PALO ALTO HIGH SCHOOL Palo Alto Unified School District MEETING NOTES. DATE: 21 September Palo Alto HS Update

Similar documents
PALO ALTO HIGH SCHOOL. Palo Alto Unified School District SCHEMATIC DESIGN TO DESIGN DEVELOPMENT TRANSITION MEETING. 21 January 2010, 12:30pm-2:00pm

The subject site plan amendment proposes the following revisions to the approved site plan:

Ohlone College Measure G Project Scope Revisions

The open space system should provide connective elements, relate to natural resources, and enhance the suburban character of the landscape..

Chain Bridge Road Sidewalk Improvements Citizen Council Work Session

February 17, Sara Ullman Planner I. Sincerley,

VEHICULAR AND PEDESTRIAN CIRCULATION

City of La Palma Agenda Item No. 5

Charles P. Johnson and Associates. Annapolis Landscape Architects

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

Green Infrastructure and Low-Impact Development Technologies

WESTERN ILLINOIS UNIVERSITY

Community Response Buchanan Elementary. December 13, 2016

Maplewood Avenue Downtown Complete Street Project

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

New High School Concept

DIVISION 32 EXTERIOR IMPROVEMENTS

S000 SITE REVIEW APPR NO. FIRE CODE COMPLIANCE ITEM

Re: Development Permit Panel Meetings Held on January 27,2016, October 12, 2016 and June 14, 2017

EAST NAPLES SELF STORAGE

Littleton Fields Master Plan

3.13. Development Guidelines

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

SOUTH UNIVERSITY Street Design Setting a Direction for Schematic Design

Improve the appearance of off-street parking areas, vehicular use areas, and property abutting public and private roads;

Juniper Networks CO-8

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

East Linden Estates Newsletter

NOTES FILED WITH TOWN CLERK

Building and Site Design Standards

Community Engagement Committee Meeting #1 December 10, :30pm-8:30pm

Landscape and Streetscape Design 2.5

Long Branch-Wayne Local Park Renovation Project

Planning Board Hearing October 20th, 2016

F. Driveways. Driveways which provide access to off-street parking or loading from public streets shall comply with the following:

LINCOLN HIGH SCHOOL MODERNIZATION BEX IV COMMUNITY MEETING JUNE 23, 2016

Advisory Design Panel Minutes

City of Kelowna Consolidated Zoning Bylaw No. 8000

City Plan Commission Briefing #2

Centennial Hall Planning Comments Public Meetings, 9/19/2011. General Comments

Norwood Public Library Rendering

Cypress High School Site Improvement Project

CITY OF EDMONTON FIRST PLACE PROGRAM

Report or technical documentations of the target areas in Siauliai

PRINCE GEORGE LIBRARY NEW ENTRANCE REPORT Patricia Boulevard Prince George, BC V2L 3V9

Worthington Scranton. Campus Exterior Architectural Plan

Neighborhood Districts

Gateway commercial MIXED USE MASTER SITE PLAN. CITILAND AIrDRIE GATEWAY VENTURE INC. airdrie GATEWAY COMMERCE CENTRE. airdrie, ALBERTA FEBRUARY 2012

VILLAGE OF SPRING LAKE PLANNING COMMISSION. MINUTES REGULAR MEETING April 28, :00 PM

AESTHETIC APPEARANCE. Design Guidelines for Grade-Separated Pedestrian, Cyclist and Equestrian Structures

SITE PLAN REVIEW APPLICATION

CHAIR AND MEMBERS PLANNING & ENVIRONMENT COMMITTEE GEORGE KOTSIFAS MANAGING DIRECTOR, DEVELOPMENT & COMPLIANCE SERVICES & CHIEF BUILDING OFFICIAL

Steve, Following are our notes from the first two meetings with Montgomery County Planning Group:

Site Design Measures. Chapter

ARLINGTON COUNTY, VIRGINIA

Community Meeting #2.1

PLANNED UNIT DEVELOPMENT APPLICATION

Figure 3-1: Public Realm Plan

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA

Landscaping Standards

Speedway Mall Project Frequently Asked Questions

ARCHITECTURAL REVIEW BOARD SUPPLEMENTAL PACKAGE 3402 PICO BLVD SANTA MONICA, CA APRIL 10, 2017

SITE PLAN REVIEW PROCESS

Urban Design Brief December 23, 2015 Southside Construction Group Official Plan & Zoning By-Law Amendment

Dorrance H. Hamilton Building

PLANNING COMMISSION REPORT Public Hearing Item FINAL DEVELOPMENT PLAN FOR BAUER FARM; XPRESS WELLNESS URGENT CARE; 4700 OVERLAND DR (MKM)

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

CITY CLERK. Consolidated Clause in North York Community Council Report 8, which was considered by City Council on October 26, 27 and 28, 2004.

