Wingecarribee Shire Council

Similar documents
Wingecarribee Shire Council

AMENDMENTS. Date Effective. Amendment No. Council. DCP 14 Davidson St, Greenacre Page 2

I615. Westgate Precinct

MASTER PLAN NO. 60 (SITE DEVELOPMENT PLAN EASTBANK/REGATTA NORTH PRECINCTS 2 4) 2008

Division 13 Local Business and Industry Buffer Zone: Assessment Criteria and Assessment Tables

Draft Ada Street Cardiff Area Plan

Part 12 Precinct Area Plans - Wyee West

I611. Swanson North Precinct

Part 4.25 Pasminco Area Plan

Planning Proposal Concurrent DA/LEP Amendment for Belmont North Pharmacy Amendment No. 24 to Lake Macquarie Local Environmental Plan (LMLEP) 2014

Subdivision Design Criteria. Penihana North GUIDELINES TO THE RULES

Planning Proposal Toronto Road, Booragul. Amendment to Lake Macquarie Local Environmental Plan (LMLEP) 2014

AOTEA SUPERMARKET ZONE. Zone Introduction

Section 12C Subdivision in the Rural Residential Zone

Kaufland supermarket and complementary uses, part 1550 Pascoe Vale Road, Coolaroo Incorporated Document (Insert date) 2019

Lake Macquarie City. A copy of the published amendment including the instrument and maps, is provided in Attachment 7 of this report.

LITHGOW CITY COUNCIL DEVELOPMENT CONTROL PLAN ADI LIMITED SITE LITHGOW SMALL ARMS FACTORY METHVEN STREET, LITHGOW

Northern Territory Compact Urban Growth Policy

SCHEDULE THREE TO THE DEVELOPMENT PLAN OVERLAY EASTERN GOLF COURSE KEY REDEVELOPMENT SITE

Development Control Plan

NORTH EAST INDUSTRIAL ZONE

6.6.2 Emerging Community Zone Code Application Purpose and overall outcomes. s6 Zone Codes Emerging Community and Township Zone Codes

SECTION 7A: WHAKARONGO RESIDENTIAL AREA

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

Authority. any changes required as a result of the approved CHMP.

Planning Proposal Charlestown Swim and Leisure Centre LEP Amendment

WATERLOO STATE SIGNIFICANT PRECINCT SUMMARY OF STUDIES

OP Council Resolution June 16, Planning and Development Services

I602. Birdwood Precinct

Development Control Plan

The West Vaughan Employment Area Secondary Plan Policies

Appendix 18F: Tauriko Business Estate Services Strategy Statement and Sequencing Schedule

GREENVALE CENTRAL PRECINCT STRUCTURE PLAN

Keystone Business Park Precinct Structure Plan North East Industrial Precinct. Part 2 Design Principles

11.3 SPECIAL CHARACTER ZONE HAWKE S BAY REGIONAL SPORTS PARK

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

SECTION ONE North East Industrial Zone Design Guide Palmerston North City Council June 2004

WELCOME TO OPEN HOUSE TWO November 28, 2018

Road transport activities and infrastructure can have adverse effects on the environment and community.

I539. Smales 2 Precinct

Leduc Industrial Outline Plan SE W4

H7 Open Space zones. (a) provide for the needs of the wider community as well as the needs of the community in which they are located;

4 Residential and Urban Living Zones

GREENBANK DEVELOPMENT MASTERPLAN

MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013

C ity of Grande Prairie Development Services Department

Urban Stormwater: Best Practice Environmental Management Guidelines. CSIRO This electronic edition published by CSIRO PUBLISHING, 2006.

Sawtell Town Centre Development Control Plan

Appendix 7 Precinct Analysis Carlton

I609. Penihana North Precinct

Rural (Urban Expansion) Environment

DAREBIN PLANNING SCHEME AMENDMENT C137

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

QUEENSTOWN LAKES DISTRICT COUNCIL SUBDIVISION DESIGN GUIDELINES

statement of environmental effects

Contents of Part 6. Part 6 Zones

Cape Cabarita (Formerly known as the Wellcome Site) Development Control Plan. Date of Adoption: 4 September 2007 Effective Date: 7 March 2008

NORTH COFFS DEVELOPMENT CONTROL PLAN ABN

COMMUNITY DESIGN. GOAL: Create livable and attractive communities. Intent

SECTION E. Realizing the Plan

4 RESIDENTIAL ZONE. 4.1 Background

I403 Beachlands 1 Precinct

and services The protection and conservation of environmentally significant and sensitive natural heritage features and functions.

