Technical Bulletin. Fire protection requirements for cabling systems MLAR 03/2000 MDBR 12/1998. Date: 08/2006

Similar documents

Notice. Approval number: Z Scope of validity By: 08 January 2013 to: 01 November 2017

Annex to the Accreditation Certificate D PL according to DIN EN ISO/IEC 17025:2005

INSTALLATION OF ACCESS FLOOR SYSTEMS IN GENERAL OFFICE AREA AND COMPUTER ROOM

Metal Cassette Ceiling with BEKA Heating and Cooling Mats

Installation of a Brunner fireplace. General Indications

PV Systems and Fire safety in Germany

Procedure for the Approval of New Fire Detection and Alarm Technologies

Smart Metering at VDE Our services at a glance

speed pipe indoor system. Secure indoor networks.

for concrete Apolo MEA Befestigungssysteme GmbH Industriestraße Aichbach DEUTSCHLAND Apolo MEA Befestigungssysteme GmbH, Plant2 Germany

European Technical Assessment. ETA-12/0166 of 18 June English translation prepared by DIBt - Original version in German language.

European Technical Assessment. ETA-15/0771 of 14 December English translation prepared by DIBt - Original version in German language

Annex to the Accreditation Certificate D-PL according to DIN EN ISO/IEC 17025:2005

CHANCES AND LIMITS OF THE TIME-EQUIVALENCE-METHOD IN STRUCTURAL FIRE DESIGN

WKE Spelsberg. The name in maintaining electrical integrity.

CE marking of fire-resistant doors the right way!

Fire Risk Assessment

Hold-open magnets DORMA

Motion Controlled Apartment Building Corridor Lighting

EM Hold-open magnets

Museum of Bavarian History Regensburg, Germany

Fire Safety Concept Hotel Jumeirah

Solutions for the health care sector

European Technical Assessment. ETA-16/0107 of 22 March English translation prepared by DIBt - Original version in German language.

European Technical ETA-10/0305 Assessment of 6 December 2017 General Part

Electrical Equipment & Systems

fulfils all requirements for extended protection of the criteria catalogue The appendix is part of the certificate and consists of 4 pages.

fischer Fireproof pipe installation Certified fire protection for safe fixings. MLAR MLAR Fire resistance classification R 120 according DIN EN

European Technical ETA-07/0142 Assessment of 9 December 2016 General Part

Quality assurance and safety aspects. Dipl.Ing. Udo Siegfriedt DGS-Berlin Brandenburg

European Technical ETA-07/0135 Assessment of 9 December 2016 General Part

SAFE CABLING SYSTEMS IN TUNNELS UNDER FIRE

European Technical Assessment. ETA-02/0020 of 11 December English translation prepared by DIBt - Original version in German language

Think connected. Conducting electricity. Routing data. Controlling energy.

European Technical ETA-11/0080 Assessment of 9 February 2016 General Part

Audible warning devices for external alarm

FIRE PROTECTION ENCLOSURES

European Technical ETA-07/0025 Assessment of 9 December 2016 General Part

Test Unit GTL 100 for Fire Detectors

European Technical Assessment. ETA-10/0352 of 6 July English translation prepared by DIBt - Original version in German language.

Taming the Health Care Building Codes NFPA vs. The International and Chicago Building Codes JENSEN & HALSTEAD LTD.

PASSIVE AND ACTIVE FIRE PROTECTION OF THE AIR HEATED SOLAR HOUSES

RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

The Quality Connection. BETAflam Fire Resistant Safety Cables

European Technical Assessment. ETA-02/0024 of 17 June English translation prepared by DIBt - Original version in German language.

VdS Guidelines CONTENTS

Data sheet referring to EU group safety data sheet adapted to EC-degree 1907/2006 (REACH)

VdS Guidelines for the Certification of Monitoring and Alarm Receiving Centres according to DIN EN 50518

IAS Surveillance Measures for Safes & Strongrooms

European Technical Assessment. ETA-14/0475 of 19 December English translation prepared by DIBt - Original version in German language

European Technical Assessment. ETA-13/0651 of 18 June English translation prepared by DIBt - Original version in German language.

ECB S Recommendation for Service, Repair and Modification Operations on ECB S Certified Secure Storage Units, Data Cabinets and Data Rooms

HEAT RECOVERY AIR HANDLING UNIT

Installation and maintenance manual

European Technical Assessment. ETA-15/0440 of 6 July English translation prepared by DIBt - Original version in German language.

