INSTALLATION INSTRUCTIONS

Similar documents
for combining TwO gas furnaces for PARAllel OPeRATIONs using The Rccl-cOIl (heating ANd AIR conditioning)

AUXILIARY ELECTRIC HEATER KITS FOR 7.5 AND 10 TON COMMERCIAL AIR HANDLERS

Installation Instructions

INTRODUCTION. NOTE: Read the entire instruction manual before starting the installation. FIRE, EXPLOSION, ELECTRICAL SHOCK HAZARD

Installation Instructions Part No , Part No Part No

Installation Instructions

INSTALLATION INSTRUCTIONS

X341119P10 Gas Furnace Var. Speed Blower Var. Speed Inducer Two Stage Heat Direct Vent Models:

maintenance should only be performed by a trained, qualified person. Consumer service is recommended only for filter replacement.

SERVICE MANUAL FOR 6636A & 6636B SERIES TWO TON HIGH EFFICIENCY PACKAGED AIR CONDITIONERS

Installation Instructions

ACCESSORY KIT INSTALLATION INSTRUCTIONS

Installation Instructions

INSTALLATION INSTRUCTIONS

SERVICE FACTS WARNING M801-SF-1C. Gas Furnaces Upflow & Downflow Induced Draft 1 Stage Heat Models: DISCONNECT POWER BEFORE SERVICING M801P040AU24AA

INSTALLATION INSTRUCTIONS

USER'S MANUAL/INSTALLATION INSTRUCTIONS

Use, Care, and Installation Guide

ADSH8. Two-Stage Convertible. Heating Input: 40, ,000 BTU/h

TECHNICAL SPECIFICATIONS

ELECTRIC COOKTOP INSTALLATION INSTRUCTIONS

Installation Instructions

G71MPP WARNING. WARNING Sharp edges. Be careful when servicing unit to avoid sharp edges which may result in personal injury. Service Literature

Installation Instructions

DM80HE. Two-Stage Convertible Multi-Speed ECM Gas Furnace 80% AFUE. Heating Input: 60, ,000 BTU/h

Installation Instructions

Installation Instructions

Installation Instructions Remote Blowers

Installation in Standard & Variable Speed Indoor Air Handlers IMPORTANT

INSTALLATION INSTRUCTIONS FOR RCQD COILS

Wt. Lbs Model Number (BTUH) Hz

Installation Instructions

USER S INFORMATION MANUAL

MODELS B1PA024, 030 AND 036

24 VAC SYSTEM CONTROL KIT

Installation Instructions

24 VAC SYSTEM CONTROL KIT

SLP98UHV WARNING. WARNING Sharp edges. Be careful when servicing unit to avoid sharp edges which may result in personal injury. Service Literature

FORM NO. G REV. 4 Supersedes Form No. G Rev. 3

USER S MANUAL AND INSTALLATION INSTRUCTIONS IMPORTANT

INSTALLATION INSTRUCTIONS

KG6TE Series. High Efficiency / Direct Vent or Non Direct Vent 2-Stage Condensing Gas Furnace with Variable Speed Blower TECHNICAL SPECIFICATIONS

FG6T(C,L) Series. High Efficiency / Direct Vent or Non Direct Vent 2-Stage Condensing Gas Furnace with Variable Speed Blower TECHNICAL SPECIFICATIONS

EarthLinked AFN Series Air Handlers Installation Manual

Installation Instructions

Cooling Capacity CFM range

EarthLinked AVN Series Air Handlers Installation Manual

Cooling Capacity CFM in. w.c. (125 Pa)

INSTALLATION INSTRUCTIONS TXV Coils for Manufactured Housing EMA

Installation Instructions

INSTALLATION INSTRUCTIONS FOR 6532 SERIES PACKAGE HEAT PUMP

80% and 95% furnace models feature aluminized steel heat exchangers to conduct heat quickly and increase durability.

80% Variable Speed, Two Stage Heating Furnace. Cooling Capacity CFM in. w.c. (125 Pa)

Installation Instruction

Installation Instructions

M3RL Series TECHNICAL SPECIFICATIONS. FEATURES and BENEFITS. High Efficiency / Direct Vent Condensing Downflow Gas Furnace

Installation Instructions

INSTALLATION INSTRUCTIONS

Your safety and the safety of others are very important.

Installation Instruction

LGB Gas fired boiler

ELITE SERIES Lo-Boy. AFUE - 83% Heating Input - 101,000 to 151,000 Btuh Nominal Add-on Cooling to 5 Ton. OIL FURNACES El0183b

INSTALLATION INSTRUCTIONS FOR 9330F4552 FREE DELIVERY PLENUM KITS

INSTALLATION INSTRUCTIONS

TECHNICAL SPECIFICATIONS

Submittal. Upflow/ Horizontal Left/Right Two Stage Condensing Gas Fired Furnace 80,000 BTUH S9V2B080U3-SUB-1-EN. February 2016 S9V2B080U3PSAA TAG:

AllStyle Coil Company, LP 7037 Brittmore Houston, TX Phone Fax

*DD2B060A9V3VA *DD2B080A9V3VA *DD2C100A9V5VA *DD2D120A9V5VA

Read these instructions carefully and completely. NOTE This appliance must be properly grounded.

