Southern Windsor County RPC Transportation Project Priorities January 2015

Similar documents
Southern Windsor County RPC Transportation Project Priorities Methodology January 2016

1.0 INTRODUCTION 1.1 TH 14 WEST STUDY AREA Project Description Functional Classification Purpose of the Project

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

Programmatic Implementation of ABC: Module 5 Public Outreach/ABC Results

Southern Gateway Project and Public Green

2.0 PURPOSE AND NEED. 2.1 Purpose. 2.2 Need Traffic Congestion in and around Downtown Derry

FY 2018 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

WELCOME TO OPEN HOUSE TWO November 28, 2018

Fall 2017 Construction Update

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Proposed FY 2004 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects

APPENDIX A. Meeting Agendas, Public Input, and Meeting Materials

Middlebury RS 0174(8)

Berkshire Regional Planning Commission Clearinghouse Review Report

COMMUNICATION URBAN DESIGN REVIEW BOARD CITY OF DES MOINES, IOWA MAY 16, 2017 MEETING

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Update. What is the Osborne Bridge Rehabilitation project all about and how is it being planned? Neighbourhood Advisory Committee (NAC)

THREE-YEAR CAPITAL IMPROVEMENT PLAN FY

I-90 Mississippi River Bridge & Interchange Project

Chapter 1 - General Design Guidelines CHAPTER 1 GENERAL DESIGN GUIDELINES

MALLETTS BAY INITIATIVE

Overall Map. Chicago. St. Louis. Summit. Joliet. Dwight. Pontiac. Bloomington-Normal Lincoln. Springfield. Carlinville. Alton EXPERIENCE IT YOURSELF.

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Project Goal. RRRC Living Towns Planning Workshp. Town of Halifax Revitalization Project. Dynamic Planning & Management Duo: July 12, 2006

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL PRESENTATION AUGUST 22, 2017

A RESOLUTION SETTING FORTH CATS S COMMITTMENT TO COMPLETE STREETS

FDOT D4 Complete Streets

5.0 IMPLEMENTATION STRATEGIES

Access Management: An Overview

Transportation Projects Quarterly Report. Morrisville Planning Department May 22, 2018

Concord, BRF-X-5099 (021), Draft Alternative Analysis

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

South Davis County COMMUNITY SPOTLIGHT

The Ambassador Bridge/ Gateway Project

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

4-Town Comprehensive Plan DRAFT 7/30/07

Below the trestle lie artifacts of past industry along the Cobbossee Stream. South end of the trestle, at the proposed trailhead area.

495/MetroWest Development Compact Plan Citizen Planner Training Collaborative Conference. March 17, 2012

Preliminary Plan Framework: Vision and Goals

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Bucks Bar Road Bridge Project Public Informational Meeting Wednesday, January 6, 2010

SH 199 Corridor Master Plan. Community Meeting No. 2 May 31, 2017

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

Hunt Highway CELESTE PEMBERTON, CFM, CPM PINAL COUNTY CARLOS SANCHEZ SORIA, PE T.Y. LIN INTERNATIONAL

Spring 2018 Construction Update

1 PURPOSE AND NEED 1.1 PURPOSE OF THE PROPOSED ACTION 1.2 NEEDS FOR THE PROPOSED ACTION

Long Branch-Wayne Local Park Renovation Project

Route 1 Corridor Study

Municipality of Anchorage. Community Council Survey Capital Projects Needs Ranking Survey (ALPHABETICAL) Airport Heights

District of Muskoka Transportation Study

Main Street Reconstruction From Ninth Line to Stouffer Street. Town of Whitchurch-Stouffville. Public Information Centre

FOSTER COMPREHENSIVE PLAN UPDATE CIRCULATION

DESIGN PUBLIC HEARING MAY 10, 2018 GRANBY TOWN HALL FIRST FLOOR CONFERENCE ROOM 10 WEST STATE STREET GRANBY, MASSACHUSETTS 7:00 PM FOR THE PROPOSED