Installation instructions

VdS 5477en : (01) Key deposit boxes

Major Changes to the 2010 National Construction Codes Contractor s Breakfast January 2014

CODE TECHNOLOGIES COMMITTEE NURSING CARE FACILITIES WORK GROUP APPROVED CODE CHANGE DRAFTS CODE GROUP B

CHAPTER 8: RISK ASSESSMENT & EMERGENCY PREPAREDNESS PLAN

AirUnit. Installation instructions. mfh systems modern floor heating. Decentralised domestic ventilation

Part 3 BUILDING CODE MYTHS & INTERPRETATIONS

European Technical Assessment. ETA-14/0028 of 22 September General Part. Technical Assessment Body issuing the European Technical Assessment:

European Technical ETA-15/0270 Assessment of 2 February 2016 General Part

City of South Salt Lake Fire Code Training Exiting, Egress Systems and Egress Control

3/6/2018. Design Tips For Fire and Smoke Barriers. Professional Development Hours (PDH) Certificates. Copyright Materials

European Technical Assessment. ETA-99/0010 of 15 December English translation prepared by DIBt - Original version in German language

AC100-PRO Ice. Stanley Black & Decker Deutschland GmbH Richard-Klinger-Straße Idstein DEUTSCHLAND

European Technical Assessment. ETA-11/0288 of 10 September English translation prepared by DIBt - Original version in German language

University of Maryland FIRE EVACUATION PLAN

VdS SCHADENVERHÜTUNG. VdS-Rules for Intruder Alarm Systems

Fire Risk Assessment

Pluggit iconvent Decentralized residential ventilation with heat recovery Operating and installation instructions

Extended Coverage Sidewall Sprinklers

European Technical Assessment. ETA-11/0163 of 22 May English translation prepared by DIBt - Original version in German language.

Hot Work Policy. Department of Risk Management. 1. Purpose. 2. Authority. 3. Scope

CERTIFICATE of Product Conformity (QAL1)

European Technical Assessment. ETA-16/0515 of 14 December English translation prepared by DIBt - Original version in German language

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)

IFE Level 2 Certificate in Passive Fire Protection

YORK COUNTY DEPARTMENT OF FIRE SAFETY BUILDING PLAN REVIEW REQUIREMENTS

Sanpress Inox G. Instructions for Use. Year built: from 02/2004 en_int

FIREPRO FIRESTOPPING AND PENETRATION SEALS PRODUCT GUIDE

FAQ. (Frequently Asked Questions) What is required to convert my unfinished basement to finished space?

European Technical Assessment. ETA-11/0240 of 7 May English translation prepared by DIBt - Original version in German language.

Technology for building automation. Ambient Air Humidity and Temperature Probes HT12 and HTF12. Device Description. Contents

European Technical ETA-13/0909 Assessment of 8 December 2016 General Part

Waste water ejection unit

European Technical Assessment. ETA-11/0360 of 6 October English translation prepared by DIBt - Original version in German language.

fulfils all requirements for high protection of the criteria catalogue The appendix is part of the certificate and consists of 5 pages.

European Technical ETA-07/0332 Assessment of 30 January 2015 General Part

European Technical ETA-12/0607 Assessment of 18 January 2018 General Part

European Technical Assessment. ETA-17/0624 of 8 September English translation prepared by DIBt - Original version in German language

CLEANING STARTS WITH

TS 93. Cam action door closer system in Contur Design

European Technical Assessment. ETA-13/0652 of 17 March English translation prepared by DIBt - Original version in German language.

European Technical Assessment. ETA-05/0069 of 3 July English translation prepared by DIBt - Original version in German language.

European Technical Assessment. ETA-05/0069 of 5 August English translation prepared by DIBt - Original version in German language.

T THATCHED BUILDINGS Electrical installations in. 1 of 5. Introduction. Consultation. Assessment of general characteristics

Transcription:

Technical Bulletin Fire protection requirements for cabling systems MLAR 03/2000 MDBR 12/1998 Date: 08/2006 This technical bulletin provides you with information on specific technical subjects. It is based on the current rules and regulations and on our current test results. The contents of this document is not legally binding.

