RHCC Heating System Upgrade. Project Summary

Similar documents
Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

TOTAL SYSTEM EFFICIENCY: AN INTRODUCTION TO CONDENSING BOILERS. David Grassl PE Mechanical Engineer Principal

Cook - Wissahickon Elementary School

Electrical Safety Program

Computing Services Center

State College Area School District High School North Building EXISTING CONDITIONS ASSESSMENT

BETTER HOME COMFORT AND PEACE OF MIND STARTS WITH THE BEST SERVICE PLANS.

2017 Remodeling Impact Report

GARCIA GALUSKA DESOUSA Consulting Engineers

GARCIA GALUSKA DESOUSA Consulting Engineers

Civil Engineering Building

Existing Conditions Assessment November 14, 2006 NORTH MIDDLESEX REGIONAL HIGH SCHOOL Townsend, MA L21366/ /Page 1

2005 EAF Melt Shops in North America MARKET STUDY Final Report

Evaluation. ems. Prepared By: Martha. a s Vineyard. Box P.O. Box June 2015

GUIDELINES FOR SIZING WATER HEATERS California Conference of Directors of Environmental Health September, 1995

95% SERIES 2 HEAT ONLY AND COMBINATION GAS WALL MOUNT BOILERS. Bringing. heat and hot water into perfect Balance

THE UNIVERSITY OF THE WEST INDIES Mona Campus Human Resource Management Division (HRMD) Environmental and Occupational Health and Safety Manual

CENTRAL STATE HOSPITAL PLAN PLANT OPERATIONS UTILITIES MANAGEMENT PLAN

National Grid s Direct Install Program for Commercial Customers

2007 ASME Boiler & Pressure Vessel Code 2007 Edition July 1, 2007

Going allstate of. the art. Pumps bring university dorms in New Hampshire into next decade ALSO:

Heating system service plans that provide total peace of mind.

Water Heating, Boiler, and Furnace Cost Study (RES 19)

NUUC CONGREGATIONAL MEETING

90% Efficiency without Boiler Replacement TRUE GREEN SOLUTIONS NEW. Patent Pending. EcoFlex 90 + System Modulating Fan-Powered Economizer

S AGE E NGINEERING A SSOCIATES, LLP

Heating and Hot Water

TECHNICAL BOOK 4: OIL FIRED APPLIANCE & SYSTEM INSTALLATION REQUIREMENTS

Site Evaluation. for. Oregon School for the Deaf. 999 Locust Street Northeast Salem, OR BE15178

Energy problems in small apartment buildings

about your house Before You Start an Energy-Efficient Retrofit Mechanical Systems

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

Food Service Establishment Plan Review Form

Qualified Boiler Inspectors Can Have a Positive Impact On a New Installation or Retrofit

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

THE ALL NEW COMBI BOILER

Northeast Gas Specialists

Guide To Troubleshooting INEFFICIENT COOLING FANS

The energy-efficient alternative

Element Z General Design Requirements Existing Facilities Information

RenewableEnergy. A Guide to Prepare for a Grain Dryer Energy Audit. Introduction. Fueling and Feeding America Through Renewable Resources

Preventative Maintenance Tables

Ways to Find the Money Hiding in Your Kitchen CLIQ INFO SERIES

STAFF REPORT DEVELOPMENT COMMISSION ZONING MEETING CITY OF COLUMBUS, OHIO JANUARY 10, 2019

Required Materials For complete material(s) information, refer to

CONNECTICUT. Downloaded

Peerless Boilers. Series MI. Residential Gas Boilers

Boilers and Water Heating Rebate Catalog Saving energy for a brighter future.

Carpet Recycling Survey Results. May 17, 2011

Wappingers Central School District Energy Performance Contract. 01/29/2013 7:00am 9:00am

BUILDING MECHANICAL SYSTEMS EVALUATION

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

An Introduction to True Modular Boiler Systems

ARTESIAN 220 & 340 Instantaneous Indirect Water Heater By Dunkirk Boilers INSTALLATION AND OPERATING INSTRUCTIONS ENGINEERING MANUAL

Get The Edge Over The Competition with The Summit

Massachusetts Energy Efficiency Partnership. 5. High Efficiency Systems for Large Boilers

This series of articles is written by senior boiler tech (and all around swell guy) Justin Skinner. Thanks Justin.

