Gulf Sulphur Services Ltd., LLLP. Hookers Point Terminal - Tank #8 Fires. LEPC November 20, 2013

Similar documents
Risk Management Services

Celtic Exploration Ltd. Well Servicing Incident: Blowout and Fire August 9, 2005

Impairments to Fire Protection Equipment

NATIONAL COMPETENCY STANDARD

Fire System Impairment Policy

IMO DEVELOPMENT OF MODEL PROCEDURE FOR EXECUTING SHIPBOARD EMERGENCY MEASURES. Fire-fighting drills. Submitted by the Republic of Korea

Date Issued: December 14, 2017 Revision: 2.1

Objectives. NFPA Dust Specific Documents. Combustible Dust Process Hazard Safety Overview of NFPA Standards for Combustible Dusts

5.0 CONTINGENCY PLAN. It is necessary to amend the plan if:

Fire evacuation drill

DUQUESNE UNIVERSITY. Fire Protection System Impairment Program (Red etag Permit)

Trinity River Authority of Texas

Root Cause Analysis Report Tesoro Golden Eagle Refinery Refinery Power Outage

Training Toolbox Series. ICA11v1.0 Information, Digital Media & Technology

Beth Israel Deaconess Medical Center BIDMC Manual

Model Policy On Portable Fire Extinguishers (Ontario Version)

LABC Gas Well Incident City Council Report

EMERGENCY ACTION PLANS HOW READY ARE YOU?

Title: Fire Protection Effective Date: 7/1/2013 Control Number: THG_0039 Revision Number: 1 Date: 10/23/2015 Annual Review Completed: 5/13/2015

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

Fire/Arson Investigation Unit Fire Investigation Report

IYRS School of Technology & Trades RCRA CONTINGENCY PLAN Bristol Facility 40 CFR 265 Subpart D 29 CFR Emergency Evacuation

Answer: B Objective: NFPA 472, (c), 4.2.3, 5.2.3(1); Level: Awareness, Operations Subject: Introduction; Chapter 1; Page 5

EMERGENCY PREPAREDNESS: EVACUATIONS

Executive Summary of Qualifications

LABORATORY SAFETY SERIES: Planning For Emergencies

SCALES NW EMERGENCY ACTION PLAN

Management Practices: Fire Protection Impairments November 2015

NY Fire Safety Institute Coordinator of Fire Safety & Alarm Systems F-80

SURREY FIRE SERVICE. Construction Fire Safety Plan Bulletin

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

Beau s Emergency Response Plan

LASER SAFETY TRAINING CATALOG LASER INSTITUTE OF AMERICA S MAKE LASER SAFETY YOUR PRIORITY LASER

NATIONAL HALON MANAGEMENT STRATEGY

Emergency Response Plan

Today, we re going to talk about emergency action and fire prevention. We hope we never have to face an emergency situation like a fire in our

Procedure DESCRIPTION/OVERVIEW

Air Compressor Electrical Fire

Agency for Health Care Administration

Managing Fire Protection System Impairment

LASER SAFETY TRAINING CATALOG LASER LASER INSTITUTE OF AMERICA S MAKE LASER SAFETY YOUR PRIORITY.

Fire Safety Policy 2018/19

Up on the Roof Fire Prevention BY David Laks, P. Eng., CFPS, ARM, RRC

BERKELEY FIRE DEPARTMENT (141 FTE)

DMP & RISK MANAGEMENT PLAN

Local Rules: Fire Safety

Located at: 313 Keystone Drive Shelocta, PA Number of Employees: 194. Net MW. Unit COD Technology. Emission Controls

Health and Safety Plans Health and Safety Policy Statement Fire Prevention Plan Objective

APPENDIX 4J SECURITY AND SURVEILLANCE SERVICES

Health & Safety Policy

PEMBROKE PINES FIRE DEPARTMENT ISO Class 1 Department

CARBON DIOXIDE SYSTEMS FOR BEVERAGE DISPENSING PERMIT REQUIREMENTS

FIRE SAFETY MANAGEMENT PLAN

Hospital Codes, Safety, Exposure Control, Emergency Plans Handout

Summary. firefighter training in Since that time the firefighter had attended semi-annual

EMERGENCY ACTION PLAN

Management of Organizational Change: A CSB Perspective

CAMDEN COUNTY FIRE COORDINATOR

Cedar Hammock Fire Rescue Standard Operational Guidelines FIRE WATCH. General. Requirements for a Fire Watch

Why did we come up with this system?

