Twin radial blower DRG 1200

Similar documents
Twin radial blower DRG 1200 with oval resistor, 12 and 24 Volt versions

Twin radial blower DRG 730

TTV 4500 / TTV 4500 HP / TTV 7000

TDS 20 R / TDS 30 R / TDS 50 R

HD Kompakt Service Manual

MANUAL Oil Level Sensor

en Inverter FU 4/5. Operator s Manual

More Precision. indusensor // Linear inductive displacement sensors

User manual UV Flash Dry C1

INSTRUCTION MANUAL MNBX14

Operating Instructions

Manual Supplement. This supplement contains information necessary to ensure the accuracy of the above manual.

OK, OKA, OKAF; ELD; ELDM; ELH; OKC; SC; SCA; SCAF; OK-LN; OKA-LN; OKAF-LN.

Installation and assembly instructions. for standard configuration radial blowers

Whole Room Dryer WRD, WRD/110

TTV 1500 / TTV 3000 OPERATING MANUAL CONVEYING FAN TRT-BA-TTV TC EN

MANUAL Overflow sensor NVF-104/34-PF

Rules for Intruder Alarm Systems

Multistage Centrifugal Blowers

AXIS-QA G TUBO-M/MZ AXIAL FANS. Axis / Tubo OPERATION MANUAL

X99 Series. Dental Handpiece. Instruction For Use

Multistage Centrifugal Blowers

Audible warning devices for external alarm

Instruction manual ASPIMAX 16

SINAMICS G130. Cabinet design and EMC. Operating instructions 03/2011 SINAMICS

Guardian CR2000 Overhead Ionizing Air Blower. User s Manual

Instruction manual. Water treatment Boiler system D 30 L

Procedure for the Approval of New Fire Detection and Alarm Technologies

INSTRUCTION MANUAL (English version) Water still

K 5.80 M ( ) Caution! Do not use the unit without first having read the operating instructions.

TTK 75 E OPERATING MANUAL DEHUMIDIFIER TRT-BA-TTK75E-TC-002-EN

Operating instructions

WHIRLPOOL AUSTRALASIA CONSUMER SERVICES

LINEAR HEAT DETECTION CABLE DURÁN-SAFE

Multistage Centrifugal Blowers

AHU INSTALLATION & OPERATION MANUAL

SEMAK VITABLEND STICK BLENDER MODELS VB250, VB360, VB410 & VB510

Low-noise fans are not a product of chance

More Precision. indusensor // Linear inductive displacement sensors

ETA ACCU 90% HIGHEST EFFICIENCY AIR HANDLING UNIT

Operating manual 1 SAFETY REGULATIONS AND INFORMATION. Original operating manual INDEX. RG CPAP 24 V mit Powermodul 24V sensorless

OPERATING INSTRUCTIONS WPSI12. Portable Soldering Station & TCP12. Soldering Tool. Weller Tech Sheet Product Code: Issue A 24/05/05

Installation Instructions Component Systems Professional Line

Forced draught gas burner

DSF xx15.xx xhv Ex-Atex Ex-Atex Certified Two wire Hall Effect Speed Sensor

IH 025 VOLCANO. Portable Induction Heater. smart mounting

CLIMA CANAL HYBRID CLIMA CANAL. Low Water Temperature system LOW TEMPERATURE SYSTEM / HEATING AND COOLING LOW TEMPERATURE SYSTEM / HEATING

COMPACT FLAME CONTROLLER CFC 200 (Formerly 8.XX)

VETO CLEANER 500 FLUE GAS CLEANER

Instruction Manual Suppository Penetration Tester. Type PM 30

Operation Manual. Diaphragm pumps. MP 054 Zp, MPC 054 Zp MP 104 Ep, MPC 104 Ep

Air-Cooled Condensing Units with Compact Screw Compressors

Operation Manual. Diaphragm pumps 2-headed. Types MP 101 Zp, MP 201 Ep MPC 101 Zp, MPC 201 Ep

User instructions. VA20HD, VA55HD, VA55IND and VA75IND. Commercial wet/dry vacuum cleaners CAUTION - READ THESE INSTRUCTIONS BEFORE USING THE MACHINE

Operator s Manual. Model G32-S Model G32-E Disinfection Soak Stations

CAUTION - READ THESE INSTRUCTIONS BEFORE USING THE MACHINE

LC3000 Level Controller Installation and Maintenance Instructions

Installation and Operating instructions for. C9900-U battery pack. Version: 2.0 Date:

HTM Circulation Pumps acc. to DIN EN 733 Type NKX

UV Flame Supervision System

Waste water ejection unit

Original instructions INCA-1 Emergency stop for enclosure installation INCA-1S Safety stop for enclosure installation

Sip Vacuum Cleaner 1400/35 Wet & Dry

OPERATING MANUAL. ba75825e03 12/2015 LR 925/01 LR 925/01-P LR 925/01(-P) ULTRAPURE WATER CONDUCTIVITY MEASURING CELL

More Precision. indusensor // Linear inductive displacement sensors

Installation and operating instructions KEMPER KHS-Timer-Set Figure and Figure

Operating manual 1 SAFETY REGULATIONS AND INFORMATION. Original operating manual INDEX 2218 F/2TDH4P

Product Data Sheet 4114 N/17HH-218. The engineer's choice

LFE50. UV Flame Safeguard. Building Technologies Division DETACTOGYR

This document is a preview generated by EVS

Grain crusher Universal. Purpose: This machine is designed for the crushing of grain in agricultural operation.

