Section Lawn & Grasses Pearl s Premium DRAFT. Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification.

Similar documents
Tel

EXTERIOR IMPROVEMENTS PLANTING. .02 Lawns and Grasses. A. General. 1. Intent:

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

SECTION TURF AND GRASSES

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

SECTION 900 TURF ESTABLISHMENT

Section Seeding

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY STANDARD SPECIFICATION. Section SODDING

SECTION SEEDING. C. Seed mix to be used will be as specified in the Bid Schedule.

SECTION SODDING

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

Section 9 Landscaping and Street Trees

SECTION LANDSCAPE

SECTION SODDING

ITEM 164 SEEDING AND EROSION CONTROL BLANKET

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

NC State University Design and Construction Guidelines Division 32 Exterior Improvements Plants, Turf Grass, and Soil Preparation

SECTION FINE GRADING AND SOIL PREPARATION

LAWN RENOVATION & OVERSEEDING

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TURF AND GRASSES

SECTION LANDSCAPING

A. Surface parking areas shall be constructed of bituminous paving.

SECTION TOPSOIL AND SEEDING

SECTION SEEDING

a. Section includes planting soils specified by composition of the mixes.

SECTION 605 PLANTING

Turfgrass Sod General

45.2. MATERIALS Shrubs, Trees and Other Plants Planting Pit Mulch and Cover Grass Materials

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

SITE TOPSOIL & FINISH GRADING

SECTION SOIL PREPARATION

7301 SCOPE. Furnish materials, labor and equipment necessary to install landscaping as specified and as indicated on the plans.

BMP-33. Stabilizing fine-graded disturbed areas by establishing permanent grass stands with sod.

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

2-B-18-UR. Revised: 3/27/2018

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

EXTERIOR PLANTS

DIVISION II PLANTING SECTION 02950

Section 816. TURF ESTABLISHMENT

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION LANDSCAPING

This section covers the planting of seed, sod, trees and vegetation.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

SECTION LANDSCAPING

LANDSCAPE WORK

SECTION 808 PLANTING TREES, SHRUBS AND OTHER PLANTS

Town of Fuquay-Varina

EC-11 COMPOST. Greenville County Technical Specification for. 1.0 Compost. 1.1 Description

INSTALLATION TIPS. Site Preparation

Volume 2, Chapter 12 - Revegetation

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

Town of Essex Small Site Erosion Control Guide

EC Building a Bluegrass Lawn

SECTION TREES, PLANTS AND GROUND COVERS

B. Finish Grade: Elevation of finished surface of planting soil.

Lawn Solutions Australia. Simple specifications for turf installation

LAWNS Chapter 12. Topic Outline. Establishing a Lawn. Establishing a Lawn

UNIFIED FACILITIES GUIDE SPECIFICATIONS

EROSION & SEDIMENT CONTROL

Public Notice. REQUEST FOR QUOTES Town of Woodstock Downtown Parking Lot Improvement Project Landscape Material. June 22, ADDENDUM NO.

C. Sod Procurement: Comply with white fringed beetle and fire ants quarantine requirements.

SECTION TREES, SHRUBS AND GROUNDCOVERS

Hollywood Management Guidelines

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2006

Lawn Establishment. Introduction. Preparing the site. Planning the new lawn

2015 Pond Area Landscape Maintenance Specifications

Section 815. LANDSCAPING

HOME & GARDEN INFORMATION CENTER

1. Division 2 Section "Earthwork" for excavation, filling, and rough grading and for subsurface aggregate drainage and drainage backfill materials.