AVS Series Air Handlers Installation Manual for CLASSIC SERIES SYSTEMS Models SC, SD, and SDH

INSTALLATION INSTRUCTIONS

Cooling Capacity CFM in. w.c. (125 Pa)

Submittal. Upflow/ Horizontal Left/Right Two Stage Condensing Gas Fired Furnace 80,000 BTUH S9V2B080U4-SUB-1-EN. February 2016 S9V2B080U4PSAA TAG:

Submittal. Upflow/ Horizontal Left/Right Two Stage Condensing Gas Fired Furnace 40,000 BTUH S9V2B040U3-SUB-1-EN. February 2016 S9V2B040U3PSAA TAG:

Installation Requirements for Models:

INSTALLATION AND OPERATING INSTRUCTIONS. For Reliance Controls Emergency Power Transfer Switch Kit Model Number 30216BRK

INSTALLATION INSTRUCTIONS FOR 8330*633* COOL ONLY A/C 8330*635* HEAT READY A/C 8530*63** HEAT PUMP CHILLGRILLE FLUSH MOUNT CEILING ASSEMBLY

80% AFUE. Multi-Position, Dual$aver. Heating Input: 70, ,000 BTU/h

50M56U-843 INSTALLER MUST READ DESCRIPTION PRECAUTIONS WARNING CAUTION

KG6RC Series TECHNICAL SPECIFICATIONS FEATURES AND BENEFITS

GE Monogram. Installation. Instructions. Component Cooktop System. Models ZEW145V ZGW124EN3 ZGW125EN3 ZEW155N ZEW166Y ZEW176Y

Installation Instructions

INSTALLATION INSTRUCTIONS

GME8 80% AFUE. Multi-Position, TwinComfort. Heating Input: 60, ,000 BTU/h

8+* Bulletin No November 1997

INSTALLATION INSTRUCTIONS

Installation Instructions

TSTAT0201CW Recommended (sold separately)

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

90 HIGH EFFICIENCY UPFLOW GAS FURNACES

Pro Ventilation Hood Liners

AHG**-0B Series Hydronic Air Handling Units

INSTALLATION INSTRUCTIONS

MERIT SERIES Downflow

CLe-series Dishwashers

GE Monogram. Installation. Instructions. Professional Gas Cooktops 48" Natural Gas Models ZGU48N4GWSS ZGU48N6RWSS ZGU48N6DWSS

INSTALLATION INSTRUCTIONS FOR 6536 SERIES TWO TON PACKAGED HEAT PUMP

Installation Instructions

INSTALLATION MANUAL WARNING WARNING MODULAR NON-VARIABLE SPEED AIR HANDLERS MODELS: MA LIST OF SECTIONS LIST OF FIGURES LIST OF TABLES

Operator: Save these instructions for future use!

Transcription:

INSTALLATION INSTRUCTIONS FOR COMBINING TWO GAS OR OIL FURNACES FOR PARALLEL OPERATIONS (HEATING AND AIR CONDITIONING) TO BE INSTALLED BY A QUALIFIED, LICENSED SERVICE PERSON. TO AVOID UNSATISFACTORY OPERATION OR DAM- AGE TO THE PRODUCT AND POSSIBLE UNSAFE CONDITIONS, INCLUDING ELECTRICAL SHOCK AND FIRE, THE INSTALLATION INSTRUCTIONS PROVIDED WITH THIS KIT MUST BE STRICTLY FOLLOWED AND THE PARTS SUPPLIED USED WITHOUT SUBSTITUTION. DAMAGE TO THE PRODUCT RESULTING FROM NOT FOLLOWING THE INSTRUCTIONS OR USING UNAUTHORIZED PARTS MAY BE EXCLUDED FROM THE MANUFACTURER S WARRANTY COVERAGE. The following upflow furnaces may be used for this application: 80% Gas Upflow (-)GPH/(-)GPJ-05*AUE (-)GPH/(-)GPJ-07*AUE (-)GPH/(-)GPJ-10*AME (-)GPH/(-)GPJ-10*BRJ (-)GPH/(-)GPJ-12*ARJ (-)GPH/(-)GPJ-15*ARJ Two-stage 80% Gas Upflow (-)GPK-05*AUE (-)GPK-07*AUE (-)GPK-07*AMG (-)GPK-10*AME (-)GPK-10*BRJ (-)GPK-12*ARJ (-)GPK-15*ARJ (-)GPL-05*BMK (-)GPL-07*BRK (-)GPL-07*BRQ (-)GPL-10*BRM (-)GPL-12*ARM 90Plus Gas Upflow (-)GRA/(-)GRJ-06*MAE (-)GRA/(-)GRJ-07*MAE (-)GRA/(-)GRJ-07*YB* (-)GRA/(-)GRJ-09*ZAJ (-)GRA/(-)GRJ-10*ZAJ (-)GRA/(-)GRJ-12*ZAJ 6.5 & 7.5 Oil Furnaces (-)OBD-084QBE* (-)OBD-095QBE* (-)OBD-112QBG* (-)OBD-130RBJ* (-)OBD-150RBJ* 7.5 & 10 ton Oil Furnaces (-)OBD-130RBJ* (-)OBD-150RBJ* (-)GPJ, (-)GRJ, and (-GPL) models using UTEC 1012-925 IFC require the twinning kit RXGP-F03. Oil furnaces require the twinning kit RXOP-D25. Twinning kits must be ordered as a separate item. COIL/ PLENUMS Cased Coil assemblies include upflow coil and insulated cabinet. 1. Unpack coil/plenum assembly, the blockoff channels, end panels, and transition. Inspect for damage. 2. Gas Furnaces Only a. Install the furnaces side by side and connect to the common supply and return duct system. Identify the furnaces as lefthand and right-hand furnace. b. Convert the right-hand furnace to right side gas and electrical supply. c. Set up left-hand furnace for left side vent and drain. Then setup right-hand furnace for right side vent and drain. 3. 17-1/2, 21, and 24 wide furnaces a. Set furnaces 1 1 2 apart. Drill four 1/8 diameter holes and attach wide blockoff channel between the two furnaces with screws provided as shown in Figure A. b. On 17-1/2 wide furnaces use 7 x 20 end panels. Drill three 1/8 diameter holes and mount with screws supplied as shown in Figure A. c. On 21 wide furnaces use 3 1 2 x 20 end panels. Drill three 1/8 diameter holes and mount with screws supplied as shown in Figure A. 4. 28 wide furnace (Oil) a. Drill four 1/8 diameter holes and attach narrow blockoff channel between the two furnaces with screws provided as shown in Figure A. b. Assemble transition and install as shown in Figure B. Note: No end panels or transition required for 24 wide gas or oil furnaces. 1. Set coil/plenum assembly on furnace with access cover toward flue outlet end of furnace. 2. Connect ductwork to plenum. Seal all joints around furnace, plenum and transition with duct tape. 3. Connect suction and liquid lines between coil and compressor/condenser section. Provide oil trap for suction line, if the vertical rise exceeds 3 ft. 4. Strap expansion valve sensing bulb to top of suction line on outside of cabinet. Be careful not to over tighten the clamps. See Figure C. 5. Insulate sensing bulb and suction line. 6. The condensate drain is 3/4 NPT. Provide a 3 trap and pitch the drain to an open sump. See Figure C. GAS FURNACE TWINNING A maximum of two furnaces may be installed side by side on a common duct system and operate as one, or as first stage and second stage. The twinning procedure makes both furnace blowers operate together, whether one or both furnaces are firing. One thermostat can control both units. This is necessary if the two furnaces supply air for one 7-1/2 or 10 ton single stage cooling system. To twin two furnaces, follow these instructions and the twinning wiring diagrams at the end of the service manual. 92-41658-01-03 SUPERCEDES 92-41658-01-02

FIGURE 1 FIGURE B TRANSITION SCREWS PROVIDED CUT 7/8 DIA HOLE LEFT-HAND FURNACE RIGHT-HAND FURNACE CUT 1-3/4 DIA HOLE (UPFLOW SHOWN) LEFT HAND FURNACE FIGURE A FIGURE C SCREWS PROVIDED BLOCKOFF CHANNEL LOCATION OF SENSING BULB END PANEL LEFT-HAND FURNACE RIGHT-HAND FURNACE 3 CONDENSATE DRAIN 2