Vacuum cleaner Instruction manual

CIR Carbon Infrared Emitter. Operating instructions

Sewage Pumps. KS - Channel Type Pumps W, WTS - Vortex Type Pumps

Forced draught gas burner

AirUnit. Installation instructions. mfh systems modern floor heating. Decentralised domestic ventilation

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

SINAMICS G130. Cabinet design and EMC. Operating Instructions 05/2010 SINAMICS

Operator Guide. Publication No. OI /97-Eng. KODAK Automixer II Plus

C Note! LGI16... Burner Controls. Building Technologies

Component. Maintenance. Manual Z SERIES. Evaporator Assembly

LHS PREMIUM LHS SYSTEM

S ILENT Series INSTALL SILENCE, INSTALL QUALITY OF LIFE. The Quietest Extractors in the World in their Category 26,5

electronics Protection

SINGLE-ROOM REVERSIBLE UNIT WITH HEAT AND HUMIDITY RECOVERY VENTO V50-1 OPERATION MANUAL

2 Ensure that all personnel in the area are wearing the appropriate protective eyewear.

BIG BEAR VORTEX FAN MODEL #BB-2

Soliphant M with electronic insert FEM52

en Direct oil-fired space heaters HD... Operator's manual

condensate pumps For air conditioning and refrigeration technology eckerle.com

Operating instructions Safety-monitoring module SRB 302X3. 1 About this document

User manual. Fjordblink Birth Pool and Water Supply Unit.

EN - english. Instructions for installation and operation. Mobile humidity meter DP 207

Service: to SLK Laboratory Hot Plates glass made of ideas

Pressure sensors. Ex ia I / IIC T6 acc. to ATEX. Features. Description. Measuring ranges. Applications

Millo / Millo pro. Nr x000 / 1805-x000. Ideen für die Dentaltechnik A

Cooling Fans ver ver.4

ECOSMART TWINFANS. (EST-X/R/B) 1 phase, Direct Drive, Run & Standby For External, Roof Mounted and Internal use Installation and Maintenance

Test Unit GTL 100 for Fire Detectors

INLINE CENTRIFUGAL FAN. Centro-M OPERATION MANUAL

Transcription:

1/7 Twin radial blower DRG 1200 Content: 1 Safety advises 2 Usage 3 Construction of the DRG 1200 4 Function 5 Installation, dimension and hole pattern 6 Technical data 7 Characteristic curve 8 Validation A U R O R A Konrad G. Schulz GmbH & Co. KG Tel.: 0 62 84 / 92 02-0 info@aurora-eos.com www.aurora-eos.com The information on this document and the copyrights are ownership of AURORA Konrad G. Schulz GmbH & Co. KG, Joachim Schulz Str. 4, D-69427 Mudau. Transmission or duplication of this document or the utilization of the contents are not allowed without the agreement of AURORA Konrad G. Schulz GmbH & Co. KG otherwise it is explicit allowed. Violation will be prosecuted. All rights of patents, industrial designs and trademarks are reserved. Please pay attention to ISO 16016. - we reserve the right to make technical modifications - established: 11.01.07 KH checked: approved: date/name date/name date/name a) 14197 05.11.08 KH b) 14718 18.02.09 KH c) 17385 21.07.11 KH d) 19627 29.01.13 KH

2/7 part : 131-601-0100 DRG 1200 12V basic version 131-602-0100 DRG 1200 24V basic version 131-601-0101 DRG 1200 12V 1-speed 131-602-0101 DRG 1200 24V 1-speed 131-601-0102 DRG 1200 12V 2-speed 131-602-0102 DRG 1200 24V 2-speed 131-601-0103 DRG 1200 12V 3-speed 131-602-0103 DRG 1200 24V 3-speed 131-602-0200 DRG 1200 24V 4-speed other versions optionally 1 Safety advises The blower is principle maintenance- and service-free. If there is maintenance work to do, make sure it is to be carried out only when the motor is not running. In order to avoid injuries, the blower is to be separated from the current circuit. Make sure that maintenance work is only carried out by specialised personnel. Do not reach into the blower and never stick objects into it. Please do not get into contact with the resistor on the blower, if it has not completely cooled down. Advice for installation and maintenance work: The rules for the prevention of accidents as well as other recognises technical and labour medical security regulations must be observed. 2. Usage The twin radial blower DRG 1200 is used for powerful usage in heaters, A/C units and ventilation systems. 3. Construction of the twin radial blower DRG 1200 3.1. Parts The twin radial blower DRG 1200 consists of the following parts - motor, radial wheels, inner and outer rings = fan unit - basic plate, half bowl, outer rings, motor holder - Dropping resistor with micro-temperature-fuse MTS for versions with several speed level, clip - housing clips, 2 screws - cables Optional with suppressor module Information about the suppressor module can be seen in technical information 912-100-0398.