Brad Goudie May 16, Fire Marshal EMS Emergency Management Fire Department

Township Of Jackson, Fire District 3, Station 55 Standard Operating Guidelines FIRE GROUND STRATEGY

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

West Chester Fire Dept. Fire Code Maintenance Handbook. Fire Prevention Saves Lives and Property

Thomasville fire rescue

Romulus Fire Department 2016 Annual Report

Emergency Action Plan Program

Public Notice of Amendment to New Shoreham General Ordinances Chapter 5 Fire Prevention and Protection New Article IV Fire Alarm Ordinance

Austin Independent School District Police Department Policy and Procedure Manual

School EMERGENCY PLAN

Freezing of Water-Based Fire Protection Systems

SANTA ROSA FIRE DEPARTMENT FIRE PREVENTION BUREAU INSPECTION CHECKLIST

Compliance Guidance for non-technical managers

Renovation Program. Renovation Program GENERAL

Properties that are determined to be architecturally and/or historically significant may be designated as one of the following:

Fire Safety. A TUC guide for trade union activists

City of Richland Stormwater Management Plan

Fire Prevention Plan for St. Barbara Hall 3904 Winding Way

Annex 2 - Shelter-in-Place

GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard

Compliance with Montgomery County Code, Chapter 33B, Pesticides

PASCOE S PTY LTD EMERGENCY RESPONSE MANUAL. (Public Version) SOP 531. July 2015

Sustainable Port Master Planning

Pollution Incident Response Management Plan

WILTSHIRE POLICE FORCE PROCEDURE. Fire Safety Management

FIRE AND ENVIRONMENTAL SAFETY INSPECTOR II

Stillwater Area Community Services Center Inc.

Emergency Response Plan

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

Evacuation Fire Safety Program

Network Chapter Leader Handbook and Other Updates from the October Advisory Board Meeting

ENVIRONMENTAL HEALTH & SAFETY

October 1, Full *2 Sprinkler System

MIT Emergency Response Guide

Comprehensive solutions for greater safety and security Answers for infrastructure.

Emergency Notification Plan. Developed By: Cleveland State University Police Department Office of Emergency Management

SNS Modulator Fire of Friday, March 21, 2008 Fire Marshal Review

FIRE PREVENTION MANUAL CHAPTER 12, FPIB 44 May 14, 2008 EMERGENCY ACTION PLAN (EAP) NON-FIRE EMERGENCIES IN CLASS E OFFICE BUILDINGS 1.

FACILITIES PLANNED UTILITY OUTAGES POLICY

Fire Safety Policy 29/09/2017. Holme Grange School Whole School Policy Including EYFS. Fire Safety Policy

Transcription:

Ltd., LLLP Hookers Point Terminal - Tank #8 Fires LEPC November 20, 2013 James Teets, P.E., Reliability Manager, Savage Services 0

Terminal Operations Savage is the operator of the GSS terminals GSS We design, operate and maintain solutions that solve unique logistics and materials management challenges Savage is a privately held company established in 1946 and currently has 2,500 employees serving Customers at over 150 locations Committed to safety of employees, customers, and neighboring communities Extensive training programs designed to engage all employees in safety Committed to compliance with all governing environmental regulations Savage was awarded OSHA VPP status at multiple sites and selected by EHS Today magazine as one of America s Safest Companies 1

Ltd., LLLP (GSS) GSS GSS Sulphur Terminals Donaldsonville, LA Chicago, IL Galveston, Texas Tampa, FL (Hooker s Point & Port Sutton) Sulphur Critical Element Sulphur is a critical component in phosphate fertilizer production Sulphur is critical to Mosaic who is both a GSS customer and GSS business partner Phosphate fertilizer inputs and products account for approximately 1/3 of the cargo moving in and out of the Port of Tampa 2

Hookers Point Sulphur Terminal GSS Tank No. 8 3

Background Late July, 2013: Holes discovered in roof of Tank 8. GSS management immediately ordered Tank 8 to be taken out of service for repairs This included filling the tank and allowing it to cool. In order to minimize the risk of fire, Tank 8 was filled to approximately 3.5 feet from the roof. The filling of Tank 8 was complete on August 4, 2013, when it was taken off-steam to cool. 4

