OPERATIONS DIVISION STANDARD OPERATING PROCEDURE

Similar documents
SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

Austin Independent School District Police Department Policy and Procedure Manual

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Sequence of Operations (excerpt)

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

DX-9100 Applications from Engineering Services

FUNCTIONAL DESIGN SPECIFICATION

Building Automation System (BAS) Design Criteria

Planned, Limited Notice and Emergency Outage Guidelines

Civil Engineering Building

Digital Precise Air Control - DPAC

DUKE CLINIC SITE-SPECIFIC FIRE PLAN Part II General Statement. Fire Procedures

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

AHU Air Handling Unit Fundamentals. j.ilangumaran

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

DDC POINT LIST. 004 Harry Griffith Hall. RFP #PW17-2 Exhibit J Page 1 of 9 AHU 1 BOILER BOX DUAL DUCT MIXING. Building: HUMBOLDT STATE UNIVERSITY

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Existing Mechanical System Operation

Skilled Healthcare Documentation Requirements Life Safety and Fire Protection

Modbus Point Map. for the. Data Aire DAP-II

CAMPUS COMMUNITY FIRE AND LIFE SAFETY POLICY

SUBJECT: Effective Date: Procedure Number:

Virginia Tech Standards for Building Automation System

Sustainability Best Practices for HVAC Retrofits. Cal Poly State University, San Luis Obispo. Presented to the UC/CSU/CCC Sustainability Conference

HVAC Controls Upgrades: Requirement Details ( )

SECTION 3 BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS DIRECT DIGITAL CONTROLS (DDCS) AND PNEUMATICS

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET

DIVISION 23 - HVAC HVAC

SEQUENCE OF OPERATIONS

BULLETIN. Temperature Controls (Chilled / Hot Water)

PLYWOOD INDUSTRY JOB EVALUATION PROGRAM JOB DESCRIPTION. Points: 242 Grade: 18

Computing Services Center

Single zone RTU, controlled by a programmable thermostat. Single zone RTU, generic description, with power exhauster

Westminster College Fire Safety Report

SECTION FIRE DETECTION AND ALARM

Verasys System Operation Overview Technical Bulletin

BACnet MODBUS N2 LON Description Type Point Description Name # Object Type Register Type ID SNVT # Name SNVT Read Only

FIRE SAFETY POLICY. 2.0 Under national, provincial and municipal fire regulations, the Board will ensure compliance with:

HVAC Controls Upgrades: Requirement Details ( )

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

Reducing HVAC Maintenance and Maintenance Recommendations. Perry Mechanical Systems

21. Plumbing fixture mixing valves, PRV, electronic faucets and flush valve(excluding batteries)optional Cost proposal to include these device

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Your Home. Jacco & Assoc.

Fire/Life Safety Policy

ASHRAE Guideline 36 Advanced HVAC Control Sequences

Southern Baptist Theological Seminary. The Michael Minger Act Report for Activity Reported for Calendar Year 2004

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Song Deng, P.E. Assistant Director Energy Systems Laboratory Texas A&M University College Station, TX

Dutchess Community College. Emergency Action Plan. Conklin Hall College Residence

Adopted February 1977 Recoded May 1998 Revised September 2007 Reviewed July 2014 Revised July 2017 EMERGENCY DRILLS

Weekly Testing of Dedicated Stairwell Pressurization Fans- Metasys System Extended Architecture Code No. LIT

ELEVATOR RESCUE PROCEDURE

ALARM SYSTEMS AND EVACUATION PLANS SELF INSPECTION CHECKLIST

WESTIN HOTEL. Smoke Control System. Testing Procedures Manual. October 10, Copyright Impact Engineering, Inc All Rights Reserved

AIRPORTS. CARECALLER PowerfulSecuritySolutionsForSeriousSecurityNeeds

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

Auburn University Basketball Arena:

