UMVIM Haiti Work Site Summary & Status Update December 2011

Similar documents
FORT ERIE SECONDARY SCHOOL FACILITY INFORMATION. Lake Erie Corridor Secondary Schools Accommodation Review

Doing Business with Bartlett Cocke General Contractors

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

Master Project List Report

Allisonville Elementary School Facilities Highlights Built: 1960 Last Major Renovation: 28 years ago Capacity: 650 Current Enrollment: 767

REPORT CARD TO THE COMMUNITY MAY 15, 2018

SUPERINTENDENT S REPORT

30% Design Community Meeting

Meadow Point Elementary School East Grand Avenue Aurora, Colorado 80015

Facilities Planning & Construction Report nd Quarter Ending December 31, 2016

Phase II: School Safety Report_ _08:56

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

Greenwood Elementary School 5550 South Holly Street Greenwood Village, Colorado 80111

Sagebrush Elementary School East Temple Place Aurora, Colorado 80015

WATER WISE SURV EY. Santa Barbara City College

Plan for Restoration of the Cottage

CHURCH OF THE HOLY CROSS Stateburg, SC

Warren County Schools Plant and Operations

Briar Crest Elementary

Kerrville ISD has called for a bond election in the amount of $88,960,000 for November 6, 2018

The community is now 10+ years old and 2000 plus residents.

Design Review of Facility Improvement Projects

Chariho Regional School District Five-Year Capital Facilities Improvement Plan (2/10/15)

The blank report forms are enclosed. If additional blank forms are needed you may contact my office at (210) and ask for Maria Castoreno.

NAZARETH AREA SCHOOL DISTRICT MAINTENANCE DEPARTMENT 357 Tatamy Road, Nazareth, PA FAX

Case Virkakatu, Oulu, Finland

Design Presentation. Chief Operations Officer Willie Burroughs

Facilities Management State-Funded and Billable Services

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

THE COMMITTEE ON BUILDINGS AND GROUNDS SHALL CONSIDER AND MAKE RECOMMENDATIONS ON ALL MATTERS RELATING TO THE BUILDINGS AND GROUNDS OF THE COLLEGE,

MASTER PLAN DIAGRAMS DISTRICT CAMPUS OVERVIEW

New High School Concept

Forest Hills Facilities Plan

Memorandum CITY OF DALLAS

Community Response Buchanan Elementary. December 13, 2016

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Rt 29 Solutions Hydraulic Planning Advisory Panel. September 14, 2017

NAPA COUNTY HEALTH AND HUMAN SERVICES AGENCY MASTER PLAN UPDATE BOARD OF SUPERVISORS MEETING MARCH 20, 2012

Emergency Management Resource Guide. Appendix A: Crime Prevention Through Environmental Design CPTED Principles Checklist for Kentucky Public Schools

Trustee update - Nov 9, Fire alarms: Quarterly Koorsen fire alarm system test was performed.

implementation r expression in landscape

LAMPETER-STRASBURG SCHOOL DISTRICT Lampeter, Pennsylvania 17537

TUFTS FACILITIES SERVICES BASELINE MAINTENANCE VS. CHARGEABLE SERVICES

Tillamook High School Bond Projects

This regulation outlines procedures to be followed for fire drills and all school event decorations.

MUNICIPAL SEPARATE STORM SEWER SYSTEM 2008 ANNUAL REPORT

TIFT COUNTY SCHOOLS E-SPLOST HISTORY

Binghamton University Construction SUMMER 2012 HIGHLIGHTS

Riverview West Side Elementary 160 Isabel Avenue East

VOTER BOND REFERENDUM 2018 SUMMARY OF WORK PROPOSED

Garfield Elementary School Feasibility Study for New Library Building Project Number A C

Department of Facilities Management Division of Maintenance. The Division of Maintenance: Supporting Student Success

Recreation Unlimited Foundation

Proposed Bond Construction Projects

January 2018 Courses Hours Section # Fee Dates Times* February 2018 Courses Hours Section# Fee Dates Times* March 2018 Courses Hours

Beaufort County Community College. Maintenance and House Keeping Plan

LKA Partners. A Professional Corporation for Architecture/Planning. 430 North Tejon Street Colorado Springs, CO /