GEOTHERMAL DESIGN GUIDE

Floor Coverings Industry Distribution Channels

Partner. Peerless. Indirect-Fired. Water Heater. Installation, Operation & Maintenance Manual

Intelligent Heating for Your Home

Use a minimum loading pad 6' curb length of a hard surface to connecting curb and sidewalk.

WELCOME. Welcome to this public exhibition about the future of the Aylesham Shopping Centre.

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

Home Energy Assessment Report

A hydronic system controls comfort by delivering heated or cooled fluid to the conditioned space through pipes.

Water Heater. Promising endless. Installing an On-Demand

CONSTRUCTION DOCUMENTS CHECKLIST

WHY TANKLESS? HOW TANKLESS WORKS LONGER LASTING CONTINUOUS HOT WATER CLEAN & FRESH WATER ENERGY SAVINGS SPACE SAVINGS. Secondary Heat Exchanger

FAIRA TRANSPARENCY REPORTS Stone Ave N, #205, Seattle, WA 98133

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

Avon Board of Education. Capital Improvement Plan Presentation to Board of Education October 17, 2017

Ohio Department of Health NFPA 2012 Life Safety Code Tips Sheet

5.5.1 General CD/30 (Oil Condensing Boiler Installation Assessment Form) General Technician Stationary...

Proposed Mechanical, Plumbing, and Electrical Systems For the LEDYARD POLICE DEPARTMENT LEDYARD, CT

CODE SUMMARY REQUIREMENTS (NEW CONSTRUCTION/TENANT IMPROVEMENT (TI))

REPORT TO MAYOR AND COUNCIL

RESPIRABLE CRYSTALLINE SILICA PARAGRAPHS (C) THROUGH (J)

TABLE OF CONTENTS. iii iv vi. vii. xii xiii xvii xix

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.

Transforming the Canadian Home

State of New Jersey BOARD OF PUBLIC UTILITIES 44 SO. CLINTON STREET 7 TH FLOOR P.O. BOX 350 TRENTON, NEW JERSEY

WATER WISE SURV EY. Santa Barbara City College

Indoor Moisture Control of Auckland Houses with Different Ventilation Systems

IES Whole-Building Energy Model Baseline Energy Model Input/ Output Report. East Liberty Presbyterian Church East Liberty Presbyterian Church

HIGH EFFICIENCY CONDENSING GAS COMBINATION BOILERS FIRE TUBE COMFORT DONE RIGHT. 95% AFUE Efficiency. f ive. nt y. pa rts w a

Save energy at home residential natural gas rebate form

Save energy at home residential natural gas rebate form

Job Name Control Systems Description Date

Florence High School / Middle School Page 1 of 3 Florence, WI

Instantaneous Water Heaters

HEATBANK Xcel Thermal Store The solution to multi-fuel heating. Renewable Energy Solutions

Foley Mechanical Perfects the Efficient Retrofit

Graphite. Everything you want from a wood burning stove. and then some...

End-Use Data Collection Requirements Data Trend Type

PVE SERIES POWER VENTER SYSTEM MANUAL

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A

COMMISSION REGULATION (EU) / of

about your house Assessing the Comfort and Safety of Your Home s Mechanical Systems

Transcription:

RHCC Heating System Upgrade Project Summary I. Boiler Replace current Smith Mills fuel oil fired boiler with a cascade system of three Buderus GB162 (290 MBH), Wall Hung, Gas Fired, Condensing Boilers. Dan Allen has used several methods to calculate the heat load for the church for the coldest day in the winter; the results showed our maximum heat load is about 600 MBH (thousand btu s per hour). Initially, he proposed two Buderus 333 MBH boilers, but codes changes for boilers above 300 MBH mean that three 290 MBH boilers don t cost any more than two 333 MBH boilers. In addition, having the three gives us a little more cushion on high side and a lower minimum rate 61 MBH vs. 69 MBH. Our existing boiler has a design capacity of about 1310 MBH, typical over design of old steam heat systems. Figure 1 Buderus GB 162 at Cobalt Lodge II. Hot Water Heater Replace current fuel oil fired domestic hot water heater with Buderus, 100 gallon solar ready, indirect hot water heater. Initially the domestic hot water tank would be heated by coil from the boilers, but it has an additional set of coils that could be connected to solar panels in the future.