Energy at Tufts Betsy Isenstein Director, Facilities Technical Services

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

Product Data. Features/Benefits. AirManager Control. 33AM Comfort System

A secure and smart firm. The JABLOTRON 100 security system with its unique MyJABLOTRON application

Building Automation System

Safety & Security update April 2014

Position Number Community Division/Region Norman Wells Sahtu Region

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

Feature Summary. I. System

Cultivator & Hybrid Cultivator

EMERGENCY OPERATIONS PLAN Revision 4.0

Demonstration and Training of MEP Systems Page 1 of 15

Prescriptions for Critical Healthcare Cx. John D. Villani, P.E. Associate Grumman/Butkus Associates

UNT Applications. Using UNT Applications...3. Introduction Key Concepts UNT Controller Applications Fan Coil Units...

SEQUENCE OF OPERATION FOR ALC CONTROL AIR SOURCE HEATPUMP RECIRCULATION AIR WITH ECONOMIZER

DACC - NMDA BUILDINGS

POLICY. Carbon Monoxide (CO) is an odorless, colorless gas that can cause sudden illness and death. 1

Instruction, Operation, and Maintenance: Controls Software Versions: R37+

Building technologies from Siemens in hotels Systems descriptions and benefits: Fire Safety, Security and Building Management Systems

Emergency Support Function #2 Communication

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

CENTRAL GEORGIA TECHNICAL COLLEGE. Maintenance, Custodial & Operation Plan Facilities & Equipment

RESIDENCE HALL EMERGENCY EVACUATION PLAN

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

U N I V E R S I T Y O F HOUSTON

Marvel S MICROPROCESSOR CONTROLLER. Installation, Operation and Maintenance Manual Effective October 2018 DISCONTINUED. For Reference Only

RADIATION CONTROL GUIDE

To: Steve Ardolf, MSU Mankato From: Chris Plum, CEE. CC: Tim Ellingson, CEE. Angela Vreeland, CEE Dan Briese, MSU Mankato Date: April 21, 2014.

Emergency Evacuation Plans and Exercises. Risk Management Services

Standard Operating Procedure Ottawa Fire Services. Fire Operations- Structural Fire Incidents SUBJECT. Fire Alarm Systems (Silence/Reset) - Revised

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Advanced Facility Air-Management Technology

Weekly Testing of Dedicated Smoke Control Dampers - Metasys System Extended Architecture

Area Systems While the alarm bell or siren is sounding, enter your user code. The system silences the alarm bell or siren.

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Town of Cochrane Policy

FIRE SAFETY PLAN. ARTLab Fort Garry 180 Dafoe Road Winnipeg, MANITOBA. February / Prepared by: Francisco Fernandez

Fire Safety & Evacuation Procedures

Sunday January 30, 2011

Transcription:

OPERATIONS DIVISION STANDARD OPERATING PROCEDURE Freeze Protection Protocol DATE: October 27, 2014 PURPOSE This Operations Division Operating Policy and Procedure (OD/OP) establishes procedures to be followed in protecting equipment and facilities from damage during times of freezing weather. REVIEW This Operations Division Operating Policy and Procedure will be reviewed in October of each year by the Energy Manager, HVAC Superintendent, ELOM Foreman, Systems Maintenance Foreman, and Emergency Maintenance Supervisor. The Energy Manager will subsequently present it to the Energy Committee. It will then be approved by the Assistant Vice President for Operations. POLICY AND PROCEDURE 1. Definitions a. AHU: Air Handling Unit b. Chilled Water Pump (CWP): Device used to pump chilled water through the cooling coil of the AHU. c. Chilled Water valve: Device used to regulate the flow of chilled water through the cooling coil of the AHU. d. Environmental Control Systems: Computers used to monitor and make adjustments to Air Handlers, Chilled Water systems, Hot Water systems, etc., in campus facilities. e. Exceptions: Buildings or AHUs which require special procedures not covered in this Operating Policy. They will be listed on Appendix A, Exceptions. f. FAB: Face and Bypass Damper. A damper which bypasses inlet air flow around the pre-heat coil. g. Heating Valve and Pre-Heat Valve: Device used to regulate the amount of steam or hot water to the heating coil of the AHU. h. Hot Water Pump (HWP): Device used to pump hot water to the heating coil of the AHU.