Fire protection requirements for electrical cabling and laying operations are specified in the Design Guidelines of the Construction Supervision Commission. These are, amongst other things, the basis of the Model Building Regulation (MBO) and the DIN VDE standards (DIN VDE 0108 T1, supplementary sheet 1 for DIN VDE 0108 T1). The above DIN VDE standard contains the MLAR cabling system design directive dated 9/1993. In practice, however, these specifications are evaluated in different ways and are not included in different state construction ordinances, or appear in a different form. A new MLAR design directive, dated 12/1998, which was agreed by the construction supervision committees and was revised in 03/2000, has specified the requirements for cabling systems with the aim of creating a standardised regulation for the whole of the Federal Republic of Germany. Before commencing planning, it should be checked which current regulations exist for the building project. The following sections are based on the current MLAR and deal with the use of electrical installation systems for cable laying. 1 Aims of the MLAR 1.1 Guarantee of usability... of important building areas (including corridors and emergency exit routes) necessary for saving the lives of people and animals in case of fire, through the limitation of installations in this case, cabling systems. 1.2 Prevention of the spread of fire and smoke... through specific fire-resistant walls and ceilings, at points through which cables pass through these walls and ceilings. 1.3 Maintenance of the function of specific cabling systems... for prescribed safety equipment (safety lighting, smoke alarm systems, smoke exhaust systems, etc.). 2 Applications The MLAR defines different cabling system designs for: 2.1 Necessary stairwells, necessary rooms between necessary stairwells and exits into the open air, necessary corridors and in open corridors in front of a building's exterior walls. 2.2 Necessary stairwells with low usage, necessary corridors with low usage (in low height residential buildings, living accommodation, units 200 m², total area 1,000 m²). @ Rp / 07.08.06 / e_brandschutztechnische Anforderungen.doc / Page 2 of 8

3 Definition of cabling systems Cabling systems can consist of electric cables, service connection equipment, fibre optic cables, distributors and cable insulation. Fixing systems and coatings are also part of the cables. 4 Installation of electrical cables Electrical cables may be installed uncovered, if they: - are non-combustible (DIN VDE 0284 Part 1), - are only used to supply the rooms according 2.1 or - have improved fire characteristics (according to DIN VDE 0472 Part 840, Part 816 also in conjunction with coatings). All other cables should be installed either inside walls, using soffits, installation ducts or underfloor systems (screed-flush electrical installation systems, raised or cavity floors) in accordance with regulations. 5 Cable glands through walls and ceilings Cables may only be installed through fire walls, walls and ceilings which are fireresistant, if there is no risk of a spread of fire and smoke or measures have been taken to prevent this. Glands are possible through - approved partitions of the fire-resistance rating S 90. - Installation ducts made of non-combustible materials with a fire resistance period of 90 minutes. Individual cables may be installed through fire walls, walls and ceilings, if - the clear distance between the cables is at least as wide as the larger cable diameter, - the wall or ceiling thickness is at least 80 mm and - the space between the cables has been fully closed off with mortar or concrete. Glands through openings require complete closing with materials made of mineral fibres or with materials which foam in case of fire. @ Rp / 07.08.06 / e_brandschutztechnische Anforderungen.doc / Page 3 of 8

6 Use of electrical installation systems in wall areas When electrical cables are installed in installation duct systems in rooms according to 2.1, they must: - not be made of combustible materials, - have a closed surface and - have a fire-resistance period which corresponds to that of the ceilings. If you do not bypass any ceilings, then a fire-resistance period of 30 minutes is sufficient. When electrical cables are installed in installation duct systems in rooms according to 2.2, which do not by-pass any ceilings, they must: - not be made of combustible materials and - have a closed surface. 7 Use of electrical installation systems in underfloor areas When installing electrical cables in underfloor areas, we would draw your attention to the Design Directive for Fire Protection Requirements on Cavity Floors and False Floors (MDBR). This new design directive was agreed unanimously in December 1998 by the german ARGEBAU Construction Supervision Commission. Alongside the requirements for cavity and false floors, Chapter 5 of the design directive contains statements on cable installation in screed-flush trunking and screedcovered duct systems. These installation systems are approved when the top covers are made of noncombustible materials. They may not have any openings. Inspection openings are approved when they close tightly and consist of non-combustible materials. There is no specified fire-resistance period. @ Rp / 07.08.06 / e_brandschutztechnische Anforderungen.doc / Page 4 of 8