BYLAW C A Bylaw of Rocky View County to amend Land Use Bylaw C

Welcome. Walk Around. Talk to Us. Write Down Your Comments

Newcourt Masterplan. November Exeter Local Development Framework

MASTER PLAN NO. 62 (SITE DEVELOPMENT PLAN BIRTINYA VILLAGE CENTRE) 2009

FORMER CANADIAN FORCES BASE (CFB) ROCKCLIFFE SECONDARY PLAN. Official Plan Amendment XX to the Official Plan for the City of Ottawa

Highway Oriented Commercial Development Criteria

15 Rural Residential Zone

Rural (Urban Expansion) Environment

Next Steps / Development Process. Structure Plan. June submitted to City of Fremantle. Structure Plan. July supported for advertising

RLE.1 Rural Living Environment

HURON COMMUNITY PLAN

Planning & Development. Background. Subject Lands

SPECIAL 35 (HIBISCUS COAST GATEWAY) ZONE

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

RURAL ZONE - POLICY. Rural Zone Policy. Issue: Rural Environment. Ruapehu District Plan Page 1 of 8

Venice Pumping Plant Dual Force Main Project Draft EIR

ESSENTIAL ENGINEERING FOR PLANNERS

4.0 Zones and Overlays

S o u t h C e n t r a l O u t l i n e P l a n. Leduc Business Park. North Leduc Industrial Area Structure Plan C it y of Led u c.

University Park, Worcester Non Technical Summary December 2011

Carter Street Precinct. Development Control Plan 2016

CITY OF FREMANTLE LOCAL PLANNING SCHEME NO. 4 AMENDMENT NO. 68 SCHEME AMENDMENT REPORT

Public Consultation. Land at Monks Farm, North Grove. Welcome

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Part 10 Other plans

Introduction How to read this document Land to which this Precinct Structure Plan applies Background information...

Asbury Chapel Subdivision Sketch Plan

RESIDENTIAL ACTIVITY PERFORMANCE STANDARDS

Commercial Development Proposal Tenth Line Road. Planning Rationale Report. Minto Developments Inc.

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

Planning Proposal Wangi Power Station Complex Administrative Amendment Lake Macquarie Local Environmental Plan 2014

UNIVERSITY TOWN NEIGHBOURHOODS 5.2 ECO-CORRIDOR MELBOURNE CAMPUS MASTER PLAN 2014

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

39 WALLACEVILLE STRUCTURE PLAN

North Oakville East Parks Facilities Distribution Plan. November, 2009

EVALUATION OF MASTER PLAN ALTERNATIVES

I404 Beachlands 2 Precinct

Transcription:

Connell Wagner Pty Ltd ABN 54 005 139 873 2 Palmer Street North Parramatta New South Wales 2151 Australia Telephone: +61 2 8896 4100 Facsimile: +61 2 9890 3558 Email: cwpar@conwag.com www.conwag.com Moss Vale Enterprise Corridor 27 February 2008 Reference 25163-002 Revision 3

Document Control Document ID: O:\25163\002\OUTPUTS\DCP\REP02_130807.DOC Rev No Date Revision Details Typist Author Verifier Approver 0 21 June 2007 Draft AI AI MS DB 1 8 August 2007 Second Draft AI AI MS DB 2 13 August 2007 Final Draft AI AI MS DB 3 27 February 2008 Following Public exhibition and reconsideration by Council A person using Connell Wagner documents or data accepts the risk of: a) Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard copy version. b) Using the documents or data for any purpose not agreed to in writing by Connell Wagner.

Contents Section Page 1. Preliminary 2 1.1 Name of this plan 2 1.2 Land to which this plan applies 2 1.3 Legal status of this plan 2 1.4 Aims of this plan 2 1.5 Relationship to other development control plans 2 1.6 Variations to the requirements 4 1.7 Definitions 4 2. Development concept plan 6 2.1 Introduction development intent 6 2.2 Land use zones and precincts 6 2.3 Special control areas 10 2.4 Access and movement 10 2.5 Services infrastructure 13 3. Development controls 14 3.1 Land use 14 3.2 Subdivision and lot design 14 3.3 Access and movement 15 3.4 Building siting and design 16 3.5 Energy efficiency 20 3.6 On-site parking and loading facilities 21 3.7 Signage 22 3.8 Fencing 23 3.9 External lighting 23 3.10 Landscaping 24 3.11 Utility services 25 3.12 Biodiversity conservation 26 3.13 Heritage protection 27 3.14 Noise 27 3.15 Air quality 28 3.16 Flood-prone land and stormwater management 29 3.17 Waste management 30 ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE i

ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 1

1. Preliminary 1.1 Name of this plan This plan is the Moss Vale Enterprise Corridor. 1.2 Land to which this plan applies This plan applies to land known as the Moss Vale Enterprise Corridor identified on the Land Application Map. 1.3 Legal status of this plan This plan has been made pursuant to Division 6 of the Environmental Planning and Assessment Act 1979 and Part 3 of the Environmental Planning and Assessment Regulation 2000. adopted this plan on <date> 2007 and the plan came into force on <date> 2007. 1.4 Aims of this plan This plan aims to support the provisions of Wingecarribee Local Environmental Plan 2007 and establish more detailed controls on development in the Moss Vale Enterprise Corridor. The particular aims of this plan are: To facilitate the development of the Moss Vale Enterprise Corridor for employment uses. To provide a clear framework for development in the Moss Vale Enterprise Corridor. To ensure the orderly and proper development of the area. To conserve and manage areas of environmental significance. To protect important Aboriginal heritage values. To provide adequate essential physical infrastructure to service development. To ensure development adopts sound urban design and sound environmental management practices. To protect the scenic amenity of the Moss Vale area. To protect the amenity of surrounding rural and residential areas. 1.5 Relationship to other development control plans The specific requirements set out in this plan are additional to the development controls contained in the following development control plans: Wingecarribee DCP No.12 Off-Street Car Parking, Loading Facilities and Vehicular Access. Wingecarribee DCP No.33 Advertising and Signage. Wingecarribee DCP No.34 Managing Our Flood Risks. Wingecarribee DCP No.41 Development and Subdivision Engineering Standards and Planning Guidelines. Wingecarribee DCP No.49 Waste Minimisation and Management. The controls set out in this plan prevail where there are inconsistencies between this plan and the other plans listed above. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 2

ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 3

1.6 Variations to the requirements The council may consider variations to the development controls set out within this plan. A request for a variation must be accompanied by written justification that outlines the reasons for the variation and demonstrates that the proposed development is consistent with the specific objectives of the control that is sought to be varied. The council will consider variations to the development controls within this plan where environmental protection and management works are proposed within conservation areas and where prior approval or agreement from the relevant government authorities has been obtained. 1.7 Definitions This plan adopts the definitions set out in the standard instrument for a principal local environmental plan in the Standard Instrument (Local Environmental Plans) Order 2006 for words and expressions used in this plan. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 4

ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 5

2. Development concept plan 2.1 Introduction development intent The Moss Vale Enterprise Corridor is to be developed as a sustainable employment area in accordance with the Development Concept Plan. The Enterprise Corridor will cater for conventional light and general industrial development to meet local and regional demands for industrial land. It is also anticipated to accommodate business park commercial development and larger scale freight storage and distribution operations associated with existing rail infrastructure and a possible intermodal freight terminal. Not all of the Enterprise Corridor is suitable for urban development. The area has important environmental and cultural values that must be protected. There are also environmental constraints that must be considered and managed in the future development of the area. The future development of the Enterprise Corridor for employment uses will require significant investment in services and transport infrastructure over time. The location and nature of essential infrastructure requirements have been determined and associated land requirements identified on the Development Concept Plan. The Development Concept Plan is described in detail below. 2.2 Land use zones and precincts Two broad land uses zones are designated conservation and employment. The conservation zone comprises land with significant environmental and heritage constraints that is unsuitable for urban development. This includes: Major riparian corridors and flood-prone land. Significant vegetation and fauna habitat. Sites and areas of Aboriginal cultural significance. No development will be permitted within the conservation zone other than: Environmental protection works. Environmental and stormwater management facilities. Roads. Suitable recreational facilities. The employment zone comprises land generally suitable for urban development with appropriate controls. The zone is further divided into two precincts Enterprise Precinct and General Industrial Precinct. The Enterprise Precinct includes land at and near the interface with the Moss Vale township and existing light industrial development. This precinct will facilitate a transition between residential uses and heavier industrial uses across the northern parts of the Enterprise Corridor. This precinct will accommodate a mix of light industrial and commercial office uses. The General Industrial Precinct covers the balance of the employment zoned land and will accommodate a wide range of industrial and warehouse land uses including freight terminal facilities and warehouse and distribution centres. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 6

ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 7

ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 8

ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 9

2.3 Special control areas There are environmental and cultural constraints associated with employment zoned land. These are not absolute constraints that preclude development. But rather these represent areas where further assessment and special development controls are required to ensure sustainable development outcomes. These areas are delineated as special control areas. Four special control areas are identified: Biodiversity conservation These areas have some identified conservation value and include open woodland plant communities. Development proposals within these areas will require detailed ecological studies to ensure development has no adverse impacts on significant flora and fauna. Flood-prone lands These areas comprise a 50 metre buffer from the estimated 100 year flood line around major watercourses. This is required as no flood modelling has been undertaken for the area. Development proposals within these areas will require further hydrological assessment to ensure the land is suitable for development. Heritage protection These are areas where predictive assessment indicates there is a likelihood of low to medium density artefact occurrences. Development within these areas has potential to impact on Aboriginal cultural material and further heritage assessment is required to support development proposals. Scenic protection This incorporates elevated and prominent parts of the site above the 690 metre contour. Development proposals within these areas will require careful consideration of visual impact. The land along the Berrima Road corridor and on the northern edge of the Enterprise Corridor visible from Burradoo are also sensitive areas. These are not identified within the special control area however specific development controls are applicable to protect visual amenity within these areas. 2.4 Access and movement Roads A modified and extended major road network will service the Enterprise Corridor. The principal access routes into and through the area will be from the west via Taylors Avenue (and a New Berrima Bypass) from the Hume Highway to Berrima Road and Collins Road and from the east via the Moss Vale Bypass from Moss Vale Road to Berrima Road. A number of road infrastructure upgrades and new roads are required to facilitate and accommodate future development. These are: Moss Vale Bypass The Moss Vale Bypass is part of a long term strategy and a road reserve has been created for this road. It is anticipated that the first stage of the bypass road would be a link from Moss Vale Road to Beaconsfield Road. As part of the bypass route a connection with Lackey Road would be required to provide access to development around Collins Road. Also forming part of the works is the construction of a roundabout at the intersection of Moss Vale Road and the bypass route. It is proposed that Suttor Road access is separated from the bypass route and maintains its standing as a local road. Constructing such a bypass route will enable vehicle movements to bypass Moss Vale and avoid further congestion on the main road (which is currently at capacity). The bypass will require a bridge to be constructed over the Main Southern Railway. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 10

When development proceeds to the areas surrounding Berrima Road an extension of the initial stage of the Moss Vale Bypass will be required. This would involve the construction of the Beaconsfield Road to Berrima Road section and provide an access link from the east to Berrima Road. Upgrade Lackey Road The current standard of Lackey Road within the site boundaries is inadequate to form part of the road network within the Enterprise Corridor. Lackey Road will need to be upgraded from the proposed Moss Vale Bypass to New Road No.2 to provide a suitable connection to the properties fronting Collins Road. Bulwer Road extension An extension of Bulwer Road is required to serve development surrounding Collins Road. This will provide a connection to Berrima Road. Part of the Bulwer Road extension would be the development of New Road No.1 and New Road No.2 up to Collins Road. Bridge over rail siding onto Collins Road There is a rail level crossing in existence at Collins Road. This would be removed by extending Collins Road on the south side of the spur line through to New Road No.2 and a new vehicular access bridge provided over the Blue Circle rail spur joining to Collins Road on the north side of the line. The extension of Collins Road will provide a link north of the rail spur to traffic entering the area via Lackey Road. Collins/Douglas Road upgrade It will be necessary to upgrade Collins/Douglas Road to an appropriate collector road standard as development will front this road. Douglas Road currently terminates on the north side of the rail spur at the level crossing. It is expected that this road will form the main access route into the development area on the north side of the rail spur. Therefore an extension will be required from the existing level crossing to Taylor Avenue. It is anticipated that upgrading to dual lanes in each direction would only be required up to the proposed overpass bridge, which connects Douglas Road to Berrima Road. Removal of Douglas Road level crossing The existing level crossing at Douglas Road can be removed once Douglas Road is extended through to Taylor Avenue. Old Hume Highway/Taylor Avenue/Medway Road roundabout A roundabout at the Old Hume Highway/Taylor Avenue/Medway Road intersection is to be constructed. This also includes the realignment of Medway Road on the approach to the roundabout. This intersection upgrade will create a high volume access for vehicles entering the development area off the Hume Highway and provide improved accessibility for heavy vehicles. New Berrima Bypass Access to the Enterprise Corridor via the Hume Highway is a critical element of the road system. The need for four-lane access to the site has been identified. A New Berrima Bypass to the south of Taylor Avenue is proposed to link Taylor Avenue and the Douglas Road extension east of the Blue Circle works to the Old Hume Highway. The bypass would be dual lane in both directions with the existing Taylor Avenue as an additional route. The bypass would avoid excessive disruption to the New Berrima residential precinct. Land acquisition will be required for the bypass as some of the route is within privately owned land. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 11