DITTMAR ROSSLYN ARLINGTON COUNTY, VIRGINIA

Cleveland Park Streetscape and Drainage Improvement Project 1

DIVISION 32 EXTERIOR IMPROVEMENTS

MEMORANDUM. This memo deals with proposed amendments to previously issued Development Permit No for Park Royal North.

SOUTH DAKOTA STATE UNIVERSITY GROUNDS MANAGEMENT PLAN FY 2013

Schematic Design Presentation December 15, 2006 David Smith

LANDSCAPE DESIGN NARRATIVE AND PRECEDENT IMAGES 37

ART AND ARCHITECTURAL REVIEW BOARD (AARB) Project Data Sheet Revised 2014 (Due two weeks before meeting to:

ACADEMY AREA CONCEPT PLAN

City of San Juan Capistrano PROJECT PRESENTATION NORTHWEST OPEN SPACE COMMUNITY PARK (CIP 09209) March 22, 2016 FOR THE PROJECT PRESENTATION

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

Re: Coastal Manor Addition, Conceptual Site Plan Submittal Orey Gadway, Owner/ Administrator Coastal Manor 20 West Main St Yarmouth, ME 04096

Building & Site Design Standards Application

SECTION 24 DESIGN GUIDELINES FOR LARGE COMMERCIAL AND RETAIL DEVELOPMENTS INTRODUCTION & PROCEDURE 24-2

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

COMPLETE GREEN STREET CHECKLIST

PRELIMINARY CONDITIONAL USE SUBMITTAL CHECKLIST REQUIREMENTS

Oconomowoc Area School District Facility Construction Update August 25, 2017

8 ARTICLE EIGHT LANDSCAPING AND SCREENING

Construction and Landscaping on Public Property

Parker Pine Curve Master Plan January 28th, 2009, Public Workshop Comments

Fall 2017 Construction Update

CITY OF THORNTON, COUNTY OF ADAMS, STATE OF COLORADO EAST 124TH AVE WASHINGTON CENTER PKWY WASHINGTON ST PROJECT LOCATION PRIVATE DRIVE

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

Design & Access Statement

New Park / Entry Court & Plaza Concept Design

COMMERCIAL DESIGN REVIEW APPLICATION

MEETING PURPOSE AND OVERVIEW

SOUTH UNIVERSITY Street Design Alternatives in Progress

Project phasing plan (if applicable) 12 copies of site plan

2012 Nevada Green Industry Conference and Trade Show

SITE PLAN SUBMISSION AND APPROVAL GUIDELINES

Transcription:

PALO ALTO HIGH SCHOOL Palo Alto Unified School District MEETING NOTES DATE: 21 September 2010 SUBJECT: Landscape Subcommittee Meeting Palo Alto HS Update The purpose of the meeting was to update the Landscape Subcommittee on the Landscape Master Plan, Theater site development and Multi-purpose fields construction progress. 1. Principal Phil Winston (PW) welcomed the subcommittee to the first landscape meeting of the new school year and led introductions of the attendees. 2. Nancy Bjork (NB) asked the question of how we decide who the actual subcommittee members are. There are several people who attend regularly and others who do not. There are also some participants who are part of the FSC or other subcommittee. PW indicated that it was an interesting question and that he will need to discuss with others about the process. 3. Erwin Lee (EL) gave a presentation on the theater design progress pointing out how the building location had been adjusted forward from that of the conceptual design. Several images were presented that compared the conceptual design to the current schematic design which showed that there was minimal impact when viewed from El Camino. The repositioning of the building resulted in a more spacious entry at the Media Arts side as well as creating a larger landscape buffer in the front facing the parking. EL noted that by moving the building forward would result in a loss of approximately 12 parking spaces. The vehicular drop-off area would be flush with the pavement to provide accessibility throughout. Removable bollards would be placed along the drop-off to prevent cars from driving onto the plaza but still allow for access for emergency vehicles or delivery by authorized vehicles. A new feature of the theater is a covered arcade facing the plaza that will connect the theater with the exterior covered walkway of the 100 Building. EL noted that it would recall the feel of the connection between the Haymarket and the Tower Building and the broad covered walkway around the 100 building. The repositioning of the building was generated by an existing easement that came into play. 4. Todd Young (TY), landscape architect with Gates and Associates, presented a schematic landscape plan and highlighted the following: Landscape Subcommittee Meeting Palo Alto High School 21 September 2010 Page 1

