Floor Standing Bath Shower Mixer Fitting instructions Please keep these instructions for future reference and request of replacement parts.
We have taken great care to ensure that this product reaches you in perfect condition. However should any parts be damaged or missing please contact your point of purchase. This does not affect your statutory rights. In addition if you require replacement parts your point of purchase will be happy to assist. Contents 1. Tools required 2. Parts Supplied 3. Specifications 4. Installation 5. Aftercare Page 2 3 3 4-7 8 Tools required (Tools not supplied) 2
Parts Supplied NO. Description Qty 1 Tap Body 1 2 Handset 1 3 Shower Hose 1 4 Holder 1 5 Grub Screw 1 6 Flexible Hose 2 7 2.5mm Allen Key 1 8 Grub Screw 2 9 Rail 1 10 Backnut 2 11 Flange 1 12 6.0mm Allen Key 1 13 Allen Bolts 3 14 Fixing Nut 1 15 Body Seat 1 16 Anchoring Bolts 3 Specifications The taps is suitable for use at water supply pressures of 1 bar (min.) to 5 bar (max.). This taps should be installed in compliance with Water Regulations. For further details contact your Local Water Authority. (a) Identify all components and check pack contents. (b) Turn off water mains supply. 3
Installation Important: flush pipe work prior to installation to remove debris from the system, turn off water supply following system flushing. 1. Prepare the recess on the floor and pipework. See page 6 Fig 4 & Fig 5. 2. Arrange the pipework so that the hot water is connected from the left and to the inlet marked with a red dot on the Body Seat (15). Ensure the pipe is long enough and make sure the pipe end screws into the Body Seat (15) a minimum of 10mm. 3. Hold the Body Seat (15) in position inside the cavity and mark the screw holes on the board. See Fig 5. Note: Holes where Allen Bolts (13) will be placed should also have clearance. 4. Remove the Body Seat (15). Using a Ø8 mm masonry bit to drill holes of up to 60mm deep on the board or into the floor. See Fig 6. 5. Install Anchoring Bolts (16) to floor or through board. Screw fixing nut of the Anchoring Bolts (16) clockwise until the thread length outside the floor of 32mm (min.). Note: An alternative fixing or suitable packing piece may be required for floor board installation (not supplied). See Fig 7 for diagram A illustration. 6. Remove the nuts, flat washers and spring washers from Anchoring Bolts (16) with a spanner. See Fig 7 for diagram B illustration. 7. Ensure that the thread of Anchoring Bolts (16) fits through the hole of the board. 8. Fit flat washers to Anchoring Bolts (16). 9. Hold the Body Seat (15) in position inside the cavity. See Fig 8. Ensure that the thread of Anchoring Bolts (16) fits through the hole of the Body Seat (15). 10. Tighten nuts and spring washers to Anchoring Bolts (16) until secure. 11. Connect the pipework to the Body Seat (15) until watertight. 12. Screw Flexible Hose (6) to Tap Body (1). Push tap assembly into the Rail (9) and ensure that the Flexible Hose (6) fits through the hot and cold holes at the end of the Rail (9). Note: the Hot Flexible Hose is marked with a red thread on the flexible hose, the Cold Flexible Hose is marked with a blue thread on the flexible hose. 13. Screw Grub Screw (8) onto Rail (9) using 2.5mm Allen Key (7) and tighten. 14. Screw Backnut (10) onto the thread of the Flexible Hose (6) and tighten. 15. Place Flange (11) over the Rail (9). See Fig 2 for a diagram illustrating this. 16. Screw Fixing Nut (14) onto the thread of the Rail (9) and tighten. 4
17. Fit Holder (4) to Tap Body (1) and screw the Grub Screw (5) using Allen Key (7) until tight. 18. Place this tap assembly onto Body Seat (15), do not damage the finish of the tap assembly. The Hot Flexible 2 Hose should be inserted into the hot outlet of the Body Seat (15), the hot outlet is marked 1 with a red dot on the surface. See Fig 3. 3 19. Screw Allen Bolts (13) to Body Seat (15) using 6.0mm Allen Key and secure it. See Fig 3. 20. Insert Hose Seal into the cone end of Shower 5 4 6 Hose (3) provided in pack and connect to Handset (2) and tighten. DO NOT OVER TIGHTEN. 21. Insert second seal into opposite end of Shower Hose (3) and connect to outlet of the Tap Body(1). DO NOT OVERTIGHTEN. 22. Put Handset (2) into the Holder (4). 8 7 23. Turn on the water supply and re-fill the system. 9 Check immediately for leaks. It is always advisable at this stage to flush out the system. To do this, open both 10 valves fully and allow water to flow for approximately 1 minute. This will remove any foreign matter within the tap body. 11 12 24. Push Flange (11) onto floor until all joints are covered. 25. Finally turn on all the water heating arrangements. 13 14 15 16 5
Fig 1 Fig 4 Make sure the flexible hoses come through the hole at the end of Rail with index. The hot water side is marked with a red dot on the surface of the Rail (9). Fig 2 Fig 5 28.5 mm Fig 3 48.5 mm Fig 6 Φ8 mm Hot water Cold water 6
Fig 7 Anchoring Bolts Nut Spring washer Flat washer 32 mm A B Fig 8 Hot water Cold water Board 20 mm Hot water Cold water 48.5 mm 7
Aftercare Whilst modern plating techniques are used in the manufacture of these fittings, the plating will wear if not cleaned properly. The safest way to clean your product is to wipe with a soft damp cloth. Stains can be removed using washing up liquid. All cleaning powders and liquids will damage the surface of your fitting even the non-scratch cleaners. 8 INST NM65 (Rev.1.0)