Liebert CRV Warranty Inspection Check Sheet

Similar documents
Liebert DataMate (1-3 Ton) Warranty Inspection Check Sheet

Liebert InteleCool Warranty Inspection Check Sheet

Liebert Fin/Tube Condenser Warranty Inspection Check Sheet

Liebert Xtreme Density Chiller (XDC) Unit Warranty Inspection Check Sheet

Liebert Small System MCD and PFH Condensers (1-5 Ton) Warranty Inspection Check Sheet

Liebert Challenger 3000/Liebert Challenger ITR with Liebert icom Control. Operation & Maintenance Manual - 50 & 60Hz

START UP FORM PACKET

Service Step by Step Trouble-Shooting Check-List

START UP FORM PACKET

Liebert CSU3000 Chiller

/ No. (\01. la-ejl~ Withthe MainDisconnectOFFcheckthe following: Owner Address I~O ~.Cc:t\". ~\\A. Contact Name, Contact Telephone # Installation Date

BasicTroubleshooting Information and Guidelines

SA Series Start up Report

Series 9. Commissioning Checklist. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

YCIV Hz & Hz

MASTER JOCKEY PUMP CONTROLLER. Model JPCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

SA Series Startup Form

Liebert PDX and PCW Thermal Management Systems

MODEL YVAA EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST CUSTOMER: LOCATION: ADDRESS: CUSTOMER ORDER NO: PHONE: JCI CONTRACT NO: JOB NAME:

EQUIPMENT PRE-STARTUP AND STARTUP CHECKLIST TEL NO: ORDER NO: CONTRACT NO:

KITS COMMON TO HEATING AND COOLING EQUIPMENT 504,652M 03/04. Supersedes 503,249M

MASTER PRESSRE MAINTANENCE CONTROLLER. Models PMCE INSTRUCTION MANUAL. C 2018 Master Control Systems, Inc

P-Series, Vertical Floor-Mount Units

KRSCP Self-Contained Walk-In Unit Installation and Service Manual Addendum

For an administrative fee of $9.97, you can get an un-locked, printable version of this book.

Installation Instructions

Trouble Shooting Guide FAA, 3-phase (D3631)

TABLE OF CONTENTS. NOTE: Read the entire instruction manual before starting the installation. TROUBLESHOOTING... 13

Surna 25-Ton Chiller Operating & Maintenance Manual

MODEL URS-1: FACTORY RETROFIT PROGRAM

Liebert Datamate: R-407C Parts Manual

Mortex INSTALLATION INSTRUCTIONS AIR CONDITIONING & HEAT PUMP INDOOR COILS

CENTRAL, SPLIT SYSTEM REFRIGERATED AIR-CONDITIONING INSPECTION INTERIOR

CAUTION. No-Load Performance, Controls in Normal Position

MAC N-407 Air-Cooled Chiller

Series 6, Vertical Floor-Mount Units

SECTION 7 AIR CONDITIONING (COOLING) UNIT 41 TROUBLESHOOTING

M2 Series Startup Form

Installation, Operation and Maintenance Manual

URS-1 SERVICE AND PARTS MANUAL SERIAL NUMBERS: UP TO

M2 Series Startup Form

OWNER S MANUAL. Vintage Classic HEAT COOL models. Proudly Made in the USA

Trouble Shooting Guide PWA, 3-phase (D10571)

Data Aire, Inc. reserves the right to make design changes for the purpose of product improvement or to withdraw any design without notice.