Widening of Taylor Avenue and Medway Road Widening of Taylor Avenue and Medway Road will be required to accommodate four lanes of traffic. It is anticipated that this will need to occur between the Hume Highway and the proposed New Berrima Bypass. These works will be required when the associated New Berrima Bypass is constructed. Berrima Road upgrade Berrima Road will be the main feeder road into the area south of the rail spur line. It is essential that the capacity of this road is increased to accommodate the increased traffic flows within the Enterprise Corridor. Further traffic modelling will determine whether Berrima Road will need to be a dual carriageway to carry predicted peak flows. The road widening will require land acquisition to extend beyond the current road reserve. Realignment of Douglas Road to Berrima Road The proposed removal of the Douglas Road level crossing will necessitate a new road to realign the connection between Douglas Road and Berrima Road. It is expected that this intersection will carry a high traffic volume during peak flow conditions and the traffic will need to be distributed into Douglas and Berrima Roads. The new road will need to be two lanes in width and will require a bridge to overpass the rail siding. Removal of part of Berrima Road The provision of the new road link between Douglas Road and Berrima Road means that part of Berrima Road will no longer be required. This will also remove the requirement for the level crossing near the Blue Circle works. Construct New Road No.1 A vehicular cross-link within the Enterprise Corridor should be provided when development proceeds along Berrima Road towards New Berrima. The new road would join Bulwer Road up to Berrima Road and would provide efficient road access to the developments bounded by Berrima Road and the rail spur line. Land acquisition will be required for the construction of the new road link. Removal of Brookdale Road There are current problems with safety and sight distances associated with the poor alignment of Brookdale Road at the intersection with Berrima Road. Brookdale Road is therefore proposed to be removed. The new access link provided by New Road No.1 would allow through flow of traffic from New Road No.1. Additional internal access roads are expected to be required to service future subdivision development. These will need to connect into the identified major road network. Pedestrian and cyclist movement Potential pedestrian and cyclist links have been considered as part of the road concept planning. Footways will be provided on all roadways throughout the site. An important pedestrian link has been identified to connect Berrima Road to Douglas Road via the existing Douglas Road level crossing. This pedestrian link should be kept separate to the new road link for safety reasons due to the high volumes of traffic expected at the intersection with the bridge crossing. This would require the establishment of a pedestrian overpass or underpass at the spur line crossing. Movement for cyclists within the site has been considered and should be adopted as part of the development. It is anticipated that most of the employees within the Enterprise Corridor would live within the surrounding areas and should be encouraged to ride to work as an alternative to use of vehicles. Cycle pathways 2.5m wide should be incorporated into the verge along all new and existing roads in the zone. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 12

A dual use pedestrian and cycle path is also proposed to extend along the Stony Creek corridor and is shown on the Development Concept Plan. Bus services Public transport access will be essential to service the development area and should be convenient and cost effective to encourage employees to avoid using private transport. An indicative bus route and possible locations of bus stops that will provide users with ease of access to their workplaces has been formulated and is shown on the Development Concept Plan. 2.5 Services infrastructure The future development of the Enterprise Corridor will require major upgrades to existing services infrastructure and significant new infrastructure. In some cases this will require land to be set aside. The location and extent of land required for new infrastructure is identified on the Development Concept Plan and includes: New water storage reservoir close to the Berrima Road/New Road No.1 intersection. Six new sewer pump stations across the area. These will require 1000 square metres of land each in the locations identified. Three new 132kV/11kV electricity zone substations in the identified locations. Each requires a one hectare square-shaped site. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 13

3. Development controls 3.1 Land use Land use and development is consistent with the Development Concept Plan. The land proposed for development is suitable for the intended use. 1. The use of land in the Moss Vale Enterprise Corridor must comply with the Development Concept Plan. 3.2 Subdivision and lot design Lot sizes are appropriate for the operational needs of the development. Lot sizes do not result in excessive land fragmentation that would preclude or restrict future development opportunities. Lots are large enough to protect special natural or cultural features within the lot. Lot sizes and shapes are appropriate for the physical characteristics of a particular location. 1. Subdivision proposals that depart from the below development standards must demonstrate that the proposed lot sizes and dimensions are suitable for the functional and operational needs of proposed site development. 2. Subdivision design must comply with the requirements set out in DCP No.41. 3. Subdivision proposals must demonstrate due regard has been given to the natural and physical features of the land. 4. Subdivision proposals must be in accordance with a concept plan for the future development of the entire parent lot. 5. Lots must be provided with suitable public street frontage and access. 6. Lots must be connected to essential utility services with capacity to accommodate the demands generated by proposed development. 7. Lots within the Enterprise Precinct must have a minimum area of 5000m2 and a minimum primary lot frontage of 30 metres. 8. Lots within the General Industrial Precinct must have a minimum area of 1 hectares and a minimum primary lot frontage of 50 metres. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 14