Background: Continued August 4, 2013, steam was taken off Tank 8 to begin the sulphur solidification process. The tank was locked out & tagged out for maintenance. August 7, 2013, forced ventilation was employed to accelerate the cooling of the sulphur and all four peripheral vents were opened 5

August 8, 2013 Fire 8:10 am: While it was being prepared for decommissioning, a fire ignited inside Tank 8 and we activated the Tank s internal fire suppression system. The steam generated by the fire suppression system combined with the smoke from the fire to produce a cloud that escaped through the holes in the roof. This cloud was visible to the surrounding communities, which alarmed some citizens. The cloud was mostly steam from the fire suppression system, but it did contain a small amount of sulphur dioxide (SO2). Monitoring at terminal perimeter revealed that release of SO2 was within all health & safety regulatory requirements 6

August 8, 2013 Fire, continued 9:00 am: Shortly after we activated our fire suppression system, representatives of the TPA and the Fire Department arrived on-site. We explained the situation and the Fire Department created what is known as a water curtain to help contain the plume. 10:30 am: In an abundance of caution, the Tampa Fire Department ordered a shelter-in-place for parts of south Tampa. 10:57 am: the fire was extinguished and the Fire Department turned off the water curtain. 11:15 am: the Fire Department lifted the shelter-in-place. 7

Immediate Response to August 8 th Fire Drain and clean the tank for inspection. Fully API 653 Internal out-of-service inspection by an independent API certified inspector. Investigation to determine the root cause of the fire and to develop measures to prevent this from happening again. As a precaution, kept Tank 8 s Steam Fire Suppression System partially activated 24 hours per day to reduce the chance of re-ignition. Scheduled meetings with the TPA, the Tampa Fire Department and the Environmental Protection Commission of Hillsborough County. 8

Fire on August 13, 2013 2:00 pm to 2:45 pm: GSS personnel were on the roof of Tank 8 to perform a visual inspection. All was normal and there was no signs of fire inside the tank. The tank was still full of sulphur. The tank was under steam but the sulphur had not yet reached sufficient temperature to start draining it yet. 4:15 pm: We then discovered that Tank 8 was on fire again and then activated the steam smothering system. 9

Fire on August 13, 2013 continued 5:15 pm: We placed a call to the Tampa Fire Department requesting assistance to extinguished the fire. Once again, the large amount of steam generated by the fire suppression system combined with the relatively small amount of smoke from the fire to produce a cloud that escaped through the hole in the roof and was visible to the surrounding communities. Upon arrival of the Tampa Fire Department, the fire was quickly extinguished. Monitoring at terminal perimeter revealed that release of SO2 was within all health & safety regulatory requirements 10

Immediate Response to August 13 th Fire In addition to keeping Tank #8 out of service, GSS took the following steps to minimize the risk of another fire while we continue to drain Tank #8 for inspection and repairs: We hired Southeast Coastal to provide continuous 24 hour per day monitoring of Tank 8 until it was fully drained and ready for inspection. We arranged to have the Tampa Fire Department remain onsite with a fire engine and a crew of fire-fighters as a precaution in the event of a re-ignition, with GSS paying the cost of the engine and fire crew. 11

Immediate Response to August 13 th Fire We hired a contractor to install temporary patches over the holes in the roof in an effort to minimize the risk of further SO2 emissions in the event that another fire ignited inside the tank. We kept tank s Fire Suppression System activated until the tank was fully drained and empty 12

GSS s Response: Cooperation with EPC and Other Agencies Full and Complete Cooperation with EPC and other Government Agencies Numerous Meetings with EPC Staff Issues discussed Incident Interim Measures to Prevent Re-Occurrence Root Cause Investigation Corrective Measures Participation in Sulphur Industry Working Group 13

s Response: Cooperation with Governmental Entities - Continued GSS Meetings with Tampa Port Authority Staff Better Communication and Coordination in Emergencies Participation in the Port s Safety Initiative Cooperation to Develop Improvements to the Port s Public Warning System Meetings with Tampa Fire Department 14

