PIP PCTPA001 Testing of Process Analyzer Systems

Similar documents
Process Control PIP PCEA001 Fixed Gas Detection Guidelines

PIP ELIMTD00 Motor Installation Details for Class I, Division 1 Areas (Motors 600 Volts and Below, 60 hp Maximum)

PIP PNE00004 Steam Trap Guidelines

August Process Industry Practices Electrical. PIP ELEHA01 Engineering Guide for Determining Electrical Area Classification

PIP ELEHA01 Engineering Guide for Determining Electrical Area Classification

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION Fluorescent Dissolved Oxygen Measuring System

SAMPLE SPECIFICATIONS CONTINUOUS MONITORING SYSTEM (Insitu)

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

SCOPE OF SUPPLY SUPPLY OF H2S ANALYZER

FIRE & LIFE SAFTEY STANDARD


SPECIFICATIONS - DETAILED PROVISIONS Section Magnetic Flowmeters C O N T E N T S

BuildingName The Description of the Project P DOCUMENTS

Moreno Valley Fire Department Fire Prevention Bureau. New and Existing Fire Alarm & Signaling Systems Guideline

SECTION Fire Pumps

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

APPENDIX H (DESIGN SUBMISSION CRITERIA)

SECTION SECURITY TESTING AND COMMISSIONING

PURCHASING SECTION th Street, Surrey, B.C. V3S 3C7 Tel: Fax: ADDENDUM NO.

SECTION DOMESTIC WATER PRESSURE BOOSTING SYSTEMS (VFD) PART 1 - GENERAL 1.1 SUMMARY

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION WET-PIPE SPRINKLER SYSTEMS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION AUTOMATIC TRANSFER SWITCHES

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH SHP-PRO CONTROL PANEL

Bold items are particular to the City of Euless

Revised March 2015 Fire Alarm Systems Verification. Schedule I(A) Services. *Manditory Site visit required*

UFGS (February 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

SECTION LABORATORY EQUIPMENT CONSTRUCTION STANDARD PART 1: GENERAL Scope of Standard

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

SECTION ELECTRICAL SYSTEMS COMMISSIONING

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CONTENTS AUTOMATIC TRANSFER SWITCHES

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

Architectural and Engineering Specification for a Real-Time Locating System Flare

Safe Operation Manual. Honeywell IQ Force Gas Detector

ENGINEERING SPECIFICATIONS FOR FM-200 CLEAN AGENT INDIRECT PRE-ENGINEERED FIRE SUPPRESSION SYSTEMS

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

Each burner shall be equipped with a Micro-Processor Based Burner Management Flame Safeguard and Parallel Positioning Control System.

CARBON DIOXIDE SYSTEMS FOR BEVERAGE DISPENSING PERMIT REQUIREMENTS

SECTION Free/Available Chlorine Analysis System

SPECIFICATION: CARBON DIOXIDE ENGINEERED FIRE SUPPRESSION SYSTEM

SECTION GENERATOR PARALLELING CONTROLS

Products Solutions Services CT287. Hazardous Area Classifications and Protection Systems

Australian Standard. Water mist fire protection systems System design, installation and commissioning AS

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

PART 1 GENERAL 1.01 SUMMARY

LaserFOCUS VLF-250 Engineering Specification

INTERNATIONAL STANDARD

An Urgent Bulletin from CSA Group

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

SECTION AUTOMATIC TRANSFER SWITCHES

Overview of Standards for CO Detection Products

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

Idaho Surveying & Rating Bureau, Inc South Cobalt Point Way Tel: (208) Meridian, Idaho FAX: (208)

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

CERTIFICATION BULLETIN

A. Air-conditioning and Refrigeration Institute (ARI) - Standard 550/590, latest edition, and ARI certification program.

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT HVAC MAINTENANCE TECHNOLOGY. Test Code: 5937 Version: 01

UFGS (November 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (August 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS

2. HVAC and smoke control systems; fire, smoke, and combination fire/smoke dampers. 5. Central control and monitoring system.

DIVISION 21 FIRE SUPPRESSION

Burner Management and Combustion Control. Copyright 2014 Rockwell Automation, Inc. All Rights Reserved.