October 27, 2014 Freeze Protection Protocol, p.2 i. MAT: Mixed Air Temperature j. OAD: Outside Air Dampers k. OAT: Outside Air Temperature l. Operator: The Emergency Maintenance Operator on duty. m. Software Override (SWO): A command on the Front End Computer to change the state of a device in the field. The command must be manually released. 2. Procedures According to System Mode/Status a. When an AHU is running properly: No action will be taken on any AHU that is online and running properly. b. If an AHU transmits a MAT Low Temperature Alarm whether or not the AHU is running: 1. Ensure the Heating Valve is 100% open. If not, issue a SWO to open it to 100%. 2. If so equipped, override the Pre-Heat Valves open and the FABs open. 3. Check the HWP indications and ensure it is running. If it is not, the Operator will issue a SWO to turn it on. 4. Issue a SWO to override the Chilled Water Pump on and open the Chilled Water Valve to 50%. 5. Ensure the OAD is closed. If the OAD is not closed, issue a SWO to close the Dampers. 6. The Heating Valves, Pre-Heat valves, HWPs, OADs and FABs will stay overridden until either: The AHU starts according to schedule, or If the alarm persists longer than 60 minutes, the Heating Valves, Pre- Heat valves, HWPs, OADs and FABs will stay overridden until next scheduled event. File a work order to repair the AHU.

October 27, 2014 Freeze Protection Protocol, p.3 c. When an AHU trips off due to: Freeze Stat AHU Low Temperature Limit, or Mixed Air Low Temperature Limit 1. Ensure the Heating Valve is 100% open. If not, issue a SWO to open it to 100%. 2. If so equipped, override the Pre-Heat Valves open and the FABs open. 3. Check the HWP indications and ensure it is running. If it is not, the Operator will issue a SWO to turn it on. 4. Issue a SWO to override the Chilled Water Pump on and open the Chilled Water Valve to 50%. 5. Ensure the OAD is closed. If the OAD is not closed, issue a SWO to close the Dampers. 6. The Heating Valves, Pre-Heat valves, HWPs, OADs and FABs will stay overridden. In order to clear the alarm and reset the AHU, contact and inform the on-call BMC Superintendent of the problem. d. When the AHU is scheduled off for weekends or holidays, and the OAT drops below 30 : The Operator will start the campus AHUs and run them for two hours during each 12 hour period during which the OAT drops to or remains below 30. Upon the initial occasion when the temperature drops below 30, the AHU should be started immediately. During subsequent 12 hour shifts, it can be restarted at the Operator s discretion. e. Any time the OAT drops below 20 : 1. The Operator will start all campus AHUs and let them run until the OAT rises above 24. 2. The Operator will contact and notify the on-call Emergency Maintenance Supervisor that this action has been taken. 3. After the OAT rises above 24, the Operator will return to the normal schedule, or if the AHU is scheduled off for weekends or holidays, to running for two hours during each 12 hour period as described in section 2.d. above.

October 27, 2014 Freeze Protection Protocol, p.4 3. Documentation and Reporting By email, immediately notify the AVP for Operations of each freeze protection action. 4. Exceptions Some specific buildings or AHUs will require unique procedures which are Exceptions to the above. These units must be listed on Appendix A, Exceptions, and must be reviewed annually at the same time as this Operating Policy. RESPONSIBILITIES POSITION SECTION MONTH Energy Manager Energy Committee October Energy Manager HVAC Superintendent ELOM Foreman Systems Maintenance Foreman Emergency Maintenance Supervisor Approved: Assistant Vice President for Operations