Oconomowoc Area School District Facility Construction Update August 25, 2017

Safety & Security. Plainview-Old Bethpage Central School District

OPERATIONS & MAINTENANCE PLAN. 571 Vance Ave Memphis, TN

Campus Middle School 4785 South Dayton Street Greenwood Village, Colorado 80111

5 Year Capital Improvement Plan Update

SCHOOLS + COMMUNITY rehabs, renovations, new construction

Master Facility Planning Update School Board Meeting May 26, 2016

Inside Out Home Inspections

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

NECC Strategic Plan Goal Team 1: Develop a Comprehensive Campus in Downtown Lawrence

SAFETY DRILLS Lincoln County School District

TSUNAMI PREPAREDNESS CHECKLIST FOR K-12 SCHOOL ADMINISTRATORS AND PRINCIPALS

sellers STAGING Guide

Helping the Homeowner: A Program for Residential Rehab

Scope of Work -Single Family Home, San Diego, CA

3. 21st Century Learning A. Districtwide Flexible Learning - Allowance for Flexible Furniture $600,000 Subtotal $600,000

Earthquake Preparedness ISY Campus

A GUIDE TO THE ROCK ISLAND HOUSING CODE. Prepared By: The City of Rock Island Inspection Division

NUUC CONGREGATIONAL MEETING

West Hartford Public School District

Certificate of Inspection CHECKLIST

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

Scope Of Work: Single Family, La Mesa, CA

Butler Junior High School

Countywide Recycling and Disposal Facility Weekly Progress Report 08/22/08

Scope of Work - Single Family, Escondido, CA

Master Plan. of a new entry ramp as depicted on the Proposed First Floor Plan.

Solar Energy Services, Inc. Solar Thermal Project Summaries

Fire Drill Requirements Group E Occupancies

Maintenance Road Show

Brown University: Institutional Master Plan Amendment #2. CPC Meeting: December 1, 2009

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

PARSONAGE GUIDELINES

NYACK PUBLIC SCHOOLS CAPITAL IMPROVEMENT PLANNING PROCESS

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

Scope of Work - Single Family, Carlsbad, CA

MEASURE A. Completed Bond Projects

PROCTOR TERRACE ELEMENTARY SCHOOL

FACILITIES PLANNED UTILITY OUTAGES POLICY

WOOSTER SAFETY CENTER

WLAC Facilities Committee Meeting. September 18, 2017

Service Description Service Shop Customer Charge Comments. Electronic Shop. Electric Shop Yes additional circuits for equipment

Transcription:

UMVIM Haiti Work Site Summary & Status Update December 2011 (for more information, contact haitivolunteers@yahoo.com) Active Project Sites: Arcahaie: Bainet/Hermitage Banique: Cabaret Carrefour Manse Carrefour School Children s Home COD Office Croix de Bouquets (Pending December) Croix de Mission (Pending Spring) Dasmas Delmas 33 (beginning January) Delmas 54 Apartments Duplan Fond Doux Freres Campus Security Wall Freres Campus Vocational School Roof Future Possible Project Sites: Leveque Church Mirebelais Montrouis Freres Campus Driveway Freres Campus Manse Freres Campus School Furcy Hinche Lagonave (beginning January) La Tremblay Leon (Pending - February) Les Cayes Mellier Petionville Guest House Petit Goave Puits Blain St. Martin Thomas Thor Church and School Turgeau Mirogoane Oliviet LaSaline SITE STATUS Arcahaie: New church construction was interrupted by earthquake and continued June 2010. Teams to Date: 13 Primary Project: Continuation of building of new church facility. Started June 2010. Secondary Projects: Latrine, Kitchen, Depot. Status: In progress (Nov 2011) Long Term: Security Wall, Water System, Back rooms to be finished Teams Scheduled: January UMVIM Haiti Work Site Summary & Status Update, December 2011 Page 1