Figure 2 Solar Ready Hot Water Tank III. Conversion of Steam Heat to Hot Water Heat Convert the existing steam heat systems in Chapin Hall, the Sanctuary, and the 53 Addition to hot water radiation. This is a big part of the cost, approximately 40%; new piping for the 53 is less certain until some walls are opened. In an earlier memo to us, Dan estimated having to make eight 2 x 2 holes. IV. Increase Number of Heating Zones Add six new heating zones, increasing the total number of heating zones from ten to sixteen. Four new zones would be added in the 53 Addition so that there would be zones on each side of the building on each floor (the Senior Pastor Office and adjacent office would continue to be a separate zone). In the Sanctuary, the Choir Room and the Narthex & bathroom, would become new zones. A complete listing of the zones is attached. Earlier we considered 5 or 6 more zones (nearly every room in the 53 Addition); so this is a compromise, a big step in improving our efficiency, but not all the way to every room a zone as modern construction would be. V. Replace Radiators in Sanctuary The three radiators on the east side of the Sanctuary need to be replaced since they can t be used in hot water service; three new radiators on the west side of Sanctuary will be replaced as well so that the east and west side match. The specific style hasn t been selected yet, but the leading candidates are Myson Horizontal Column, Myson Flat Panel or Buderus Flat Panel. Below are a couple of images; most flat panel radiators look alike. The flat panel radiators don t extend as far from the wall.

Figure 3 Myson Horizontal Column Radiator Figure 4 Buderus Flat Panel Radiator VI. Gas Piping Install gas piping from point where CNG connects gas to the Church (expected to be to the room where the Chapin Hall air handler unit is) to the new boilers. Make provision for future use of gas appliances in kitchen. VII. Exhaust Exhaust from the three boilers will be piped directly out the side the boiler room in a single exhaust vent. Specific design of the vent on outside of building hasn t been selected yet, but the design used at the Grace Lutheran Church is the leading candidate. The picture below shows Grace Lutheran Church in

Hartford. They have two pipes, but we would only have one. It isn t clear from this picture, but each one is a pair of concentric pipes, for inlet combustion air as well as exhaust gases. Figure 5 Grace Lutheran Exhaust VIII. Connecticut Temperature Control (CTC) Work CTC will provide six zone valves with electronic actuators and pipe temperature sensors. They will install six space zone temperature sensors with set point and override. They will wire and program new zone valves. They will provide control relays, current switches and programming for zone pumps. The six new space temperature sensors are expected to be in the Narthex, Choir Room, Chapel, Room 24, Church Office, and Room 25. We need to contact CTC to see whether they want a single payment or would want this amortized over the remaining years of our current contract. IX. Thermostatic Radiator Valves Some non electric, thermostatic radiator valves will be added to some radiators to offer more control within a zone. Most of these haven t been specified yet. One that has been specified is the radiator in the bathroom in the Narthex. Some additional possibilities are the new radiators in the Sanctuary (to balance the temperature from east side to west side) and the Parlor and classrooms in the 53 addition. X. Demolition and Debris Removal In general, Mechanical Energy, LLC will be responsible demolition and debris removal. RHCC intends to contract with a scrap metal dealer to recover the scrap value of iron and steel in boiler, piping and six radiators from the Sanctuary. RHCC will arrange for a dumpster for the scrap metal. In addition, RHCC will attempt to resell the six steam control valves and actuators that CTC installed in February 2010. Our preliminary plan is attached.