IMPORTANT: ONLY TWIN FURNACES WITH IDENTICAL CON- TROLS FROM THE SAME MANUFACTURER OF CONTROL BOARD. IMPORTANT: ONLY BOTTOM RETURNS CAN BE USED. NO MORE THAN TWO FURNACES CAN SHARE THE SAME SUP- PLY AND RETURN. FURNACES MUST HAVE SAME HEATING AND BLOWER CAPACITY. TWINNING FURNACES MUST OPERATE OFF THE SAME PHASE OF POWER. NOTE: The transformer of both furnaces must be in the same phase. NOTE: The OK LED flashes if the twinning is not installed properly. Hot surface ignition control boards flash OK LED continually if twinning kit or installed properly. Direct spark ignition control boards flash the OK LED five (5) times, pause, and then flash five (5) times again. NOTE: Twinning kit cannot be used for heat pump fossil fuel kit application. TURN OFF ELECTRIC POWER AT THE FUSE BOX OR SER- VICE PANEL BEFORE MAKING ELECTRICAL CONNECTIONS; FAILURE TO DO SO COULD RESULT IN AN ELECTRICAL SHOCK HAZARD, PROPERTY DAMAGE AND/OR PERSONAL INJURY. BOTH FURNACE CABINETS MUST BE PERMANENTLY GROUNDED. A GROUND SCREW IN THE JUNCTION BOX IS FOR THIS PURPOSE. GROUND CONNECTIONS MUST BE COMPLETED BEFORE MAKING LINE VOLTAGE CONNEC- TIONS. FAILURE TO DO SO COULD RESULT IN AN ELECTRI- CAL SHOCK HAZARD, PROPERTY DAMAGE AND/OR PER- SONAL INJURY. THE FURNACES MUST BE INSTALLED SO THE ELECTRICAL COMPONENTS ARE PROTECTED FROM WATER. ELECTRICAL POWER MUST BE SUPPLIED TO BOTH FUR- NACES FROM THE SAME SEPARATE BRANCH CIRCUIT, FAILURE TO DO SO COULD RESULT IN EXPOSING THE FUR- NACE CONTROLS TO AN OVER VOLTAGE (230 VAC) CONDI- TION. THIS COULD RESULT IN DESTRUCTION OF THE CON- TROL BOARDS, PROPERTY DAMAGE AND/OR PERSONAL INJURY. L1 (HOT) AND NEUTRAL POLARITY MUST BE OBSERVED WHEN MAKING FIELD CONNECTIONS TO THE FURNACES. FAILURE TO DO SO COULD RESULT IN A DIRECT SHORT VIA THE CONNECTION BETWEEN THE EAC TERMINAL WHEN THE INDOOR BLOWER RELAY CLOSES. THIS COULD RESULT IN DESTRUCTION OF THE CONTROL BOARDS, PROPERTY DAMAGE AND/OR PERSONAL INJURY. THE FURNACE MUST BE ON THE SAME BRANCH CIRCUIT WITH ADEQUATE AMPACITY AND OVERCURRENT PROTEC- TION. DO NOT USE EXISTING LIGHTING OR OTHER CIR- CUITS. NOTE: See the furnace rating plates for motor HP ratings, electrical characteristics, and amp draw. NOTE: Use time delay fuses or circuit breakers. All electrical work must conform with the requirements of local codes and ordinances and the National Electric Code ANSI / NFPA No. 70 latest edition or the Canadian Electrical Code Part 1 CSA Standard C22.1 for Canadian installations. FOR (-)GPH, (-)GPK, AND (-)GRA MODELS WITH UTEC 1012-920, 1028-927 AND -928 IFC BOARD 1. Single Stage Wiring a. Ensure that both furnace 24 volt power supplies are in phase. b. Connect furnace right-hand side control board to thermostat. c. Connect control board terminal C to C, W to W, and twin to twin. d. Set DIP switch to 3 to the twin position on both control boards. e. Set both furnace control board DIP switches #4 to the 1 st position. 2. Two Stage Wiring a. Ensure that both furnace 24 volt power supplies are in phase. b. Connect furnace on the right-hand side control board terminal W to the W1 terminal on the thermostat. c. Connect furnace on the left-hand side control board terminal W to the W2 terminal on the thermostat. d. Connect control board terminals C to C and TWIN to TWIN. e. Set DIP switch 3 to the ON position on both furnace control boards. f. Set furnace control board DIP switch #4 to the 1 st position on the right-hand side furnace. g. Set furnace control board DIP switch #4 to the 2 nd position on the left-hand side furnace. h. Set the thermostat heat anticipator for 0.1 amps on each stage of heat. NOTE: The UTEC 1028-927 and -928 controls use only switch #3 for twinning. Connect the thermostat to the furnace intended to be first stage. The other furnace automatically becomes second stage. IMPORTANT: A UTEC 1012-920A CONTROL CAN BE TWINNED WITH A UTEC 1012-920 CONTROL. FOR JOHNSON CONTROLS GL961AJ-2401 AND -2402 5. Single Stage operation a. Control board on the right-hand side is on the furnace connected to the thermostat. b. The 24VAC supply to both control boards must be in phase with each other. c. Connect the C, W and TWIN terminal to counterparts on each control. d. Both control boards must have switch #1 in the ON position. e. Control board on the right-hand side furnace must have switch #2 in the ON position. Control board on the lefthand side furnace must have switch #2 in the OFF position for single stage heat. 6. Two Stage Operation a. Follow the above instructions except connect W2 on the thermostat to W on the left-hand side furnace control board. b. Control board on the left-hand side must be the slave (not connected to the thermostat) in two-stage operation. 3