3.3 Access and movement An efficient and interconnected road system is established to service the area. Internal roads are designed to an appropriate standard for industrial traffic. Site access arrangements do not compromise the safe and efficient generation of the surrounding road network. Road reserves provide for pedestrian and cyclist movement to increase transport choices and reduce reliance on the private car. The Enterprise Corridor is serviced by a local bus route to encourage public transport use and reduce reliance on the private car. 1. The major road network is to be developed in accordance with the Development Concept Plan. 2. New internal access roads must be designed with a minimum road reserve of 20 metres and must accommodate pedestrian and cycle facilities. 3. Intersection treatments are to be designed in accordance with the relevant Austroads guidelines based on a traffic generation determined through a traffic impact assessment for the development. 4. Direct vehicular access onto the main road network will be limited to one access point for each development site. 5. No additional road connections will be permitted to Berrima Road or the Moss Vale Bypass other than those identified on the Development Concept Plan. 6. Access points and connections to the Main Southern Railway must be designed to meet Australian Rail Track Corporation and/or other relevant rail authorities requirements. 7. Vehicle access arrangements must comply with minimum standards set by applicable Australian Standards as well as Council s Council Development Control Plan No 41 Design (Vol 1) and Construction (Vol 2) and must be adequate to meet the needs of the development and associated vehicular traffic. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 15

3.4 Building siting and design The bulk and scale of new development is appropriate to the area. The size and siting of buildings within lots maintains the open rural character of the area. The siting of buildings ensures that important natural or cultural features within lots are protected. The bulk and scale of new development does not compromise the scenic amenity of the area. Development is not visible from public viewpoints along Berrima Road and from surrounding townships. Buildings are designed to reduce water and energy use. Buildings are sited and designed to minimise bushfire hazard. 1. Development proposed within the Scenic Protection Special Control Area must be accompanied by a visual impact statement prepared by a suitably qualified person. The visual impact statement must demonstrate that the development will not result in a significant adverse visual impact on the surrounding area 2. The height of buildings and other structures located within 50m of Berrima Road must not exceed 15 metres above ground level. 3. The height of buildings and other structures must otherwise not exceed 20 metres above ground level. 4. The minimum building setback from Berrima Road and the Moss Vale Bypass is 15 metres. 5. The minimum building setback from other roads is 10 metres. 6. The minimum building setback required to side and rear lot boundaries next to rural zoned land is 15 metres. 7. Front building setback areas must be used for landscaping or staff and visitor car parking. Open storage is not permitted. 8. Building footprints must not exceed 65% of the total site area. 9. Building materials should be non-reflective and external colours are to be muted earth and bush vegetation tones. Dark colours and large areas of white or vibrant colours are to be avoided. 10. Building design is to include measures to reduce water and energy use. These measures (including the energy efficiency measures set out in section 3.5 and water conservation measures such as recycling and reuse of treated waste water) are to be documented in a building sustainability statement prepared by a suitably qualified person submitted with the development application. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 16

11. The siting of buildings and other structures should consider the mature size and height of existing vegetation and proposed landscape treatments to protect assets and occupants. 12. The siting and design of buildings within bushfire prone land must demonstrate compliance with the requirements of Planning for Bushfire Protection 2006 published by the NSW Rural Fire Service. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 17

ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 18

ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 19

3.5 Energy efficiency Buildings are designed to minimise energy use. Greenhouse gas emissions from new development are minimised. The thermal performance of buildings is maximised. Innovative technologies are incorporated in new developments where possible to reduce ongoing energy use and maintenance costs. 1. Building design demonstrates an appropriate response to local climate and to the site and its context. 2. Passive solar and passive ventilation is incorporated into the design of buildings to minimise reliance on electrical and mechanical systems. 3. New development must consider building design and operation measures that reduce energy consumption relative to conventional buildings. These measures could include: use of renewable energy sources such as solar or heat pump water systems use of renewable or recyclable building materials insulation of roof and walls to comply with relevant Australian Standards use of sustainable energy technologies such as photovoltaic cells and cogeneration where appropriate 4. Maximise the use of natural light to internal spaces through window type and location and insulated roof windows. 5. Use energy efficient (low energy demand) fittings and switches. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 20

3.6 On-site parking and loading facilities Adequate on-site vehicle parking is provided for employees and visitors. On-site loading facilities and vehicle manoeuvre areas are adequate for the operational needs of site development. Large open hardstand areas are screened and landscaped to reduce visual impact. 1. On-site parking shall be provided as per the table below 2. Council will generally require the provision of adequate on site turning facilities of commercial vehicles. 3. Under no circumstances will Council permit the reversing of vehicles onto a main or arterial road or future by-pass route. 4. For the design of off street commercial vehicle facilities refer to AS 2890.2 : 2004 for guidelines. 5. Loading and unloading of materials and goods must take place within the site. 6. Loading bays are not to be used for the storage of goods or waste storage other than during the unloading / loading process 7. Open parking areas should be designed to incorporate a 2.5 metre wide landscape bay for tree planting every 6 to 8 car bays. 8. Other open hardstand areas should be screened from public view with appropriate landscape treatments. USE CAR PARKING SPACES Industrial Uses Factory 1 space per 40 sq m of office and showroom area, PLUS 1 space per 100 sq m of gross floor area, or 1 space per 2 employees, whichever is the greater Warehouse Car Repair Station Motor Car, Caravan, Boat and Truck Showroom Storage Units 1 space per 300 sq m of gross floor area 6 spaces per workshop bay 1.5 spaces 200m2 site area plus 6 spaces per any workshop bay I space per 500m2 of storage area plus 1 space per employee ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 21