CAN/ULC-S INTEGRATED SYSTEMS TESTING OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

SECTION SOLAR PHOTOVOLTAIC (PV) POWER GENERATION SYSTEM

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi 50 CONTROL PANEL

SECTION INDUCTIVE CONDUCTIVITY ANALYZERS

Title: Standard Operating Procedure for Measurement of Total Hydrocarbon Using a Flame Ionization Detection

UNIFIED FACILITIES GUIDE SPECIFICATIONS

CO 2 Fire Extinguishing Systems

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING SuperLite TM I-XL minute SuperLite TM I-XL IGU minute PART 1 GENERAL

CALIFORNIA MECHANICAL CODE OVERVIEW OF 2016 UPDATES CHANGES AND RAMIFICATIONS

CAN/ULC-S1001, INTEGRATED SYSTEMS TEST OF FIRE PROTECTION AND LIFE SAFETY SYSTEMS

Architectural and Engineering Specification for a Personal Alarm System System (PAS)

SPECIFICATION MODEL 5200 GAS MONITOR SYSTEM. User Instructions For The Model 5200 Gas Monitor System

Explosive atmospheres Part 29-2: Gas detectors Selection, installation, use and maintenance of detectors for flammable gases and oxygen

FIRE INSPECTION GUIDELINES FOR FOSTER GROUP HOME PARENTS Effective June 1, 2002, Update September 2011

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

Town of Cochrane Policy

The Impact the Reference Standards in the 2012 Edition of NFPA 101 have on the Operation of Health Care Facilities: NFPA 80 and 99

Instruction Manual. CAT 100 & CAT 200 Continuous Analyzer Transmitter Addendum for Hazardous Area Applications. 3 rd Edition 05/2007

Shipboard incinerators with capacities up to 4000 kw

Smoke detection in hazardous areas:

Technical Standards for the Air Conditioning and Heat Pump Professional BPI STANDARDS

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

DTW Master Specification Section EMCS: Start Up, Verification and Commissioning

SECTION FIRE-SUPPRESSION STANDPIPES

Architectural and Engineering Specification for a. Flash / Flare

AMENDMENTS TO THE BUILDING AND FIRE CODE FOR THE CITY AND COUNTY OF DENVER

Transcription:

January 2016 Process Control PIP PCTPA001 Testing of Process Analyzer Systems

PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing standards of major industrial users, contractors, or standards organizations. By harmonizing these technical requirements into a single set of Practices, administrative, application, and engineering costs to both the purchaser and the manufacturer should be reduced. While this Practice is expected to incorporate the majority of requirements of most users, individual applications may involve requirements that will be appended to and take precedence over this Practice. Determinations concerning fitness for purpose and particular matters or application of the Practice to particular project or engineering situations should not be made solely on information contained in these materials. The use of trade names from time to time should not be viewed as an expression of preference but rather recognized as normal usage in the trade. Other brands having the same specifications are equally correct and may be substituted for those named. All Practices or guidelines are intended to be consistent with applicable laws and regulations including OSHA requirements. To the extent these Practices or guidelines should conflict with OSHA or other applicable laws or regulations, such laws or regulations must be followed. Consult an appropriate professional before applying or acting on any material contained in or suggested by the Practice. This Practice is subject to revision at any time. Process Industry Practices (PIP), Construction Industry Institute, The University of Texas at Austin, 3925 West Braker Lane (R4500), Austin, Texas 78759. PIP Member Companies and Subscribers may copy this Practice for their internal use. Changes or modifications of any kind are not permitted within any PIP Practice without the express written authorization of PIP. Authorized Users may attach addenda or overlays to clearly indicate modifications or exceptions to specific sections of PIP Practices. Authorized Users may provide their clients, suppliers and contractors with copies of the Practice solely for Authorized Users purposes. These purposes include but are not limited to the procurement process (e.g., as attachments to requests for quotation/ purchase orders or requests for proposals/contracts) and preparation and issue of design engineering deliverables for use on a specific project by Authorized User s client. PIP s copyright notices must be clearly indicated and unequivocally incorporated in documents where an Authorized User desires to provide any third party with copies of the Practice. PUBLISHING HISTORY January 2001 Issued August 2006 Complete Revision January 2016 Complete Revision Not printed with State funds

January 2016 Process Control Table of Contents PIP PCTPA001 Testing of Process Analyzer Systems 1. Introduction... 2 1.1 Purpose... 2 1.2 Scope... 2 2. References... 2 2.1 Process Industry Practices... 2 3. Definitions... 2 4. Requirements... 2 4.1 General... 2 4.2 Original Equipment Manufacturer (OEM) Tests.. 3 4.3 Factory Acceptance Tests (FAT)... 4 4.4 Site Acceptance Tests (SAT)... 7 Process Industry Practices Page 1 of 8