TORONTO COMPLETE STREETS GUIDELINES

Henderson County Project Prioritization Discussion

Introduction to the Project

CURRICULUM VITAE REZA MARSHAL, MECE, PE, PTOE

Rappahannock- Rapidan Regional Commission

Victoria Bridge Municipal Class EA Civic Works Committee

Public Information Centre. Welcome

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

Engineering Department

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

Town of Corinth Road Erosion Inventory Report

Capital Projects in and near Odenton Town Center

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

Memorandum CITY OF DALLAS

I. DESCRIPTION OF PROPOSED ACTION... 1 A. General Description... 1 B. Historical Resume and Project Status... 2 C. Cost Estimates...

Town of Vershire Road Erosion Inventory Report

North Carolina Department of Transportation Project Development and Environmental Analysis Branch

ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET ARROYO PROJECTS

IMPLEMENTATION STRATEGIES. In This Chapter. Goals & Strategies 182 Project List 183 Future Land Use 186 CHAPTER 11 IMPLEMENTATION STRATEGIES

ARGENTA TRAIL (CSAH 28/63) REALIGNMENT SOUTH PROJECT (CP 63-25)

Cottage Grove Road Reconstruction. City of Madison Engineering

foi"#'.w County Road Needs Report i*"-i"s;a,i=?;;,#'1 County udges' Association of Arkansas 20L7 Annual Winter Meeting le0isrtnet tta shsl201-7

County Transportation Plan Workshop

Page. I. Introduction 1. II. Project Purpose and Need 2. IV. Description of Section 4(f) Property 2. V. Impacts to Section 4(f) property 3

LITTLE ELM CAPTIAL IMPROVEMENT BOND STREET PRESENTATION

1. Lenox Dale Community Character Strengths and Opportunities Identified by Residents: Strong neighborhood identity and sense of community.

DRAFT SCOPE OF SERVICES PEER REVIEW OF BAKER PARK. Request for Qualifications (RFQ)

Appendix E Preliminary Location Hydraulic Study

TOWNSHIP OF HOWELL TOWNSHIP OF HOWELL ENGINEERING PROJECTS STATUS REPORT OCTOBER 19, Resurfacing of Aldrich Road West Contract # 11-06

Windsor Locks Transit-Oriented Development Planning Grant Request. Project Background

CTH C RESURFACING Douglas County, Wisconsin

City Center Specific Plan Amendments And Background Report City of Richmond. PLANNING COMMISION FINAL DRAFT January, 2001

Trail Feasibility and Planning Project for Northern Dutchess County, New York

2013 Paving Program. Erik T. Deyoe, P.E. Commissioner of Public Works & Interim Superintendent of Highways. 26 June 2013

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

Agenda Summary December 11, 2017

ARROYO PROJECTS ADOPTED CAPITAL IMPROVEMENT PROGRAM BUDGET

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

Public Meeting. US Highway 14 (6TH Street) from Main Ave to Medary Ave Urban Reconstruction Project Brookings, SD P-PH 0014(179)419 PCN 027B

BeltLine Corridor Environmental Study

Commissioners Road West Realignment Environmental Assessment

Services Department B September 10, 2007

Transcription:

Southern Windsor County RPC Transportation Project Priorities January 205 The Southern Windsor County Regional Planning Commission (the RPC) has been evaluating and prioritizing transportation projects in the Region for more than 5 years based on an established evaluation process. This evaluation process was developed by staff with the assistance of the regional Transportation Advisory Committee (TAC). The intent of the evaluation process is to determine how well projects correspond with the priorities established in the Regional Transportation Plan. In 2005, the state Transportation Bill (H.523) was passed requiring the Agency of Transportation (VTrans) to develop a project prioritization system to serve as a basis for the annual transportation capital programming process. This legislation included a requirement for VTrans to use RPC priorities as a criterion in the state prioritization system. The RPC modified the previously established regional project evaluation process based on VTrans guidance, and established regional priorities in the summer of 2005 for the FY 2007 capital programming process. The RPC has continued to prioritize projects annually in response to both Legislation and VTrans guidance ever since. Criteria for Prioritizing Programmed Transportation Projects The process used by the RPC includes the following criteria in evaluating programmed transportation projects: Impact on Congestion & Mobility The impact on congestion and mobility are indicated by a LOW or HIGH. This determination is based on consideration of the identified problem and if the proposed solution will likely reduce congestion or improve mobility. Alternative Routes Alternative routes are indicated by a YES or NO. A YES indicates that an alternative route is available to maintain a flow of traffic in the event the bridge or roadway section is closed or restricted. Importance for Economy Importance for the economy is indicated by a LOW or HIGH. HIGH indicates that the bridge or highway segment serves a vital importance in the linkage of the local, regional or state economy. LOW would indicate a lesser importance. Factors considered for this criterion include location relative to the state truck network, National Highway System, regional economic development plans, local zoning bylaws, town plan objectives, etc. Social / Cultural Importance The functional importance the highway segment or bridge in the social and cultural life of the surrounding communities is indicated by a YES or NO. YES indicates significant social or cultural importance, which might be based on historical resources, recreational opportunities, access to civic facilities, environmental considerations, etc. Conformance with Local & Regional Plans The conformance with local and regional plans is indicated with a YES or NO. Local Support Local support was determined through consultation with town managers, selectboards, TAC representatives and the general public. The following additional criteria are only used to determine priorities if two projects are tied: Sufficiency Ratings Roadway and bridge sufficiency ratings have been used by the RPC for years to understand the relative condition of each roadway section or bridge, with particular attention to the worst conditions. The most recent available ratings information from VTrans may be used as needed. For bridges, additional information including condition assessments of the decking, superstructure and substructure were also noted. Southern Windsor County RPC Transportation Project Priorities For Regional Prioritization January/ February 205

AADT Annual Average Daily Traffic (AADT) figures may be used as needed to estimate the traffic levels at each location, with particular emphasis on the most heavily traveled areas. The most recent data from VTrans or the RPC are used. High Crash Location High Crash Locations (HCL) are indicated by a YES or NO. Particular emphasis is given to areas of significant safety concern. Recent and historic crash data from VTrans were used. Criteria for Prioritizing Town Highway Bridge Pre Candidate Needs In autumn of 2009, the RPC was asked by VTrans to help to identify and prioritize pre candidate projects for the Town Highway Bridge Program. Following VTrans guidance, the RPC worked with the TAC, town highway departments and other town officials to develop a list of the top 8 pre candidate town bridge projects. Criteria used to evaluate Town Highway Bridge pre candidate needs are similar to the above criteria, with a few modifications: Structure Condition Based on VTrans most recently provided bridge inspection data, including the following sub criteria: o Deck Rating o Superstructure Rating o Substructure Rating o Culvert Rating AADT See above High Crash Location See above Impact on Congestion & Mobility See above Alternative Routes Based on two sub criteria: o Alternative Routes are indicated by a YES or NO. A YES indicates that an alternative route is available to maintain a flow of traffic in the event the bridge or roadway section is closed or restricted. o Detour Length is indicated in miles, based on data from VTrans. Importance for Economy See above Social / Cultural Importance See above Conformance with Local & Regional Plans See above Local Support See above Town Highway Bridge pre candidate needs are then added to the overall project prioritization list as a separate category. Local and Regional Comments Comments are also listed with each project on the attached spreadsheet. They consist of additional information gathered to help evaluate projects and/or documenting input collected during the consultative process. RPC staff contacted all town managers or other town representatives to get input into the regional evaluation process, to determine local support and to re evaluate last years priorities. Determining priorities TAC and RPC Board The TAC then meets to determine priorities based on the above criteria, goals and policies of the Regional Transportation Plan, and local knowledge. Then, the RPC Board of Commissioners accepts the TAC priorities based on the TAC s recommendations. Southern Windsor County RPC Transportation Project Priorities For Regional Prioritization January/ February 205