Trees would be planted in front of the theater to provide shading for the westerly facing lobby. The trees would also help define the edge of the patio which the lobby opens out to. The grades around the Haymarket will be adjusted so that the plaza is not sloped. This was accomplished by adding steps and a landing in front of the Haymarket Theater. A ramp was proposed to provide accessibility into the Haymarket Theater Two, large existing trees will become a feature and maintained in a raised planter in the middle of the new plaza. A portal element was proposed between the Haymarket Theater and the 100 Building. The area behind the theater has become larger creating a desirable gathering space. There is now adequate room for the theater students to work on large props without interfering with pedestrian traffic. 5. TY continued with a discussion of the tree study and proposed tree mitigation measures. The study showed which trees would need to be removed and which trees would remain. There are currently three large pine trees that will need to be removed for the theater as well as several relatively young trees in the proposed parking area. The mitigation plan indicated that 10 trees were required due to their size and type according to the proposed mitigation plan. The landscape plan proposes to add 53 new trees The selected tree species will be reviewed by the subcommittee and the arborist before finalizing any selection. 6. The following were comments from the attendees based on the material presented: Anne Anderson (AA) wanted the design team to consider the potential impact of new circulation patterns that may be created by the new theater and plaza. The proposed location of the theater and plaza may encourage students to circulate in front of the theater. TY pointed out that the connection between the theater and 100 Building will be maintained. Ruth Gordon (RG) liked the proposed sidewalk from the Embarcadero bus stop to the campus and how it will become a more defined entrance. AA shared that the existing chain like fence is not very attractive and if it was going to be replaced. EL indicated that it is currently not in the scope of work but could be addressed as a bid alternate. TY suggested that it could be replaced with an ornamental fence. The group felt that if a new theater was going to be the focus near the Embarcadero entry that the street edge should be address as well. Everything should look good from the street. Stephen Pond (SP) appreciated the idea of addressing the landscape on both sides of the Embarcadero entry including the proposed entry features. Both sides should be considered as bid alternates. Lauren Swezey (LS) wanted clarification on the tactile surface required at the dropoff and suggested that it should not be yellow. TY indicated that the tactile surface only needs to meet the color contrast. LS noted that she has seen a dark color used on California Street in PA and thought that would be much more appealing. Landscape Subcommittee Meeting Palo Alto High School 21 September 2010 Page 2

RG thought that the edge of the planter in the plaza was very close to the tree. TY indicate that he would work with Debbie Ellis, District Arborist, to determine what the appropriate distance should be. RG questioned whether the additional portal is necessary between the 100 Building and the Haymarket noting that building is set apart by the addition of the steps. EL added that the portion of the theater that is seen between the 100 Building and the Haymarket is the end of a long visual and physical axis and a very important design element. 7. EL shared with the committee the idea of creating a landscaped retention pond within the large triangular area in the parking lot. This would address the drainage issue as well as provide a significant landscape area as part of the theater parking project. He mentioned that the retention pond would take the place of underground storm water storage tanks that were used for the Media Arts and Classroom Building. Although the idea was generally well received, there was concern as to what the trades offs might be in lieu of using the underground solution. EL indicated that some or all of the area could be used for parking and that the retention pond would eliminate this as a future option. SP asked that estimates be generated between the two options as well as pros and cons of each solution. EL shared that it was his understanding, from his initial master planning meetings, that the area was not to be touched and that it was an arboretum and outdoor living classroom. No one in attendance shared this thought or had this feeling. The group felt that the site drainage needs to be reviewed as a campus-wide exercise and not just project by project. SP noted that this is a critical decision in order to give the civil engineers direction and must be made sooner than later. This idea will require further study and discussion with the facilities steering committee. 8. Parking was raised as a concern and what the impact that the theater will have on the overall parking count. EL indicated that they had done several parking studies representing various phases of the Master Plan. EL noted that parking will be reduced in the El Camino lot when the theater parking project is completed. However, the count will increase and be closer to the existing count after the second portion of the parking is completed due to increased efficiency. Aimee Lopez (AL) indicated that we will bring parking plans at the various phases of the Master Plan development for the next meeting. 9. Heidi Rank (HR) gave an update on the multi-purpose fields with the following highlights: HR reviewed the landscape drawing that was prepared and submitted by members of the landscape subcommittee. HR noted that the cargo container wall be moved behind the D Building and a suggested tree location may need to be modified. Much of the discussion involved the revised planting plan for the parking and the review of the proposed tree species. Landscape Subcommittee Meeting Palo Alto High School 21 September 2010 Page 3