1. Introduction 1.1 Purpose This Practice provides requirements for inspection and acceptance testing of process analyzer systems and field enclosures. 1.2 Scope 2. References This Practice describes requirements inspection and acceptance tests for process analyzer systems performed as follows: a. On process analyzer(s) performed by the OEM b. On the fabricated process analyzer systems and shelter(s) performed by the Analyzer System Vendors (ASV) c. On the installed systems on site as a requirement for turnover to the owner Applicable parts of the following Practices, industry codes and standards, and references should be considered an integral part of this Practice. The edition in effect on the date of contract award should be used, except as otherwise noted. Short titles are used herein where appropriate. 2.1 Process Industry Practices (PIP) 3. Definitions PIP PCEPA002 - Process Analyzer Project Implementation Guidelines PIP PCSPA002 - Process Analyzer System Data Sheet Instructions PIP PCSPA002-D - Process Analyzer System Data Sheet owner: The party who owns the facility wherein the process analyzer systems will be used 4. Requirements 4.1 General 4.1.1 Inspection and acceptance testing of process analyzer systems on a major capital project can require the participation of only one or several of the following resource groups: a. Owner company personnel b. Engineering & Construction contractor personnel c. Analyzer System Vendors (ASV) d. Analyzer Original Equipment Manufacturer (OEM) 4.1.2 Physical inspections shall be performed by both the ASV and the OEM. 4.1.3 Acceptance testing shall be performed at factory (FAT) and at site (SAT). Test procedures shall be approved by Owner prior to testing. 4.1.4 Before performing an acceptance test, statistical quality control (SQC) performance data shall be provided by the ASV and/or the OEM. Process Industry Practices Page 2 of 8

4.1.5 If specified on purchaser s process analyzer system data sheet, PIP PCSPA002- D, system-specific inspections and tests shall be performed before final inspection. 4.2 Original Equipment Manufacturer (OEM) Tests 4.2.1 General 4.2.1.1 OEM tests are acceptance tests performed at the analyzer OEM s facility. 4.2.1.2 OEM tests shall have defined and measurable parameters with repeatability factors or tolerance factors stated in the data sheets or in engineering notes. Comment: Examples of these tests are baseline drift, repeatability, resolution, signal ranges, etc. 4.2.1.3 The analyzer manufacturer shall provide all testing equipment required. 4.2.1.4 Inspection and acceptance tests at an analyzer OEM shall be limited to complex analyzers or analyzers that require specific applications engineering or development beyond that which is normally defined in an OEM s literature. 4.2.1.5 All analyzers and peripheral support hardware for each analyzer shall be powered and operational during inspections and tests. 4.2.1.6 The tasks outlined in Sections 4.2.2 through 4.2.4 shall be completed during this stage of the testing and inspection. 4.2.2 Hardware Inspection 4.2.2.1 Visually inspect and verify that the each analyzer meets stated, specified, or approved outline mounting and dimensions. 4.2.2.2 Visually inspect and verify fit and finish of each analyzer housing, cabinet, or enclosure. 4.2.2.3 Visually inspect and verify type and location of all electrical and tubing penetrations of each analyzer housing or cabinet. 4.2.2.4 Visually inspect and verify conformance to approved interconnecting diagrams for electrical and signal wiring. 4.2.2.5 Visually inspect and verify conformance to specified materials of construction. 4.2.2.6 Visually inspect and verify conformance to specified utility and safety alarm relay and indication systems. 4.2.2.7 Visually inspect and verify conformance of equipment to specified electrical specifications. 4.2.2.8 Visually inspect and verify conformance of equipment to specified electrical area classification to include, e.g., Underwriter Laboratory (UL) labeling, Factory Mutual (FM), and Canada Safety Association (CSA) approvals. 4.2.2.9 Verify presence of all required accessories and options. Process Industry Practices Page 3 of 8