3/7 3.2. Material The housing lower part is made out of plastic granulate polyamide PA6 GK30. Housing upper part, motor holder, inlet rings and the wheels are made out of plastic granulate polyamide PA6, 35% glass-fibre-reinforcement. This material is has a high temperature-resistant and because of the glass-fibre-reinforcement a high stability. A safety data sheet about the granulate can be ordered by AURORA. 3.3. Speed control The blower can be delivered in 1-speed-, 2-speed- or 3-speed level versions. (option: 4-speed) Caution! The vehicle side fuse protection of 15 A at 24V or 30A at 12V has to be made by the customer. See circuit diagram blower. The different blower speed are achieved using a dropping resistor. The dropping resistor is a cemented ceramic resistor. The blower is protected from overload and a possible burning danger with a micro-temperature- fuse (MTF) installed at the resistor. 3.4 cables The used wires are unscreened low tensions wires with thin-wall isolation for road vehicles. FLRY with colour marking of wires according to DIN IEC 304.

4/7 4. Function The air enters axial into the fan wheels, then the air will be radial turned round and leaves on the area vertical to the suction direction. Note: the blower carbon brush is a wearing part. If the carbon brushes are outworn, defective or contaminated, the motor will not run or not in a suitable way. At any service interval (depending on usage situation) the blower function has to be checked and the blower has to be changed, if necessary. The check of the blower in a disconnected state: optical check on - physical damage on the housing, the air grille or the fan wheel - contamination, dust, corrosion and other, that impair the function stiffness Then a function check is recommended abnormal noises uneven running fluctuating current consumption a decrease of air flow rate blower don t run under voltage any more If one or more of these impairments apply, the blower function is not given any more and the blower has to be replaced. During check pay attention to the necessary safety advises (chapter 1) 5. Installation, dimensions and hole pattern Dimensions:

5/7 Hole pattern: Installation instructions: For reliable operation of the DRG, the maximum fan bracing of 1 mm are not exceeded. Provision shall be made for a suitably flat mounting surface. to illustrate:

6/7 6. Technical data air flow volume valid environmental temperature range weight double ball bearing special air flow through the motor for high lifetime (patented) 1200 m 3 /h (736 cfm) -40 C to +85 C about 2,65 kg (basic version) speed 1 speed 2 speed 3 Vair in m 3 /h 470 800 1250 Vair in cfm 277 471 736 Pel in W 70 150 307 Lp in db(a) 56 68 77 power information assumes no system resistance (free-blowing) 7. Characteristic curve

8. Conducted validation tests for DRG-family (motors) 7/7 Test method Standard basis AU standard Short description Validation power measuring 963-38T-0010 evaluation air characteristic curve characteristics OK Sound intensity level test DIN IEC 651 963-38T-0011 sound intensity level free-blowing OK dust test 963-38T-0003 function at dust influence 1000h operation OK vibration test according to DIN IEC 68 963-38T-0007 vibration test 30...100Hz / max 8g OK IVECO 18-2105 10-200Hz/5g OK salt spray test DIN 50021 963-38T-0016 corrosion resistance 72h OK electr. Function test start-up test over voltage 32V 60 min OK polarity test OK Insulation test/electric strength 500V OK 963-38T-0012 run behaviour with resistor OK balance quality DIN ISO 1940 blower balanced OK temperature test storage DIN IEC 68 storage 95h /2h OK temperature test operation DIN IEC 68 72h at 85 C OK temperature test operation DIN IEC 68 500h at 80 C thermal shock test IVECO 18-2105 10 cycles 2h at -30 C/2h at 80 C OK temperature cycling test DIN IEC 68 35 cycles 8h between -40/+80 C OK climate test humidity constant DIN IEC 68 55 C at 95% air humidity 21 days OK climate test humidity cyclical DIN IEC 68 12 cycles of 24h at 10-80 C / 95% humidity OK cold test DIN IEC 68 function + storage at -40 C/72h OK arctic test MAN LH 259001 function + storage at -46 C OK EMC tests 2006/28 EC directive emitted interference / interference resistance OK electrostatic sensitive device tests MAN LH 259 001 electrostatic discharge OK lifetime test 963-38T-0008 Continuous operation, free-blowing at 13/26V, max. load ca. 5000 h laboratory conditons