SECTION LANDSCAPE ESTABLISHMENT

A. Provide labor and materials necessary for installation of turf sod and other related work as required.

Entegra Roof Tile: Bermuda Natural Gray Roof Tile with no antique

Lawn Seed Information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

C-10. Disconnected Impervious Surface

Addendum No. 2 for Drainage Improvements For Nueces River Fishing Area

900 Roadside Improvement

Exhibit II - Expanded Scope of Work. Xeriscaping / Rain Water Harvesting Sustainability Program

Chapter 4 - Lawn establishment

UNIVERSITY OF ROCHESTER DESIGN STANDARDS OCTOBER 2009

Lesson 2 of 4. Self-Guided Educational Module

EnkaTech Note. Installation Guide for Enkamat Slopes and Channels. Site Preparation. Anchor Trench. Enkamat Installation

Exhibit A. Scope of Work

NEW GARDEN MAINTENANCE GUIDE. Enjoy a luscious garden with our simple month-by-month garden TLC guide

SECTION AMENDED TOPSOIL

CHARLES SOIL CONSERVATION DISTRICT PLAN SUBMITTAL GUIDELINES

Earthwork Excavating, Backfilling, and Compaction for Utilities Irrigation System Landscaping.

5.0 Storm Water Landscape Guidance Introduction

FNGLA Landscape Maintenance Manual Fertilization

HIGHLANDS COMMUNITY DEVELOPMENT DISTRICT Corporate Boulevard, Orlando, FL 32817

VEGETATED SLOPE STABILIZATION DESCRIPTION APPLICABILITY. Advantages

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Alternative Names: Erosion Control Matting, Erosion Control Netting, Rolled Erosion Control Products (RECP)

SOD INSTALLATION AND CARE GUIDE. Over 40 Years of QUALITY SOD & QUALITY SERVICE. Delivery, Installation & Pick-Up

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

The planning and zoning board held workshops on January 11, 2016, January 18, 2016 and January 25, 2016 to discuss the issue.

LANDSCAPE ORDINANCE 1. LANDSCAPE PLAN REVIEW REQUIREMENTS

St. Monica Food Pantry

SERIES 5000: ANCILLARY ROADWORKS. seeds in the seed mixture shall be as specified in the project specifications.

Transcription:

Section 02930 DRAFT Pearl s Premium Lawn Grasses are the only acceptable seed / sod choice for this specification. No substitutes are permitted. Part 1 General 1.1 Summary (Non-inclusive) A. Section Includes: Lawn and grasses (Pearl s Premium) with soil amendments and maintenance. 1.2 Related Work Specified Elsewhere (Non-inclusive) A. Applicable Sections: Division 1. B. Finish Grading: Division 2. C. Trees, Shrubs and Ground Covers: Division 2. 1.3 Submittals A. Submit per the requirements of Division 1. B. Samples: For approval of the following: PRODUCT QUANTITY OR SIZE 1. Mulch Material 1/4 cubic foot C. Quality Control Procedures: 1. Test Reports: For approval, test reports, manufacturer s certificates or independent lab tests for the following: a. Fertilizer. b. Limestone. c. Certification of Bulk Fertilizer or Limestone. d. Certificate of Pearl s Premium seed. e. Certificate of Pearl s Premium sod. f. Peat Moss 2. Daily Hydro-seeding Report: Hydro-seed mix description, amount of coverage area and location 02930, Page 1 of 12

Section 02930 DRAFT 3. Monthly Worksheet: For Guarantee and Maintenance Work. D. Closeout Submittals: Guarantee: As Indicated. 1.4 Quality Assurance A. Referenced Codes and Standards: Comply with the following in accordance with Division 1. 1. Association of Official Analytical Chemists (AOAC) Standards 2. Association of Official Seed Analysts (AOSA) Testing Provisions 3. American Sod Producers Association (ASPA) Guidelines Specifications to Sodding Part 2 Products 2.1 Topsoil A. Cleaned and placed as specified in Finish Grading: Division 2. 2.2 Pearl s Premium Seed A. Pearl s Premium Ultra Low Maintenance Grass Seed: 1. Pearl s Premium Sunny Mix for areas in full or substantially full sun 2. Pearl s Premium Shady Mix for areas in full or substantially full shade 3. Pearl s Premium Sun / Shade Mix for areas in mixed sun / shade 4. Conforming to applicable State and Federal Regulations and to test provisions of Association of Official Seed Analysts. 5. Consult Pearl s Premium (pearlspremium.com.) for additional seed information. NOTE: Pearl s Premium Ultra Low Maintenance Grass Seed is subject to one or more patent applications. Use of the Pearl s Premium blends is strictly prohibited without authorization. Purchase of the product(s) directly from Pearl s Premium or an authorized distributor constitutes authorization. 2.3 Pearl s Premium Sod A. Pearl s Premium Sod. Nursery-grown and cultivated from certified Pearl s Premium seed mix. Sod to be from 11 to 36 months in age before lifting, uniform in density, natural green color, free of noxious weeds. Cut sod 3/4 inch. 1/8 inch tolerance plus or minus, with grass height at 1 1/2 to 2 inches, wetted before cutting. Obtain approval of sod and certify Pearl s Premium before cutting or delivery to Project Site. Consult Pearl s Premium (pearlspremium.com.) for additional sod information. 02930, Page 2 of 12