Southern Windsor County Regional Planning Commission Project Prioritization for FY 207 Prioject prioritization follows guidance from the Legislature and VTrans. Project timeline - Candidate > D&E > Front of Book D&E =Development and Evaluation PC = Pre-Candidate Town Highway Bridge List FOB = Front of Book N/R= Not Ranked 205 RPC RANK TIMELINE TOWN NUMBER DESCRIPTION RPC/ TOWN COMMENTS PAVING CHESTER- SPRNGFIELD- ROCKING STP 2952() RESURFACE VARIOUS CLASS I ROUTES: CHESTER: VT (0.833 MILE), VT03 (.667 MILES); SPRINGFIELD: VT (2.82 MILES), VT06 (0.058 MILE); ROCKINGHAM (BELLOWS FALLS): US5 (.493 MILES); AND WINDSOR: US5 (0.800 MILE), AND VT44 (3.335 MILES). Class Town Highway paving projects for Chester, Rockingham, Windsor and Springfield due to be done summer 205. 2 ROCKINGHAM- CLARENDON NH SURF(49) RESURFACE VT 03 BEGINNING AT THE US 5/VT 03 INTERSECTION IN ROCKINGHAM AND EXTENDING NORTHERLY 42.036 MI. TO THE VT 03/US 7 INTERSECTION IN CLARENDON. OMIT CHESTER AND LUDLOW CLASS I. While VT-03 was only relatively recently repaved, the goal is to keep the roadway in good condition with regular maintenance which requires less funds than letting it fall into disrepair and then having to fund major rehabilitation or reconstruction. 3 New project (first requested in 202) WEST WINDSOR RESURFACE VT-44. 202 Request from Tom Kenyon. Try to coordinate project with sewer work in 205 by West Windsor along VT-44 if possible. 4 5 CAVENDISH- WEATHERSFIELD CHESTER- SPRINGFIELD ER STP 046(4) STP 2942() REHABILITATION OF VT3 IN CAVENDISH AND WEATHERSFIELD, BEGINNING AT THE VT03 INTERSECTION AND EXTENDING EASTERLY 8.974 MILES TO THE VT06 INTERSECTION. INCLUDES IMPROVEMENTS TO AREAS THAT SUSTAINED SUBSTANTIAL DAMAGE AS A RESULT OF TS IRENE. RESURFACE VT0 IN CHESTER AND SPRINGFIELD, BEGINNING AT THE VT03 INTERSECTION AND EXTENDING EASTRLY 4.373 MILES TO THE VT06 INTERSECTION. Project was delayed due to expanding scope of project. 2/9/205 Town manager has new concerns on roadway concerning line of sight - resulting from reconstruction of Bridge in Whitesville in 204. Was previously scheduled for construction in 205, but was pushed out since the quick paving job in 203 is doing well. 2/4/205 Chester Selectboard has some safety concerns - especially the steep curve about 2 miles in. ROADWAY S D&E CAVENDISH- LUDLOW NH F 025-(30) RECONSTRUCTION OF VT 03 IN CAVENDISH AND LUDLOW, BEGINNING 0.896 MILE NORTH 0F THE VT3 INTERSECTION AND EXTENDING NORTHERLY.3 MILES, INCLUDING THE REPLACEMENT OF BRIDGE NOS. 23 AND 24. "Smithville Reconstruction". Was slated for deletion in 20, but VTrans kept the project. Project scope to be reconsidered with VTrans & towns. Project has been moved from Front of Book in 204 rankings to D&E SAFETY & TRAFFIC OPERATIONS LUDLOW HES SGNL(44) INSTALLATION OF A NEW TRAFFIC SIGNAL AT THE INTERSECTION OF VT03 AND VT00 NORTH IN LUDLOW. Required as part of an Act 250 permit. Traffic analysis now suggests that traffic levels warrant a traffic signal. Southern Windsor County Project Prioritization for FY 207 Page of 2