FIGURE 2 UTEC SINGLE STAGE TWINNING FIGURE 4 JCI TWINNING SWITCHES FIGURE 3 UTEC TWO STAGE TWINNING INSTALLATION PROCEDURES Install the furnaces side by side and connect to the common supply and return duct system. Follow the furnace installation instructions. Convert the right hand furnace to right side gas and electrical supply. 1. Install the two boxes from the kit in the furnace jackets using the screws provided before locating the furnaces. Remove the knockouts as required. Insert the snap bushings and plug buttons while access is available. 2. Identify the furnaces as number 1 and 2 for wiring purposes. The wiring diagram arbitrarily shows furnace 1 on the left. 3. Turn off the electrical supply to both furnaces before making any electrical connections. 4. Disconnect and remove the control transformer from furnace 2. Remove the black and white line voltage transformer leads from the L1 and neutral terminals on control board 2. Remove only the red and yellow transformer lead wires from the 24 VAC and COM terminals. 5. Remove the black wires connecting the blower door switch (PBS) and L1 on the control boards in furnaces 1 and 2. 6. Install the switches from the kit in the boxes. Insert each switch in the rectangular mounting hole. 7. Install the line voltage interconnecting wires as shown in the wiring diagram. Route the wires out of the top hole in each control box and through the strain relief bushing. a. The blue wires connect the original door switch 1, through the new door switch in furnace 2, and to terminal L1 of control board 1. b. Similarly, the yellow wires connect the original door switch 2, through the new door switch in furnace 1 and to terminal L1 of control board 2. c. The red wire connects the two electronic air cleaner (EAC) screw terminals on both control boards. d. Secure the line voltage wires with strain relief bushings at the 7/8" dia. hole where they exit the control boxes. 8. Connect control power (24 VAC) from terminal board R in furnace 1 to the 24VAC terminal (1/4" push on) on the control board in furnace 2. Use the 4" piggyback terminated red wire and wire nut connector. 9. Connect control (24VAC) wires between thermostat terminals W, Y, G and C on furnace control boards 1 and 2. 10. Install a control thermostat (field supplied) according to its instructions to FURNACE 2. IMPORTANT: ELECTRICAL POWER TO BOTH FURNACES MUST BE SHUT OFF WHEN WIRING THE THERMOSTAT. THE FURNACE CONTROL SYSTEM TERMINAL C (COMMON) IS CONNECTED TO THE (CABINET) GROUND AS PART OF THE FLAME SENSE CIRCUIT. ACCIDENTAL SHORTING OF THER- MOSTAT WIRES TO GROUND DURING INSTALLATION CAN DAMAGE THE CONTROL TRANSFORMER. 11. Control voltage power (24 VAC) to the thermostat must be supplied from thermostat terminal R on the control board in furnace 2. Connect the thermostat to W (heat), Y (cool), and G (fan) that are now common to both furnaces as shown in the wiring diagram. Connect the remote compressor contactor (CC) leads to terminals Y (cool) and C (common) that also are common to both furnaces. If the thermostat has an adjustable heating anticipator, set it for approximately 0.8 amps or the measured current amperage. Do this after the furnaces are in operation. 12. Use the provided wire ties to secure the interconnecting and thermostat wiring in place to avoid contact with exposed edges, moving parts, or service procedures. Field provide additional materials, if required. Attach the wiring diagram from the kit to one furnace. 13. Replace the blower compartment doors and check that the doors fit correctly. Adjust the fit if required to assure easy removal and installation by the user when servicing air filters. 14. Complete the furnace installation and put the furnaces in operation following the furnace installation and operating instructions. Make all proper operational and safety checks. Remove the blower compartment doors individually and ensure that electrical power to both furnaces is shut off when either door is off. NOTE: This twinning kit cannot be used for heat pump fossil fuel kit applications. NOTE: Two parallel condensing units may be used for twinning applications by wiring the control circuits (4) in parallel. 4