Section 02930 DRAFT NOTE: Pearl s Premium sod is in limited availability; contact Pearl s Premium or authorized Pearl s Premium distributor (pearlspremium.com) at time of specification (landscape architect) and bidding (landscape contractor) to ensure availability for installation. 2.4 Limestone A. Ground agricultural dolomitic limestone, 90 percent calcium carbonate equivalent, conforming to standards of Association of Official Analytical Chemists and applicable State and Federal Regulations. 2.5 Fertilizer A. Conforming to standards of Association of Official Analytical Chemists, delivered to Project Site in sealed and labeled bags, or in bulk with certification as to quality and analysis. Nitrogen source shall be at least 33 percent water insoluble. Basic and Starter Fertilizers shall be used. Formulations shall be based on recommendations from soil testing. Organic fertilizer strongly recommended. 2.6 Soil-Stabilizing Agent A. For use in hydro-seed mix only. Material shall be one (1) of the following: 1. "Verdyol Complex": Weyerhaeuser Company. 2. "Curasol": Wolbert Master Associates. 3. "Terra-Tack": Grass Growers, Inc. 4. "J-Tac": Reclamare Company. 2.7 Mulch Material A. General Use: Straw, salt marsh hay, or a combination of both. Material shall be reasonably weed free, not brittle or overly decomposed. NOTE: use only if necessary as mulch material can introduce unacceptable levels of weed into a newly installed, slow growing lawn, making establishment harder. B. For Hydraulic Seeding: Wood cellulose "Fiber Mulch", containing nontoxic green dye marker. 2.8 Asphalt Anchorage Material A. ASTM D 977, Type RS-1 emulsion. For use with mulch material (general use type), if needed. 2.9 Water A. On Project Site potable. Owner will supply water at no cost. Transport on Project Site water to 02930, Page 3 of 12

Section 02930 DRAFT planting bed locations at no additional cost. 2.10 Peat Moss A. A mix of partially decomposed reed-sedge peat and sphagnum peat moss, yellow-brown in color, free from lumps, roots and stones and meeting the following analysis: 1. Organic Matter: On dry weight basis, 90 percent or better. 2. Moisture Absorption: On dry basis of its own weight 450 percent. 3. ph Factor: 3.5 to 5.5. B. Furnish manufacturer's test report of peat moss. Part 3 Execution 3.1 Preparing Topsoil A. Existing On Project Site Topsoil for lawn areas: Incorporate the following materials uniformly throughout the entire depth of topsoil by disking, roto-tilling, or other approved method: 1. Limestone: [ ] pounds per acre. Determined by test reports. 2. Organic Fertilizer: [ ] pounds per acre. Determined by test reports. 3. Kick-Start Seed Activator: [ ] pounds per acre. Determined by test reports. B. Off Project Site Topsoil Fine Lawn and Sodded Areas: Incorporate the following materials uniformly throughout entire depth of topsoil: 1. Limestone: [ ] pounds per acre at the rate specified by Soil Test Report. 2. Organic Basic Fertilizer: [ ] pounds per acre at the rate specified by Soil Test Report. C. Existing on Project Site topsoil for Pearl s Premium Meadow Grass Areas: Incorporate the following materials uniformly throughout entire depth of topsoil by disking, roto-tilling, or other approved method. 1. Limestone: [ ] pounds per acre at the rate specified by Soil Test Report. 2. Organic Basic Fertilizer: [ ] pounds per acre at the rate specified by Soil Test Report. 3. Kick-Start Seed Activator: [ ] pounds per acre. Determined by test reports. D. Add organic starter fertilizer at the following rates to surface of seed bed or include as an ingredient in hydro-seed mix: 02930, Page 4 of 12

