102740-ICX-CMOS-E-2007 I&C Engineer Holds a B. Sc. in Electronics & Communication Engineering and has over 8 years hands-on experience working in I&C field. PERSONAL DATA Nationality : Egyptian Birth Date : 22/10/1985 Gender : Male Marital Status : Married Residence : Currently Kuwait EDUCATION : B. Sc. in Electronics & Communication Engineering, Alexandria Institute of Technology (AIT), 2007 LANGUAGES Arabic English : Native Language : Very Good COMPUTER SKILLS : Windows, MS Office, Internet TRAINING COURSES AND CERTIFICATIONS : Training course in freelance system (IIT-CF-AC800F-DIGIVIS): Configuration and maintenance at ABB Company in GENOVA ITALY (Nov. 2011). : Yokogawa Training in centum CS 3000. : PLC ALLEN BRADLEY training by ROCKWELL AUTOMATION. : HRSG operation and maintenance from NEM Company. : HRSG controls and instrumentation from NEM Company. : HRSG water chemistry and safety from NEM Company. : Field instrument from Toshiba Company. : TWS controls and instrumentation from TARNOS Company. : Linear Heat Detection System from LIOS TECHNOLOGY Company. : Continuous Emissions Monitoring System (CEMS) from FORNEY Company. : Course in Cisco Certified Network Associate (CCNA): Training at Switching, Routers CISCO & TCP/IP. Cisco Devices Configuration and Administration. www.egyptrol.com Page 1 of 5 Updated: Jun. 2016
: Certification & Course in International Computer Driving License (ICDL). : Certification at ITP TOFEL TESTS. : Certification & Course in MS Excel. CHRONOLOGICAL EXPERIENCE RECORD Dates : From Dec. 2015 till now Employer : KHARAFI NATIONAL Job title : Senior Design Engineer at Kuwait Head Office Job Description : I worked in design of the project Sulaibyia Waste Water Project 600,000 m3/d. I worked in design of the project KOC project Brine Pumping Station. Dates : From Jul. 2015 till Dec. 2015 Employer : PSP EL SEWEDY Project : Dresser-rand Gas Compressors Project Job title : Lead Construction & Commissioning Engineer Job Description : I worked in construction & commissioning of instrumentation to upgrade from pneumatic system to electrical system with control system PLC (GE). Dates : From Jan. 2015 till Jul. 2015 Employer : ANSALDO ENERGIA Project : Al-Mahmodia Project 330MW (2x160 ANSALDO Gas turbine (V 94.2)) Job title : Senior Construction & Commissioning Engineer Job Description : I worked in commissioning of the new power station 2 units Gas turbine with DCS ABB and worked in pre-commission, commission and start-up test of the ANSALDO turbine (V 94.2). Dates : From Oct. 2013 till Mar. 2014 Employer : ABB POWER & PRODUCTIVITY Project : Damanhour Project (300MW) (300MW Steam turbine "ANSALDO" with main DCS ABB) Job Description : I worked in pre-commissioning, commissioning and start-up tests for the BOILER with DCS Harmony system with Composer software. Dates : From Feb. 2013 till Jul. 2013 Employer : MEGA CONSTRUCTION & INDUSTRIES Project : Damietta Project (500MW) Job title : Construction Engineer Job Description : I worked in construction and commissioning for first project in Middle East with new modification for gas module and combustion Chamber. www.egyptrol.com Page 2 of 5 Updated: Jun. 2016
Dates : From Oct. 2012 till Feb. 2013 Employer : Kharafi National Project : Damietta Project (500MW) (DLN (Dry Low NOx) for GE Gas turbine (9E) 125MW) Job Description : I worked in construction and commissioning for first project in Middle East with new modification for gas module and combustion chamber. Dates : From Jul. 2011 till Dec. 2011 Employer : Kharafi National Project : Al-Shabab Project (1100MW) (8x125 GE Gas turbines (9E) with BOP and main DCS) Job Description : I worked in commissioning of the new power station 8 units Gas turbine with water treatment plant and worked in pre-commission, commission and start-up tests of the GE TURBINE (9E) DCS control system "Mark VIe" and Main DCS system for all plant "YOKOGAWA CENTUM VP". Dates : From Mar. 2008 Project : Sidi Krir Combined Cycle Power Plant (750MW) (consists of one steam turbine ANSALDO 250MW and two Gas Turbines MITSUBISHI 2x250MW and two HRSG NEM) Job title : I&C Engineer Job Description : I worked in new power station, commissioning of the YOKOGAWA CENTUM CS 3000 DCS system & NEM HRSG. Field of experience : Design of Kuwait Oil Company Brine water Pumping Facility project, new Waste Water stations and BOP and DCS Design for new power stations according to international standers and codes for instrumentation, control cables and different types of control systems. Design control connection and interface between 16 substations in Sabah el Ahmed project and check vendor scope of work with submitted technical documentations of control system for SCADA system include control media