October 27, 2014 Freeze Protection Protocol, p.5 APPENDIX A, Exceptions The Air Handlers below require special procedures which cannot be addressed in the Freeze Protection Protocol due to extensive and unique details: Animal Science AHUs 2, 3, and 5 then ensure the OAD is closed and the HWV and CWV are open per the Freeze Protection Protocol, and call out a technician. Units are 100% OA and will be starved if the dampers become shut. Animal Science AHUs 1 and 4 Art 3D AHUs 1, 2, 3 Art 3D AHUs 4 and 5 then ensure the OAD is closed and the HWV and CWV are open per Freeze Protection Protocol, and call out a technician. Units are 100% OA and will be starved if the dampers become shut. Biology AHUs 1-11 and 16 then ensure the OAD is closed and the CWV is open per Freeze Protection Protocol, and call out a technician. Do not SWO the steam valves at this location any time because it may damage the controls and create false fire alarms. Biology AHUs 12-15 Do not SWO the steam valves at this location any time because it may damage the controls and create false fire alarms. Chemistry Building All AHUs AHUs in the Chemistry building utilize Steam Valves which should not be opened to 100%, as are the Heating Valves above, because this action could overheat and damage components such as temperature sensors and smoke detectors.

October 27, 2014 Freeze Protection Protocol, p.6 For Steam Valves in the Chemistry building, no action should be taken except at the direction of the technician who has been dispatched to troubleshoot the problem. Otherwise, concerning chilled water pumps and valves, the Protocol should be followed. College of Business Administration then ensure the OAD is closed and the HWV and CWV are open per Freeze Protection Protocol, and call out a technician. Controls will take care of themselves. College of Engineering AHU 1 Do not SWO the OA dampers closed on this unit unless the unit trips off due to Low Limit Alarm. If the OA dampers do not automatically close, then override them closed and call out a technician. This AHU supplies fume hoods and can create a hazardous atmosphere in the room if the dampers become closed. If the HWV and/or CWV do not automatically open, then override them open as per the Freeze Protection Protocol, and call out a technician. College of Engineering AHUs 2, 3, and 4 Experimental Science Do not SWO the OA dampers closed on these units. Leave the units alone unless they trip off on Low Limit Alarm; then ensure the OA dampers are closed, and the HWV and CWV are open, as per the Freeze protection Protocol. Call out a technician. These AHUs supply fume hoods and can create a hazardous atmosphere in the rooms if the dampers become closed. IEHH 555 (Reese) All AHUs Do not SWO the OA dampers closed on these units. Leave the units alone unless they trip off on Low Limit Alarm; then ensure the OA dampers are closed, and the HWV and CWV are open, as per the Freeze protection Protocol. Call out a technician. These AHUs supply fume hoods and can create a hazardous atmosphere in the rooms if the dampers become closed.

October 27, 2014 Freeze Protection Protocol, p.7 Jones Stadium (West) AHU 2 When the OA temperature drops to 40, issue a SWO of 100% open to the heating valve. Per Jamie (32) and Terry Neal 12/21/12. Engineering Materials (OLD Mass Communications) This building is currently mothballed with an asbestos abatement going on. DO NOT start up any air handlers. Outreach and Extended Studies This building is currently mothballed. Take no actions. United Spirit Arena Do not SWO the steam valves open at this location anytime because it may damage the controls and create false fire alarms. Do not SWO the dust switch or dampers at this location anytime. If you receive the MAT in low alarm for any unit, turn the unit on and run the unit until the OAT is above 32, per email from Eric Newell 12/20/12. Send an email to Eric Newel, Jamie Doggett, Steve Allsup, Lon Mirll and David Bass with all log information. West Hall AHUs 1 and 3 Close these dampers per freeze protection protocol. West Hall AHU 2 then ensure the OAD is closed and the HWV and CWV are open per Freeze Protection Protocol, and call out a technician. Units are 100% OA and will be starved if the dampers are shut.