TWLC - Tempered Water Logic Controller. The Intelligent Control

Installation Instructions

F1 Series. Installation, Operation & Maintenance. Indoor Air Handing Units WARNING WARNING WARNING NOTICE QUALIFIED INSTALLER

Electric Heat Inspection Form Revised September 2012

Bottom Mount Refrigerator---Technical Information

4A6H5042G1000A 208/230/1/ DURATION - SCROLL 3/4 208/230/1/ NO (Use BAYKSKT263) YES YES PROPELLER DIRECT

JBL2088HES JBL2088HES0, JBR2088HES JBR2088HES0, JFC2089HEP JFC2089HEP0, JFC2089HES JFC2089HES0, JFC2089HPF JFC2089HPF0, JFC2089HPY JFC2089HPY0

AFI2538AE* AFI 2538AE*0, MFI2568AE* MFI2568AE*0 CAUTION

Liebert DSE Thermal Management System

INSTALLATION AND OPERATIONAL MAINTENANCE MANUAL

CAUTION. No-Load Performance, Controls in Normal Position. Percent Run Time ±10%

R-410A AFFINITY SERIES DEX DEY Ton

Owners Manual UA75 TO UA1200 SERIES Refrigerated Air Dryer

Horizon Elite Ice Machine Installation Instructions for Remote Condensing Unit

INSTALLATION AND OPERATIONAL MAINTENANCE MANUAL

Installation Instructions

Table of Contents. Service Procedures. Service Procedures. Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8)

Trouble Shooting Guide RAA, 1-phase (D3627)

Trouble Shooting Guide PAA, 1-phase (D3731)

Installation Instructions

Condensing Unit Installation and Operating Instructions

Installation Instructions

4TTB3060D1000B 208/230/1/60 35 SCROLL /230/1/ /8

Installation Instructions

CHILLER. Operator s & Installation Manual

Air-Cooled Split-System Condensing Units for Rooftop Systems and Air Handlers Models RCS 10E to 20E 10, 12.5, 15 & 20 Tons

CS/CD/CP AIR COOLED CONDENSING UNITS (P/N E207120C R2)

Installation Instructions

Due to a possibility of personal injury or property damage, always contact an authorized technician for service or repair of this refrigerator.

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS

Series 11, Ceiling Units

Installation Instructions

CROWN. Boiler Co. Santa-Fe Series. Hydronic Air Handlers INSTALLATION, OPERATION & MAINTENANCE INSTRUCTIONS

Installation, Operating & Maintenance Instructions. Horizontal Models: LH & HL

Cased Aluminum Coils "Dedicated Upflow / Downflow" Convertible to horizontal with separately purchased kit

7/8 NO NO NO PROPELLER DIRECT / /230/1/ SPINE FIN /8 8 LBS., 0 OZ. YES 7/8 3/8

Installation Instruction

Emerson Blue Easy Set 1H/1C

Packaged Air Conditioning Units. Owner s Guide to Operating and Maintaining Your Air Conditioner. This manual should be left with the owner.

INSTALLATION AND OPERATING INSTRUCTIONS

MACH N-407 Heat Pump Air-Cooled Chiller

AquaSaver DISPOSER CONTROL CENTER Installation Manual. Model AS-101K

Owners Manual Refrigerated Air Dryer MHT SERIES

DANFOSS OPTYMA PLUS INVERTER UNITS

CHILLER. Model CH3000. Operator s & Installation Manual

Installation Instructions

Installation Instructions

AE R1 October to 5 Ton ZPS*K6 Copeland Scroll Two-Stage Compressors

INSTALLATION AND OPERATING INSTRUCTIONS (2 Through 10-ton Air Cooled Single Stage Chillers)

Installation Owner Diagnostics

Bulletin (Jan 2011) And User s Guide

NetworkAIR FM Precision Air Conditioner. Installation

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION

Instruction Manual. Bottle Cooler. Models HBC-50 (-S) HBC-65 (-S) HBC-80 (-S) HBC-95 (-S) hoshizakiamerica.com. Issued: Revised:

Emerson Inspire 1HDEZ Installation Instructions. Thermostat/Interface Equipment Control TROUBLESHOOTING

APPLICATION GUIDELINES FOR COPELAND COMPLIANT SCROLL COMPRESSORS (ZR*1 Models)

Transcription:

The following information must be fully completed and forwarded to your local Liebert sales office to establish your equipment warranty. Installer Address Owner Address Owner e-mail address Date of Installation Was the unit received in good condition? Yes No If no, has the carrier been notified? Yes No Have the manuals been kept with unit? Yes No PRE-START-UP CRV Serial Number: CRV Model Number: Condenser / Drycooler Serial Number: Condenser / Drycooler Model Number: Compressor Serial Number: Compressor Model Number: Page 1 of 7

Arc flash and electric shock hazard. Open all local and remote electric power disconnect switches, verify with a voltmeter that power is off and wear personal protective equipment per NFPA 70E before working within the electric control enclosure or any hazardous voltage electric connection enclosure. Failure to comply can cause serious injury or death. With the electric power to the unit OFF check the following items as noted: Internal piping clamps tight and secure on Evaporator and Condenser. Field piping properly supported and secure. Hot Gas line pitched according to User Manual. Field piping trapped according to User Manual. Field piping properly sized according to the User Manual. ALL electrical connections are tight and properly terminated on Evaporator and Condenser/Drycooler. Heat Rejection Interlock wiring has been correctly installed between Evaporator and Condenser/Drycooler (70 and 71). CAN Communication cable has been correctly installed between Evaporator and Condenser Equipment is installed level. Remove all debris from unit area. Water supply line(s), condensate pump, or gravity drain connections are tight and do not leak. Drain lines are open and clear of dirt and debris. Duct work is complete, and secured. (If Applicable) Verify Proper Water/Glycol Maintenance/Treatment has been performed. Yes Strainers No (if no, conformation available please inform end user) Shut off valves Rack Sensors installed. Number of Rack Sensors Page 2 of 7

Filters installed in the unit? Filter Size Quantity Evaporator Inspection Risk of electric shock, contact with high speed moving parts and hot surfaces, Can cause serious injury or death. Use extreme caution when working inside the unit cabinet of an energized unit near bare live hazardous voltage terminals, high speed moving parts such as EC fan blades and hot surfaces such as motors, heater elements, hot gas lines, and humidifier bottle. 1. Check voltage at disconnect and record. L1-L2 L2-L3 L1-L3 Arc flash and electric shock hazard. Wear personal protective equipment per NFPA 70E before working within the electric control enclosure or any hazardous voltage electric connection enclosure. Use extreme caution when checking the status of live hazardous voltage circuits. Failure to comply can cause serious injury or death. Check unit electrical phasing with a phase meter. If phasing is incorrect, change wiring at input source to unit. Do not change any unit or component phasing. Check the compressors for proper rotation by bumping the contactors and watching the gauge pressures. If the pressures are equalized and the compressor sounds noisy, then compressor is running backwards. 2. Close all local and remote electric power disconnect switches. Verify with a voltmeter that power is on and the supply voltage matches the marked unit voltage rating. 3. Check and record control voltage transformers for proper output. (Secondary voltage should not be under 23 VAC or exceed 27 VAC under load, change tap if necessary). T1 Volt 4. Record icom Software Version Note: The software version is located in the Network Menu that is located in Service Menus. Note: Test all devices through the Service Menu in the Service Menus. The fans must operate to test each device. Page 3 of 7