UTEC 1012-925 IFC BOARD TWINNING INSTRUCTIONS (RXGP-F03) IMPORTANT: THIS KIT MAY ONLY BE USED WITH THE FOL- LOWING GAS FURNACE MODELS EQUIPPED WITH THE UTEC 1012-925 IFC. (-)GPJ SERIES (-)GRJ SERIES THESE INSTRUCTIONS ARE INTENDED AS AN AID TO QUALI- FIED, LICENSED SERVICE PERSONNEL FOR PROPER INSTALLATION, ADJUSTMENT, AND OPERATION OF THIS PRODUCT. READ THESE INSTRUCTIONS THOROUGHLY BEFORE ATTEMPTING INSTALLATION OR OPERATION. FAIL- URE TO FOLLOW THESE INSTRUCTIONS MAY RESULT IN IMPROPER INSTALLATION, ADJUSTMENT, SERVICE OR MAINTENANCE POSSIBLY RESULTING IN FIRE, ELECTRICAL SHOCK, CARBON MONOXIDE POISONING, EXPLOSION, PER- SONAL INJURY OR PROPERTY DAMAGE. Install the RXGP - F03 kit when twinning to assure that both indoor blowers run simultaneously and so that when either blower door is opened, both furnaces shut down. The kit contains additional blower door switches, wiring connections, and other hardware needed to twin the above listed furnace models. TABLE 1 PARTS LIST - RXGP-F03 PARALLEL FURNACE KIT Part No. Part Description Quantiy AE-61475-02 Junction Box 2 AE-61476-02 Junction Box Cover 2 AS-50240-41-TT Wire, Red, 16GA, 48 1 AS-50251-05-AD Wire, Red, 18GA, 4 1 AS-53397-41-JJ Wire, Blue, 18GA, 48 2 AS-76693-41-JJ Wire, Yellow, 18GA, 48 2 45-17055-11 Bushing, Strain Relief 7/8 OD 2 45-17057-02 Bushing, Snap 7/8 OD x 3/4 ID 2 64-17606-01 Wire Tie, 8 4 45-18058-07 Wire Connector, Yellow 1 45-18232-02 Plug Button (7/8 Dia.) 1 42-22692-01 Switch, Push Button (Cherry, 2 E69-08C - 10A) 63-22338-03 Screw, Sheet Metal #8-18 x 1/4 B, 6 Hex Hd. 63-22505-02 Screw, #10-32 x 3/8, Hex Hd. 2 92-23521-04 Installation Instructions 1 90-23553-02 Wiring Diagram 1 FIGURE 5 COIL INSTALLATION ELECTRICAL WIRING TURN OFF ELECTRIC POWER AT THE FUSE BOX OR SER- VICE PANEL BEFORE MAKING ANY ELECTRICAL CONNEC- TIONS. FAILURE TO DO SO COULD RESULT IN AN ELECTRI- CAL SHOCK HAZARD, PROPERTY DAMAGE AND/OR PER- SONAL INJURY. BOTH FURNACE CABINETS MUST BE PERMANENTLY GROUNDED. A GROUND SCREW IN THE JUNCTION BOX IS FOR THIS PURPOSE. GROUND CONNECTIONS MUST BE COMPLETED BEFORE MAKING LINE VOLTAGE CONNEC- TIONS. FAILURE TO DO SO COULD RESULT IN AN ELECTRI- CAL SHOCK HAZARD, PROPERTY DAMAGE AND/OR PER- SONAL INJURY. THE FURNACES MUST BE INSTALLED SO THE ELECTRICAL COMPONENTS ARE PROTECTED FROM WATER. ELECTRICAL POWER MUST BE SUPPLIED TO BOTH FUR- NACES FROM THE SAME SEPARATE BRANCH CIRCUIT. FAILURE TO DO SO COULD RESULT IN EXPOSING THE FUR- NACE CONTROLS TO AN OVER VOLTAGE (230 VAC) CONDI- TION. THIS COULD RESULT IN DESTRUCTION OF THE CON- TROL BOARDS, PROPERTY DAMAGE AND/OR PERSONAL INJURY. L1 (HOT) AND NEUTRAL POLARITY MUST BE OBSERVED WHEN MAKING FIELD CONNECTIONS TO THE FURNACES. FAILURE TO DO SO COULD RESULT IN A DIRECT SHORT VIA THE CONNECTION BETWEEN THE EAC TERMINALS WHEN THE INDOOR BLOWER RELAY CLOSES. THIS COULD RESULT IN DESTRUCTION OF THE CONTROL BOARDS, PROPERTY DAMAGE AND/OR PERSONAL INJURY. The furnaces must be on the same branch circuit with adequate ampacity and overcurrent protections. Do not use existing lighting or other circuits. NOTE: See the furnace rating plates for motor H.P. ratings, electrical characteristics, and amp draw. NOTE: Use time delay fuses or circuit breakers. NOTE: Use the wiring diagram, when installing this twinning kit. TWINNING KIT INSTRUCTIONS Twinning or parallel operation of two furnaces, installed side by side, connected by a common duct system and controlled by a single thermostat can be done with UTEC 1012-925 integrated furnace controls using this wiring kit. The addition of the two blower compartment door interlock switches in this kit assures that all electrical power to both furnaces is deenergized if either furnace blower compartment door is not in place. The additional switch, located in the remote furnace is in series to the furnace electrical supply as shown in the wiring diagram included in kit. A line voltage connecting wire between the electronic air cleaner (EAC) terminals on both furnace control boards assures simultaneous indoor blower operation. The switches, line voltage wiring and 5

mounting materials are included in this kit. The thermostat and low voltage (24 VAC) control wiring materials are normal field supplied items. All electrical work must conform with the requirements of local TABLE 2 CIRCUIT PROTECTION SIZING MOTOR CIRCUIT MAXIMUM FUSE OR AMPS TOTAL AMPS H.P. AMPACITY CIRCUIT BREAKER SIZE 1/2 6.8 13.6 18.7 25 3/4 9.5 19.0 24.8 30 codes and ordinances and the National Electric Code ANSI / NFPA - No. 70 latest edition or the Canadian Electrical Code Part 1 - CSA Standard C22.1 for Canadian installations. 6

FIGURE 6 UTEC NO. 1012-920/920A/1028-927/928 CONTROL BOARD TWINNING CONNECTION, SINGLE STAGE OPERATION NOTE: THERE IS NO #4 SWITCH ON THE 1028-927/928 BOARD CONTROL BOARD #1 NOTE: THERE IS NO #4 SWITCH ON THE 1028-927/928 BOARD CONTROL BOARD #2 7