Section 02930 DRAFT 1. Limestone: [ ] pounds per acre at the rate specified by Soil Test Report. 2. Organic Basic Fertilizer: [ ] pounds per acre at the rate specified by Soil Test Report. E. For Spring Seedings, use Organic Water Wizard (hydretain) at rate of 1 gallon per 16,000 sq. ft. to help retain moisture in root stock during initial establishment period. Fl Grade lawn areas as follows: 1. Fine Lawn: Drag smooth and hand rake topsoil to final grade elevations. Roll if necessary to stabilize in order to commence seeding. Remove all ruts, mounds, and ridges on surface of topsoil. Remove all stones greater than 1 inch, roots, or other debris visible on soil surface. Resulting holes shall be filled with specified topsoil, leaving a uniform planar surface. Grade uniformly so soil surface does not have low spots, which may collect water. 2. Low Maintenance Lawn: Drag smooth or power rake topsoil to final grade elevations. Remove ruts, mounds, and ridges on surface that are in excess of 3 inches. Remove all ruts, mounds and ridges on surface interfering with surface flow of water. Remove loose surface stones greater than 3 inches and all roots and biodegradable debris visible on soil surface. 3. Meadow Grass: Grade as specified for rough lawn. F. Sodding operation shall take place while topsoil is in friable, loose condition, with no crusting of surface. G. For Spring or Summer Sodding, use Organic Water Wizard (hydretain) at rate of 1 gallon per 16,000 sq. ft. to help retain moisture in root stock during initial establishment period. H. Contractor shall obtain Design Professional s approval for sod bed preparation prior to beginning of sodding operation. Two (2) days prior notice will be required for review. 3.2 Pearl s Premium Seeding A. Seeding shall be done between the following dates. 1. Fine Lawn, Low Maintenance Lawn: [4/15 through 10/15] [ ]. 2. Temporary Lawns: [3/15 through 10/15] [ ]. 3. Meadow Grass: [6/15 through 10/15] [ ]. NOTE: For spring seedings Organic Water Wizard (hydretain) should be used to retain moisture in root stock and help with initial summer establishment period. 02930, Page 5 of 12

Section 02930 DRAFT NOTE: Pearl s Premium is slow growing. Planting in late spring or early summer during periods of significant heat and weed activity can impact the initial result. Early spring seeding and late summer/early fall seeding periods are highly desirable. Heavy seeding rate desirable to thicken lawn quickly thereby choking out weed growth. Over-seeding second season should be anticipated. B. Seed during favorable weather conditions. Prepared bed shall be in moderately dry condition during seeding. C. Sow Pearl s Premium seed mix at the following rates per acre: 1. Fine Lawn: 340 pounds. 2. Low Maintenance Lawn: 300 pounds. 3. Meadow Grass: 215 pounds. D. Sowing may be by the following optional methods: 1. Mechanical Power-Drawn Seeder: Combination grass planter and land packer or pulverizer. Plant seed not deeper than 1/4 inch. Keep seeding operation as close as possible to contours and not up and down slopes. After seeding, compact with land roller, such as a culti-packer making sure not to over-compact soil in process. With proper equipment, sowing seed and culti-packing in one (1) operation is satisfactory. 2. Hopper Type Spreader: Manually-propelled or power-drawn hopper devices. Uniformly distribute seed by sowing half seed in one (1) direction and remainder at right angles to direction of first sowing. Cover seed an average depth of 1/4 inch by means of chain harrow, culti-packer, or other approved method. NOTE: Never cover seed with more an ½ inch of soil to ensure germination. NOTE: For Spring and Summer seedings, spary on Organic Water Wizard (hydretain): As specified. 3. Hydro-seeding: a. Hydraulic broadcasting of prepared material, with written approval of Design Professional, at the following rates per acre. Provide daily reports of hydro-seed mix description as indicated: 1) Water: As specified. 02930, Page 6 of 12