8 Primary changes in the MLAR compared with the previous version The new MLAR no longer talks of halogen-free cables, but rather defines the installation types for "normal" cables and cables with improved fire properties. There is no longer a fire load limit of 7 kwh or 14 kwh per m² of halogen-free cables, due to a lack of practical experience. Indeed the installation regulations have become more stringent. If, previously, wall ducts made of non-combustible materials were sufficient in necessary rooms, a fire-resistance period of 30 minutes is now required. 9 Areas of application for Ackermann installation systems with accessories, taking the new design directives into account Wall installation systems made from sheet steel can be used in rooms according to 2.2 (necessary stairwells with low usage, and necessary corridors of low usage). It is possible to pass our wall installation ducts through fire walls if the fire bulkheading pack BSP 6 is used. The use of cable installation systems, such as grid channelling systems and wall installation duct systems in the form of a ceiling duct in the ceiling partitions, is possible at any time, as the fire protection requirements only apply to the ceiling partition. However, on fixing, ensure that fixing materials are used which are approved for fire conditioning. The screed-flush trunking and screed-covered duct systems OKA, OKU, EBK and EÜK can be used in necessary rooms according to 2.1, if they do not have any openings or the inspection openings are closed using the RK cassette solution or the DUF blind cover. When passing underfloor systems through fire walls, the partitions used must have a fire-resistance period of 90 minutes. Usually, specialist design companies are used who install suitable, improved partitions. The use of our fire bulkheading pack BSP 6 is also possible, as the approval for use in installation ducts specifies a surface of 0.0314 m². @ Rp / 07.08.06 / e_brandschutztechnische Anforderungen.doc / Page 5 of 8

Information sheet on fire protection requirements for cabling systems Ceiling partition: F30 on both sides, if no ceilings are bypassed. Duct system: the following is always valid: - Closed surface - Non-combustible In addition, the following is valid: - For necessary rooms: F30 - Necessary rooms of low usage: no fire-resistance period Fire partition S 90 or Duct system F 90 Covers: Tight-closing, noncombustible, no fire-resistance period required. @ Rp / 07.08.06 / Brandschutztechnische Anforderungen.doc / Page 6 of 8

Information sheet on fire protection requirements for cabling systems Appendix overview of standards and directives Safety standards DIN VDE 0100 DIN VDE 0107 DIN VDE 0108 DIN VDE 0132 Erection of low-voltage installations with rated voltages up to 1,000 V, initial tests Low-voltage installations in hospitals and medical rooms outside hospitals Low-voltage installations and safety power supplies on construction sites Measures to be taken in the case of fire in or near electrical installations Guidelines MLAR 03/2000 MDBR 12/1998 VdS 2025 VdS 2097-8 Information sheet on fire protection requirements for cabling systems Fire protection requirements for cavity floors and false floors Cable systems, guidelines on damage prevention Installation ducts and cable systems with function maintenance Erection regulations DIN VDE 0100-520 Wiring systems Cable product regulations (for heavy-current installations) DIN VDE 0250 Cables, wires and flexible cords for power installation DIN VDE 0250-816 Heat-resistant silicon hose lines DIN VDE 0267 Halogen-free cables with improved fire characteristics DIN VDE 0276 Power cables DIN VDE 0284 Mineral insulated cables DIN VDE 0298 Application of cables and cords in power installations DIN VDE 0472 Testing of cables, wires and flexible cords Product definitions DIN VDE 0604 ceilings Cable ducting systems intended for mounting on walls and/or DIN VDE 0634 Underfloor electrical installation ducts DIN VDE 0605 Conduit system for electrical installations @ Rp / 07.08.06 / Brandschutztechnische Anforderungen.doc / Page 7 of 8

Reference sources for standards and definitions DIN VDE Normen VDE-Verlag GmbH Merianstrasse 29 63069 Offenbach or Beuth-Verlag GmbH Burggrafenstrasse 4 10 10772 Berlin VBG regulations Carl-Heymanns Verlag KG Luxemburger Strasse 449 50939 Köln MLAR Publication in DIBt communications Deutsches Institut für Bautechnik Kolonnenstrasse 30L 10829 Berlin DIBt communications can be obtained from Verlag Ernst & Sohn Bühringstrasse 310 13086 Berlin VdS directives Gesamtverband der Deutschen Versicherungswirtschaft e.v. (GDV) Amsterdamer Strasse 174 50735 Cologne @ Rp / 07.08.06 / e_brandschutztechnische Anforderungen.doc / Page 8 of 8