4.2.2.10 Visually verify presence and conformance to specified wire tags, labels, and equipment tag numbers. 4.2.3 Analyzer Performance Tests 4.2.3.1 Witness and verify operation and calibration of all inputs and outputs. 4.2.3.2 Witness and verify zero and span calibration with known standards. a. Witness and verify acceptable or specified signal-to-noise ratio. b. Witness and verify stability (drift) and reproducibility runs against stated specifications. c. Witness and verify that the analyzer meets required linearity. d. Witness and verify analyzer response time against specification. 4.2.3.3 Witness and verify acceptable compensation for stated background interferences. 4.2.3.4 Witness and verify operation and performance of internal diagnostics. 4.2.3.5 Verify operating software version number against specifications. 4.2.3.6 Functionally test all alarm and alarm indication circuits. 4.2.3.7 Verify SQC data against performance requirements. 4.2.4 OEM Test Documentation 4.2.4.1 Review and verify that all required documentation is complete and in acceptable format. 4.2.4.2 Obtain signoff by owner, or by owner-authorized agent, of inspection discrepancies (punch list). a. The punch list shall define items for correction, acknowledged exceptions, or deficiencies. b. The signoff shall include timing for satisfactory resolution of all items by responsible organization. 4.2.4.3 Re-inspect as required to ensure compliance and note all deficiencies on the punch list. 4.3 Factory Acceptance Tests (FAT) 4.3.1 General 4.3.1.1 FATs are performed at the ASV s facility after complete fabrication and assembly of the analyzer system(s). 4.3.1.2 These tests shall have defined and measurable parameters that encompass the complete analyzer system including any support peripherals such as analyzer shelters or buildings and all ancillary equipment. 4.3.1.3 Reviewing documentation and conducting physical inspection for compliance to codes and standards plus adherence to the analyzer system engineering specification shall be part of this acceptance test. Process Industry Practices Page 4 of 8

4.3.1.4 The ASV shall supply all equipment required for testing (e.g., air velocity, shelter interior sound levels, steam generators, etc.). 4.3.1.5 Sample transport and sample conditioning systems are normally custom engineered and fabricated by the analyzer OEM or ASV and shall require inspection and acceptance testing. 4.3.1.6 Analyzer system shelters are normally custom-engineered and fabricated by the analyzer OEM or an ASV and shall require inspection and acceptance testing. 4.3.1.7 All analyzers and peripheral support hardware for each analyzer shall be powered and operational during inspections and tests. 4.3.1.8 All analyzer enclosure or shelter utility and alarm systems shall be powered, fully operational, and demonstrated. 4.3.1.9 The tasks outlined in Sections 4.3.2 through 4.3.6 shall be completed during this stage of the testing and inspection. 4.3.2 Shelter 4.3.2.1 Review all required certificates of analyzer OEM to ensure compliance with specifications (e.g., welding certifications, electrical area classification compliance, Professional Engineer (PE) certification of base support structure). 4.3.2.2 Visually inspect and verify conformance to shelter dimensional and mounting specifications. 4.3.2.3 Visually inspect and verify conformance to specified shelter materials of construction and fabrication requirements. 4.3.2.4 Visually inspect and verify conformance to specified/approved sample system enclosure type, materials of construction, location, and mounting. 4.3.2.5 Visually inspect and verify conformance to specified electrical components, piping and valves, and mounting hardware. 4.3.2.6 Visually inspect and verify conformance to specified electrical grounding requirements. 4.3.2.7 Visually inspect and verify conformance of HVAC system to specification, including issuance of a certificate of compliance to the electrical area classification. 4.3.2.8 Visually inspect and verify conformance of HVAC to specified dimensional and mounting specifications. 4.3.2.9 Visually inspect and verify size and location of all utility and process connection points. 4.3.2.10 Visually inspect and verify shelter layout against specifications and approved drawings. 4.3.2.11 Visually inspect and verify accessibility and maintainability of all utility and analyzer systems and peripheral support hardware components. Process Industry Practices Page 5 of 8