5. Enable Manual Mode. 6. Enable Fans and record Main Fan amperage. L1 L2 L3 Fuse/Circuit Breaker L1 L2 L3 Fuse/Circuit Breaker Note: For 300mm (12 inch) CRV individual fan current draws are not required. Record only the total current draw of all fans. 7. Enable Reheats and record amperage. Disable Reheats after test. L1 L2 L3 Fuse/Circuit Breaker 8. Enable Humidifier; allow bottle to fill. Record amperage. Drain bottle and check for leaks at all piping connections. Disable Humidifier after test. Risk of electric shock and contact with extremely hot parts, can cause serious injury or death. Use extreme caution when working near bare live hazardous voltage terminals or energized humidifier bottle. L1 L2 Fuse/Circuit Breaker 9. Check condensate pump for proper operation by filling pump with water. Check for leaks at all piping connections. Record pump amperage. (If Applicable) Risk of electric shock and contact with hot motor surfaces, Can cause serious injury or death. Use extreme caution when working near bare live hazardous voltage terminals or the energized condensate pump motor. Do not remove the condensate pump electric connection terminal cover. Use extreme caution and do not spill water on the motor or the electric connection cover. L1 L2 Fuse Chilled Water units Page 4 of 7 a. Set parameter S344 (Manual CWV (Anaout2)) to 100%. Verify the valve strokes open completely. b. Change parameter S344 to 0%. Verify the valve closes completely. c. Check for leaks at all piping connections. d. Chilled water supply temperature: e. Chilled water Supply GPM:

Compressorized Units Notes: On air cooled systems an initial refrigerant charge of at least 75% to 80% of the calculated charge should be added to the circuit before starting the compressor. Digital compressor must be at fully loaded operation. 10. Enable compressor in the Charge Mode and allow the system to operate for 10-15 minutes. Air-Cooled Condenser w/fan Speed Add additional refrigerant to obtain the proper superheat and subcooling for fan speed model condensers. Refer to associated condenser warranty inspection sheet for additional information. Air-Cooled Condenser w/lee-temp On the receiver at the condenser there are two refrigerant-level sight glasses. Refrigerant level will vary with outside temperature. Check refrigerant level after the system has been on for at least 15 minutes. Add additional refrigerant to achieve refrigerant level based on the ambient condition. Ambient Temperature a. Sight Glass Level (Check appropriate box) 40 F (4.5 C) and lower bottom sight glass is 3/4 full 40 to 60 F (4.5 to 15.5 C) bottom sight glass is full 60 F (15.5 C) and higher top sight glass is 3/4 full b. Record Voltage to Heater Pads Volts Water/Glycol System Operation If the system has balancing valves in it, these valves should be adjusted for the proper water flow required for the unit. After the valves have been set up properly, the system should be allowed to run for 10 to 15 minutes to obtain stable conditions. Entering condenser water/glycol temperature Leaving condenser water/glycol temperature Page 5 of 7

11. Record Suction and Discharge Pressures. Suction Pressure Discharge Pressure 12. Check superheat and record. Superheat should be approximately 15-25. Superheat F 13. Check subcooling. (Refer to MC Condenser User Manual and Warranty Inspection sheet for subcooling requirement.) Subcooling F 14. Record Total Charge Circuit #1 LBS 15. Record Compressor amperage. L1 L2 L3 Fuse/Circuit Breaker 16. Disable Compressor. 17. Turn OFF Manual Mode. 18. Record compressor crankcase heater amperage. Amperage NOTE: Scroll and Digital Scroll Compressor Additional Oil Requirements System charges over 28lbs (12.7kg) may require additional oil charge to be added. Refer to the CRV User Manual for the amount of oil required for various system charge levels and associated safety alerts. After the system has been fully charged with refrigerant, use a hand pump to add the additional oil at the suction side of the system while the system is running. The amount of oil added by field service must be recorded on the tag marked Oil Added Field Service Record, attached to each compressor. The date of oil addition must be included as well. Page 6 of 7

Your Start-up is now complete. Your input is important to us. Did you encounter any factory or field issues? If YES, please check the YES box and supply detailed description below. If NO, please check the NO box; however please feel free to provide any additional comments or suggestions. YES NO Comments: START-UP PERFORMED BY START-UP DATE (Please print name) COMPANY PHONE # IMPORTANT: This form must be properly completed and returned to your local Liebert Sales office. If you do not know who your local Liebert sales office is, call 1-800-Liebert or check our website at: http://www.emersonnetworkpower.com/en-us/brands/liebert/pages/default.aspx Page 7 of 7