Section 02930 DRAFT 2) 1,500 pounds of wood cellulose, plus 15 percent for slopes 5 percent and steeper. 3) Fertilizer: As specified for starter fertilizer. Starter fertilizer may be added to surface of seed bed. 4) Soil stabilizer of type and at rate recommended in writing by manufacturer. 5) Seed Mix: As specified. 6) Kick-start: As specified. 7) For Spring and Summer seedings, Organic Water Wizard (hydretain) : As specified. b. Mix and agitate all materials, except wood cellulose, according to material coverage specifications and tank size in partially filled tank; then add specified wood cellulose, fill tank with water and continue agitation. Seed promptly, under constant agitation of mix, beginning when complete mix is a uniform slurry. c. Take precautions against overspray onto roads, curbs, sidewalks, building walls, and other surfaces except ground areas. Contractor shall promptly clean all areas of overspray to satisfaction of Owner s Representative and Design Professional. E. [Meadow Grass] Areas: After topsoil has been prepared for seeding, allow inherent weed seed to germinate. After germination of weed seed, apply organic herbicide "Phydura" in accordance with manufacturer's written recommendations. Wait seven (7) days after application of herbicide and hydro-seed with Pearl s Premium mix. Keep disturbance of topsoil to a minimum. 3.3 Pearl s Premium Sodding A. Provide Pearl s Premium sod in the following areas: 1. As indicated on Drawings. 2. All slopes equal to or steeper than four (4) horizontal to one (1) vertical. 3. Four (4) feet from edge of the following: a. Manholes. b. Catch basins. c. Exterior light fixtures. 4. Minimum 10 feet from face of all new buildings, including retaining walls connected to building and plazas. 02930, Page 7 of 12

Section 02930 DRAFT 5. Within drainage swales as indicated on Drawings. B. Place sod on topsoil bed prepared as indicated for seeded areas, including lime, basic fertilizer, starter fertilizer, kick-start applied to bed surface. For Spring or Summer sodding, apply Organic Water Wizard (hydretain) to attract moisture to root stock and aid in initial establishment. At time sod is placed, topsoil shall be in a damp, friable, loose condition, with no surface crust. Organic fertilizers highly recommended. C. Retain sod on slopes equal to or steeper than four (4) horizontal to one (1) vertical and in drainage swales, using sod pins driven into sod until top is flush with sod. D. In placing sod, keep rows parallel with contour lines. Keep Work true to finished grade, and tamp or roll to establish firm contact with topsoil bed. Butt pads tightly and stagger ends with those in adjacent rows. If sod separates less than 1/2 inch, backfill with topsoil flush with sod and over-seed with Pearl s Premium seed mix. If sod separates 1/2 inch or greater, overlay with sod and spade cut to fit. 3.4 Mulching A. Except hydro-seeded areas, seeded areas sloped four (4) horizontal to one (1) vertical or greater, and areas where lawn would be difficult to establish, shall be mulched at rate of 1.5 tons per acre. B. Use wood fiber mulch or soil stabilizing agents, hydraulically applied in water at rate of 1,500 pounds of wood fiber per acre, plus l5 percent on slopes greater than four (4) to one (1). C. For dry-mulched areas, spray with asphalt anchorage material immediately after spreading straw or salt marsh hay or both, at rate of 200 gallons of asphalt per acre, in a method to bind mulch to soil and inhibit wind loss of mulch. Do not apply asphalt anchorage material within 30 feet of building lines, nor when ambient temperature is below 55 degrees F. Clean off misplaced spray from building walks, paving, light standards and bases, and other surfaces to satisfaction of Owner s Representative or Design Professional. 3.5 Watering A. Keep newly seeded areas continuously moist until grass becomes well rooted typically 30 days. Thereafter, reduce or stop watering as weather conditions allow to encourage root growth. B. In event of insufficient rainfall and during first summer s heat, water areas every two (2) or three (3) days to ensure proper lawn establishment. Thereafter, water only as needed. When watering sod, 02930, Page 8 of 12