Prioject prioritization follows guidance from the Legislature and VTrans. Project timeline - Candidate > D&E > Front of Book D&E =Development and Evaluation PC = Pre-Candidate Town Highway Bridge List FOB = Front of Book N/R= Not Ranked 205 RPC RANK TIMELINE TOWN NUMBER DESCRIPTION RPC/ TOWN COMMENTS STATE HIGHWAY BRIDGES ANDOVER BHF 06-(29) 2 CANDIDATE CHESTER BF 025-( ) REHABILITATION OF BRIDGE NO. 4 ON VT IN ANDOVER, OVER THE MIDDLE BRANCH OF THE WILLIAMS RIVER. SCOPING TO EVALUATE ALTERNATIVES FOR BR4 ON VT03 IN CHESTER (north of Gassetts), OVER THE WILLIAMS RIVER AND THE GREEN MOUNTAIN RAILROAD. 205 - Town Regional Concerns meeting in March 203. Construction schedule moved forward to 205 due to major scour issues. 205 - Town has no particular comments except that it is on a major route in the area. TOWN HIGHWAY BRIDGES LUDLOW BRF 025-(42) 2 Candidate SPRINGFIELD BF 2500( ) 3 Candidate NORTH SPRINGFIELD BO 442( ) 4 Candidate CHESTER BO 442( ) 5 D&E CAVENDISH BO 442 ( ) 6 Candidate LUDLOW VILLAGE BO 443( ) REPLACEMENT OR REHABILTATION OF BR25 (Walker Bridge) ON VT03 (Main St) IN LUDLOW, OVER THE BLACK RIVER. SCOPING TO EVALUATE ALTERNATIVES FOR BRIDGE NO. 62 (McDs) ON VT (RIVER ST.) IN SPRINGFIELD, OVER THE BLACK RIVER. SCOPING TO EVALUATE ALTERNATIVES FOR BRIDGE NO. 56 (Willard) ON TH6 (Main St North Springfield) IN SPRINGFIELD, OVER GREAT BROOK. SCOPING TO EVALUATE ALTERNATIVES FOR BRIDGE NO. 62 ON TH8 (Thompson Rd) IN CHESTER, OVER THE WILLIAMS RIVER. SCOPING TO EVALUATE ALTERNATIVES FOR BR58 ON DEPOT ST (TH) IN CAVENDISH, OVER THE BLACK RIVER. SCOPING TO EVALUATE ALTERNATIVES FOR BRIDGE NO. 57 ON TH324 (MILL ST.) IN LUDLOW VILLAGE, OVER THE BLACK RIVER. 2/9/205 (Town Manager). Regional Concerns meeting in Spring 202. Construction delayed and most likely will not occur until 207. Top town priority. 2/6/205 (Town Manager). Top town priority. Cannot do small fixes anymore. Needs new decking. Very high traffic volume and vital connection for traffic through town. 2/6/205 (Town Manager). Need for this bridge replacement for ongoing access to the Industrial Park. 2/7/205 (Road Foreman) - just been weight posted for 5 tons. 2/0/205 (Town Manager and Road Foreman). Beyond the Town's ability to fix - particularly with issues of proximity to VT-03 (within 0ft of the fog line). May need to relocate bridge. Serves 2 homes and a dairy farm. 2/9/205 (Town Manager) - Scoping started - VTrans reached out to town for initial questionnaire in Feb 204. Road Foreman says weight limit is now down to 5 tons and just added steel plate in 202/203, but maybe not be able to add more in future. Weight limit been applied for 4.5 years - so service trucks (including oil) using different route. 2/9/205 (Town Manager). Town Priority 4. Town wants to keep the bridge on the list, but low priority. Currently closed to traffic. Served as pedestrian bridge until damaged by Irene so now no one can use the bridge. Historic metal truss. Want to replace bridge with a pedestrian bridge, but since historic, need to restore. Project priorities determined by the SWCTAC at the February 25, 205 meeting. Project priorities confirmed and approved by the SWCRPC Board at the March 24, 205 meeting. Prioject prioritization follows guidance from the Legislature and VTrans. "PC" - Before 205 SWCRPC prioritized "Candidate" bridges with the Pre-candidates. From 205 onwards they are prioritized with FOB and D&E projects. Starting 204, no longer rank Bike & Pedestrian Facilities, Park & Ride Lots Southern Windsor County Project Prioritization for FY 207 Page 2 of 2

