Present. and. Future

Similar documents
Interstate 10 Hassayampa Valley Roadway Framework Study. Chapter 6. Alternative Transportation Network Description and Evaluation.

This page intentionally left blank

Welcome. Northern Segment of Hwy 100 I-90 to South of Madison Street Meeting Goals:

WESTERN AREA PLAN ALSO KNOWN AS WESTERN AREA GENERAL PLAN UPDATE, APPLICATION NO. GP Adopted by Resolution No.

I-4 Beyond the Ultimate. Florida Transportation Builders Association February 9, 2018

Route Planning and Environmental Assessment Study Highway 17 Four-Laning from Sudbury to Markstay GWP

CITY OF LAKEWOOD 2012 THREE-MILE PLAN

2. AGENCY COORDINATION AND PUBLIC INVOLVMENT

APPENDIX C Agency Scoping Meeting Materials

Pinal Regional Transportation Plan

AASHTO SUBCOMMITTEE ON DESIGN. June 15, 2006 MARK ROBINSON, P.E. DISTRICT 5 INTERSTATE PROGRAM MANAGER FLORIDA DEPARTMENT OF TRANSPORTATION

DOMINION BOULEVARD CORRIDOR STUDY AND ECONOMIC DEVELOPMENT STRATEGIC PLAN A MODEL FOR CHESAPEAKE S FUTURE

SUNBRIDGE PARKWAY PRELIMINARY DESIGN STUDY. November 30, 2017

Exhibit A. SH 161 RTC Work Program of New Projects. Collin County

Yellowhead Corridor Area Structure Plan

MARGARITA ROAD. Harveston Community 1,900 homes centered around Harveston Lake DATE STREET ±180,000 CPD. Future French Valley Overpass On/Off Ramp

Dysart and Northern Commerce Center -- Military Compatibility Permit SWC Dysart Road and Northern Avenue Approved

US-69 McAlester. Anthony Echelle, P.E. ODOT Division II Engineer

A Connected Region for Our Future. Tampa Bay Regional Planning Council

City of Phoenix Street Transportation Department East Sonoran Parkway Alignment (ESPA) Committee Committee Recommendation April 2006

PUBLIC MEETING NO. 4 OCTOBER 29, 2013

master plan of highways bus rapid transit amendment

State Highway 121 Southwest Parkway. Fort Worth s Transportation Success Story in Design and Cooperation

Comprehensive Plan Advisory Panel Meeting #3

Land Use and Transportation Plan

2040 Long Range Transportation Plan

Capital Projects in and near Odenton Town Center

Longmeadow Parkway Fox River Bridge Corridor. August 6, 2015

Panama City Beach Community Redevelopment Agency ON THE MOVE IN PCB

I. INTRODUCTION. Project Background and Study Area

SEWRPC. Joint Meeting of the Advisory Committees on Regional Land Use Planning and Regional Transportation Planning APRIL 26, 2018

Transportation Committee

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

CHAPTER 4: LAND USE & TRANSPORTATION PLAN

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

Floodplain Technical Memorandum

Panama City Beach Community Redevelopment Agency Condo Con Property Owner Conference & Expo November 14, 2014

Transportation Improvements

Decision Notice. Proposed Action

Iowa 100 Extension Project Visualizations for Design and Public Involvement ASCE Transportation Conference November 6, 2013 Ames, Iowa

HIGH-SPEED RAIL PROGRAM UPDATE. Gilroy Unified School District & Gilroy City Council September 24, 2018 Gilroy City Council Chambers, Gilroy, CA

BYLAW NO. 3549/2015. Being a Bylaw of The City of Red Deer to provide a uniform levy of off-site costs in respect of previously undeveloped land.

Grand River Ravines Georgetown Township

Old Brick Township DRI Recommendation Report

Northeast Anthony Henday Drive Manning Freeway to Whitemud Drive Welcome to this Construction Information Session

RZC Public View Corridors and Gateways

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

THE REGIONAL MUNICIPALITY OF YORK BY-LAW NO. OP

South Dakota 100 Corridor Preservation

TxDOT Experience with Long-Term Private Maintenance Agreements

The Trinity River Corridor Project Update

Light Rail Northwest Extension Dunlap Park-and-Ride Site Development. May 27, 2009

Heritage Assessment and Considerations. Tamara Anson-Cartwright Pourya Nazemi City of Toronto Urban Land Institute, November 24, 2017

Borderland Expressway Coalition Status Report Camino Real RMA Board Meeting. El Paso, TX April 11, 2018

Atlanta BeltLine, Inc. Pathways to Urban Sustainability

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

Memorandum CITY OF DALLAS. Riverfront Boulevard Design From Continental Avenue to Cadiz Street

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS NOTICE OF PREPARATION OF A PROGRAM ENVIRONMENTAL IMPACT REPORT AND PUBLIC SCOPING MEETING

Stafford VDOT Cooperative Activities

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

DETROIT RIVER INTERNATIONAL CROSSING STUDY. County of Essex. June 4, 2008

The Border Transportation Partnership

New Braunfels Growth & Development. Garry Ford, Jr., P.E., PTOE City Engineer City of New Braunfels

The Long Road from Planning to Breaking Ground:

APPENDIX P MASTER STREETS AND HIGHWAYS PLAN ACCESS2040 APPENDIX P (MASTER STREETS AND HIGHWAYS PLAN)

Farmers Investment Co. (FICO) Continental Farms

Urban Development Areas Bedford County

Hastings Area Roadway System Study. February 2009

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

4.1 AESTHETICS AND VISUAL QUALITY

South Davis County COMMUNITY SPOTLIGHT

OPEN HOUSE #3. Project Manager Kristi Sebastian, PE, PTOE

TABLE OF CONTENTS PAGE

Henderson County Project Prioritization Discussion

Creative Engineering Group Inc, (Creative) Construction Engineering and Inspection (CEI) Professionals

BROOKHILL NEIGHBORHOOD MODEL ZONING MAP AMENDMENT PREFACE TO APPLICATION

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

ESTRELLA MOUNTAIN REGIONAL PARK MASTER PLAN UPDATE PUBLIC OPEN HOUSE MEETING JANUARY 30, 2016

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

III. ENVIRONMENTAL SETTING

We d like to thank you for attending this Wekiva Parkway Section 8 Preliminary Design Update hosted by the Florida Department of Transportation.