Section 02930 DRAFT make sure that water soaks through sod into topsoil bed below. C. For lawns installed in Spring, apply second treatment of Organic Water Wizard (hydretain) at onset of hot summer weather or no more than three (3) months after installation. 3.6 Protective Work A. Provide materials and Work necessary to protect Work from damage. Prevent damage to Owner's property and Work specified in other Sections during these operations. B. Protective work shall include wire line and stakes along walkways with cloth strips at 4 feet intervals as evidence of wire and also "KEEP OFF" signs. C. Defer Work when continuation of construction Work must occur over certain lawn areas. 3.7 Maintenance Prior To Acceptance A. Maintain all sodded areas by properly mowing, watering, weeding, and similar care following Pearl s Premium Lawn Maintenance Guidelines to keep Work in a clean and neat condition at all times. Advise Owner's Representative, in writing, when Work is in condition to meet acceptance. 3.8 Conditions Of Acceptance A. Fine Lawns shall be approved to begin one (1) year Maintenance and Guarantee Period based on the following requirements: 1. Bare spots, not greater than 1 square foot, shall be permitted up to a maximum of 3 percent of Fine Lawn Area. B. Sod Areas will be approved to begin one (1) year Maintenance and Guarantee Period based on the following requirements: 1. Sodded areas shall have been mowed at least once since time of installation. 2. Sod shall have shown signs of knitting with topsoil layer and adjoining sod pads. No open joints between sod pads nor sod slippage on slopes will be acceptable. 3. Sod shall be in a thriving and vigorous condition exhibiting a healthy green color. Bare spots or brown spots will not be accepted. C. Low Maintenance, Meadow Grasses and Wildflower Areas: Shall be approved to begin one (1) year Maintenance and Guarantee Period based on the following requirements: 1. Bare spots, not greater than 1 square foot, shall be permitted up to a maximum of 5 percent of 02930, Page 9 of 12

Section 02930 DRAFT Fine Lawn Area. D. During one (1) year Maintenance and Guarantee Period, Owner will do no Maintenance Work, watering or cutting of lawns provided under this Contract. Contractor shall follow Pearl s Premium Lawn Maintenance Guidelines. E. Contractor may use existing underground irrigation systems if available. F. When Work meets conditions specified above, Date of Acceptance shall be date that Guarantee Period commences. Design Professional will notify Contractor in writing of said date. 3.9 Semi-Final Inspection A. Inspection of Work to determine its completion for beginning Maintenance and Guarantee Period will be made by Owner and Design Professional upon written notice requesting such inspection submitted by Contractor at least ten (10) days prior to anticipated date. B. All sodded areas shall be healthy and thriving at time of Semi-final Inspection. C. After inspection, Contractor will be notified of date that Work has been approved for beginning Maintenance and Guarantee Period or, if there are any deficiencies, of requirements for beginning this Period of Work. 3.10 Maintenance And Guarantee Of Fine Lawn Areas and Sodded Areas A. Provide all Maintenance Work following Pearl s Premium Lawn Maintenance Guidelines throughout Guarantee Period, which shall be one (1) year from Date of Acceptance. B. Guarantee Work to be in vigorous and thriving condition by end of Guarantee Period, free of objectionable quantities of weeds and other undesirable growth. Maximum percentage allowed for scattered bare spots shall not exceed 3 percent of fine lawn area. Each bare spot shall not be larger than 1 square foot. C. Maintenance Work shall follow Pearl s Premium Lawn Maintenance Guidelines, including watering, remedial Work such as repair of eroded areas and re-sodding if required. Provide general cleanup of stakes, strings, temporary signs, and sweeping of paving and sidewalks. Cut grass a maximum of 16 cuttings a year. Include other Work as maintenance as necessary, such as lawn feeding, grub control, weeding, broadleaf weed control, as deemed required by Contractor in support of his/her Guarantee, or as may be brought to his/her attention during Guarantee Period. Organic treatments highly 02930, Page 10 of 12