connection, protocol connection, FAT and SAT test. Create DCS and SCADA network Arch according to plant control philosophy, "standards, codes" and control system "hardware and software" include system reliability and availability, processor scanning time, processor capacity, interface modules, I/Os modules and connection with other control systems via OPC. Control system data points present all of control channels "type, area, tag name, set point for AI, Zero and Span for DI, marshalling and control cabinet for this channel". Control cable Schedule include the following: cable tag name, cable routing from marshalling cabinet to field, control cable capacity and spare channels in every control cable. Control logics sheets for equipment, C.B in substation and plant overall in "start-up, stop, Normal operation and Emergency shutdown" upon to operation philosophy. Create a Main Basic Design Criteria Report present plant design criteria www.egyptrol.com Page 3 of 5 Updated: Jun. 2016
and main control system concept. Create Control Philosophy for overall plant includes every equipment in "Start, Stop, Normal operation and ESD" in Auto and manual operation modes. P&ID Design drawing of different type of systems present location of instrumentation and main equipment control signals according to owner standards. Instrumentation list present all of field instruments "type, location, description, instrument tag name, instrument range and instrument set point". Instrumentation data sheets include "instrument tag, instrument location, range, process connection, type of process media, site conditions and special tools for calibration" upon ISA format and owner format. Create instrumentation location and hookup drawing present instrument process connection and supports. Construction, Commissioning of different types of instrumentation and control systems "DCS and SCADA". Maintenance and troubleshooting of DCS Yokogawa CS 3000. Modification for logic and builder in yokogawa centum CS 3000. Construction of Field Instrument Hook-up and Installation. Commissioning and Instrument loop testing and functional testing of all Pneumatic and electronic control in the process and utilities. Calibration of Switches, Pressure, Flow, level Measurements. Calibration of Control fisher with positioned type DVC 6020 & 6010 and on-off valves. Calibration of scope v/v type BIFFI for the electrical feed water pump. Calibration of Control masoneilan with positioned master ABB with type EDP300&TZIDC (110-210). Adjusting the dust analyzer ultrasonic with receiving module type DURAG. Adjust for the taco-meter sensor which is measuring the speed and rotation. Construction for first project in Middle East (DLN) Dry Low NOx for GE TURBINE (9E) 125MW. Construction of new gas module (DLN), tube, transmitters, solenoid valves. Installation for 14 solar tubes between auxiliary skid and turbine starting from Flow divider to cans. Installation for 28 solar tubes between shear valve (auxiliary skid) and cans. Construction and Installation for tow pressure switches for auxiliary skid. Construction atomizing air panel for turbine and Installation for 9 tubes from this panel to turbine, differential pressure transmitters, purge skid.etc. Installation a new digital I/O card in MARK VIe for GE gas turbines. Following P&I diagrams, control diagrams, wiring diagrams for pressure instruments, instruments cable, level instruments, temperature instruments, control and shut off valves. Installation for air processing unit instruments for air supply. Construction of water injection pressure switches, lighting, limit switches. Construction and Installation for air filter unit temperature elements, solenoids, pressure switches, level switches. www.egyptrol.com Page 4 of 5 Updated: Jun. 2016
Construction of Turbine compartment instruments (level indicators, pressure transmitters, solenoid valves, vibration sensors, thermocouples, RTD, flame detectors, level switches, servo valves, pressure gauges, ). Construction of Auxiliary compartment instruments (thermocouples, fire alarm, heaters, gauges, pressure sensors). Prepare the inspection and test planning (ITP) documentation for all instruments calibration & installation and testing. Close out the management changes made through NCR's Site Instructions & Engineering queries appropriately. Prepare and review test documentation, submit results to Client and End User for Approval and Verification. Familiar with Programmable Logic Control (PLC) Siemens STP 7 (200). Familiar with Programmable Logic Control (PLC) Allen-Bradley RsLogix5000. Splicing for optical fiber cable by using Fuji Kura machine. Control system of TARNOS traveling water screen (TWS). www.egyptrol.com Page 5 of 5 Updated: Jun. 2016