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

JACKSON COUNTY PARKS AND RECREATION ADVISORY COMMITTEE REGULAR MEETING MINUTES February 18, 2015

Appendix 2. Implementation Project Descriptions Page A2-1

REPRESENTATIVE CIVIL ENGINEERING INFRASTRUCTURE PROJECTS

Highlights of the I-11 Draft Tier 1 Environmental Impact Statement and Preliminary Section 4(f) Evaluation Nogales to Wickenburg

Mendota Heights 2040 Comprehensive Plan Draft Vers

Constructing PCCP Under High Traffic Volume

Workshop. Valley Vision Stanislaus. Our Schedule. Help Shape Our Region s Future! The Scenarios. Who is StanCOG? How Do I Select a Scenario?

CITY OF SIMI VALLEY MEMORANDUM

Presentation Outline. Southwest Area Plan. Slide 1. Slide 2. Presentation to the Committee of the Whole. September 20, 2011

City of Golden. Annexation Study Area Report

Transcription:

Present and Future

July 1985 303 from MC 85 to I-17 included in the Regional Freeway System May 1989 State Transportation Board adopts Loop 303 1990 Revenues from Proposition 300 insufficient; 303 removed from RFS 1992/93 Interim two-lane roadway built Thomas Road to Grand Avenue

1998 State Transportation Board decides the State will not abandon 303 to local jurisdiction July 2000 IGA/JPA with MCDOT for O&M of interim roadway November 2004 MAG Regional Transportation Plan $1.42 billion for 303 March 2005 MCDOT renames roadway from Estrella Parkway to Bob Stump Memorial Parkway

July 2006 ADOT reassumes control of SR303L August 2006 ADOT completes DCR and EA from Happy Valley to I-17; 30% design begins June 2007 Final designs for Happy Valley Parkway to I-17 underway July 2008 Intersection improvements started at Bell, Cactus, and Waddell Roads (CMAR)

January 2009 Construction begins from Happy Valley to I-17 March 2009 ADOT completes DCR and EA for I- 10 to US60 FONSI received from FHWA July 2009 Final design contract issued for system interchange at I-10 August 2009 five final designers selected for segments from I-10 to US60

The Present

Depressed under I-10 Basically at-grade between Indian School Road and Greenway Road Depressed between Greenway Road and US 60 Elevated over US 60 System Interchanges at I-10, Northern Parkway, and US 60 Regional Drainage System from Bell Road south to Gila River

20-mile, divided freeway Freeway-to-freeway interchange at I-17 and Loop 303 Environmental study process US60 to Happy Valley Parkway scheduled to be completed early in 2010

SR303L US60 to Happy Valley Parkway

Loop 303 Happy Valley to Lake Pleasant Parkways

Loop 303 Lake Pleasant Parkway to I-17

Happy Valley Parkway TI September 2006

Happy Valley Parkway TI May 2009

Happy Valley Parkway TI June 2009

Happy Valley Parkway TI August 2009

Happy Valley Parkway TI December 2009

Jomax Parkway TI September 2006

Jomax Parkway TI December 2009

Caterpillar Tanks Wash December 2009

Agua Fria River Crossing May 2009

Agua Fria River Crossing May 2009

Lake Pleasant Parkway TI September 2006

Lake Pleasant Parkway TI May 2009

Lake Pleasant Parkway TI December 2009

CAP Siphon Crossing

CAP Siphon Crossing May 2009

CAP Siphon Crossing May 2009

CAP Siphon Crossing September 2009

CAP Siphon Crossing December 2009

The Future

!"

Future Interchange at I10

Future Northern Parkway TI

Future Interchange at I17 Interim Condition

Future Interchange at I17 Final Condition

The Future FY11 I-10 System Interchange ($253M) Peoria to Waddell and Waddell to Mountain View combined project ($150M) FY12 Thomas to Camelback ($72M) Glendale to Peoria ($113M) Includes Northern Parkway Interim TI

The Future FY13 Camelback to Glendale ($62.9M) Design of US60 Interim Interchange ($4.5M) FY14 US60 (Grand) Interim Interchange ($48.4M)

The Future RTP Phase III 6-lane freeway Grand to I-17 3 design segments, 2 construction segments

The Future RTP Phase IV Complete 6-lane freeway Grand to I-17 Design final US60 Interchange Design 2 segments MC85 to I-10

The Future RTP Phase V US60 Ultimate Interchange ($116.4M) Northern Parkway Ultimate TI ($80M) MC85 to I-10 Six Lane Freeway ($229M) Includes Phase 2 of I-10 System Interchange

Present and Future

Right-of-Way Dedication Owners dedicated approximately 300 feet In exchange, State to construct, operate, maintain, and improve Interim Roadway and ultimate freeway Automatic reverter clause was created Reverter of the unused portion of right-of-way if State failed to commence construction Reverter of any portion of right-of-way not used by ADOT should ADOT fail to commence construction of freeway by December 31, 2005

Proposed Freeway Passes Through Six Jurisdictions City of Goodyear Maricopa County City of Glendale (Luke Air Force Base) City of Surprise City of Peoria City of Phoenix