Southern Windsor County Regional Planning Commission Prioritization of Pre-Candidate Town Highway Bridge Projects in 205 RPC Rank Town Bridge Number Road Name Location River crossed RPC/ Town Comments Windsor Br. 55 Main St (US 5) 2 Springfield Br. 79 Park Street 3 Ludlow Br.7 4 Andover 5 Ludlow Br. 9 (High) Br. 26 (Vail) Pleasant St Extension Weston Andover Rd Main St (VT 03) 6 Windsor Br. 24 Brook Road 7 Weathersfield Br.63 Ascutney Basin Road 0. MI S JCT. VT.44 Near Main Street Mill Brook Black River 2/9/205 (Town Manager). The bridge was given a cursory inspection after Irene. While it was not determined that repairs were required as a result of the storm the retaining wall, apparently owned by the American Precision Museum just upstream (and attached to the bridge) suffered considerable damage. The end result is that the bridge is in marginally worse condition, the retaining wall is in poor condition. 2/6/205 (Town Manager). Town top priority after McDonalds Bridge. Deck issue. Important connection within town. 0. mi Jct VT03 Black River 2/9/205 (Town Manager). Town Priority 2 (after Walker which is a Candidate). Process access to 75 jobs and west side of town. 3.8 mi N Jct VT. (west of campground) 0. mi N Jct VT00 South 0.3 mi to Jct with TH6 0.02 mi to Jct with VT06 Trout Brook Jewell Brook Mill Brook North Branch Black River 2/6/205 (Road Foreman) Added to list by town in 202. High town priority. Approaches fixed a few years ago but problem recurring (big bumps on both approaches to bridge). Will need replacement in about 3 years according to Mark Pickering. At the moment they are just doing patches to keep it going. Town may also try to apply for funds through Structures program 2/9/205 (Town Manager). Town Priority 3 (after Walker and Br 7). Critical for getting through town. 2/9/205 (Town Manager) Bad alignment. Bridge deck needs a lot of work. Spaulded down to the rebare. Rusting out. Problems getting worse 2/3/205 (Town Manager). Needs work. Bridge approach (apron) moved during Irene. Bridge now sealed concrete rather than asphalt on top of concrete. If do work, would also need to upgrade to current hydraulic standards. The following towns did not have any bridges for the pre candidate list this year Reading (2/7/205 SB Chair), Cavendish (2/9/205 Town Manager), Chester (Town Manager and Road Foreman 2/0/205), and West Windsor (2//205 SB Chair). The following bridges were removed from previous year all those which are now candidates, and Br 22 on Brook Road in Windsor (2/9/205 Town Manager Notes: Priorities were determined by the SWCTAC at the February 25, 205 meeting. Priorities were confirmed and approved by the SWCRPC Board at the March 24, 205 meeting. Prioject prioritization follows guidance from the Legislature and VTrans. Before 205 SWCRPC prioritized "Candidate" bridges with the Pre-candidates. From 205 onwards they are prioritized with FOB and D&E projects since they have funding for starting scoping.