3.7 Signage The location and size of signage balances business identification needs and visual impact. The content of signage relates to site development. The design of signage is integrated with building design. 1. Signage must comply with the relevant requirements of DCP No.33. 2. Signage must be contained within the site and must be limited to information that relates to the use of the site and the name of the premises or occupier. 3. The number of signs within a site is to be minimised and sited in accordance with a signage strategy submitted with development applications. 4. Signage must be designed as an integral part of site development and building design. Design details must be provided in a signage strategy prepared by a suitably qualified person submitted with a development application. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 22

3.8 Fencing New boundary fencing is designed to secure development sites without adverse visual impact. 1. Transparent or open-style fencing along street frontages is encouraged and should not be located forward of the building line. 2. The integration of landscaping with fence lines is encouraged. 3. Fencing details must be submitted as part of a development application. 3.9 External lighting Adequate external lighting is provided for operational and security purposes. Light spill and glare from external lighting does not impact on surrounding properties or compromise road safety. The design of external lighting minimises visual impact on surrounding areas. 1. An external lighting strategy must be submitted with development applications and must indicate the location and design of lighting and the proposed hours of use. 2. A light spill impact assessment prepared by a suitably qualified person must be submitted with development applications for land located next to rural or residential zones and land within the Scenic Protection Special Control Area. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 23

3.10 Landscaping Landscape treatments integrate existing native vegetation within the development site where possible. Landscape treatments complement the area and create consistent and attractive streetscapes. Landscape treatments reduce the visual impact of development and enhance the amenity of users. Water use for maintenance of landscaped areas is minimised. 1. A landscape concept plan prepared by a suitably qualified person is to be submitted with a development application. The landscape concept plan must indicate the location and nature of proposed landscape treatments within the development site including identification of species and mature heights. 2. A minimum 20 metre wide landscaped area is to be established along lot frontages to Berrima Road and the Moss Vale Bypass. 3. A minimum 20 metre wide landscaped area is to be established along lot frontages to internal access roads and along boundaries with rural zoned land outside the Enterprise Corridor. 4. A minimum 20 metre wide landscaped area is to be established along the side and rear boundaries of a site unless otherwise specified above. 5. The height and density of vegetation within building setback areas must be sufficient to provide effective visual softening to buildings and other structures and open hardstand areas. 6. Landscaping should be integrated with existing native vegetation where possible and should use compatible local native species selected from the council native species list. 7. Strategic landscaping within other parts of the site should be established to provide shade to car parking areas and to soften the appearance of large expanses of hardstand areas. 8. Native plant species are to be used for Riparian zones and a mix of exotic and native plants should be used in all landscaped areas with an emphasis on water-efficient species. The plant species must be selected from the council species list and must be compatible with existing native vegetation including native or remnant within the site. 9. Reticulated water must not be used for irrigation purposes. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 24

3.11 Utility services The Moss Vale Enterprise Corridor is serviced with essential utility services with adequate capacity to meet future demand. There is adequate land set aside for the provision of essential utility services and associated infrastructure. 1. A servicing strategy prepared by a suitably qualified person must accompany development applications for the subdivision of land and must be consistent with the Development Concept Plan. 2. Lots must be connected to essential utility services before development can proceed. 3. Utility services must be adequate to meet the demands generated by the proposed development. 4. A water storage reservoir site may need to be set aside as indicated on the Development Concept Plan. The need for the site will be confirmed by a water modelling exercise and could require an area in the order of 1000 to 2000 square metres. 5. Six 1000 square metre sewerage pump station sites are to be set aside as indicated on the Development Concept Plan. 6. Three one hectare electricity zone substation sites are to be set aside as indicated on the Development Concept Plan. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 25

