proceed to the fire pump room (B-1250). E. Shut both the Fire pump and Jockey pump off for the test per Fire Pump disconnect procedure. F. Close pet cock and remove the gauge from the supply side. Open pet cock and purge any excess debris/air from the port before installing the calibrated gauge.

Revision No.: 4 Page 2 of 5 G. Open the 2 main drain to release the pressure from the weekly pump test to street pressure. H. Close the 2 main drain. I. Observe and document the static pressure on the supply side and Start Test Time on Appendix 1. J. Open the 2 main drain fully and watch the supply side calibrated pressure gauge to see how much lower the pressure drops. When the pressure stabilizes, note and document the residual pressure on Appendix 1. K. When the pressure gauge stops dropping and stabilizes, close the main drain fully, note the time on Appendix 1 as Time Test Completed. L. Watch the calibrated gauge as it returns to match the actual street pressure and record static pressure and time on Appendix 1 under Time System Stabilized. M. The flow-testing portion is completed. N. The pressure should not drop 10%. If so, refer to Fire Marshal. Example: Street pressure is 60 psi X 10% = 6 psi. The calibrated gauge should not drop past 54 psi during the stabilized timed flow test. O. Once the main drain is closed, turn the jockey pump back on and wait for the system pressure to return to normal. Caution: If the fire pump is turned on, it will activate and slam the system pressure quickly and possibly cause damage and/or multiple flow alarms. P. Remove the calibrated gauge from the street side. Open the pet cock and purge any excess debris/air from the port before re-installing the system gauge. Q. Complete the Main Drain-UR test form (Appendix 1). Turn this form into the Fire Marshal for review. R. Once the entire system pressure is returned to normal, turn the fire pump back on and return SMH (1-3452), and G-3000 fire alarm panels back to normal per the system disconnect/reconnect procedures.

Revision No.: 4 Page 3 of 5 S. Contact the University Public Safety Communication Center and advise them the test is completed. T. Contact facilities work center (ext. 34567) and advise them the testing in completed. VI. REFERENCES NFPA 25 (2014) Standard for Inspection, Testing and Maintenance of Water- Based Fire Protection Systems VII. APPENDICES/FORMS Fire alarm procedures Word documents SMH City Tie SMH Test Form Excel document Main Drain VIII. REVISION HISTORY Date Revision No. Description 2/13/2009 1 Added Step J and amended Step K 6/27/2011 2 Review of policy 4/18/2013 3 Add calibrated gauge and reduce weekly pump test pressure 8/17/2017 4 Complete re-write of procedure

Revision No.: 4 Page 4 of 5 Appendix 1 DATE SYSTEM TEST POINT VALVE MODEL TEST INFORMATION BUILDING LOCATION TEST FREQUENCY VALVE NUMBER Quarterly STATIC PRESSURES RESIDUAL PRESSURES PSI (BELOW CHECK VALVE) PSI (BELOW CHECK VALVE) SYSTEM FLUSHED PIPING SATISFACTORY SYSTEM INSPECTED VALVE OPERATED START TEST TIME STOP TEST TIME RECOVERY TIME FINAL STATIC PRESSURE SPRINKLER HEAD INFORMATION PSI TIME SYSTEM STABILIZED SPARE HEADS PROVIDED CHANGING TOOLS CLEAN OF DEPOSITS SPECIAL HEADS IDENTIFIED

Revision No.: 4 Page 5 of 5 NUMBER OF HEADS PENDANT PENDANT HEADS GREATER THAN 8' AFF HAVE CAGES UPRIGHT SPRINKLER SIGNAGE INFORMATION SIDEWALL SIGNAGE IDENTIFYING FLOW DIRECTION LABELS AREA ON PIPING OF PROTECTION HYDRAULIC CALCULATIONS FIRE DEPT CONNECTION ON RISER PROPERLY IDENTIFIED COMMENTS/CORRECTIVE ACTIONS INSPECTOR