Bainet/Hermitage: Scope of Project: Finishing school; continued work on water project Status: Report Pending Teams: Sept 2010 Banique: Primary Project: Building of security wall around property 150 X 300 Teams to date: 6. First Team: March, 2011 Status: Front and sides of wall have been completed; front gate installed. Secondary Projects Repairs for school: second floor needs roof on 1/3 of building (Completed) Generator Housing: Completed Replace windows and doors for church Completed Long Term: Rear security wall; cafeteria; finish work on school Cabaret: Repairs to church wall due to earthquake and other projects Teams: 5. First Team: October 2010 Primary Project: Rebuild Security Wall Status: (Completed) Secondary projects: Finish outside walls of teacher dorm, cookhouse; Exterior wall block. Youth Play area for school Completed Long Term: Repairs and renovations to school; purchase of two gates. Status: No teams scheduled Carrefour Manse: Primary Project: Rebuilding/Repairs to Manse severely damaged by earthquake. Teams: 11. First Team July, 2010 Status: Primary Projected Completed Secondary Projects Finish work and upgrades. Funds advanced (8/11). In progress. Status: No teams scheduled Carrefour School: Scope of Project: Bathrooms/washrooms for students and teachers; septic system Teams: 3. First team, March 2011 (Aug 2011) Secondary: Renovate old building in back to be used as cafeteria. No plans or estimate Children s Home: Primary Projects: Repairs and painting to both buildings; partial damage due to earthquake; other purchases Teams: 11. First team May, 2010 Status: (Primary Project completed) UMVIM Haiti Work Site Summary & Status Update, December 2011 Page 2

COD/UMCOR/EMH Relief office: Scope of Project: roof repairs; interior clean up; minor plumbing repairs; purchase of office furniture Teams: 2 Status: UMVIM portion of project completed Secondary Projects: Internet installation by EMH (to be done) Completion of electrical work by EMH (to be done) Croix de Bouquets: This is a project placed on the priority list (Nov 2011). Primary Project: Extensive Repairs to Security Wall Teams: First Team: December 28 Croix de Mission: Primary Project: Building of church Teams: Pending Dasmas: Primary Project: extensive repairs to church. Teams: 2 Status: In progress. VIM staff visited site, December 2011 Teams scheduled for March Delmas 33: Primary Project: extensive repairs to church Status: two teams scheduled for January Delmas 54 Apartments: Primary Project: Rebuild apartments. Teams: 3: Two VIM; one team from Ireland Team (Dec 2010 Jan); March (2) 2011. 5/11 Secondary Project: Build Caretaker s Home; started March 10, 2011 Status: UMCOR is renting this location for offices. Caretaker s Home was changed into a storage depot and guard house. Duplan: Scope of Project: Build Clinic in back section of new building. Finish community building. Build new temporary classrooms on property adjacent to Church. Teams: 11. First Team: June 2010 Status: Initial project was officially completed and dedicated January 9, 2011. Secondary Project: Building expansion for triage room, waiting area, and laboratory. Status: In progress (Nov 2011) UMVIM Haiti Work Site Summary & Status Update, December 2011 Page 3

Fond-Doux: Primary Project: Demolition, removal and rebuilding of church. Teams: 14. First Team: May 2010 Status (Nov 2011): Exterior of building complete. Pews built. Interior work in progress. Freres Campus: Security Wall Scope of Project: Repair and increase height of security wall around back side of security wall. Teams: None assigned by local labor Freres Campus: Roof for Vocational School Scope of Project: Remove and replace roof on Vocational School (2 buildings). Teams: 2 First Team: March 2011 Freres Campus: Driveway Primary Project: Build new driveway access off Delmas 95 and new parking area behind Guest House Teams: 2. First Team February 2011 Secondary Projects: Funds have been used to build walls and new parking area for teachers near playground area: Completed New access to GH dining area has been constructed: Completed Freres Camput (Superintendent) Manse Scope of Project: Check building for structural damage and make repairs, including electric, plumbing, carpentry, etc. Primary Project: Remove and replace interior and exterior walls, including ceiling on porch and main living area. Teams: 3 (teams spent parts of weeks pending plans). VIM portion has been completed. Project has been continued by professional contractors with outside funding. Freres Campus School Primary Projects: New roof on girls latrines. New roof on student cafeteria; rewiring and painting of cafeteria. Teams: 3. First Team: October 2010 Status: Projects Completed UMVIM Haiti Work Site Summary & Status Update, December 2011 Page 4