FIGURE 7 UTEC NO. 1012-920/920A/1028-927/928 CONTROL BOARD TWINNING CONNECTION, TWO STAGE OPERATION NOTE: THERE IS NO #4 SWITCH ON THE 1028-927/928 BOARD CONTROL BOARD #1 NOTE: THERE IS NO #4 SWITCH ON THE 1028-927/928 BOARD CONTROL BOARD #2 8

FIGURE 8 JOHNSON CONTROLS G961DAJ-2401, -2402 CONTROL BOARD TWINNING CONNECTION, SINGLE STAGE OPERATION 9

10 FIGURE 9 JOHNSON CONTROLS G961DAJ-2401, -2402 CONTROL BOARD TWINNING CONNECTION, TWO STAGE OPERATION

OIL FURNACE TWINNING OIL WIRING KIT - MODEL RXOP-D25 (FOR DRUM STYLE HEAT EXCHANGERS) FIGURE 10 BLOCKOFF CHANNEL INSTALLATION WIDE BLOCKOFF CHANNEL FOUR SHEET METAL SCREWS (PROVIDED) The following furnaces may be used for this application: (-)OBD 84,000 BTU HEATING CAPACITY WITH 3 TON COOLING 95,000 BTU HEATING CAPACITY WITH 3 TON COOLING 112,000 BTU HEATING CAPACITY WITH 4 TON COOLING 130,000 BTU HEATING CAPACITY WITH 5 TON COOLING 150,000 BTU HEATING CAPACITY WITH 5 TON COOLING FURNACE PREPARATION AND COIL/PLENUM INSTALLATION Recognize this symbol as an indication of Important Safety Information Cased Coil assemblies include upflow coil and insulated cabinet. 1. Unpack coil/plenum assembly, the blockoff channels, end panels, and transition. Inspect for damage. 2. 17 1 2, 21, and 24 wide furnaces a. Set furnaces 1 1 2 apart. Drill four 1/8 diameter holes and attach wide blockoff channel between the two furnaces with screws provided as shown in Figure 10. b. On 17 1 2 wide furnaces use 7 x 20 end panels. Drill three 1/8 diameter holes and mount with screws supplied as shown in Figure 10. c. On 21 wide furnaces use 3 1 2 x 20 end panels. Drill three 1/8 diameter holes and mount with screws supplied as shown in Figure 10. 3. 28 wide furnace (Oil) a. Drill four 1/8 diameter holes and attach narrow blockoff channel between the two furnaces with screws provided as shown in Figure 10. b. Assemble transition and install as shown in Figure 11. NOTE: No end panels or transition required for 24 wide gas or oil furnaces. 1. Set coil/plenum assembly on furnace with access cover toward flue outlet end of furnace. 2. Connect ductwork to plenum. Seal all joints around furnace, plenum and transition with duct tape. 3. Connect suction and liquid lines between coil and compressor/condenser section. Provide oil trap for suction line, if the vertical rise exceeds 3 ft. 4. Strap expansion valve sensing bulb to top of suction line on outside of cabinet. Be careful not to over tighten the clamps. See Figure 12. 5. Insulate sensing bulb and suction line. 6. The condensate drain is 3 4 NPT. Provide a 3 trap and pitch the drain to an open sump. See Figure 12. To twin two furnaces, follow these instructions and the twinning wiring diagrams at the end of the service manual. IMPORTANT: Only twin furnaces with identical controls from the same manufacturer of control board. FIGURE 11 TRANSITION INSTALLATION FIGURE 12 COIL INSTALLATION SHEET METAL SCREWS (PROVIDED) PLENUM ADAPTER NARROW BLOCKOFF CHANNEL 11