Section 02930 DRAFT recommended. D. Additional organic fertilization and limestone shall be required. Spread one (1) additional application of 10-6-4 organic fertilizer evenly over fine lawn area at rate of 871 pounds/acre and spread one (1) additional application of limestone at rate of 2,000 pounds per acre. Complete applications in fall season of the year approaching termination of Maintenance and Guarantee Period. E. Cutting of fine lawn areas shall occur when grass is dry and to maintain a height of at least 3 inches. Cut grass a maximum of 1/3 of total grass blade height. Sharpen mower blades before each cutting. Maintain a neatly-trimmed edge condition throughout at all times. F. During one (1) year Maintenance and Guarantee Period, Owner will do no Maintenance Work, watering or cutting of lawns provided under this Contract. Contractor will follow Pearl s Premium Lawn Maintenance Guidelines. G. Contractor may use existing underground irrigation systems if available. 3.11 Maintenance And Guarantee Of Low Maintenance Lawn And Meadow Grass Areas A. Provide all maintenance work following Pearl s Premium Lawn Maintenance Guidelines throughout Guarantee Period, which shall be one (1) year from Date of Acceptance. B. Additional fertilization and limestone shall be required. Spread a minimum of one (1) additional application of 10-6-4 organic fertilizer evenly over area at rate of 436 pounds/acre and spread one (1) additional application of limestone at rate of 1,000 pounds per acre. Applications shall be completed in fall season of year. C. Guarantee Work to be in vigorous and thriving condition by end of Guarantee Period. Scattered bare spots not larger than 10 square feet will be allowed up to a maximum of 5 percent of area. D. Maintenance Work shall follow Pearl s Premium Lawn Maintenance Guidelines, including watering as required and remedial Work such as: repair of eroded areas, reseeding if necessary, general cleanup of stakes, strings, temporary signs; cutting of grass as herein specified. Other Work shall be included as maintenance Work if required, as deemed required by Contractor in support of his/her Guarantee, or as may be brought to attention of Contractor in support of his/her Guarantee, or as may be brought to attention of Contractor during Guarantee Period. E. Cutting of grass shall be done when ground is firm enough to prevent ruts caused by mower 02930, Page 11 of 12

Section 02930 DRAFT equipment. Cut meadow grass once per year during late November or early December to minimum height of 18 inches or maximum of 1/3 grass blade length. Cut low maintenance lawns once monthly during growing season to height of 4 inches to 6 inches. F. During one (1) year Maintenance and Guarantee Period, Owner shall do no maintenance Work on lawns provided under this Contract. 3.12 Monthly Worksheet A. Contractor shall submit a monthly worksheet to Owner and Design Professional stating Work performed during Maintenance and Guarantee Period. 3.13 Final Inspection And Acceptance A. Toward end of Maintenance and Guarantee Period, give notice in writing to Owner's Representative stating desired Date for Final Inspection. B. At time of Final Inspection, lawn work shall be in condition required by Maintenance and Guarantee Work specified hereinbefore. C. If Work is accepted at time of Final Inspection, Guarantee shall be considered fulfilled and terminated. Should any Work need replacement at time of Final Inspection, continue Guarantee Period until such re- placements are made and deemed acceptable. D. Design Professional will notify Contractor in writing of Date of Final Acceptance. 3.14 Exclusions From Guarantee A. During Maintenance and Guarantee Period, damage to lawn areas not caused by Contractor shall be excluded from Guarantee. B. Such damage shall include ruts caused by driving vehicles over lawns, excavation and backfill work in lawn areas, or acts of vandalism. C. Where evidence of such damage exists, advise Owner in writing, stating location of damage. Owner, upon receipt of such notice may order Contractor to correct damage at Owner's expense or to exclude damaged area from Guarantee provisions and correct damage by any arrangement deemed by Owner in his/her best interest. END 02930, Page 12 of 12