Furcy: Scope of Project: Various Projects. Teams: 3 Primary Projects: Build new latrines at school (completed 2/11) Deconstruct Principal s House: completed July 2010 Gutters at school to capture rain water (completed 11/10) Repairs to school cookhouse (completed July 2011) Secondary Project: Build small store for the Church as a revenue source and to provide easier access to goods. Status: Building complete (Nov 2011). Needs doors, windows, cabinets, and finishing work. In progress. Hinche: Primary Projects: Complete work on church; build security wall; sacristy area. Teams: 7. First team March 2011 Status: Both Church and security wall in progress Secondary Project: Sacristy and rest room in church. In progress Long Range Project request: New school construction on back property Lagonave: These projects have been placed on the EMH priority list (October 2011) Primary Project: extensive repairs to damaged church First teams: January 2012 LaTremblay: Primary Project: Deconstruction, removal, and rebuilding of Church Teams: 14, beginning February 2011 Status: Priority Site. Construction in progress. Exterior walls are up. Second story/balcony in progress. Leon: Primary Project scope of project under review. Teams to be assigned. Les Cayes (Torbeck): Scope of Project: Building of new church Teams: to be assigned Status: reports pending Mellier: Scope of Project: Demolition, removal and rebuilding of church and school damaged significantly during earthquake. Teams: 31 (beginning May, 2010) Status: Priority Site Security Wall (120 X 200) Completed; New latrines/showers Completed Church: In progress: 4500 sq/ft church building with balcony. Foundation has been completed and walls in progress (Nov 2011) UMVIM Haiti Work Site Summary & Status Update, December 2011 Page 5

Petionville Guest House: Primary Projects: Repair of various areas due to earthquake damage Teams on Site: 5 Status: Primary Projects Completed Petit Goave: Scope of Project: extensive damage at several locations: Clinic, Church, Guest House property. Several new building projects have been proposed and accepted: Library/Bookstore; Brakeman School second floor/computer lab. Teams: 21, beginning May, 2011 Status: Clinic: rubble removed and rebuilding to be done by future sponsoring group Church: Completed Repairs were made and building was rededicated and opened Guest House: Damage repaired and other upgrades made. Completed. Superintendent s Manse: Repairs. Completed. Library: In progress. Exterior construction nearing completion (Nov 2011) Brakeman School: Pending. Puits Blain: School had minor earthquake damage. EMH has designated this as a priority site (June 2011) Scope of Project: Various projects: finish all classroom walls, floors; second story addition, installation of plumbing and electric, outdoor play area. Teams: 7, beginning June 2011 Primary Project: Second story addition Status: In progress (Nov 2011) Secondary Project: Outdoor play area Finish classrooms: In progress Plumbing/Electric: TBD St. Martin: Scope of Project: Repair of security wall, church and school damaged during earthquake. Two UMVIM teams removed rubble and took down damaged portions of wall VIM Project: (Completed) Thomas: Primary Project: Repairs to main church building and security wall Teams: 11, beginning August 2010 Primary Project: Security Wall Repairs Completed Church Repairs and Rededication on Sept 19: Completed Secondary project: building of kitchen and depot behind church Status: In progress. Buildings have been constructed; need to be finished and fixtures added. Secondary Project: Youth basketball/play area in front of building Completed. Emergency Repairs: new walkway from street to church Completed UMVIM Haiti Work Site Summary & Status Update, December 2011 Page 6

Thor: (School and Church) Scope of Initial Project: Repairs to church and school (see below) New roof on school Current bathrooms renovated Temporary shower area installed Site prepared for teams to reside there Finishing of walls on second floor of the school Demolition of non-load bearing walls on lower level of school Cleaning and preparation of worksite Project II: Renovations to Kitchen, bathrooms & showers (plans & estimate rec d) Status: In progress Project III: Renovations to sanctuary Total Teams at Site: 7.5 Additional Work: New Horizon Church installed fans in school rooms (May 2011) at own expense Turgeau: Project: This was a rental building owned by the EMH which collapsed during the earthquake. Teams were requested to remove rubble, and build security wall. Teams: 2 UMVIM Haiti Work Site Summary & Status Update, December 2011 Page 7