3.12 Biodiversity conservation Significant remnant native vegetation is retained. Threatened plant species and endangered ecological communities are protected. Threatened fauna species and important habitat and habitat corridors are protected. 1. High conservation value areas are to be protected within the conservation zone delineated on the Development Concept Plan. 2. Development proposals within the Biodiversity Conservation Special Control Area identified on the Development Concept Plan must consider the biodiversity conservation value of these areas. It is noted that the maps prepared as part of this DCP are broad areas of potential existence. A threatened species assessment prepared by a suitably qualified person in accordance with Department of Environment and Climate Change (DECC) guidelines must be submitted with all development applications in these areas to confirm whether or not sensitive areas exist on the proposed development site which should be excluded from development. In the majority of cases, it is likely that the development exclusion areas will affect only a portion of the total development site. 3. Targeted surveys for threatened flora and fauna species as identified in the Moss Vale Enterprise Corridor Flora and Fauna Assessment prepared by Total Earth Care Pty Ltd (February 2007) must be undertaken in accordance with DECC guidelines and submitted with development applications in other parts of the Employment Zone. 4. The siting of development must consider the presence of remnant vegetation. Mature trees are to be retained where possible. 5. The biodiversity values of minor watercourses within development sites must be assessed as part of development applications. These watercourses should be retained as natural drainage corridors with suitable buffers where significant. 6. The requirements of relevant biodiversity conservation legislation must be met. 7. Remnant native vegetation and conservation areas within development sites must be managed in accordance with an approved Vegetation Management Plan. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 26

3.13 Heritage protection Sites and artefacts of Aboriginal heritage significance are protected. 1. Areas with significant Aboriginal cultural heritage values are to be protected within the conservation zone delineated on the Development Concept Plan. 2. Development proposals within the Heritage Protection Special Control Area identified on the Development Concept Plan must consider and assess the potential impact on Aboriginal cultural material.. It is noted that the maps prepared as part of this DCP are broad areas of potential existence. A heritage assessment prepared by a suitably qualified person must be submitted with development applications in these areas to confirm whether or not any items of Aboriginal Heritage exist on the proposed development site which should be excluded from development. In the majority of cases, it is likely that the development exclusion areas will affect only a portion of the total development site. 3. The requirements of relevant heritage protection legislation must be met. 3.14 Noise Noise emissions from future development do not adversely impact on surrounding rural and residential uses. 1. Development must comply with the requirements of the NSW Industrial Noise Policy and Environmental Protection Authority (EPA) requirements. 2. A noise impact statement prepared by a suitably qualified person must be prepared for development proposals within 500 metres of a rural or residential zone boundary. The noise impact statement must demonstrate that noise from the proposed development will not result in a significant adverse impact on the amenity of surrounding rural or residential properties based on accepted noise criteria. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 27

3.15 Air quality Development does not adversely impact on ambient local air quality. Emissions to air from development does not cause nuisance or health issues for surrounding properties. 1. Emissions to air from development must comply with relevant legislation and EPA requirements. 2. An air quality impact statement prepared by a suitably qualified person must be submitted with a development application for development proposals with the potential to generate significant air pollutants such as odour or particulates. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 28

3.16 Flood-prone land and stormwater management Flood-prone land is protected from development. The risk to life and property due to flooding is not increased by development. Stormwater is managed on-site to ensure post-development runoff does not exceed pre-development levels. Development does not adversely impact on water quality in local watercourses. Sustainable development practices form part of the stormwater management strategy for site development. 1. Flood-prone land is incorporated into the conservation zone delineated on the Development Concept Plan. 2. Development proposals on land within the Flood-Prone Land Special Control Area as identified on the Development Concept Plan must be accompanied by a flood assessment. The assessment must demonstrate the land is suitable for development and that development will not increase the potential for downstream flooding. 3. Development must comply with the requirements of DCP No.34 and DCP No.41. 4. A stormwater management plan prepared by a suitably qualified person must be submitted with development applications. The plan must address the requirements set out below: A minor drainage system collecting runoff from roads and hardstand areas must be provided. This shall include a pipe drainage system designed for a 1 in 20 year storm event. Overland flow paths to accommodate flows in excess of the 1 in 20 year storm and up to the 1 in 50 year storm event must be provided. Detention basins to limit post-development flows to pre-development flows for all storm durations. Details of water quality devices to ensure pollutants do not contaminate water leaving the site. Sustainable development and water sensitive urban design measures proposed. 5. An erosion and sediment control plan must accompany development applications. This must detail measures proposed to prevent soil erosion and sediment transport. 6. Stormwater management facilities should be integrated with conservation areas or proposed landscape areas where possible. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 29

3.17 Waste management Waste minimisation and management practices are implemented in new developments. 1. Development is to comply with DCP No.49. 2. A waste management plan must be submitted with development applications outlining the waste minimisation and management measures proposed. 3. Adequate storage for waste materials shall be provided on-site and stored waste must be removed at regular intervals. 4. Waste storage areas must be screened from public roads or surrounding properties and must be located behind the building setback. 5. On-site incineration is not permitted as a means of waste disposal. 6. Adequate silt traps and oil grease arresters must be provided for plant and machinery repair and maintenance areas and wash down areas. Details must be provided in the waste management plan. ENTERPRISE CORRIDOR\MOSS VALE CORRIDOR DCP.DOC FEBRUARY 2008 REVISION 3 PAGE 30