Root Cause Investigation In response to these two events, GSS initiated a Root-Cause- Investigation: Objectives: To thoroughly and comprehensively investigate the two events to determine the root cause, any contributing factors To develop and implement measures to prevent reoccurrence 15

Composition of Investigation Team Investigation team comprised of independent, third-party experts and in-house engineers with expertise in: Independent, API-Certified Tank Inspection Storage tank design and operation API 653 standards Storage tank maintenance and repair Structural engineering Mechanical engineering Chemical engineering Emergency response Fire suppression Pyrophoric Reactions 16

Root Cause Investigation - continued Full API 653 Internal Out-of-Service Inspection has been completed by an API certified Tank Inspector Third-Party Expert (CTI) has determine cause of the fires. Significant Findings: The fire was caused by a pyrophoric reaction The tank s stream smothering system is marginal and should be improved Holes in the roof impaired the effectiveness of the steam smothering system 17

GSS s Root Cause Investigation - continued Findings of Root Cause Investigation Team: Significant Finding: External corrosion is the primary cause of roof holes (not product-side corrosion) The Root Cause: Need to repair areas of roof corrosion more quickly before they develop into holes Contributing Factors: API 653 Inspection Protocols not robust enough for sulphur tank roofs Sub-optimal Emergency Response/Communications Plan 18

Corrective Action Options In Review GSS Inspections: Non-Destructive Inspection Techniques Thermographic Internal Visual PEC (Pulse Eddie Current) Inspect to categorize the current tank condition More Frequent Better Training Corrosion Rate Analysis for Roof Changes to Existing Systems: New Methods to Prevent / Retard Roof Corrosion Coatings - External Improved Insulation Improved Coverings Steam Smothering System Upgrade Alternative Materials of Construction 19

Emergency Response & Communication Improve Education & Communications with local agencies (TPA, Fire Department, EPC, LEPC) Education on sulphur operations & hazards Potential Community Impacts Update Emergency Response Procedures & Communication Plan Annual Emergency Response Drills/Site Familiarization Activities Active Involvement Safety Councils all Ports 20

Current Status & Path Forward GSS Tank 8 currently out of service, repairs in progress pursuant to findings from API 653 Inspection Continue to evaluate Corrective Measures Coordinate with EPC regarding review and implementation of Corrective Measures GSS continue to participate on EPC Industry Group Implement Corrective Measures consisting of overall process, tank inspection, and tank maintenance improvements Implement new Emergency Response Communication & Coordination Plan 21

Presentation by the Environmental Commission of Hillsborough County GSS Mr. Sterlin Woodard, P.E. Assistant Director Air Division Environmental Protection Commission Of Hillsborough County 22

Latest Available Technology (LAT) & Reporting Proposal for Molten Sulfur Storage Tanks EPC Board Use Existing Rules & Permits to: Prevent or Minimize Fires Prevent or Minimize Spills Prevent or Minimize Excess Emissions Improve Emergency Response & Notification

Latest Available Technology (LAT) & Reporting Proposal for Molten Sulfur Storage Tanks Rules Chapter 1-1.07(2), Rules of the EPC Requires the use of Latest Available Technology if it results in or expected to result in lower or improved emissions Chapter 1-3.25(2), Rules of the EPC Prohibits excess emissions caused entirely or in part by poor maintenance, poor operation during startup, shutdown, or malfunction shall be prohibited Chapter 1-1.05, Rules of the EPC Requires 24-hr notification to the EPC of equipment breakdown which could cause air pollution that has the potential to cause significant harm to the environment or represents an immediate threat to public health

Latest Available Technology (LAT) & Reporting Proposal for Molten Sulfur Storage Tanks Corrosion Causes Fires - FeS BMP & Improved Inspection Procedures (API-653) to Prevent Corrosion

Latest Available Technology (LAT) & Reporting Proposal for Molten Sulfur Storage Tanks Improved Reporting 1. Develop Written Emergency Response Plan (24 hr Notification) Tampa Port Authority SWP Fire Rescue EPC 2. Annual Training & Biennial Exercises with Port Authority and Fire Rescue 3. Membership on Tampa Bay Spill Committee & LEPC Facility Disaster Planning Subcommittee 4. Submit copies of API-653 Inspections to EPC

GSS is committed to safety and being a good neighbor Discussion and Questions 27