MG shared that one of the goals was to create shade and that trees with different growth rates were combined so that the faster growing species would back up the slower growing species. As an arborist, DE was concerned about the potential long term impact that the tree roots might have on the adjacent asphalt pavement. She recommended that the root barriers be properly installed to reduce potential root problems. AI asked how the trees would be protected while they are young. DE suggested that there are several options but the most likely would be to install four lodge poles with ties between that would allow the tree some movement. Protection must remain in place for many years to insure survival. DE will provide a detail or example to HR for information. MG agreed that it is very important that the root barrier is properly installed. Several subcommittee members asked how and who would select the actual trees. HR will ask the landscape contractor, Valley Crest, when an appropriate time would be to visit the nursery to make the selection. Several subcommittee members were interested in participating. SP wanted to make sure that the irrigation is being planned at the same time. Not just for the trees but for any other plant material in the area. AL suggests that a plan be put together for Chuck s review and comment. It was noted that no-mow grass would be planted in the islands as well. The group agreed to preceed with the tree selection recommendations. HR will review the scope change/s with the contractor and update the facilities steering committee on changes and recommendations. Attachments: Agenda Sign-in sheet Churchill Parking Lot Tree Planting Plan Theater Progress Presentation END Prepared by Erwin Lee of Deems Lewis McKinley. Please advise in writing if you feel that any of the above items are inaccurate. cc: Attendees File Landscape Subcommittee Meeting Palo Alto High School 21 September 2010 Page 4

Progress Update Performing Arts Center DLM A R C H I T E C T U R E P A L O A L T O H I G H S C H O O L Palo Alto Unified School District 28 September 2010

Palo Alto High School Site Plan

Schematic Design: Schematic Design: Program Elements: Lobby with restrooms, tickets, concession and gallery/display area Seating capacity of 600 with approximately 392 at orchestra level and 230 at balcony level Stage sized for band, orchestra, choral, and theater g,,, Full fly loft Orchestra pit and trap room Control room and tech equipment support rooms Control room and tech equipment support rooms Green Rooms with adjacent toilet and changing rooms Scene, prop and costume storage, front of house storage P f i A t Cl Performing Arts Classroom Performing Arts Center office and work areas Total Area: approx 29,000 SF Palo Alto High School Construction Cost: approx $14.7m

Performing Arts Center Theater 100 Building Plaza Haymarket Parking Palo Alto High School Enlarged Site Plan

Building 100 Theater Plaza Bikes Patio Entry Plaza Haymarket Theater Drop-off Parking Palo Alto High School View from parking lot

Second Floor Palo Alto High School First Floor Floor Plans

Palo Alto High School View from El Camino

Palo Alto High School View from El Camino

Palo Alto High School View from parking lot

Palo Alto High School View from parking lot Conceptual Design

Palo Alto High School View from parking lot Schematic Design

Schematic Design Palo Alto High School Conceptual Design

Palo Alto High School View from Embarcadero entrance

Palo Alto High School View from Embarcadero entrance

Views across Embarcadero from Town and Country parking lot Palo Alto High School

Palo Alto High School View from parking lot

Embarcadero Palo Alto High School Deems Lewis McKinley Conceptual Design 1 June 2010

Embarcadero Palo Alto High School Deems Lewis McKinley Schematic Design 28 September 2010

Palo Alto High School Tree Study Gates + Associates

Palo Alto High School Tree Mitigation Strategy Gates + Associates

A R C H I T E C T U R E