IMPORTANT: Only bottom returns can be used. No more than two furnaces can share the same supply and return. Furnaces must have same heating and blower capacity. Twinning furnaces must operate off the same phase of power. NOTE: The transformer of both furnaces must be in the same phase. NOTE: Twinning kit cannot be used for heat pump fossil fuel kit application. TURN OFF ELECTRIC POWER AT THE FUSE BOX OR SER- VICE PANEL BEFORE MAKING ANY ELECTRICAL CONNEC- TIONS; FAILURE TO DO SO COULD RESULT IN AN ELECTRI- CAL SHOCK HAZARD, PROPERTY DAMAGE AND/OR PER- SONAL INJURY. BOTH FURNACE CABINETS MUST BE PERMANENTLY GROUNDED. A GROUND SCREW IN THE JUNCTION BOX IS FOR THIS PURPOSE. GROUND CONNECTIONS MUST BE COMPLETED BEFORE MAKING LINE VOLTAGE CONNEC- TIONS. FAILURE TO DO SO COULD RESULT IN AN ELECTRI- CAL SHOCK HAZARD, PROPERTY DAMAGE AND/OR PER- SONAL INJURY. THE FURNACES MUST BE INSTALLED SO THE ELECTRICAL COMPONENTS ARE PROTECTED FROM WATER. ELECTRICAL POWER MUST BE SUPPLIED TO BOTH FUR- NACES FROM THE SAME SEPARATE BRANCH CIRCUIT, FAILURE TO DO SO COULD RESULT IN EXPOSING THE FUR- NACE CONTROLS TO AN OVER VOLTAGE (230 VAC) CONDI- TION. THIS COULD RESULT IN DESTRUCTION OF THE CON- TROL BOARDS, PROPERTY DAMAGE AND/OR PERSONAL INJURY. L1 (HOT) AND NEUTRAL POLARITY MUST BE OBSERVED WHEN MAKING FIELD CONNECTIONS TO THE FURNACES. FAILURE TO DO SO COULD RESULT IN A DIRECT SHORT VIA THE CONNECTION BETWEEN THE EAC: TERMINAL WHEN THE INDOOR BLOWER RELAY CLOSES. THIS COULD RESULT IN DESTRUCTION OF THE CONTROL BOARDS, PROPERTY DAMAGE AND/OR PERSONAL INJURY. THE FURNACE MUST BE ON THE SAME BRANCH CIRCUIT WITH ADEQUATE AMPACITY AND OVERCURRENT PROTEC- TIONS. DO NOT USE EXISTING LIGHTING OR OTHER CIR- CUITS. NOTE: See the furnace rating plates for motor HP ratings, electrical characteristics, and amp draw. NOTE: Use time delay fuses or circuit breakers. All electrical work must conform with the requirements of local codes and ordinances and the National Electric Code ANSI/NFPA No. 70 latest edition or the Canadian Electrical Code Part 1 CSA Standard C22.1 for Canadian installations. ROBD SERIES (REFER TO WIRING DIAGRAM 90-22924-03, AND FIGURES 15, 16 AND 17) 1. Mount the kit control box to the left inside panel of the right hand furnace by using two blunt sheet metal screws provided. LEFT FURNACE: 2. Loosen screws securing transformer/cover assembly of the furnace junction box. Pull cover assembly away from box. 3. Take the 12 black wire and connect to kit relay #1. Run the stripped end through hole A of the right hand side furnace and existing hole of the primary junction box on the left hand side furnace. 4. Take the 12 white and connect to the kit relay fan terminal and run through hole A into the primary junction box through existing hole. Then take the 75 white wire through hole B of the right hand side furnace and hole E of the left hand side furnace. Then bring each end of the wires through the bottom hole of the respective primary junction boxes. On the left hand side furnace remove the existing short white wire (used for individual operation power connection) from this bundle and connect to the 12 and 75 white wires to the bundle. On the right hand furnace connect the other end of the 75 white wire to the existing white bundle. 5. Take 75 Black wire with 1 4 terminal and connect to Kit Relay #4. Run through side of Kit J box along blower shelf of right furnace into Primary J box. Take other 75 black wire and run through holes B of right furnace and E of left furnace into Primary J box and connect to black PBS lead (power lead for individual operation). Run other end along blower shelf of right furnace into Primary J box and connect both 75 black wires to existing Black bundle. 6. Take 53 Red wire and connect to Kit Relay #3 and run through side of Kit J box on through holes A of right furnace and E of left furnace. Continue through existing hole on blower shelf to inside of Blower J box. Disconnect blower heating speed bundle. Connect Red from Kit Relay #3; Red from Safety Relay #5; and desired heating speed tap into one bundle. 7. Take 53 Purple with piggyback terminal and connect it to Kit Relay Fan Terminal. Run through side of Kit J box on through holes A of right furnace and E into left furnace. Continue on through existing hole in blower shelf into Blower J box and connect to existing NO lead from Fan Timer that was disconnected from heating speed tap bundle. 8. Take 76 Red wire and connect to Kit Relay #6. Run through side of Kit J box and along right furnace blower shelf on through existing hole into Blower J box. Disconnect heating speed tap bundle and connect together Red from Kit Relay #6; Red from Safety Relay #5; and desired heating speed tap. 9. Take 76 Blue and connect to purple piggyback on Kit Relay Fan Terminal. Run through Kit J box, along right furnace blower shelf, through existing hole into Blower J box and connect to existing Red wire from NO terminal of Fan Cycle Control. FIGURE 13 LEFT HAND FURNACE 12

FIGURE 14 RIGHT HAND FURNACE 10. Take 73 Orange, Green, and Brown and run through holes B of right furnace and E of left furnace. Connect to appropriate terminals of Primary Controls. CONDENSER UNIT WIRING 1. Connect control wires of the condenser unit to the terminal C and Y of the control transformer of the left hand furnace. Refer to the condensing unit s instruction manual for the proper polarity of connection. 2. Refer to manufacturer s installation instructions for proper wiring of power to unit. 3. Test for functionality by cycling the thermostat. FIGURE 15 WIRE ROUTING FIGURE 16 JUNCTION BOX LOCATION FIGURE 17 TWINNING WIRING 13

FIGURE 18 TWINNING UPFLOW HEATING AND COOLING OIL FURNACE SCHEMATIC 14

15

16 CM 1203