XI. Carpentry and Painting RHCC will be responsible for any sheetrock repair, painting, and other construction needed for pipe concealing. XII. System Startup & Training XIII. Schedule of Values The June 7, 2011 estimate $120,900 needs to be revised to incorporate scope changes since then, such as fewer zones (16 instead of 20), more radiators for Sanctuary, vender pricing, etc. The CTC estimate of $12,932 may need to be revised as well; in their estimate they have assumed six new zone pumps. XIV. Payment Schedule Earlier Dan suggested the following milestones for payments but didn t include percentages: 1. Acceptance of proposal (contract signing) 2. Boilers on site 3. Piping connected 4. Boiler fired and punch-out list 5. Town Approval 6. Completion XV. Rebates or Incentives Dan says he has received an announcement that there are some incentives this year, and he will help us apply. Probably would be several thousand dollars if we are successful. Introduction Heating Zones for RHCC Heating System Upgrade This is the list of heating zones being included in our project to renovate our heating system. Currently we have 10 zones 5 in the 1993 addition and 5 for the remainder of the church. The 5 zones in the 1993 addition will stay as is. The new system would have 16 zones. Chapin Hall (One Zone) 1. Zone 1 - Air Handler System & Wall Radiation (same as current arrangement) Sanctuary (Three Zones) 1. Zone 2 Main Floor & Balcony 2. Zone 3 - Narthex & Bathroom off Narthex (new zone) 3. Zone 4 Choir Room (new zone)

1953 Addition (Seven Zones) 1. Zone 5 RHCC Nursery School 2. Zone 6 Senior Pastors Office & Adjacent Office (Mission Room) 3. Zone 7 Chapel (new zone) 4. Zone 8 Rooms 20,22, & 24 (new zone) 5. Zone 9 Child Care & Youth Rooms 6. Zone 10 Church Office, Parlor, & First Floor Bathrooms (new zone) 7. Zone 11 Rooms 21,23 & 25 (new zone) 93 Addition (Five Zones, same as current arrangement) Other 1. Zone 1- Quilters Room( Room 6) 2. Zone 2 Associate Pastor s Office (Room 16) 3. Zone 3 Fiorilli Room (Room 15) 4. Zone 4 CE Director s Office (Room 26) 5. Zone 5 Classroom 27 There are some additional radiators in spaces that aren t yet included in the above zones. How they will be handled has to be determined. In the 93 Addition, there is a radiator at the Center Street entrance and in the Custodian s Room. In the 52 Addition there are radiators at the Old Main Street entrance and stairways, the Custodian closet, and one ground floor bathroom. Location of New Thermostats New Thermostats will be installed in Narthex, Choir Room, Chapel, Room 24, Church Office, and Room 25. RHCC Heating System Upgrade Demolition and Salvage Plan Introduction In general it will be the responsibility of our primary contractor, Mechanical Energy LLC (Dan Allen), to demolish and remove parts our old heating system that will be replaced. However, recognizing the potential value of the metal in the boiler and piping to be removed we are investigating ways to get its salvage value. Additionally, the six Siemens

control valves and actuators that were installed in our February 2010, may have a value of several hundred dollars if we can find a buyer. Metal Salvage Neal Cox and Jay Montana are already investigating possible salvage buyers for all of the metal in the old boiler and piping in boiler room (primarily high grade cast iron). First estimates are that we could get 12 to 14 cents per pound, and we think that the boiler and piping weighs 5000 to 6000 pounds. In addition, we will be replacing at least three (possibly six) cast iron radiators which weigh 300 to 400 pounds each. We would ask Dan Allen to remove the material from the church and put in the salvage buyer s dumpster. He would also do any asbestos abatement that is necessary. He has already said that he would do so and that he has no interest it attempting to get the salvage value of the material. One potential buyer has said that they would charge us about $100 for the dumpster; we would still net several hundred dollars and would be recycling as opposed to just sending the material to a dump. Siemens Valves and Actuators These valves and actuators are only two years old and are in very good condition. The challenge is in finding a buyer. So our next step is to get detailed specifications on the parts from CTC who installed them. CTC has stated that they won t buy them back, as they only install new devices that are under manufacturer s warranty. We would ask Dan Allen to remove these without causing any damage and set them aside for us. In the meantime, we start looking for companies that install HVAC system and who might be interested. In addition, we could try to sell them online thru sites like ebay or Craig s List. Fuel Oil Tanks The easiest approach is to just ask Dan Allen to take care of removal and disposal. Since a lot of consumers are probably doing what we are doing, switching from fuel oil to gas, there may not be any value for our tanks. Alternatively, we might ask Cromwell Energy if they would be interested in removing them. In any event, we should try to manage our fuel oil deliveries so that we aren t left with a lot of fuel oil at the end of the heating season.