4.3.2.12 Visually inspect and verify presence of all enclosure utility and safety alarm sensors and indicators. 4.3.2.13 Visually inspect and verify specification compliance for all bolt on or field-mounted accessories, e.g., awnings, cylinder racks, and sample recovery systems. 4.3.2.14 Visually inspect and verify shelter lift points against approved lifting drawings. 4.3.3 Sample System 4.3.3.1 Visually inspect and verify sample system against approved flow diagrams. 4.3.3.2 Visually inspect and verify accessibility, operability, and maintainability of as-built sample system. 4.3.3.3 Visually inspect and verify sample system components against approved manufacturer lists. 4.3.3.4 Visually inspect and verify sample-wetted materials of construction against specifications (e.g., o-rings, diaphragms, floats, rotameter tubes, and similar components). 4.3.3.5 Visually inspect and verify all sample system component tagging and labeling. 4.3.3.6 Visually inspect and verify presence, size, and range of all sample system and utility support indicators and control devices (e.g., pressure gauges, cabinet heater, dial thermometer, temperature controller, cabinet purge flowmeter, heat exchangers, insulation, and heat tracing). 4.3.3.7 Visually inspect and verify presence of all sample system safety alarm and indicating systems. 4.3.3.8 Visually inspect and verify proper cabinet penetrations for all electrical, utility, and sample line penetrations. 4.3.3.9 Visually inspect and verify sample probe assemblies for conformance to specified requirements. Inspection should include verification of proper sizing, materials of construction, tagging, flange bolt patterns, welds, and weld certifications. 4.3.3.10 Visually inspect and verify proper labeling (externally and internally) of all sample cabinet penetrations. 4.3.3.11 Verify total sample flow to analyzer house interior against stated design parameters. 4.3.4 Shelter Performance Testing 4.3.4.1 Verify proper operation of all electrical utility functions (e.g., interior and exterior lighting, HVAC, analyzer power, sample system power, UPS power feeds, switches, and breakers). 4.3.4.2 Verify proper operation and calibration of all shelter alarm and shutdown systems (e.g., oxygen deficiency, smoke detectors, combustible gas Process Industry Practices Page 6 of 8

detectors, toxic gas detectors, shelter pressurization/flow sensors, visual and audible alarms, analog, and digital outputs). 4.3.4.3 Functionally check and verify total airflow and velocity against stated pressurization and air change requirements. 4.3.4.4 Verify total utility flows (e.g., N 2, H 2) to analyzer shelter interior. 4.3.5 Analyzer and Sample System Performance Testing 4.3.5.1 Pressure-test and leak-check all sample systems. 4.3.5.2 Functionally check the operation of all manual and automatic streamswitching valves, calibration valves, automatic system isolation valves, and valve position indicators. 4.3.5.3 Functionally check the operation and calibration of the sample temperature controls, heating/cooling system controllers, and indicators. 4.3.5.4 Functionally check the operation and calibration of all sample system alarm and/or shutdown systems (e.g., toxic gas leak detectors and combustible gas detectors). 4.3.5.5 Verify sizing and calibration, and functionally check the operation of all sample system flow indicators and controllers. 4.3.5.6 Verify sizing and calibration, and functionally check the operation of all sample pressure regulators, indicators, and pressure relief valves. 4.3.5.7 Functionally check and verify all analog/digital interconnections and communications for owner systems. 4.3.6 FAT Documentation 4.3.6.1 Review and verify that all required documentation is complete and in acceptable format. 4.3.6.2 Obtain signoff by owner, or by owner-authorized agent, of inspection discrepancies (punch list). The punch list shall define items for correction, acknowledged exceptions, or deficiencies. The signoff shall include timing for satisfactory resolution of all items by responsible organization. 4.3.6.3 Re-inspect as required to ensure compliance with all deficiencies noted on the punch list. 4.4 Site Acceptance Tests (SAT) 4.4.1 General 4.4.1.1 The SAT demonstrates analyzer system performance following a defined period of uninterrupted, on-line operation and shall be in accordance with the performance test requirements. 4.4.1.2 SATs, including the documentation requirements and standards compliance, shall be fully defined at the bidding stage of an analyzer project. Comment: See Section 4.6 of PIP PCEPA002. Process Industry Practices Page 7 of 8

4.4.1.3 The tasks outlined in Section 4.4.2 shall be completed during this stage of the testing and inspection. 4.4.2 Performance Tests 4.4.2.1 Check and verify proper installation of sample probes, sample lines, calibration gas tubing runs, and all utility and vent headers. 4.4.2.2 Check and verify operation of heat-traced sample lines and controller operation. 4.4.2.3 Verify total system (analyzer and sample system) response time with introduction of known zero and span calibration standards. 4.4.2.4 Verify sample system flow, temperature, and pressure operation against stated design parameters. 4.4.2.5 Verify calibrated analyzer on-stream analytical response against plant lab or grab sample analysis. 4.4.2.6 Functionally check and verify all analog/digital interconnections and communications to owner systems. 4.4.2.7 Verify operation and performance of each analytical system against specified turnover criteria (e.g., 5 days continuous operation). 4.4.2.8 Verify performance of all shelter and sample system alarm functions. Process Industry Practices Page 8 of 8